MOVE, GROW, and BE GREEN with
Kenilworth-Parkside Recreation Center Master Plan
Community CharretteSaturday March 1, 2014
MOVE, GROW, and BE GREEN with
Agenda
• Project Timeline• Findings from Community
Engagement Process• Charrette
– Break Out Groups Exercise– Break Out Group Presentations
• Next Steps
2
MOVE, GROW, and BE GREEN with
Mid - June 2013 DPR prepares RFP for Kenilworth Parkside Recreation Center Master Plan. (Done)
End September 2013 - Contractor for Kenilworth Parkside Master Planis chosen. (Done in October 2013)
October/November/December 2013 - Community Engagement Process starts. (On-going. Meetings held in November, January, and March)
Thursday March 27, 2014 – Presentation of findings + concept design.
April 2014 – DPR works with DGS to procure design/build team.
Spring 2014 – Design/build firm is selected.
October 2014 - Design portion is completed.
Construction Timeline: 12 to 18 months to build.
Opening - October 2015 and April 2016.
Kenilworth-Parkside Recreation Center Master PlanProject Timeline Update
MOVE, GROW, and BE GREEN with
Program + Facilities Needs Assessment ProcessKenilworth-Parkside Neighborhood
4
• Population + Demographics Projections• Existing Program Providers + Programs• Community Engagement Process
– DC Parks and Recreation Master Plan Statistically Valid Survey Findings
– Recreation Center Survey Findings– Project Kick‐Off + Public Workshop Findings– Stakeholder Meetings
MOVE, GROW, and BE GREEN with
Population + Demographic ProjectionsKenilworth-Parkside Neighborhood
5
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
0 to 9years
10 to 19years
20 to 34years
35 to 54years
55+ years Total
20102020+45% -0.5% +53% +25% +116%
+48%
MOVE, GROW, and BE GREEN with6
DCPNI• Boxing Gym• Classrooms• Computer Room
Programs:• Digital Media Arts• Microsoft Training• Resume Workshops• Homework Help• Legal Clinics• Illustration/Oil Painting• Dance• Boxing• DJ’ing• Hip Hop Songwriting/Music
Production• Performance Poetry• Young Men’s/Women’s Group
Kenilworth-Parkside Recreation Center Master PlanExisting Program Providers
MOVE, GROW, and BE GREEN with
Community Engagement Process Findings• DC Parks and
Recreation Master Plan (Summer 2013)– Statistically Valid Survey– Recreation Center
Survey
• Kenilworth-Parkside Neighborhood Recreation Plan Kick-Off + Public Workshop (November 2013)
• Stakeholder Meetings (January 2014)
7
MOVE, GROW, and BE GREEN with
DC Parks and Recreation Master PlanStatistically Valid Survey Findings
• Community Special Events Programs
• Adult Fitness Programs
• Picnic Shelters• Outdoor Pool• Indoor Pool
Community Special Events Adult Fitness + Wellness
Indoor Fitness Center Picnic Shelters
MOVE, GROW, and BE GREEN with
DC Parks and Recreation Master PlanRecreation Center + On-Line Survey Findings
• Walking Trails• Playgrounds• Running Track• Outdoor Pool• Tennis Court• Adult Softball Fields• Skateboard Parks
MOVE, GROW, and BE GREEN with
Kenilworth-Parkside Recreation Center Master PlanPublic Engagement Findings
Facilities• Senior Activity Area• Teen Activity Area• Kitchen• Multi-Purpose
Room• Fitness Center• Indoor Gymnasium• Outdoor Basketball• Playground• Picnic Shelters +
BBQ• Outdoor Pool• Natural Areas
Programs• Teen Programs
o Digital Media Classeso Dancing Classeso Music Classes
• Programs for Adults Over 50• Health + Wellness
Workshops/Seminars• Life Skills Cooking• Field Trips• Arts + Crafts
• Adult Workforce Trainingo Computer Skillso Resume Skills
• Youth Athletics (recreation + competition)
Participants• 65+ Residents at Project
Kick Workshop• 20 Stakeholders
– Councilmember Alexander’s Office
– ANC – Representatives– Eastland Gardens
Civic Association– DPR– DCHA– DCOP– DCPNI– Local Church
Representatives
MOVE, GROW, and BE GREEN with
Kenilworth-Parkside Recreation Center Master PlanProposed Recreation Center Square Footage + Facilities
Component Square Footage
Multi-Purpose Room 4,400
Kitchen 300
Senior Activity Area 1,200
Teen Activity Area 1,200
Fitness Center 2,200
Gymnasium 9,000
Support Spaces
Lobby/Lounge 800
Front Desk 200
Office Space 400
Locker Room 1,400
Restrooms 800
Vending 100
General Storage 400
Mechanical Space 1,500
Sub-Total 23,900
Net/Gross (20%) 4,780
Grand Total 28,680
+Outdoor BasketballPlaygroundPicnic Shelters + BBQOutdoor PoolNatural AreasWalking Trails
MOVE, GROW, and BE GREEN with
Charrette• 5 Break-out Groups– Site Base Map @ 1” = 20’– Neighborhood Aerial– Recreation Center Space +
Facility Cut-Outs
13
How should we locate the proposed Recreation Center spaces + facilities within the site + neighborhood? Consider utilizing: • The existing Elementary
School spaces
• Other areas throughout the neighborhood
MOVE, GROW, and BE GREEN with
Charrette
14
Charrette: 45 Minutes
Group Presentations: 30 Min.
MOVE, GROW, and BE GREEN with
Group 1 Concept
15
MOVE, GROW, and BE GREEN with
Group 2 Concept
16
MOVE, GROW, and BE GREEN with
Group 3 Concept
17
MOVE, GROW, and BE GREEN with
Mid - June 2013 DPR prepares RFP for Kenilworth Parkside Recreation Center Master Plan. (Done)
End September 2013 - Contractor for Kenilworth Parkside Master Planis chosen. (Done in October 2013)
October/November/December 2013 - Community Engagement Process starts. (On-going. Meetings held in November, January, and March)
Thursday March 27, 2014 – Presentation of findings + concept design.
April 2014 – DPR works with DGS to procure design/build team.
Spring 2014 – Design/build firm is selected.
October 2014 - Design portion is completed.
Construction Timeline: 12 to 18 months to build.
Opening - October 2015 and April 2016.
Kenilworth-Parkside Recreation Center Master PlanProject Timeline Update