Key Elements of a Comprehensive DSM Programme

36
Presentation at Forum of Regulators Lawrence Berkeley Laboratory Team Mahesh Patankar, PhD, CMVP; Director – Market Innovations (Asia) – Customized Energy Solutions and Cathie Murray; Regulatory Assistance Program November 16, 2010

description

Key Elements of a Comprehensive DSM Programme. Presentation at Forum of Regulators Lawrence Berkeley Laboratory Team Mahesh Patankar, PhD, CMVP; Director – Market Innovations (Asia) – Customized Energy Solutions and Cathie Murray; Regulatory Assistance Program November 16, 2010. Outline. - PowerPoint PPT Presentation

Transcript of Key Elements of a Comprehensive DSM Programme

Page 1: Key Elements of a Comprehensive DSM  Programme

Presentation at Forum of RegulatorsLawrence Berkeley Laboratory Team

Mahesh Patankar, PhD, CMVP;Director – Market Innovations (Asia) – Customized Energy Solutions

and Cathie Murray; Regulatory Assistance Program

November 16, 2010

Page 2: Key Elements of a Comprehensive DSM  Programme

Part 1: Recapping need for DSM initiatives Part 2: DSM design and implementation

plans Part 3: Key attributes of DSM programs (and

plans) Part 4: Structure of DSM plan and program

design document

November 2010 2

Page 3: Key Elements of a Comprehensive DSM  Programme
Page 4: Key Elements of a Comprehensive DSM  Programme

Incorporation of customer load modifications as alternatives or additions to traditional resource planning

Intervention by utility on the “customer side of the meter” to change magnitude or shape of customer loads

Broad range of alternatives for reducing, adding or changing load

Partnership between customer and utility with benefits to both

Usually involves actions by utility on the customer side of the meter

November 2010 4

Page 5: Key Elements of a Comprehensive DSM  Programme

Cost

Without DSM

With DSM

Time

November 2010 5

Page 6: Key Elements of a Comprehensive DSM  Programme

Cost-effective end-use electricity efficiencymeasures have the potential to eliminate the

expected electricity deficit by 2014 while atthe same time requiring less investment for

new power supply compared to the BAUscenario. Removal of the electricity deficit through these

means leads to a $505 billionand $608 billion increase in India’s economic

output by 2017 and 2020 respectively(Reference – 2010 publication by Dr. Jayant

Sathaye et al)

November 2010 6

Page 7: Key Elements of a Comprehensive DSM  Programme

BENEFITS OF DSM

CUSTOMERBENEFITS

• More Reliable Energy Service

• Reduced tariff

• Improved Value of Service

• Maintain/Improve Life-style & Productivity

SOCIETALBENEFITS

• Reduce Pollution

• Conserve Resources

• Protect Global Environment

• Maximize CustomerWelfare

UTILITYBENEFITS

• Lower Cost of Service

• Improve OperatingEfficiency, Flexibility

• Reduce Capital Needs

• Improve Customer Service

November 2010 7

Page 8: Key Elements of a Comprehensive DSM  Programme

Peak Clipping Valley Filling Load Shifting Strategic Conservation Strategic Load Growth (Load Building) Flexible Load Shape

November 2010 8

Page 9: Key Elements of a Comprehensive DSM  Programme

November 2010 9

Page 10: Key Elements of a Comprehensive DSM  Programme

November 2010 10

Page 11: Key Elements of a Comprehensive DSM  Programme

November 2010 11

Page 12: Key Elements of a Comprehensive DSM  Programme

November 2010 12

Source – Wartsila presentation/analysis

Page 13: Key Elements of a Comprehensive DSM  Programme

Capital availability Energy prices Lack of information/motivation Other investment opportunities High transaction costs Perception of risk Management priorities Split-incentives (ownership)

November 2010 13

Page 14: Key Elements of a Comprehensive DSM  Programme

November 2010 14

Page 15: Key Elements of a Comprehensive DSM  Programme
Page 16: Key Elements of a Comprehensive DSM  Programme

INPUTS TO DSM ANALYSIS

• Market Research• Rate Design• Profitability Analysis

• Load Research• Competitive Analysis• Benefit/Cost Analysis

ExternalOperatingEnvironment

CustomerNeeds andBenefits

UtilityCharacteristicsand Mission

DSM GoalsandObjectives

ConductSituationAnalysis

ScreenProgramChoices

SegmentMarkets

DevelopMarketingStrategies

AssessEnd Uses/Technologies

EstimateMarketPotential

EvaluateImpacts

DevelopMarketingStrategies

ImplementPrograms

EvaluatePrograms

CONDUCT DETAILED ANALYSIS

November 2010 16

Page 17: Key Elements of a Comprehensive DSM  Programme

Utility Characteristics

MarketSegments

Supporting Data

DSM OPTIONSANALYSIS

DSM PLANDEVELOPMENT

• Technologies• Marketing strategies• Incentives• Benefits/costs

Analysis ofcost-effectiveprogram packages

Information forIntegrated Resource Planning

Load Shapes

TechnologyCharacteristics

%

CustomerAcceptance

$

Rate Structures

DSMPlan

November 2010 17

Page 18: Key Elements of a Comprehensive DSM  Programme

November 2010 18

Page 19: Key Elements of a Comprehensive DSM  Programme

Forum of Regulators issued a Draft Model DSM Regulations document◦ http://www.forumofregulators.gov.in/

Maharashtra Electricity Regulatory Commission issued 2 regulations◦ http://www.mercindia.org.in/Regulations.htm ◦ DSM Implementation Framework Regulation◦ Cost-effectiveness Assessment Regulation

November 2010 19

Page 20: Key Elements of a Comprehensive DSM  Programme
Page 21: Key Elements of a Comprehensive DSM  Programme

Customer reach ~ equity Meets the load-shape objectives

◦ Peak and non-peak demand benefits – load shifting◦ Conservation and efficiency

Provides long-lasting savings◦ Equipment with high useful life

Facilitates market transformation◦ One-time intervention towards technical standards◦ Pricing policies◦ Behavioral change

Incentivizing high-cost DSM interventions◦ Getting over high first-cost barrier

November 2010 21

Page 22: Key Elements of a Comprehensive DSM  Programme

TRC/

Societal Utility Ratepayer Participant

Avoided energy costs (fuel, O&M of power plants, T&D lines)

Benefit Benefit Benefit

Avoided capacity costs (constructing power plants, T&D lines, pipelines, balancing, storage)

Benefit Benefit Benefit

Participants’ incremental cost (above baseline) of efficient equipment

Cost Cost

Incentives (rebates) Transfer Cost Cost Benefit

Program administration costs (staff, marketing, evaluation, etc.)

Cost Cost Cost

Other benefits (fossil fuel savings, water savings, equipment O&M, etc.)

Benefit (Cost) Benefit (Cost)

Externalities (e.g., environmental benefits like emissions reductions)

Benefit

Lost utility revenue / lower energy bills (due to lower sales)

Transfer Cost Benefit

November 2010 22

Page 23: Key Elements of a Comprehensive DSM  Programme

Three tests proposed around the Net Present Value (NPV) of Benefits - Costs:◦ Total Resources Cost (TRC) Test (Hurdle Test)

Compares total cost of technology and benefits over its life cycle (B-C >0 q)

NPV of Benefits = ∑ [(Bt)/ (1+r)t-1 ] (equation 1)NPV of Cost = ∑ [(Ct)/ (1+r)t-1 ] (equation 2)Benefits = Avoided power purchase cost

◦ Ratepayer Impact Measure (RIM) Compares utility expenditure and avoided costsCost includes “Loss of Revenue” for the utility; cost socializes

for non-participants as well◦ Life-cycle revenue impact (LRIIRM) (B-C/total MWh sales)

Should be less than INR 0.01/kWh or less than 1% of existing tariff

◦ Other two supporting tests for structuring incentives Participants’ Cost Test (PCT) and Societal Cost Test (SCT)

Confidential (www.ces-ltd.com)23

Page 24: Key Elements of a Comprehensive DSM  Programme

November 2010 24

Page 25: Key Elements of a Comprehensive DSM  Programme

Adoption curves by measure◦ ƒ(participant test w. and w/o program)

0%

10%

20%

30%

40%

50%

60%

70%

80%

0 5 10 15 20 25 30

Participant Benefit-Cost Ratio

Max

imum

Pen

etra

tion

Rat

e

B-C Ratio: With 50% incentive

Initial B-C Ratio: No incentive

Net increase in adoption

November 2010 25

Page 26: Key Elements of a Comprehensive DSM  Programme

Adoption curves for different EE measures reflect different levels of market barriers, e.g.:

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 5 10 15 20 25 30

Participant Benefit-Cost Ratio

Ma

xim

um

Pe

ne

tra

tion

Ra

te

Moderate Barriers

High Barriers

No Barriers

Low Barriers

Extremely High Barriers

November 2010 26

Page 27: Key Elements of a Comprehensive DSM  Programme

Macro-level◦ Coincident feeders with the utility load shapes◦ Historic and current seasonal variations

Sector-level◦ Sector-wise peak and non-peak load contribution◦ Cost-to-serve and tariff realization

Segment-level◦ End-uses by sectors, segments and tariff

categories◦ Ownerships and vintage of appliances/equipment◦ Appliances/equipment saturation◦ Efficiencies of existing stocks

November 2010 27

Page 28: Key Elements of a Comprehensive DSM  Programme

Components of LR of Mumbai utilities Strategies are multifold

Top-down, metering approach (Automated Meter reading)

Focused Energy Audits of sample clients

Questionnaire-based Surveys of residential customers

November 2010 28

Page 29: Key Elements of a Comprehensive DSM  Programme

Sector Proposed load research strategy

Implementing agencies

Large Commercial and Industrial

Sponsored sample-audits

Utility Energy Accounting Dept + External Auditors

Small Commercial and Industrial

Sample walk-through audits and questionnaire-based surveys

External Auditors + University Students

Large Public Buildings Sponsored sample-audits

External Auditors

Public Water Works Sponsored sample-audits

External Auditors

Residential Questionnaire-based survey instruments

Market Survey Agency

November 2010 29

Page 30: Key Elements of a Comprehensive DSM  Programme

Distribute annual savings by energy period Generally by end use and building type Can derive from hourly 8760 usage data

◦ Specific to geographic region & climate

LoadshapeName

Summer On-Peak

Energy

Summer Off-Peak

Energy

Summer Intermed.

Energy

Winter Off-Peak

Energy

Winter Intermed.

EnergyGrocery_Cool 44.1% 15.8% 23.8% 0.8% 15.5%Grocery_ElecDHW 16.7% 3.9% 9.1% 9.3% 61.0%Grocery_ElecTotl 18.7% 9.6% 11.1% 15.5% 45.1%Grocery_Heat 0.0% 0.0% 0.0% 48.6% 51.4%Grocery_InLight 17.8% 6.2% 9.6% 12.3% 54.2%Grocery_OutLight 6.9% 15.5% 7.1% 34.4% 36.1%Grocery_Refrig 16.0% 9.6% 9.9% 17.9% 46.5%Grocery_Vent 14.2% 9.7% 9.4% 19.5% 47.2%

November 2010 30

Page 31: Key Elements of a Comprehensive DSM  Programme

Portion of demand reduction occurring at peak demand period(s)

Can derive from 8760 usage data ◦ Based on max kWh/kW ratio

LoadshapeName

Summer Gener.

Capacity

Winter Gener.

CapacityGrocery_Cool 0.95311 0.01925Grocery_ElecDHW 0.71869 0.83869Grocery_ElecTotl 0.86659 0.59967Grocery_Heat 0.00000 0.27096Grocery_InLight 0.94737 0.91866Grocery_Misc 0.71869 0.59967Grocery_OutLight 0.05000 0.13571Grocery_Refrig 0.94380 0.81351Grocery_Vent 0.99381 0.99916

November 2010 31

Page 32: Key Elements of a Comprehensive DSM  Programme
Page 33: Key Elements of a Comprehensive DSM  Programme

1. Executive Summary2. Introduction3. Characteristics of distribution licensee system4. DSM plan targets and resource availability

estimates5. Identification of sectors, segments and end-

uses6. Identification of DSM technologies7. Individual program description8. Annual and cumulative achievements9. DSM plan monitoring and EM&V10. Implementation plan

November 2010 33

Page 34: Key Elements of a Comprehensive DSM  Programme

1. DSM program descriptionDescription of target sector, segment, geographical reach, technologies, standards, pricing, replacement/guarantee facility, stakeholders, financiers; barriers addressed, program delivery strategy (incentives/promotion), program management and oversight

2. EM&V and reportingBaseline calculations, metering/measurement requirements, third-party engagement,

3. Detailed implementation planPhase-wise implementation of the DSM program, milestones, reporting mechanism

4. Estimates of annual and cumulative savings5. Annual program funding requirements6. Cost-effectiveness calculations7. Dispute resolution mechanism

November 2010 34

Page 35: Key Elements of a Comprehensive DSM  Programme

LBNL training at FOR and utilities USAID ECO II presentations

November 2010 35

Page 36: Key Elements of a Comprehensive DSM  Programme

Questions?

Contact details –

[email protected]@raponline.org

November 2010 36