Military Sealift Command Mission-focused… Value-driven 1
MSC Port Engineer Conference2010
MSC’s Changing Fleet
Kevin Baetsen
2 NOV 2010
![Page 2: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/2.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven
TRUST
USNS Rigel
USNS Mosopelea
USNS Taluga
Other Missions: 1981 – Korean Flag Shipping Program (59
ships)1988 – Float on/Float off
1990 – NEO/HADR passenger ships (1st Gulf War)
1993 – Contract Harbor Tugs1996 – Special Cargo Transport
(DOE/NAVSEA)1998 – CLF Shuttle Ship Commercial Helo
2007 – CLF Load Management
2010 – MSC Today – 175 Ships (including Ready Reserve Force –
RRF)
SS Orion Planet
USNSGreenvi
lleVictory
*
USNS Suamic
o**
USNS GeneralDaniel
I. Sultan*
**
RRF - SS
Catawba Victo
ry
USNSMercury
USNS Kilau
ea
1949 – 1970: MSTS – ~400 Ships including Aircraft Transports, Landing Ship Tanks/Docks, Refrigeration, Forward Floating Depots, Arctic Ships and other short-
term missions
1949 to Present – More Than 20 Different Missions Entrusted to MSTS/MSC
USNSAlbert
J. Myer
USNSBowdi
tch
USNSRange Tracke
r
1971-72 1973-75 1977-80 2000-01 20031986-89 2002 2006 2007 2009-101949-52
1984 1992-971958-62
Ships & Missions
Dry Cargo Ships*, Tankers**, Troopships*** (Last Troopship retired in 1973)
Build & Charter TankersMissile Range Instrumentation Ships
Oceanographic Survey ShipsCable-Laying/Repair Ships
Fleet Replenishment OilersOcean-going Tugs
Combat Stores Ships
Ammunition ShipsDry
Cargo/Ammunition
Prepositioning ShipsReady Reserve Force (Cargo Ships 1977; Crane Ships* 1984; OPDS Ships** 1986)
Ocean Surveillance ShipsFast Sealift Ships – Surge
USNSSupply
USNSMercy
RRF - SS
Potomac**
USNS Algol
USNSStalw
art
RRF - SS
Keystone
State*
USNSShughart
USNSHaye
s
HSVWestpacExpress
USSCorona
do
JHSV, SBX, ???
Hospital ShipsAcoustic Survey Ships
Large, Medium-Speed, Roll-On/Roll-Off (LMSR)Fast Combat Support Ships
High-Speed Vessels
Command Ships
Rescue and Salvage Ships
USNS Grasp
USS Emor
y S.
LandSub Tenders
Special Warfare Support
USNS Lewis & Clark
![Page 3: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/3.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 3
T-AKE
USNS Lewis and Clark Class Dry Cargo/Ammo Ships 14 Ships (11 NFAF and 3 MPF(F))
Currently under construction at NASSCO10 ships delivered to date
Last delivery scheduled for late FY12 / early FY13
![Page 4: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/4.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 4
T-AKE Issues
• NASSCO continuing to deliver ships ahead of schedule
• Overall quality continuing to improve with each successive ship delivered
• T-AKE remains a shining star amongst current Navy ship acquisition programs
• Discussion on which ships to use for Prepo–Last 3 or first 3
• Last ship in a class is always a challenge
![Page 5: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/5.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 5
T-AGM 25
Missile Range Instrumentation ShipEventual replacement for Observation Island
Currently under construction at VT Halter Marine
![Page 6: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/6.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 6
T-AGM 25 Issues
• Delivery previously rescheduled from Jun 10 to Dec 10
–VTHM has continued to fall behind schedule and is now reporting anticipated additional slip in delivery date
• Ship to be provided as GFE to Raytheon for radar installation not later than 1 Feb 11
–PEO (IWS 2.0) contemplating towing incomplete ship to Corpus Christ in mid-Jan 11 for radar installation
–Plan for having VTHM complete ship unclear at this time
–Plan for delivering ship to MSC unclear at this time
• Significant concerns regarding quality of ship design and construction and quality of ILS documentation
![Page 7: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/7.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 7
JHSV
Joint High Speed Vessels10 ships (currently 5 Army and 5 Navy under contract)
(Possibility of 15 or more ships total for Navy)Currently being designed and built at Austal USA in Mobile, AL
Lead ship delivery scheduled for November 2011
![Page 8: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/8.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 8
JHSV CONOPs
• Primary mission: high speed intra-theater logistics/sealift capability (600 short tons of payload at 35 knots over a distance of 1200 nautical miles)
• Specialized secondary missions:
–Theater Security Cooperation
–Global Fleet Station
–Humanitarian Assistance/Disaster Relief
–Augment CLF
–Sea Base to Shore Connector
• Adaptive force packages consisting of personnel and equipment will be embarked to support specialized missions
![Page 9: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/9.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 9
JHSV Issues
• Quality of construction/workmanship thus far is good
• Concerns regarding a number of design issues–Minimal change proposals being entertained per ASN
(RD&A) direction
• Significant concerns regarding ability to sustain ships when operating in austere ports due to limited onboard spare parts and provisions
• Army and Navy senior leadership discussing possibility of MSC taking over operation of Army vessels prior to delivery of first ship of class
![Page 10: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/10.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 10
MLP
Mobile Landing Platform3 ? Ships (variant of NASSCO BP Alaska Class tanker design)
Original program of record design concept changed to FLO-FLO design conceptDetailed design currently in progress at NASSCO
![Page 11: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/11.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 11
MLP Issues
• Program is cost constrained (~$500M/ship)
• Current major concerns:–Anticipate minimal onboard spare parts
–Adequacy of anchor sizing
• Primary missions is sea base to shore connector–Use of mission modules on wet deck being considered to
increase potential mission capabilities• Pier at Sea – Allows offload at Sea
• Personnel Berthing
• Hospital Facilities
• HA/DR
• Aviation
• SPECWAR
• Irregular Warfare
![Page 12: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/12.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 12
T-AGS 66
Oceanographic Survey Ship (FY10-FY13) Design/construction contract awarded to VT Halter Marine
![Page 13: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/13.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 13
T-AGS 66 Issues
• T-AGS 63 Class variant –Addition of mid-body sonar moon pool
–Replacement of DC propulsion system with AC system
• Detailed design in progress
• Anticipate start of construction early FY11
![Page 14: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/14.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 14
T-AO(X)
Fleet Replenishment Oilers14 Ships
Accelerated acquisition program included in Navy’s POM12 submission
![Page 15: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/15.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 15
T-AO(X) Issues
• Analysis of Alternatives–Optimum cargo capacity – liquid and dry
–Potentially replace T-AOE when paired with T-AKE
–Existing commercial design (T-AO or T-AKE variant)
–Foreign “Support Ship” design
–Leasing options
• MARPOL double-hull and 12a compliant design
• Competitive procurement anticipated–Objective is to award detailed design and construction
contract in early FY14 due to industrial base considerations
![Page 16: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/16.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 16
T-AGOS (X)
• Last-minute addition to Navy’s POM 12 submission–Not related to FY22 POR for T-AGOS(X) program to
eventually replace existing T-AGOS vessels
• Single ship procurement to fulfill emergent LANT fleet requirement
–Requirement for dual mission capability (active and passive arrays) similar to T-AGOS 23
• Design alternatives being evaluated–T-AGOS 23 variant
–T-AGOS 19 Class variant
–New design
![Page 17: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/17.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 17
T-ATF/T-ARS/T-ATS
• 30 year shipbuilding plan–ATF recap officially starts in 2015
–ARS recap officially starts in 2020
• Options–Replace in kind
–Replace with enhanced capabilities
–Common hull (single ship class)
–Hybrid propulsion
–Own, lease or charter
• Navy’s POM 12 submission reflects accelerated procurement with objective of awarding detailed design and construction contract
![Page 18: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/18.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 18
Future New Construction Projects
• Additional new construction projects in current Navy 30-year shipbuilding plan
–LCC(R) – 1 Ship (FY12-FY15) – AOA ongoing• Likely to result in life extension for current LCC
–T-AGOS(X) – 5 Ships (FY20-FY28)
–T-AOE(X) – 4 Ships (FY29-FY36)• Maybe rolled into T-AO(X)
• Programs subject to change pending completion of QDR and subsequent revision of 30-year shipbuilding plan
![Page 19: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/19.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 19
AS-40 Conversion
USS FRANK CABLETransferred to MSC in FY10
Completed phase I of conversion at GSY in FY10 Phase II of conversion to be performed in Guam in FY12 (~$30M)
![Page 20: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/20.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 20
T-AOE Conversions
Fast Combat Support ShipsScheduled for CIVMOD conversions in FY12 – FY16
Control System ReplacementHeavy UNREP prototype installation
Habitability ImprovementsDrydocking
M&R / Alterations
![Page 21: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/21.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 21
MT WHITNEY SLEP
• FY service life extension availability being contemplated for FY14
![Page 22: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/22.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 22
MT WHITNEY SLEP
• MSC tasked to develop recommendations for Life Extension on Mt Whitney to 2029 (58 years)
• MSC input will be joined with NAVSEA input on USS BLUE RIDGE for a joint report
• MSC Life Extension study reveals major systemic issues
– structural deterioration
– ventilation deterioration, dirt, mold
– Galleys, laundries and fan rooms without structural fire protection
– electrical deficiencies
• MSC Life Extension Cost Estimate approximately $110 million
![Page 23: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/23.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 23
LSD 41/48 Class
• USFFC has requested MSC provide a proposal to assume operation of engineering, deck and steward department functions for 12 LSD 41/48 class vessels
• Hybrid manned ship like LCC, AS
• Transfers would tentatively commence in FY12 / FY13
![Page 24: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/24.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 24
LPD 17 Class
• USFFC requested MSC proposal to assume operation of engineering, deck and steward department functions for one LPD-17 class vessel
![Page 25: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/25.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 25
Ship Life Extensions
• Life Extension Studies conducted (generally 45-50 years):
– Fast Sealift Ships (FSS), MPS – Waterman, Maersk, and AMSEA classes, T-AGM 24 (50+ years), Wheat, Stockham, Martin, Zeus, T-AGOS 19 class
• Life Extensions Studies currently ongoing:– Mt Whitney / Blue Ridge (58 + years)
• Life Extensions Studies to be accomplished:– T-AGM 23, T-AGS 60, T-AKR 300,T-AKR 310 (45-50 years)
– T-AOE class, T-AO class, T-AH class, T-ARS, T-ATF to be done by PM1 (45-50 years)
– Possible OPNAV task for Gordon/Gilliland class, Martin, Stockham, MPS Waterman and AMSEA classes, Shughart/Yano class, and the Wheat to 60 years
![Page 26: Kevin baetsen presentation](https://reader033.fdocuments.us/reader033/viewer/2022061221/54bf5a344a7959654a8b46ce/html5/thumbnails/26.jpg)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 26
Other Issues
• Environmental–Protective Coating Performance Standard (SOLAS II-1/3-
2) - Ballast Tank Coating Systems
–Ballast Water Management Convention• Install Ballast Water Treatment Plants
–Diesel Emission guidelines
• Energy Conservation
• Maintenance Management–Capture all maintenance planning and execution data