3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Current State • Two stand alone facilities -
without renewal, the existing facilities would not last for the next generation.
Proposed Actions
• KTHR, the MOH and the Kelvington and area steering committee agree to pursue a project to add the hospital and primary health care clinic to the existing LTC, with renovations to LTC
• Project is approved for a Lean 3P process for March 2013
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Project Metric
• $15M Project Budget
Future State
• Pursue “right size” integrated services to include Acute Care, ER/outpatient, Lab and Diagnostics, Support Services, Primary Health Care Clinic
• Create efficiencies to find savings to reinvest into significant LTC renovations.
• Together with patients, providers and community, design a patient-centred facility that will provide the flexibility to meet the needs of Kelvington and area residents into the future.
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better health• Family Focus
• Long Term Care Connection
• Health and Wellness Education
• Patients & Families at the Centre of the Process
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better teamsDesign:
• facilitates communication
• improves flows
• breaks down professional barriers
• improves patient care
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better care• Design focuses on the
real physical needs for the spaces
• Design will allow providers to spend more time with patients
• Integration of services and providers will improve the care for the Patients and Residents
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
7 Ways
better health• Long Term Care
Connection
better teams• Integrated Team with LTC
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
7 Ways – Option 3
better health• Long Term Care
Connection
better teams• Integrated Team with LTC
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better health
better teams
better care
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better health• Health Education and
Wellness
• Family Focus
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better teams• Facilitates
communication
• Breaks down professional barriers
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better teams• Improves Flows
• Improves Patient Care
• Release Time to Care
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better care• Design focuses on the real
physical needs for the spaces
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better care• Design will allow
providers to spend more time with patients
• Integration of services and providers will improve the care for the Patients and Residents
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
30/60 Day Work
7Flows / 7Wastes
• Trace all 7 Flows• Patients• Family• Clinicians• Medication• Supplies• Equipment• Information
• Evaluate the Waste• Edit the Design
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
30/60 Day Work
7Flows / 7Wastes
• Evaluate the Waste• Edit the Design
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
30/60 Day Work
7Flows / 7Wastes
• 30/60/90 Day work included the design of 3P Sub-teams in a 2 day event focussed on the 7 Flow/7Wastes.
• This event design, developed by our team has become the standard work for our 30/60/90 Day work.
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Results
better value• Primary Care Clinic
rooms 40% larger than typical for Collaborative Primary Care
• Staff flows greatly reduced.
• The 12hr Nurse shift reduced travel distance by 18%, and the 8 hour nurse reduced travel by 55% for a savings of over 4700 steps in daily
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Results
better value• Construction budget for
addition from $12.5M to $9.1M
• Capital dollars freed for desperately needed renovations to the existing LTC facility
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better health
better teams
better care
better value