KERBSIDE MTFI MAP
4
MTFI KERBSIDE FUEL POINT North Yorkshire O7/02/11 CREATED BYDAVID MURRAY 1 of 4 CONTROL ROOM AND EMERGENCY PHONE KEY FIRE POINT SPILL KIT PUMP 2 KEY READER TANK 1 MT DIESO TANK 2 ULGAS UK DIES O PATH TO SQN BARRIER Way in EXIT AIR LINE PUMP 1 Zone 2 Zone 1 Zone 0 VENTS PUMP 4 INTERCEPTED AREA IN RED (ARCO DRAINS) BECOMES Zone 2 AROUND SPILLAGE 3 M INTERCEPTOR Vent pipe for ULGAS and INTERCEPTOR opening (Zone 1) at 5m above working level and a Zone 2 radius of 2m around it. Vent dia 50mm at 250hr rate. (h=5m ,R1 = 2m.
-
Upload
david-murray -
Category
Documents
-
view
48 -
download
0
Transcript of KERBSIDE MTFI MAP
MTFI KERBSIDE FUEL POINT North Yorkshire O7/02/11 CREATED BYDAVID MURRAY
1 of 4
CONTROL ROOM AND EMERGENCY PHONE
KEY
FIRE POINT
SPILL KIT
PUMP 2KEY READER
TANK 1MT
DIESO
TANK 2ULGAS
UK DIES
O
PATH TO SQN
BARRIER
Way in
EXIT
AIR LINE
PUMP 1
Zone 2Zone 1Zone 0
VENTS
PUMP 4
INTERCEPTED AREA IN RED (ARCO DRAINS)BECOMES Zone 2 AROUND SPILLAGE 3 M
INTERCEPTOR
Vent pipe for ULGAS and INTERCEPTOR opening (Zone 1) at 5m above working level and a Zone 2 radius of 2m around it. Vent dia 50mm at 250hr rate. (h=5m ,R1 = 2m.
MTFI KERBSIDE FUEL POINT North Yorkshire O7/02/11 CREATED BYDAVID MURRAYZONE AS SEEN ON PICTURE
3 of 4