Kendig Keast Collaborative (“KKC”) is pleased to submit the...

37
6860 S. Yosemite Ct., Ste. 2000 | Centennial, CO 80112 Phone : 303.577.7466 Fax : 720.255.2837 Performance Concepts in Planning www.kendigkeast.com BATON ROUGE, LA | CENTENNIAL,CO | CHICAGO,IL | ELK GROVE, CA | STURGEON BAY, WI | SUGAR LAND,TX March 6, 2012 Garfield County Procurement Department Attn: Jamaica Watts 108 8 th Street, Ste. 403 Glenwood Springs, CO 81601 RE: Request for Proposals RFP-GC-BP-01-02 Consulting Services for the Facilitation and Drafting of a Revised Land Use Code Dear Jamaica: Kendig Keast Collaborative (“KKC”) is pleased to submit the enclosed response to the Garfield County’s Request for Proposals RFP-GC-BP-01-02, Consulting Services for the Facilitation and Drafting of a Revised Land Use Code. KKC offers a group of accomplished, award-winning professionals who specialize in land development regulation; plan implementation; comprehensive, economic development, special area, and community redevelopment planning; and design. Our team of professionals has a diverse set of perspectives (to ensure that all issues are identified and appropriately resolved) and a common purpose (to provide a practical code and highly responsive customer service). KKC brings the breadth and depth of experience to help the County with its code update. We are prepared to commit the resources that are needed to listen carefully, build trust, and build the foundation of agreement from which the strategies and specifics of this phase of code development will be formulated. KKC is pleased to team with Lamont Planning Services, LLC, adding more than 17 years of planning and land use experience specific to the Roaring Fork Valley. The Kendig Keast Difference. The KKC team brings: Proven approaches to procedural reform, ensuring diversity of economic opportunity, creating a climate for private investment, protecting natural and agricultural resources, enhancing community character, and promoting housing affordability; Multiple perspectives, to ensure that the full range of ideas presented are understood and brought together; A local team-mate with more than 17 years of experience in land use planning in the region -- as a public sector current planner (development review) a private sector developer representative; A strong commitment to quality and client service; and An option for online publication of the adopted code using ZoningPlus™, our proven on-line code drafting and publishing package that offers significant advantages over the County’s existing use of PDF files on-line, including:

Transcript of Kendig Keast Collaborative (“KKC”) is pleased to submit the...

Page 1: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

6860 S. Yosemite Ct., Ste. 2000 | Centennial, CO 80112

Phone : 303.577.7466 Fax : 720.255.2837

Performance Concepts in Planning

www.kendigkeast.com

B A T O N R O U G E , L A | C E N T E N N I A L , C O | C H I C A G O , I L | E L K G R O V E , C A | S T U R G E O N B A Y , W I | S U G A R L A N D , T X

March 6, 2012

Garfield County Procurement Department

Attn: Jamaica Watts

108 8th Street, Ste. 403

Glenwood Springs, CO 81601

RE: Request for Proposals RFP-GC-BP-01-02

Consulting Services for the Facilitation and Drafting of a Revised Land Use Code

Dear Jamaica:

Kendig Keast Collaborative (“KKC”) is pleased to submit the enclosed response to the Garfield

County’s Request for Proposals RFP-GC-BP-01-02, Consulting Services for the Facilitation and Drafting of

a Revised Land Use Code. KKC offers a group of accomplished, award-winning professionals who

specialize in land development regulation; plan implementation; comprehensive, economic

development, special area, and community redevelopment planning; and design. Our team of

professionals has a diverse set of perspectives (to ensure that all issues are identified and

appropriately resolved) and a common purpose (to provide a practical code and highly responsive

customer service).

KKC brings the breadth and depth of experience to help the County with its code update. We are

prepared to commit the resources that are needed to listen carefully, build trust, and build the

foundation of agreement from which the strategies and specifics of this phase of code development

will be formulated. KKC is pleased to team with Lamont Planning Services, LLC, adding more than

17 years of planning and land use experience specific to the Roaring Fork Valley.

The Kendig Keast Difference. The KKC team brings:

Proven approaches to procedural reform, ensuring diversity of economic opportunity,

creating a climate for private investment, protecting natural and agricultural resources,

enhancing community character, and promoting housing affordability;

Multiple perspectives, to ensure that the full range of ideas presented are understood and

brought together;

A local team-mate with more than 17 years of experience in land use planning in the region --

as a public sector current planner (development review) a private sector developer

representative;

A strong commitment to quality and client service; and

An option for online publication of the adopted code using ZoningPlus™, our proven on-line

code drafting and publishing package that offers significant advantages over the County’s

existing use of PDF files on-line, including:

Page 2: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Jamaica Watts

March 6, 2012

Page 2 of 2

STURGEON BAY, WI | CHICAGO, IL | CENTENNIAL, CO | SUGAR LAND, TX

o Fast, intuitive, interactive browsing and searching of the entire code without the

need for the Adobe Acrobat plugin;

o The capability to provide in-line graphic images, video, calculators, and integrated

GIS-based zoning maps, which make the code more attractive, and easier to access

and apply; and

o A tool that allows for on-line commenting during code development, and

collaborative editing among consultant team members and County staff.

We hope that our qualifications will be favorably received, and would welcome the opportunity to

discuss our qualifications and approach in person. If you have any questions about the enclosed

materials, please contact me at (303) 577-7466.

Sincerely,

KENDIG KEAST COLLABORATIVE

Todd Messenger, AICP

Associate-in-Charge / Code Practice Leader

Kendig Keast Collaborative

Page 3: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Request for Proposals RFP-GC-BP-01-02

Consulting Services for the Facilitation and Drafting of a Revised Land Use Code

Respectfully submitted March 6, 2012

Kendig Keast Collaborative6860 South Yosemite Ct., Ste. 2000

Centennial, CO 80112

and

Lamont Planning Services, LLC725 Melissa Lane

Carbondale, CO 81623

Page 4: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Kendig Keast Collaborative (“KKC”) represents the collaboration of Bret C. Keast,

AICP, Gary K. Mitchell, AICP, and a select group of talented principals and

associates. Our firm has earned a reputation for its innovation and repeated success

in solving problems of varying complexities for small and large clients in a range of

environments. Our practice emphasizes the pursuit of good land stewardship, as well

as promoting durable economic development, conserving resources, preserving and

enhancing community character, protecting rural functions, promoting neighborhood

integrity, and ensuring fiscal responsibility. Our proven approach is founded on the

principle of performance, meaning development that is in context with its built and

natural environments.

Highlights�� Kendig�Keast�Collaborative�(“KKC”)� was� founded� by�nationally-known� zoning�reformer� Lane� Kendig� in�1982� as� Lane� Kendig,� Inc.�The� company� has� been� in�business�for�30�years.

�� KKC�has�11�employees�with�broad�and�deep�professional�experience.� The� size� of� our�firm� represents� the� intent�of�the�principals�to�provide�responsive� and� highly�personalized�service.�

�� KKC’s� principals� and� senior� staff� are� experienced� and� accomplished�public�speakers�and�facilitators.�We�help�our�client�communities�articulate�their�shared�values�in�“concrete”�terms,�which�makes�for�great�code�and�satisfied�volunteer�participants,�who�tell�us�things�like:

—� “Thanks�for�writing�code,�not�covenants.”

�—� “You�have�succeeded�in�making�a�cynic�a�supporter�of�your�efforts.”

�� KKC’s� professionals� have� diverse� backgrounds,� enabling� them� to�speak� the� “languages“� of� all� of� the� stakeholders� (e.g.,� elected� officials,�County�staff,�engineers,�developers,� farmers,�environmental�advocates,�neighborhood�groups,�and�realtors).�Project�volunteers�know�that�their�time�and�substantive�input�are�valued.

Firm Qualifications

OFFice LOcatiOns

Todd Messenger, AICP, Code Practice Leader6860 South Yosemite Court, Suite 2000Centennial, CO 80112Tel: 303/577-7466

Bret C. Keast, AICP, PresidentGary K. Mitchell, AICP, Vice President1415 Highway 6 South, Suite A300Sugar Land, TX 77478Tel: 281/242-2960

Lane H. Kendig, Strategic Advisor4089 Snake Island RoadStugeon Bay, WI 54235Tel: 920/743-0005

Paula Daneluk, AICP9370 Studio Court, Suite 160Elk Grove, CA 95758Tel: 916/691-2034

Lucien ‘Lu’ Cutrera, AICP, Principal Associate9422 Common Street, Suite 9Baton Rouge, LA 70809Tel: 225/769-3323

KKc at-a-Glance

Expertise Comprehensive and Special Area Planning and Plan Implementation in Rural, Suburban, and Urban Environments

Established 1982

Employees 11

Recent Awards

Zachary, LA Unified Development Code (LA APA Award of Merit, 2011)Tangipahoa Parish, LA Comprehensive Plan (LA APA Award of Merit, 2011)Centennial, CO Land Development Code (CO APA Award of Merit, 2010)

Page 5: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

�� KKC’s� principals� and� senior� staff� have� completed�more� than� 90� land�development� code� projects,� including� complete� rewrites,� amending�ordinances,�and�critical�assessment�studies.

�� KKC� has� five� well-connected� office� locations:� Centennial,� CO;� Sugar�Land,�TX;�Sturgeon�Bay,�WI;�Baton�Rouge,�LA;�and�Elk�Grove,�CA.

�� KKC� is� an� innovator� in� electronic� codification� of� land� development�regulations� and� the� developer� of� ZoningPLUS,� a� fully-featured�collaborative� code� development� and� on-line� codification� tool� used� by�many� local� governments� across� the� country� to� save� time� and� money�during�codification.�

—� ZoningPLUS� was� highlighted� by� the� Colorado� chapter� of� the�American� Planning� Association� when� it� awarded� the� City� of�Centennial�the�Outstanding�Planning�Project�Award�for�its�new�Land�Development�Code�in�2010.

Qualifications

Generally

KKC�has�assembled�a�highly�qualified�professional�staff�who�contribute�the�breadth�of�knowledge�and�depth�of�experience�that�are�needed�in�order�to�provide�sound�advice�to�our�clients.�Our�team�members�are�educated�with�advanced�degrees�in�planning,�public�administration,�economics,�landscape�architecture,�or�law,�with�interdisciplinary�undergraduate�degrees�and�special�studies� in� architecture,� community� and� regional� planning,� urban� design,�land�planning,�resource�planning,�geographic�and�information�management�systems,�communication,�and�facilitation.�

The�professional�planners�at�KKC�bring�experience�with�county,�municipal,�and�regional�governments,�civic�organizations,�developers,�farmers,�foresters,�miners,�business�owners,�and�neighbors�who�are�affected�by�new�development.�This� diversity� of� experience� gives�KKC� a� range� of� perspectives� regarding�planning,�regulatory,�and�development�issues�and�the�types�of�measures�that�will�be�most�effective�to�resolve�—�or,�ideally,�prevent�—�conflicts.�In�all�of�its�work,�KKC�strives�to�improve�development�processes�and�outcomes�through�appropriate�planning�methods�and�continuing�innovation.

Firm Qualifications

Members of the Centennial Advisory Team celebrate receipt of the Outstanding Planning Project Award from the Colorado Chapter of the American Planning Association.

Page 6: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Plan Implementation ExperienceKKC�has�extensive�experience�in�the�development�of�zoning�ordinances�and�unified� development� codes� (integrating� zoning,� subdivision� regulations,�site� disturbance,� sign� regulations,� street� naming,� addressing,� floodplain�management,�impact�fees,�procedures,�development�agreements,�landscaping�/�tree�preservation,�etc.).�

The� firm’s� broad� experience� includes� assisting� communities� in� the�development�of�“first-ever”�zoning�ordinances�and�zoning�maps;�facilitating�public� education� and� outreach� efforts;� conducting� thorough� critiques�of� existing� ordinances,� standards� and� development� review� procedures;�providing�detailed�amendment�recommendations�as�a�component�of� larger�planning� studies;� and� writing� complete� land� development� regulations� for�more�than�90�jurisdictions�across�the�nation,�including:

Aberdeen, SD Hillsborough Co., FL Perkasie Borough, PAAltus, OK Hitchcock, TX Perkasie Planned Dev., PABaytown, TX Houston, TX Pinelands Comm’n, NJBeaufort Co., SC Huntsville, TX Pleasanton, TXBossier City-Parish, LA Indian Creek, IL Polk County, IABrevard Co., SC Jacksonville, FL Ponca City, OKBrownsville, TX Jefferson Co., WV Quakertown Area, PABuckingham Twp., PA Jupiter Island, FL Queen Anne’s Co., MDCentennial, CO Kerrville, TX Riverwoods, ILChesterfield, MO Kootenai County, ID Rosenberg, TXChicago, IL Lake Co., IL Saipan, Northern Mariana Isl.Cincinnati, OH Lake Villa, IL Sarasota Co., FLClovis, NM Lake Zurich, IL Savannah & Chatham Co., GACollege Station, TX Langhorne Borough, PA Seabrook, TXCrystal Lake, IL League City, TX Sellersville Planned Dev., PADavie, FL McAllen, TX Sleepy Hollow, ILDickinson, TX Miami-Dade Co., FL Springfield Twp., PADurango, CO Milwaukee, WI St. Mary’s Parish, LAEdinburg, TX Monroe Co., FL Stafford, TXEl Campo, TX Morgan City, LA Sugar Land, TXFlagstaff, AZ New Britain Twp., PA Tangipahoa Parish, LAFlorence, SC New Castle Co., DE Teton Co. & Jackson, WYFlorida DCA (state agency) Oakland, IA Topeka-Shawnee Co., KSFranklin, TN Ocean Springs, MS Town & Country, MOFrederick Co., MD Olathe, KS Tullytown Borough, PAGeorgetown, TX Oswego, IL Upper Southampton Twp., PAGranville Co., NC Oviedo, FL Valparaiso, INGroton, CT Palm Beach, FL Wharton, TXGrundy Co., IL Paola, KS Williams, CAHialeah Gardens, FL Penndel Borough, PA Williamson Co., TNHighlands Comm’n, NJ Pennridge Area, PA Zachary, LA

Creating� thoughtful� and� appropriate� regulations�has� been� a�major�part� of�KKC’s�practice�since�the�firm�was�founded�in�1982.�KKC�is�a�consistent�leader�

Firm Qualifications

Page 7: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

and� innovator� in� the� area� of� land� development� regulation� from�multiple�angles:�the�substantive�and�procedural�solutions,�electronic�presentation�and�delivery,� interactive� tools� for� administration� and� compliance� review,� and�client-based�codification�after�code�adoption.�

The� firm’s� approach� is� deeply� rooted� in� a� tradition� of� effective� problem-solving.� Lane� Kendig,� founder� of� KKC,� is� the� original� developer� of� the�performance�zoning�system.�Performance�zoning�was�born�from�the�need�to�deal�with�the�inability�of�Euclidean�zoning�to�protect�agricultural�landscapes�and�economies�in�rural�Pennsylvania�from�sprawling�development�patterns.�Its�core�is�thoughtful�analysis�about�how�to�fit�together�a�set�of�regulations�that� directly� address� planning� objectives� (like� protection� of� community�character�or�preservation�of�farming�communities)�in�the�context�of�market�realities.�Because�of�this�root,�KKC�is�careful�to�ensure�that�its�modern�codes�are�well� tailored�to� implement�plans�—�without�overreaching�and�limiting�the�creativity�of�problem�solvers�“on�the�ground.”

Because�KKC�knows�that�there�is�no�substitute�for�hard�work,�the�firm’s�clients�know�that�their�codes�will�be�tailored�to�their�individual�needs,�according�to�the�character�of�the�community,�the�community’s�stated�planning�objectives,�the�input�from�project�participants,�the�administrative�resources�and�technical�capacity�of�the�community�and�the�private�sector,�the�legal�authority�of�the�community,�and�local�political�and�market�imperatives.

Success and ReputationKKC� and� each� of� its� employees� have� been� recognized� for� quality� results�in�plan�making�and�development� code�preparation.�The�firm�has� received�awards�from�the�national�organization�of�the�American�Planning�Association�(“APA”),�state�chapters�and�local�sections�of�APA,�the�National�Association�of� Counties,� and� the� Florida� Planning� and� Zoning� Association,� as� well�as� the� “Best� in�American�Living”� award� from� the�National�Homebuilders�Association,�Better�Homes�and�Gardens,�and�Professional�Builder�magazines.�Awards� received� by� the� firm� and� its� staff� (including� those� staff�members�received�while�with�former�employers)�include:

national awards

�� Loudoun�County,�Virginia�General�Plan,�Comprehensive�Planning:�Small�Jurisdiction,�American�Planning�Association�National�Award,�1994.

�� New� Castle� County,� Delaware,� Comprehensive� Plan,� National�

Association�of�Counties,�1988.

Firm Qualifications

“The personnel of Kendig Keast are great presenters . . . . They keep the discussion interesting and relevant and make sure that it is clearly understood by all who are present. In sum, their comprehensive understanding, openness to new and alternative ideas, and approach to meetings . . . have made this an exceptional project . . . .”

— Rita McConnell, AICP Deputy Director of Planning and Development, City of Centennial, Colorado

Page 8: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

�� Lake� County,� Illinois,� Natural� Resources� Plan� and� Zoning,� National�

Association�of�Counties,�1979.

�� The� Fields� of� Long� Grove� (160-acre� residential� development),� Best� in�American�Living,�National�Homebuilders�Association,�Better�Homes�and�Gardens,�and�Professional�Builder�magazines.

state and local awards

�� Tangipahoa� Parish� Comp.� Plan,� Outstanding� Plan,� LA� Chapter� APA�(2011).

�� Zachary� Unified� Dev.� Code,� Outstanding� Project/Program� Tool,� LA�Chapter�APA�(2011).

�� Waller�Advance�Plan�Livable�Centers�Study,�TX�Chapter�APA�(2010).

�� Centennial�Land�Dev.�Code,�Outstanding�Planning�Project,�CO�Chapter�APA�(2010).

�� Carbondale�(IL)�Comp.�Plan,�Daniel�Burnham�Award,�IL�Chapter�APA�(2010).

�� Valparaiso�Unified�Dev.�Code,�Outstanding�Project,�Honorable�Mention,�IN�Chapter�APA�(2010).

�� McAllen�Parks�&�Recreation�Master�Plan,�Community�of� the�Year,�TX�Chapter�APA�(2009).�

�� Temple�Comp.�Plan,�Central�TX�Section�APA�(2009).

�� Stafford�Corridor�Design� Study,� Plan,� and� Implementing� Regulations,�Houston�Section�APA�(2009).

�� Foresight�McAllen�Comp.�Plan,�TX�Chapter�APA�(2008).

�� Edinburg�Unified�Dev.�Code,�TX�Chapter�APA�(2007).

�� Edinburg�Comp.�Plan/Park�Master�Plan,�TX�Chapter�APA�(2007).

�� El�Lago�Context�and�Form�Study,�TX�Chapter�APA�(2007).

�� El�Lago�Context�and�Form�Study,�Houston�Section�APA�(2007).

�� Pearland�Parks�and�Trails�Master�Plans,�Houston�Section�APA�(2007).

�� Hobbs�Comp.�Plan,�NM�Chapter�APA�(2005).

�� Rosenberg�Parks�and�Recreation�Master�Plan,�Houston�APA�(2004).

�� Nacogdoches�Comp.�Plan�Update,�TX�Chapter�APA�(2003).

�� Kerrville�“LINK�to�the�Future”�Comp.�Plan,�TX�Chapter�APA�(2002).

�� Bastrop�Comp.�Plan,�TX�Chapter�APA�(2001).

�� Lockhart� 2020� Comp.� Plan,� Professional� Planning�Award,� Central� TX�Section�APA�(2000).�

Firm Qualifications

“KKC offers a fresh way of looking at a project, and did not provide us with a boiler plate set of regulations that only slightly differ from work for other clients, and tailored the document to meet the specific needs of our community.”

— Craig Phillips, AICP Frmr. Planning Director, City of Valparaiso, Indiana

Page 9: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

�� Starr�County�Comp.�Colonia�Study�and�Plan,�Honorable�Mention�Award,�TX�Chapter�APA�(2000).�

�� Bryan�Comp.�Plan�Update�and�Municipal�Annexation�Plan,�Community�of�the�Year,�TX�Chapter�APA�(2000).�

�� New�Braunfels�New�Millennium�Plan,�TX�Chapter�APA�(1999).�

�� Sugar�Land�Comp.�Zoning�Study,�TX�Chapter�APA�(1998).�

�� Harlingen�Vision�2020�Comp.�Plan,�TX�Chapter�APA�(1997).�

�� Regulatory�Effectiveness�Studies�for�the�Armand�Bayou�and�Christmas�Bay�Coastal�Preserves�(for�the�Galveston�Bay�National�Estuary�Program),�Excellence�in�Environmental�Planning,�TX�Chapter�APA�(1992).

Publications

�� Kendig,� Lane� and� Bret� Keast.� A� Practical� Guide� to� Planning� for�Community�Character.�Island�Press,�2011.

�� Kendig,� Lane� and� Bret� Keast.� Community� Character,� Principles� for�Design�and�Planning.�Island�Press,�2010.

�� Kendig,�Lane.�Too�Big,�Boring,�or�Ugly:�Planning�and�Design�Tools�to�Combat�Monotony,�the�Too-big�House,�and�Teardowns.�American�Planning�Ass’n,�Planning�Advisory�Service�(PAS)�Report�#528,�1995.

�� Kendig,�Lane,�et�al.�Performance�Zoning.�Chicago:�Planners�Press,�1980.

�� Performance�Zoning.�Bucks�County�Planning�Comm’n,�1973.��(revised�and�reprinted,�1976).

�� Traffic� Sheds,� Rural�Highway� Capacity,� and�Growth�Management.�American�Planning�Ass’n,�PAS�Report�#485,�Mar.�1999.��

�� “Local� Government� Urban� Planning� Activities� in� the� Galveston� Bay�Watershed.”� Proceedings� of� the� 2001� State� of� the� Bay� Symposium,�Galveston�Bay�Estuary�Program,�Feb.�2001.

�� Kendig,�Lane�and�Brian�Blaesser.� “Computerized�Zoning:� �The�Future�Is�Now.“�Land�Use�Law�and�Zoning�Digest.�48:�4,�American�Planning�Ass’n,�Apr.�1996.

�� “Meeting�Procedures�and�Liability�Issues�for�Public�Officials.”�Guide�to�Urban�Planning�in�Texas�Communities�(1996).

�� Kendig,�Lane�and�Marc�Mylott.�“Tomorrow’s�Planning�Tools�Today.”�Z�Management� Ideas.� Zucker� Systems’�Management� Info.� Services,� July�1995�(Issue�31).

�� Kendig,�Lane.�“Stop�the�Insanity!”�Land�Use�Law�and�Zoning�Digest,�47:�1,�American�Planning�Ass’n,�Jan.�1995.

Firm Qualifications

Page 10: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Firm Qualifications

�� “Land� Use�Management� Techniques� for�Water� Pollution� Prevention.“�Houston-Galveston�Area�Council,�1994.

�� “Regulatory�Effectiveness�Studies�for�the�Armand�Bayou�and�Christmas�Bay�Coastal�Preserves.”�Galveston�Bay�National�Estuary�Program,�1991.

�� “Pipe�Dreams.”�Planning.�American�Planning�Ass’n,�June�1989.

�� “Performance� Zoning� for� Sensitive� Land� in� Queen� Anne’s� County,�Maryland.”�Urban�Land.�August�1988.

�� Kendig,� Lane.� New� Standards� for� Nonresidential� Uses.� American�Planning�Ass’n,�PAS�Report�#405,�1987.

�� “Why�Consider�Fishing�in�Urban-Suburban�Planning.”�Urban�Fishing—Symposium�Proceedings.�The�American�Fisheries�Society,�1984.

�� “Performance�Guaranties.”�Land�Use�Law�and�Zoning�Digest.�35:�2,�Feb.�1983.

�� “Designer’s�Notebook.”�NatureScape.�Sep.�1981,�Nov.�1981,�Jan.�1982,�&�May�1982.

�� “Developers�and�Performance�Zoning.”�Urban�Land.�41:�1,�Jan.�1982.

�� “Performance�Zoning�—�An�Alternative�to�Euclidian�Zoning.”�Planning.�American�Planning�Ass’n,�1977.

�� “TDR�—�a�Pragmatist’s�View.”�The�Urban�Lawyer.�9:�3,�1977.

�� “Carrying�Capacity�as�a�Planning�Tool.”�Urban�Land.�Dec.�1977.

Page 11: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Kendig Keast Collaborative has assembled a highly-qualified group of staff who

contribute the breadth of knowledge and depth of experience required to offer sound

consulting advice. Nearly all of our personnel have advanced degrees in planning,

public administration, or law, with interdisciplinary undergraduate degrees and

special studies in architecture, community and regional planning, urban design,

historic preservation, growth management, economics, and environmental planning.

Our professional backgrounds all include experience with local, county and regional

governments -- as well as with private developers -- experience which we believe

to be essential to our understanding of the interests and issues from a variety of

perspectives, and the measures that are needed to effectively resolve and address them.

Project Team

Generally

The�KKC�team� is� led�by�Todd�Messenger,�AICP,�our�code�practice� leader,�who� has� 12� years� of� experience� in� land� use� planning,� six� of� which� were�spent� as� a� land� use� attorney� in� a� complex� regulatory� environment.� Todd�will� be� the� principal� facilitator� and� draftsperson,� will� provide� overall�project�management,�and�will� time�and�sequence�individual�team�member�involvement.�

Project team, Roles, and Responsibilities

Todd Messenger, AICP Project Manager; Principal Substantive Contact; Principal Draftsperson; Facilitation

Lane Kendig Strategic Advisor

Bret Keast, AICP Quality Control; Principal Administrative Contact

Liz AustinResearch; Design; Analysis

Matt Bucchin, AICPDrafting; Research

Leslie Lamont, AICP Facilitation

Page 12: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Project team, Roles, and Responsibilities

KKC’s� President,� Bret� Keast,�AICP,�will� provide� performance� review� and�quality�control,�and�KKC�personnel�Matt�Bucchin�and�Liz�Probst�will�provide�support�as��needed.�Lane�Kendig�will�provide�strategic�support.�

Subcontractor�Leslie�Lamont�will�assist�with�the�initial�outline�of�issues�and�with�public�facilitation.

todd MessenGer, aicP, Project ManaGer

Todd� will� manage� the� project� and� be� the� principal�point� of� contact� for� substantive�matters.� Todd� has� a�broad�and�deep�background�in�land�use�planning�and�land� development� regulation,� public� involvement,�redevelopment�planning�and�due�diligence,�and�public�and�private�sector�representation�in�land�development�and�land�use�issues.�Todd’s�perspective�and�analytical�methodology�are�shaped�by�six�years�of�experience�as�a�land�use�attorney.�While�Todd�does�not�practice�law�with�KKC,�he�is�well�positioned�to�help�our�clients’�counsel�identify�and�resolve�issues.

Todd� views� the� drafting� of� land� development� regulations� as� the� art� of�articulating�the�client�community’s�shared�values�in�a�way�that�underscores�what�it�means�to�be�a�“good�neighbor”�with�respect�to�the�use�and�development�of�land.�This�starts�with�the�assumptions�that:

�� People�should�be�able�to�do�whatever�they�want�with�their�land,�but�that�their�rights�stop�where�their�neighbors’�rights�begin;�and

�� Codes� should� provide� stability� that� promotes� investment� in� property�and�durable�development�of�the�local�economy.

In� that� context,� and� since� land� development� decisions� have� consequences�that�typically�last�for�decades,�Todd�believes�that�regulations�should�be�clear�enough�so�that�people�understand�in�advance�what�is�allowed�—�and�should�provide�quick�approvals� for�projects� and�uses� that� are� consistent�with� the�articulated�rules�for�being�a�“good�neighbor.”�Todd�believes�in�eliminating�procedures�that�do�not�materially�add�to�the�quality�of�development�outcomes.

Matt bucchin, aicP, leed Green associate

Matt�Bucchin�will�work�with�Todd�on�analysis,�and�drafting� of� the� new� regulations.� Matt� brings� more�than�15�years�of�public� sector�experience,� including�seven� years� focusing� primarily� on� community� and�development� planning,� citizen� participation� and�the� public� use� and� protection� of� natural� resources.�Before� joining�KKC,�Matt� led� the�planning�division�

During the development of the Valparaiso, IN Unified Development Ordinance, Todd worked within the framework of Indiana’s zoning enabling statutes, and worked well with the City Attorney to introduce new applications of state law into the City’s new Unified Development Ordinance. Todd provided the research, the reasoning, and the proposed regulatory language, and the City Attorney reviewed and endorsed the proposals. After the project was completed, Todd presented some of the approaches used in Valparaiso at an advanced continuing legal education seminar in Indiana.

Page 13: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

for�Forsyth�County,�Georgia,�a�fast-growing�county�in�metropolitan�Atlanta.�During� his� tenure,� he� gained� extensive� experience� in� drafting� code� that�reflected�good�planning�principles,�while� at� the� same� time�being� sensitive�and�responsive�to�local�political�culture�and�imperatives.

In�addition�to�his�substantive�and�leadership�responsibilities�at�the�county,�Matt� was� a� contributing� author� to� the� American� Planning� Association’s�Rebuilding�America�Green�Infrastructure�Sub-Task�Force�Report.�The�report�evaluated�current�conditions�and�challenges,�and�identified�recommendations�for�changes�in�policy�and�practice�regarding�green�infrastructure.

bret Keast, aicP, President

Bret� Keast,� AICP,� President,� will� be� the� principal�administrative� contact� and� will� be� responsible� for�quality� assurance� /� quality� control.� Bret� has� 22�years� of� experience� in� both� the� public� and� private�sectors.� His� practice� focuses� on� comprehensive�planning,� implementing� regulations,� land� use� and�transportation� studies,� parks� and� recreation�master�plans,� special� area� plans,� plan� implementation�programs,� and� public� involvement.� His� client�communities� have� been� recognized� each� year� since� 1997� with� statewide�awards�for�outstanding�plans�and�projects.

Bret� is� the�co-author� (with�Lane�Kendig)�of� two�recently�published�books:�Community� Character,� Principles� for� Design� and� Planning� and� A�Practical� Guide� to� Planning� for� Community� Character� (Island� Press,�2010).�In�addition�to�contributing�to�the�profession�through�his�writing,�Bret�is�a�frequent�presenter�and�panelist�at�state,�multi-state,�and�national�planning�conferences�and�workshops.�

lane KendiG, strateGic advisor

Lane� Kendig� will� provide� strategic� guidance� to� the�project.� Lane� is� a�nationally�known� innovator� in� the�field� of� planning� and� land� development� regulation.�For�more�than�35�years,�Lane�has�advanced�the�fields�of� land�use�planning,�growth�management,�housing,�environmental�planning,�zoning�and�land�use�controls,�site� and� land� design,� and� impact� and� feasibility�analyses.�He�has�worked�throughout�the�United�States�and�in�Saipan,�Commonwealth�of�the�Northern�Mariana�Islands.�

Project team, Roles, and Responsibilities

Page 14: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Lane�has�written�plans�and�ordinances�separately�and�simultaneously�and�studied�special�problems�concerning�economic�development,�transportation,�growth�management,�special�zoning�regulations,�and�open�space�programs,�among�others.

liz austin, aicP

Liz�Austin,�AICP�will�provide�support�for�the�project�with� respect� to� research,� analysis,� and� design.� Liz�works�on�multiple�scales,�ranging�from�site�analysis�of� small� study� areas� to� regional�GIS�mapping.�Her�current�and�ongoing�experience�includes�conducting�background�studies,�site�analysis,�conceptual�design,�graphic�design,�and�technical�writing.

leslie laMont, aicP laMont PlanninG services, llc

Kendig�Keast�Collaborative� is�pleased� to� team�with�Leslie� Lamont,�AICP� of� Lamont� Planning� Services,�LLC� for� this� project.� Leslie� has� been� doing� general�land� use� planning� work� throughout� the� Roaring�Fork�Valley�for�the�last�17�years,�and�brings�a�broad�and�deep�understanding�of�the�planning�issues�that�affect�Garfield�County�and� the� region�—�as�well� as�the�perspectives�and�philosophies�of�the�people�who�live�there.

Leslie�began�her�own�planning�consulting�service�in�2003.�Her�firm�is�built�on�years�of�experience�which�included:�principal�planner�for�Otak,�Inc.,�project�planner� and�Deputy�Director� of�Community�Development� for� the�City� of�Aspen� (focusing�on� current�planning� /�development� review)� and� caseload�planner�for�the�Boston�Redevelopment�Authority.�Leslie�has�also�served�as�a�County�Commissioner�for�Pitkin�County.�

Leslie� lives� and� works� in� Carbondale,� Colorado,� where� she� is� currently�working� on� the� Town’s� Comprehensive� Plan� revisions� with� a� team� that�includes�Kendig�Keast�Collaborative.

Project team, Roles, and Responsibilities

Page 15: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Kendig Keast Collaborative’s diverse portfolio of work includes rural counties,

freestanding small towns, and metropolitan cities, all in various stages of development.

Central to all of the firm’s projects is a focus on the existing and desired character of

the community. KKC helps its clients:

� Reform procedures to ensure that land use decisions are timely, consistent,

informed, efficient, and fair;

� Identify the aspects of the community’s character that are dear to its residents

and then protect those assets using the power of the market; and

� Identify the areas where change is desirable or inevitable and then help the client

communities manage that change according to their adopted plans.

Project Examples

centennial, colorado

Land Development Code

Centennial,� Colorado� is� a� southern�suburb�of�Denver� that� incorporated�in� the� year� 2000.� At� the� time� of�incorporation,� the� City� was� mostly�built-out,� but� still� subject� to� a� land�development� code� drafted� decades�earlier� for�a� rural� county.�After� the�City�developed�a�Comprehensive�Plan�and�several�special�area�plans,�it�engaged�KKC�to�write�a�new,�original�Land�Development�Code�to�implement�those�plans.

The�principal�objectives�of�the�project�were�to:�implement�the�City’s�vision�and�plans;�protect�neighborhoods;�modernize�the�Code,�making�it�integrated�and�easy�to�use�for�developers,�residents,�staff,�and�decision-makers;�streamline�the� approval� procedures� while� ensuring� meaningful� public� participation;�allow� for� the�development�of�modern� real� estate�products� (e.g.,�mixed-use�and� traditional� neighborhood� development);� create� value� by� promoting�infill� development� and� redevelopment� in�designated� areas;� strengthen� the�link�between� land�use�and� transportation� (and� thereby�promote�mobility);�promote� sustainable� development� patterns� and� techniques;� mitigate� the�impacts� of� development;� provide� for� housing� diversity;� and� implement�design�standards�in�key�areas.

Project examples

ReLevance

� Community participation � Code modernization � Plan implementation � Housing diversity � Service provider

coordination � Provision for mixed-use

centers � Protection of established

neighborhoods � Respect for property rights � Colorado Chapter, APA

Award-Winner

Page 16: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

KKC� worked� with� a� Technical� Team� made� up� of� City� staff� and� agency�representatives� to� consider� technical� issues� of� the� rewrite;� an� Advisory�Team�made�up�of� elected�and�appointed�officials,� civic� and�neighborhood�representatives,� developers,� and� business� owners� to� make� policy� and�implementation�recommendations;�and�the�public,�via�community�meetings�and�on-line�comments�submitted�in�Zoning�PLUS.

teton county and town of jacKson, wyoMinG

Comprehensive Plan & Land Development Regulations

Lane� Kendig,� Inc.� (now� Kendig�Keast�Collaborative)�was�engaged�to�develop� a� comprehensive� plan� and�zoning� regulations� jointly� for� Teton�County�and�the�Town�of�Jackson,�Wyoming.�Teton�County�is�home�to�a�portion�of�the�Grand�Teton�National�Park,�the�Snake�River,�National�Elk�Refuge,�and�a�strong�tourist�economy.�Project�priorities�included�protecting�community�character;�managing�growth;�protecting�natural�resources,�including�habitat,�skylines� and� scenic� views;� providing� for� affordable� housing;� respecting�property�rights;�and�enhancing�community�mobility.

Kendig� developed� a� comprehensive� plan� for� the� two� jurisdictions,� with�expansion�areas�for� the�Town�and�other�areas�designated�to�remain�under�County�jurisdiction�(e.g.,�a�growth�area�was�designated�for�a�major�ski�resort).�The�remainder�of�the�County�was�to�remain�rural.�To�address�the�challenge�of�natural�resource�stewardship,�Kendig�developed�a�methodology�for�assessing�the�carrying�capacity�of�the�land�for�development�and�wildlife�habitat.�

With�assistance�from�a�local�wildlife�consultant,�a�habitat�rating�system�was�developed.�It�was�originally�calibrated�to�threatened�and�endangered�species,�and�then�through�a�peer�review�committee,�balanced�to�protect�winter�ranges�of�deer�and�elk,�as�well�as�calving�grounds�and�feeding�areas.�The�habitat�rating� system�was� then� incorporated� into� the� environmental� performance�standards�component�of�the�zoning�regulations.

The�plan�and�ordinance�provided�for�design�standards�for�Jackson;�also�dealt�with�nonconformities;�and�limited�so-called�“monster�homes.”�The�“monster�home”�provisions�were� successfully�defended� in� court,� and�have�been� the�subject�of�several�American�Planning�Association�conference�discussions.

Relevant Projects

ReLevance

� Broad range of natural resource and wildlife stewardship issues (habitat, sensitive lands, skylines, feeding areas, views)

� Community character � Growth management � Housing affordability

Page 17: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Kootenai county, idaho

Unified Land Use Code and Interlocal Agreements

Kootenai� County,� Idaho� retained�KKC�to�develop�a�new�unified�land�use� code� (“ULUC”)� to� implement�its�new�Comprehensive�Plan,�which�was� developed� in-house.� Kootenai�County� is� located� in�Northern� Idaho� along� the� I-90� corridor.� The� County�is�approximately�1,244�square�miles� in�area,�and�is�home�to�nearly�139,000�people,�approximately�70�percent�of�whom�live�in�incorporated�Cities.

Kootenai�County�has�a�diverse�landscape�that�is�rich�with�natural�resources,�including�timber,�scenic�lakes,�and�a�prolific�yet�vulnerable�aquifer.�Growth�in�the�County�during�the�“boom”�of�the�early�2000s�highlights�the�need�for�protecting�rural�economies�and�rural�character�and�reducing�the�impact�of�development�on�water�quality.

Idaho�law�requires�Counties�and�Cities�to�agree�to�the�regulations�that�apply�within� negotiated� “areas� of� city� impact.”� In� addition� to�working�with� the�County�on�developing�a�new�ULUC,�KKC�is�currently�facilitating�discussions�with�the�cities�to�create�new�ACI�agreements�that�will�address�land�use�issues�around� the�Cities� and� ensure� that� Cities� do� not� get� “cut� off”� from� future�growth�due�to�inefficient�development�patterns�on�the�urban�fringe.

Grundy county, illinois

Unified Development Ordinance

KKC� prepared� a� new� Unified�Development� Ordinance� (“UDO”)�for�Grundy�County,�Illinois.�Grundy�County�is�located�at�the�southwestern�edge� of� the� Chicago� Metropolitan�Area,�and�is�known�for�having�some�of�the�most�productive�farmland�in�the�United�States.�Because�of�its�strategic�location,�demand�for�future�urban�and�suburban�development�in�the�area�has�been�accelerating.�

County�officials� responded� to� this�by�adopting�a� comprehensive�plan� that�places� greater� emphasis� on� slower� growth� in� the� rural� areas,� protecting�natural�resources��and�scenic�areas,�and�preserving�farmland.�

Relevant Projects

ReLevance

� Rural / agricultural county with need to protect agriculture and forestry

� Protection of water resources and wildlife habitat

� Streamlined procedures � Application of statewide

planning law � Highly diverse points of view � Respect for property rights

ReLevance

� Rural / agricultural county with need to protect agriculture and diversify economic opportunity

� Protection of scenic areas and vistas

� Streamlined procedures � Respect for property rights

Page 18: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

KKC�was�retained�to�develop�the�UDO�to�implement�the�goals�and�objectives�of� the�Plan.�The�principal�objective�of� the�plan�and� the�new�regulations� is�to�support�the�County’s�rural�community�character.�Accordingly,�the�UDO�offers�simple,�proven�techniques�for�farmland�and�natural�resource�protection,�with�greater�emphasis�on�clustering�residential�lots,�preserving�open�space,�and�using�conservation�easements� that�permanently�protect� farmland.�The�UDO�also�simplified�procedures�and�reduced�the�number�of�zoning�districts�in�the�County�from�twelve�to�six.�

tanGiPahoa Parish, louisiana

Comprehensive Plan & Draft Subdivision Regulations

Kendig�Keast�Collaborative�developed�a� first-ever� Comprehensive� Plan� for�Tangipahoa� Parish,� Louisiana.� The�Parish� is� an� 803� square� mile� area�centered�along�a�rail�corridor,�located�on� the� north� shore� of� Lake� Ponchartrain.� Traditionally� a� slow� growing,�predominately� rural� setting� where� agriculture� and� forestry� industries�dominate�the�landscape,�the�Parish�experienced�a�sudden�influx�of�7,000�to�10,000�people�in�the�aftermath�of�Hurricane�Katrina.�“Ex-urban”�residential�subdivisions� proliferated� at� an� unprecedented� rate� in� the� unincorporated�Parish,� changing� its� character� and� the� quality� of� life� for� the� long-time�residents,� not� to� mention� overburdening� infrastructure� that� was� already�outmoded�before�the�new�development�came.

Tangipahoa� Parish� was� confronted� with� considerable� challenges� in�preserving�its�heritage,�managing�its�character,�upgrading�and�maintaining�its� infrastructure,� creating�good� jobs�and�sustaining�a�sound� tax�base,�and�overcoming�its�housing�constraints.�

The�planning�process�was�heavily�citizen-based,�with�no�less�than�20�meetings�(7�small-group,�6�“citizens’�congress,”�and�7�steering�committee)�scheduled�during�the�planning�process;�a�web�site�for�posting�planning�documents�and�receiving�feedback;�and�extensive�public�outreach.�Open�steering�committee�meetings�and�public�outreach�built�trust�among�a�sizeable�group�of�farmers�and�foresters�that�distrusted�planning�and�regulation,�by�showing�them�how�planning� protected� their� individual� and� economic� interests.� The� plan�was�ultimately�adopted�with�overwhelming�support�from�a�broad-based�group�of�Parish�residents.

Relevant Projects

ReLevance

� Large rural parish (county) with freestanding and composite municipalities

� Many independent service providers

� Need to manage growth in a fiscally responsible way

� Protection of water quality; management of erosion, runoff, and on-site sewers

� Fire protection and public safety for development in unincorporated areas

� Meaningful participation and outreach in a challenging political environment

� Respect for property rights � Louisiana Chapter, APA

Award-Winner

Page 19: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

After� adopting� the� plan,� the� Parish� retained� KKC� to� revise� the� Parish’s�subdivision�regulations�to�implement�the�plan.�The�proposed�new�regulations�used� the� “traffic� shed”� concept� to� calibrate� development� potential� to� the�available�rural�road�capacity,�based�on�dimensions,�surfacing,�and�proximity�to�state�highways.�They�also�encouraged�higher�densities�near�municipalities�with�services�and�in�centers�that�already�had�a�critical�mass�of�development.

The� Center� for� Planning� Excellence� recognized� the� extraordinary� success�of� the� comprehensive�planning�effort� and� selected� the�Parish�as�one�of� two�jurisdictions� in� the� state� to� test� a� “land�use� toolkit”� it�was�developing.� The�selection� occurred� after� the� subdivision� regulations� were� well� underway,�but�before�they�were�finalized.�Given�the�unique�opportunity�(which�would�provide�a�more�comprehensive�set�of�regulations�without�cost�to�the�Parish),��and�the�potential�confusion�that�may�be�caused�by�adopting�two�different�sets�of�implementing�regulations�in�a�relatively�short�time�frame,�the�Parish�opted�to�participate�in�the�pilot�program�and�not�finalize�the�subdivision�regulations.

Relevant Projects

Page 20: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Kendig Keast Collaborative’s philosophy is simple — provide unique, innovative

(yet realistic), and implementable regulatory solutions that address the unique and

complex issues that each client faces. That means: (1) the product must be useful;

(2) “one size does not fit all;” (3) the code must be “as simple as possible, but not

simpler;” (4) the code must help the County use the market to deliver real estate

products that implement the County’s plans and expectations; and (5) the code

should create (and add) value.

This underlying philosophy defines the firm’s approach to this and every project, and

is particularly relevant to Garfield County considering its substantive and procedural

objectives for this phase of its regulatory amendments.

Philosophy Behind KKC’s Code PracticeKKC’s�philosophy�is�rooted�in�its�commitment�to�hard�work�on�behalf�of�its�client�communities.�This�dedication�leads�to�satisfied�clients�and�professional�recognition.�Indeed,�since�May�2009,�six�of�KKC’s�clients�have�earned�awards�from�their�state�chapters�of�the�American�Planning�Association�as�a�result�of�the�adoption�of�plans�and�codes�created�by�KKC.�

The�firm’s�approach�is�defined�by�five�principles,�which�shape�the�proposed�scope�of�work�and�all�of�the�project�deliverables.�They�are�summarized�below.

the Product Must be useful

One�factor�that�tends�to�set�KKC�apart�is�that�it�cuts�through�trendy�planning�buzzwords�and�“groupthink”�to�make�sure�that�its�codes�come�from:

�� Critical� thinking� about� the� articulated� objectives� and� needs� of� the�client;�and

�� Sensitivity�to�the�unique�character�of�the�community.�

Because�KKC�does�not�bring�a�canned�“prescription,”�but�instead�identifies�issues�before solutions,�its�codes�are�useful,�effective,�and�durable.

one size does not fit all

KKC�is�careful�to�deliver�(and�calibrate)�appropriate�tools�that�its�clients�will�use�to�solve�real-life,�everyday�problems.�This�is�a�two-part�process:�

�� First,�the�client�must�be�able�to�use�the�tool�(it�must�fit�the�administrative�capacity�of�the�County�and�the�capabilities�of�the�private�sector);�and�

Philosophy & approach

PROBLeM sOLvinG is KeY

Land development regulation is a multifaceted challenge that requires looking at issues through a variety of “lenses.” Regulations should be balanced to address all facets of the County’s planning objectives.

One metaphor is the Rubik’s Cube. Each side represents a different aspect of land development regulation, such as: form and design, housing choice, economic development, natural resource protection, mobility, and growth management.

Solving for only one side — such as the form of development, has impacts on the other sides — but does not necessarily (or even, usually) solve them too.

KKC understands how the various facets of land development regulation are related, and carefully thinks through its codes to “solve all sides” — with the objective of reducing unintended consequences.

Page 21: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

�� Second,� the� tool� must� be� appropriate� (it� must� be� functional� and�directly�solve�the�problem).�

To�ensure� that� the�process�works,� the�firm�helps� its� clients�articulate� their�challenges�first,�and�then�helps�them�choose�specific�tools�to�address�them.�

codes Must be as siMPle as Possible

Our� team� firmly� believes,� as� Albert� Einstein� once� said,� that,� “everything�should�be�made�as�simple�as�possible,�but�not�simpler.”�

To� be� effective,� land� development� regulations�must� be� presented� in� plain�terms,�with� illustrative�graphics� and� straightforward�procedures.�As� such,�KKC�organizes�regulations�around�the�two�questions�that�landowners�most�often�have�in�mind:�

�� “What�can�I�do�with�my�property?”�

�� “Who�(and�how)�do�I�have�to�ask?”�

KKC’s�codes�are�designed�to�answer�the�most�common�questions�in�a�manner�that�has�both�flexibility�and�certainty�and�that�promotes�the�public’s�interests�in� protecting� community� character,� managing� natural� resources,� creating�space�for�economic�activity,�and�providing�housing�and�mobility�choices.�The�firm�also�works�within�the�constraints�of�applicable�state�law�to�simplify�and�standardize�development�approval�procedures�to�the�greatest�extent�legally�and�politically�feasible.

codes Must use the MarKet to deliver on PlanninG objectives

Of� course,� answering� the� most� common� landowner� questions� requires�an� understanding� of� the� County’s� planning� objectives,� knowledge� of�the� preferences� of� the� County’s� residents� with� regard� to� alternative�implementation�measures,� and� an� appreciation� for� how� regulations�work�with�(or�against)�the�market�to�produce�physical�results�and�lasting�economic�opportunity.� In� this� respect,�KKC�consults� the�County’s�plans,�seeks� input�from�those�involved�in�ongoing�planning�efforts,�and�pursues�a�robust�public�involvement�strategy.�

codes should create (or add) value

Codes� should� create� or� add� value.� Accordingly,� members� of� the� firm�frequently�advocate�for�code�provisions�that�include�qualitative�and�flexible�site� design� standards� that� reflect� best� practices� for� stewardship� and� fiscal�responsibility.� For� developers� who� bring� such� projects,� the� code� should�provide�a�predictable�and�timely�approval�process.�

Philosophy & approach

KKC routinely scopes its projects to provide plain language issue summaries (excerpts are pictured above) to a steering committee to frame discussions. By addressing code issues before technical language is drafted, the technique promotes meaningful discussion and general agreement among technical and non-technical participants alike.

Page 22: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Kendig Keast Collaborative offers the following proposed scope of services as a

starting point for scoping out this project. The scope is set out in three phases (with

and optional fourth), which correspond to the phases in the Request for Proposals.

KKC is committed to creating a scope that meets the expectations and budget of the

County, and therefore will work with the County to modify the scope as appropriate.

Proposed Scope and Project Phasing

Generally

KKC�proposes�to�build�upon�the�outline�of�the�scope�of�work�presented�in�the�Request�for�Proposals.��

Phase 1 | assessMent and ProPosed revisions

Phase� 1� involves� an� assessment� of� the� existing� � policy,� regulations,� and�proposals� for�reform;� two�meetings�with�the�advisory�committee�and�Staff�to�focus�in�on�priority�items;�and�a�presentation�to�the�Board.�During�Phase�1,�KKC�will:

1.� Meet� with� County� Staff� to� establish� communications,� scheduling,� file�format,�and�administrative�protocols;�receive�data�(e.g.,�GIS�files,�aerials,�etc.);�lay�out�a�detailed�schedule�for�the�project;�and�refine�project�roles.

� Deliverable: memo regarding schedule, protocols, and roles

2.� Compile� and� comprehensively� review� relevant� existing� documents,�including�the�Phase�I�code�revisions,�Spring�2011�stakeholder�interviews,�Phase� II� recommended� changes� (Clarion� report),� and� December� 2011�working�group�recommendations.

� Deliverable: Initial consolidated outline of recommendations, to be presented to the advisory committee.

3.� Facilitate� two� meetings� with� the� advisory� committee� and� meet� with�County�staff�to�discuss�proposals�for�revision,�reach�general�agreement,�and�establish�priorities�for�implementation.

� Deliverable: Consolidated, prioritized outline of recommendations

4.� Present�the�consolidated,�prioritized�outline�of�recommendations�to�the�Board.

� Deliverables: Final consolidated, prioritized outline of recommendations; presentation materials

scope of services

Page 23: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

scope of services

Phase 2 | iterative draftinG

Phase�2�involves�translating�the�plain-language�priority�items�into�regulatory�text�for�inclusion�in�the�County’s�code.�During�Phase�2,�KKC�will:

1.� Draft� code� revisions� to� implement� the� recommendations� developed�during�Phase�1.

� Deliverables: First draft code revisions.

2.� Present�and�review�the�draft�code�revisions�with�the�advisory�committee,�County�staff�and�legal�counsel�for�the�County.�

� Deliverables: Two in-person meetings of the advisory committee and county staff, an additional two telephone meetings with County staff and legal counsel, presentation materials, up to two sets of revisions based on feedback.

Phase 3 | adoPtion and Publication

Phase� 3� involves� presentation� to� the� Board� and� revisions� per� the� Board’s�direction.�During�Phase�3,�KKC�will:

1.� Compile�the�public�hearing�draft�document�and�adopting�ordinance;

2.� Present�the�draft�code�to�the�Board�of�County�Commissioners;

3.� Make�final�revisions�as�directed;

4.� Present�the�final�document�to�the�Board�for�adoption;�and

5.� Deliver�a�final�electronic�document�to�the�County.

oPtional Phase | zoninGPlus™ Publication

Kendig�Keast�Collaborative� is� the�creator�of�ZoningPLUS™,�an� innovative�and� flexible� online� code� publishing� tool.�With� ZoningPLUS™,� our� clients�enjoy�graphics-rich�presentation�of�their�codes�on�the�Internet,�with�intuitive�search� and� browse� functions.� KKC� would� be� pleased� to� work� with� the�County�to�create�a�scope�of�work�for�publishing�the�County’s�new�code�in�ZoningPLUS™.

We�invite�the�County�to�view�Centennial,�Colorado’s�code�at:

http://www.zoningplus.com/regs/centennial

Collaborative drafting is easy in ZoningPlus because all authors have access to the same document at the same time. Authors can track changes with colored strike and underline, or simply track updates using convenient reporting features.

ZoningPlus makes it easy to solicit public comments via the web, and ensures accountability by tracking the team’s responses.

Navigating a published code is intuitive, with browse and search features, “pop-up” definitions, and fast access to maps and tables. Articles, sections, and divisions can be exported directly to PDF files.

Page 24: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

₋ Kickoff meeting; compile and

review documents

₋ Meet with Advisory

Committee; refine priorities /

recommendations

₋ Finalize recommendations and

present to Board

₋ Iteratively draft amendments

based on recommendations;

meet with Advisory Committee

₋ Present to Board; finalize;

present for adoption

Proposed TimelineThe�proposed�timeline�for� the�project� is�set�out�below.� It�accomplishes� the�project�tasks�within�the�time�frame�set�out�in�the�RFP.

scope of services

Page 25: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Proposed Budget & References

Proposed BudgetThe�proposed�budget�for�the�project�is�set�out�below.�This�budget�is�based�on�KKC’s�understanding� of� the�nature� and� relatively� limited� scope� of� the�project� (procedural�streamlining�and�removal�of� impediments�to�economic�development).�KKC�would�be�happy�to�work�with�the�County�to�develop�an�alternative�scope�and�budget�to�meet�the�County’s�needs�and�expectations.

TABLE 1 COST ESTIMATE BY TASK

PHASE / TASK FEES EXPENSES TOTAL

Phase 1. Assessment and Proposed Revisions

1. Kick-off meeting; compile / review documents $5,760 $- $5,760

2. Meet with Advisory Committee; refine priorities and recommendations $7,680 $700 $8,380

3. Present to Board $2,400 $350 $2,750

Phase 2. Iterative Drafting

1. Draft code $16,320 $ - $16,320

2. Present code for review by Advisory Committee; update code $11,520 $700 $12,220

Phase 3. Adoption and Publication

1. Two presentations to the Board, with revisions between presentations $7,680 $700 $7,880

TOTAL $51,360 $2,450 $53,810

References

rita Mcconnell, aicPDeputy�Director�of�Planning�and�DevelopmentCity�of�Centennial,�Colorado13133�East�Arapahoe�RoadCentennial,�CO��80111T:�(303)�754-3316F:�(720)�[email protected]

craig Phillips, aicPFormer�Planning�DirectorCity�of�Valparaiso,�IndianaC:�(219)�405-3708

scott clarkDirector�of�Community�DevelopmentKootenai�County,�Idaho451�Government�WayCoeur�d’Alene,�Idaho�83816-9000T:�(208)�446-1040F:�(208)�[email protected]

Greg hochDirector�of�Planning�and�Community�DevelopmentCity�of�Durango,�Colorado949�East�Second�AvenueDurango,�CO��81301T:�(970)�375-4850F:�(970)�[email protected]

Page 26: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

RESUME FOR

LAMONT PLANNING SERVICES, LLC

Page 27: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Leslie Lamont, AICP 725 Melissa Lane

Carbondale, Colorado 81623

970.963.8434

SUMMARY

Leslie Lamont has been doing general land use planning work throughout

the Roaring Fork Valley for the last 17 years. She began her own planning

consulting service in 2003. Prior to starting her own firm Leslie was a

principal planner for Otak, Inc. for two years. Before Otak, Leslie was a

County Commissioner for Pitkin County. For five years Leslie played a key

role in policy and budget decisions for the County. Before her election to the

Board of County Commissioners, Leslie was a project planner for six years as

well as Deputy Director of Community Development for the City of Aspen

and a caseload planner for the Boston Redevelopment Authority for three

years.

SELECTED PROJECT EXPERIENCE

Comprehensive Plan Update; Carbondale, Colorado

Community Outreach – as a local sub consultant, Leslie coordinates

community meetings linking with special interests groups, elected officials

and Town staff to ensure their perspectives are part of the Update process.

Because the consultant team is outside of the region, Leslie provides valuable

feedback to the team on issues and concerns “heard on the street” so the

team can strategically respond.

Roaring Fork Transportation Authority

Facilitator – Leslie facilitated the annual RFTA Board retreat which included

interviews of key staff and every Board member and alternate Board

member to prepare the retreat agenda.

Aspen Glen; Carbondale, Colorado

Design Review Administrator – Leslie manages the DRC process to ensure

that potential applicants construct a home that is consistent with the Design

Guidelines. Leslie works with a 5 member design committee and facilitates

development plan review between the committee and applicant and assures

that construction complies with approved plans.

Aspen Valley Hospital Master Facilities Plan; Aspen Colorado

Planning and Entitlement Process - Leslie, as a member of the

design/development team, prepared the land use application for the Planned

Unit Development conceptual and final land use review process. Leslie

worked closely with the team and hospital staff to ensure that the Master

Facilities Plan was consistent with community goals and the land use code.

Town Hall Facilitation; Town of Snowmass Village, Colorado

Facilitator – working with Town staff Leslie directed a Town Council

appointed sub-committee through a consensus based process to select a new

location for Town Hall. The sub-committee was charged with making a

recommendation to the Council on a preferred site in an extremely short

time-frame. The sub-committee successfully completed their task on-time.

Page 28: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Burlingame Ranch Affordable Housing Project; Aspen Colorado

Entitlement Process – Leslie is a member of the design team that won the

design competition to design/build a 236 unit affordable housing

development. Specifically, Leslie created the land use application submittal

and steered the application through the City of Aspen land use review

process.

Obermeyer Place Infill Project; Aspen, Colorado

Project Manager - Obermeyer selected Otak’s planning and urban design

team to facilitate the exciting opportunity to redevelop an industrial/service/

commercial district on the edge of Aspen’s commercial core. Leslie organized

a public/private partnership with the City of Aspen and the Obermeyer

Team in the course of developing the proposal. Responsibilities include

creation of a public process that engaged a citizen’s Task Force to create a

development from the “ground up.”

Granby Downtown Enhancement Plan; Granby, Colorado

Planner – the Town of Granby hired Otak to prepare a Downtown

Enhancement Plan. The Plan recommended physical and visual

improvements as well as business support strategies for the main street

corridor. Leslie coordinated and conducted a series of meetings designed to

gather public input for the Plan and solicit reactions to various design

concepts for the downtown. Leslie drafted significant sections of the Plan as

well as participated in a review of the draft with Town staff and elected

officials.

Aspen Area Community Plan; Aspen, Colorado

As a member of the City of Aspen Community Development Department,

Leslie worked on the production of the Aspen Area Community Plan for the

City and surrounding Pitkin County. Leslie facilitated a Housing Committee

that developed new guidelines for affordable housing and identified

potential locations for development. Seven years later as a County

Commissioner, Leslie was a member of an oversight committee that worked

with staff and interested citizens to update the Aspen Area Community Plan.

EDUCATION

Masters of Regional Planning Bachelor of Arts in Geography

University of North Carolina University of Oregon

REFERENCES

Cindy Houben – 970-925-4092 - personal

Ned Collum - 970-927-4780 – professional

Laura Kirk - 970-963-6520 – professional team member

Page 29: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

REQUIRED AFFIDAVITS

Page 30: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

NON-COLLUSION AFFIDAVIT

I hereby attest that I am the person responsible for the final decision as to the price(s) and amount of my firm's bid for this project. or the person with this responsibility has given me written authorization, attached hereto, to make the following statements on his/her behalf and on behalf of my firm:

I further attest that:

1. In arriving at the price(s) and amount of my firm's bid, my firm and I acted independently and did not engage in any consultation, communication or agreement having the purpose or effect of restricting competition in the bidding for this project.

2A. My firm and I have not disclosed any price(s) or amount(s) of my firm's bid to any other prime bidder or potential prime bidder, and my firm and I will not make any such disclosure prior to the bid opening.

2S. No other prime bidder or potential prime bidder has disclosed any price(s) or amount(s) of its bid to my firm or me.

3A. My firm and I have not attempted and will not attempt to solicit, cause or induce any other prime bidder or potential prime bidder to refrain from bidding for this project, to bid higher than my firm's bid, to bid lower than my firm's bid, or to submit any high, low or other form of a noncompetitive or comp'lementary bid for this project.

3S. No prime bidder or potential prime bidder has solidted my firm or me to refrain from bidding for this project. No prime bidder or potential prime bidder has solicited my firm or me to bid higher than another prime bid, to bid lower than another prime bid, or to submit any high, low or other form of a noncompetitive or complementary bid for this project.

4. My firm and I have not reached any understanding, made any agreement, or engaged in any consultation, communication or discussion concerning my firm's bidding higher than another prime bid, my firm's bidding lower than another prime bid, or my firm submitting any high, low, or other form of a noncompetitive or complementary bid for this project. My firm and I are submiUing my firm's bid in good faith and not pursuant to any such understanding, agreement, consultation, communication or discussion.

5. My firm has not afforded to award a subcontract, has not offered to award any other agreement pertaining to the purchase or sale of services or materials, and has not offered to pay money or anything else of value in consideration of a promise from another prime bidder or potential prime bidder to retrain from bidding, to bid higher than my firm, to bid lower than my firm, or to submit any high, low or other form of a noncompetitive or complementary bid for this project.

Page 1 of 2

ATIACHMENTC

Page 31: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

6. No prime bidder or potential prime bidder has offered to award my firm a subcontract, to award my firm any other agreement pertaining to the purchase or sale of services or materials, or to pay my firm money or anything else of value in consideration of a promise from my firm to refrain from bidding, to bid higher than another prime bid, to bid lower than another prime bid, or to submit any high, low or other form of a noncompetitive or complementary bid for this project.

7. I have made a diligent inquiry of all the members, officers, employees and agents of my firm with responsibilities relating to the preparation, approval or submission of my firm's bid for this project. I have been advised by each of them that he/she has not engaged in any communication, meeting, discussion, agreement, understanding or other conduct inconsistent with any of the statements and representations made in this affidavit.

8. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from Garfield County, of the true facts relating to the submission of bids for this project.

I DECLARE UNDER PENALTY OF PIERJURY THAT THE FOREGOING STATEMENTS AND ATTESTATIONS ARE TRUE, ACCURATE AND COMPLETE.

~J~ I ' 1I 5"r {a( (il ~O(ahve mpany Name)

DATE: ")15 110\'"& By: , I

Name: :JdJA Me5Se~-e(" Title: Ac;50c; $I+~ -,'" - ('\1\( .. ~e

(Please type name of 2nd Contractor's Firm or Company Name, if Joint Venture)

DATE:_______ By:Name:______________________________

Title:

SUBSCRIBED AND S~!!-N TO b7!Jlre me in the County of },JJ,.,p, State of Colorado, this day of JYrrch ,20Q. V7J~

My commission expires on: fa/£>j/d..

Note: This document must be signed in ink. . MARINA M. AlGlEN •~t2b NOTARY PUBUC(j)

• JEfFERSON COUNTY, COlORAOO Page 2 of 2

MY COMM. EXPIRES 06/2512012

ATIACHMENTC

Page 32: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

BOARD OF COUNTY COMMISSIONERS OF GARFIELD COUNTY CERTIFI,CATION AND AFFIDAVIT REGARDING ILLEGAL ALIENS

The Contractor, whose name and signature appears below, certifies and agrees as follows:

1. The Contractor shaU comply with the provisions of C.RS. 8-17.5-101 et seq. The Contractor shall not knowingly employ or contract with an illegal alien to perform work for the Soard of County Commissioners of Garfield County, Colorado (ASOCC@) or enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien.

2. The Contractor represents, warrants, and agrees that it has confirmed the employment eligibility of all employees who are newly hired for employment to perform work under this public contract for services through participation in either the E-Verify Program or the Department Program and otherwise shall comply with the requirements of C.RS. 8-17.5-1 02(2)(b).

3. The Contractor shall comply with all reasonable requests made in the course of an investigation under C.RS. 8-17.5-102 by the Colorado Department of Labor and Employment. If the Contractor fails to comply with any requirement of this prOVision or C.RS. 8-17.5-101 et seq., the SOCC may terminate work for breach and the Contractor shan be liable for actual and consequential' damages to the State.

4. If the Contractor is a sole proprietor, the undersigned hereby swears or affirms under penalty of perjury under the laws of the State of Colorado that (check one):

I am a United States citizen, or

I am a Permanent Resident of the United States, or

I am lawfully present in the United States pursuant to Federal law.

5. I understand that this sworn statement is required by law because I am a sole proprietor entering into a contract to perform work for the SOCC. I understand that state I.aw requires me to provide proof that I am lawfuUy present in the United States prior to starting work for the SOCC. I further acknowledge that I will comply with the requirements of C.R.S. 24-76.5-101 et seq. and will produce the required form of identification prior to starting work.

6. I acknowledge that making a false, fictitious, or fraudulent statement or representation in this sworn affidavit is punishable under the criminal laws of Colorado as perjury in the second degree under C.RS. 18-8-503.

Page 1 of2

Page 33: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

CERTIFIED and AGREED to this 6 qt

day of

CONTRACTOR:

FEIN or Social Security Number

. MARINA M. ~LGIEN _ '" NOTARY PUBUC ••~. JEFFERSON COUNlY, COLORADO

MY COMM. EXPIRES 0612512012

Page 2 of2

Page 34: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

Garfield County

STATEMENT OF QUALIFICATIONS (WITH PRICE LIST)

SOLICITATION

Garfield County Solicitation Number: .:..;R:.:,.F..:..P_-G.:.:C:....-B:.:...P....:-O:..1:....-..:..12=-__________ CONSULTING SERVICES FOR THE FACILITATION AND DRAFTING OF A REVISED LAND USE CODE

COMPANY INFORMATION

Kendig Keast CollaborativeLegal Name of Company:

Trade Name, if any, of Company: ___________________

(Colorado Office): 6860 South Yosemite Ct., Ste, 2000Street Address:

Centennial, CO 80112City, State & Zip Code:

Principal Owner/Officer Name: __Br_et_K_ea_s_t,A_IC_P_'_T_O_dd_M_e_ss_e................ ________nger, A IC_P

President (Bret) Associate-in-Charge (Todd)Title:

Federal Employer Iidentification Number: __36_-3_2_164_2_1____________ _

(303) 577-7466Telephone Number:

(720) 255-2837Facsimile Number:

Company E-mail Address: __in_fo_@_ke_n_dig_k_ea_st_ ________________,co_m

Todd Messenger, AICPContact:

[email protected] E-mail Address:

Page 1 of 3

Page 35: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

COMPANY HISTORY

If a Colorado corporation or limited liability company, is the company in "good standing." with the Colorado Secretary of State? yes no (N/A)

If a foreign corporation or limited liability company, is the foreign corporation or I'imited liability company registered to do business in Colorado and in "good standing" with the Colorado Secretary of State? x yes no

How long has the company been in business in Colorado? __5_ years.

How long has the company been in business in Garfield County? __O_years.

Has the company, or any officer or director acting in an official capacity, ever been successfully sued? yes x no If yes, complete the chart below, and any additional pages if necessary:

Court Case Number Year Judgment Amount

Has the company, or any of its officers or directors, ever been disbarred, suspended, or disqualified from any public procurement? yes x no. if yes, complete the chart below, and any additional pages if necessary:

Agency Agency Number Year Length of Disqualification

Has the company, or any of its officers or directors, ever been involved in a voluntary or involuntary bankruptcy proceeding? yes x no If yes, complete the chart below, and any additional pages if necessary:

Court Case Number Year Judgment Amount

If required for a project, has the company ever been denied bonding? ___ yes _X__ no

If yes, complete the chart below, and any additional, pages if necessary:

Company Name Type of Bond Year Stated Reason

(Attach additional sheets if needed to fully respond to the above questions.)

Page 2 of 3

Page 36: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

PREVIOUS WORK EXPERIENCE

List the dollar amount of the smallest and largest projects your company has worked on as a prime contractor: Kendig Keast Collaborative projects range from on-call agreements for small projects «$10,000)

to not-to-exceed contracts in excess of $300,000, depending upon the scope and scale of services

List the do/!lar amount of the smallest and i:argest projects your company has worked on as a su bcontractor: When Kendig Keast Collaborative serves as a subcontractor, its fees have generally been in the range

of $10,000 to $75,000, depel1ding upon the scope and scale of services

Has your company ever performed services similar to the services that are the subject of this RFQ for Garfield County? yes x no

If yes, what was the total dollar amount of that work in a 12 month period? N/A

Has your company ever performed work for Garfield County in the last five years as either a prime contractor or subcontractor? yes x no

If yes, what was/were the projects (attach additional sheets if necessary)?

Department/Elected Office Project Year

REFERENCES

Name Tele~hone Number ComRan~ Name Relationshi~ Rita McConnell , AICP (303) 754-~}16 Cit~ of Centennial, CO client community

Name Tele~hone Number Com~an~ Name Relationshi~ Craig Phillips (2191405-3708 Cit~ of Valparaiso, IN (formerl~) client community

Name TeleQhone Number ComQany Name RelationshiQ Scott Clark (208) 446-1040 Kootenai County, ID client community

CERTIFICATION

The undersigned, as an authorized officer/owner of the company, states that the undersigned has actual authority to sign this Statement of Qualifications; and, to the best of my knowledge, information, and belief, the information submitted in this Statement of Qualifications is true and accurate as of the date of this Statement of QuaHfications is submitted.

KENDIG KEAST C~LA80RATIVEBy: Signature: Printed Name: Todd Messenger

Legal Title: Associate-in-Charge

Page 3 of 3

Page 37: Kendig Keast Collaborative (“KKC”) is pleased to submit the …garfield-county.granicus.com/DocumentViewer.php?file=... · 2012-03-06 · provide sound advice to our clients.

6860 S. Yosemite Ct., Ste. 2000 | Centennial, CO 80112

Phone : 303.577.7466 Fax : 720.255.2837

Performance Concepts in Planning

www.kendigkeast.com

B A T O N R O U G E , L A | C E N T E N N I A L , C O | C H I C A G O , I L | E L K G R O V E , C A | S T U R G E O N B A Y , W I | S U G A R L A N D , T X

March 6, 2012

Garfield County Procurement Department

Attn: Jamaica Watts

108 8th Street, Ste. 403

Glenwood Springs, CO 81601

RE: Request for Proposals RFP-GC-BP-01-02

Consulting Services for the Facilitation and Drafting of a Revised Land Use Code

Statement Regarding Standard Professional Services Contract

Dear Jamaica:

Pursuant to the RFP requirements, Kendig Keast Collaborative (“KKC”) will agree to the terms of the

Garfield County standard professional services contract.

Sincerely,

KENDIG KEAST COLLABORATIVE

Todd Messenger, AICP

Associate-in-Charge / Code Practice Leader

Kendig Keast Collaborative