Keikaku Hozen Master Plan
Transcript of Keikaku Hozen Master Plan
Keikaku Hozen Master Plan
Step Description Year
1st 2nd 3rd 4th
1 Guidance & Support to Jishu Hozen
2 Evaluating Equipment & Grasping present Status
3 Carrying out Zero Failure activities
4 Development of Maint. Information mgt. system
5 Establishing predictive maintenance methods
6 Establishing Lubrication management activities
7 Establishing Spare parts management activities
8 Enhancing maintenance technology &skills
9 Practicing Self management
10 Evaluation of Planned Maintenance
Start End Plan continues
Detailed Plan : Step-1Step-1 : Guidance & Support to JH activities Year
1st 2nd 3rd 4th
1 Preparing Line Diagrams for training Operators
2 Training operators for finding abnormalities
3 Gathering Past Failures M/C wise, S/A wise, Part wise
4 Study of Past Failures and Countermeasures
5 Removing the Fugai which operator cannot remove.
6 Taking countermeasures for contamination sources and
hard to access areas.
7 Helping in making cleaning, inspection and lubrication standards
8 Implementing visual controls in the machines to make
inspection easy and quick.
9 Preparing basic training material for different Equipment
categories
10 Training to Circle leaders about machine functions & causes
of past failures
Detailed Plan : Step-2
Step-2 :
Evaluate Equipment and Grasp present Status
Year
1St 2nd 3rd 4th
1 Create and update equipment ledger
2 Decide Equipment ranking evaluation criteria.
3 Rank all Equipments based on criticality.
4 Decide Equipment Failure ranking criteria
5 Rank all past and present failures based on criticality
6 Establish Bench mark and Targets
7 Select appropriate maintenance method
8 Review & revise existing maintenance system
9 Draft the inspection and maintenance standard procedures
10 Select parts and members for TBM activities
Detailed Plan : Step-3Step-3 : Zero failure activities Year
1St 2nd 3rd 4th
1 Training Staff / Technicians to do why – Why analysis
2 Restoring unattended deterioration & Elimination of forced deterioration
3 Carrying out Why Ok analysis to check equipment health
4 Analyzing past failures M/c wise, Sub-Assembly wise, ,
part wise, root cause wise and taking preventive actions
5 Identification & Elimination of week designs / overloading
6 Analyzing current failures & preventing re-occurrences
7 Eliminating Environmental deterioration
8 Reducing / Eliminating manual work
9 Standardizing TBM calendar & Maintenance schedule
10 Horizontal replication of of Kaizen ideas
Train
Detailed Plan : Step-4
Step-4 : Develop & Implement maintenance information management system. (CMMS)
Year
1St 2nd 3rd 4th
1 Build failure data management system.
2 Build & implement equipment maintenance
Management system
3 Build & implement System for spare parts
management.
4 System for maintenance budget management.
5 System for Lubrication management.
6 System for condition based maintenance
management
Detailed Plan : Step-5
Step-5 : Establish Predictive maintenance system.
1st Year 2nd Year 3rd Year 4th Year
1 Study the need for predictive maintenance
& Learn equipment diagnostic techniques
2 Identify components to be diagnosed
based on criticality Ranking of
components
3 Find out various suitable diagnostic
techniques.
4 Prepare CBM calendar and schedule /
Implement CBM
5 Find out latest technological development
in the field of CBM
6 Research & development of in-house
diagnostic techniques.
Detailed Plan : Step-6
Step-6 : Lubrication management activities
1st Year 2nd Year 3rd Year 4th Year
1 Review & revise existing Lubrication
management system.
2 Establish & implement lubrication
management standards.
3 Investigate & integrate various type of
lubricants.
4 Promote visual control systems & easy to
lubricate devices to eliminate failures by
oil shortage.
5 Systematize lube. Oil purchasing & used
oil disposal management.
Detailed Plan : Step-7Step-7 :
Spare Parts Management Activities.
1st
Year
2nd
Year
3rd
Year
4th
Year
1 Arranging and reviewing of spare part drawings and details
2 Evaluate existing spare parts management system.
3 Establishing spare parts management criteria
(What item, What quantity)
4 Establish spare parts control standards
5 Establish replacement parts management
6 Systemize purchasing system
7 Computerize spare part management system
8 Spare parts inventory & cost control
Detailed Plan : Step-8Step-8 : Enhance Maintenance Technology and Skills
1st Year 2nd Year 3rd Year 4th Year
1 Training need identification
2 Prepare Training Materials
3 Training for upgrading maintenance
Skill & knowledge
4 Training to enhance maint. Technology
Step 9 is Self Audit: make your own audit points based on the rest of the 8 Steps. (Activities to be done in 8 steps) Step 10 is Evaluation: Checking performance Indicators such as Equipment failure No., MTBF, MTTR, Maintenance Cost, No.of men trained. Etc.