PRESS EQUIPMENT
Regular equipment maintenance is something that everycompany knows it should do, but which few follow through on. Studies indicate that 70 to 85 percent of equipment failures are self-induced, meaning their cause can be traced back to improper maintenance practices.
Our COE-Certified Inspection and Maintenance Programmakes it easy for you to keep your equipment running at its best. With a simple call to our service team, we send a technician to your facility to thoroughly inspect your existing COE coil processing equipment using our COE-Certified 210-point inspection checklist.
Don’t wait until you find yourself in a reactive situation. No company can afford downtime or to have equipment running at less than full productivity. Contact COE Press Equipment today.
For more information on the COE-Certified Inspection and Maintenance Program, call 586-979-4400 and ask for the Service Department or email [email protected]
Keep Equipment Running at Optimal Productivity
COE-Certified
COE-Certified COE-Certified
Who better to keep your coil processingequipment functioning at its best than thepeople who designed and built it?
40549 BrentwoodSterling Heights, MI 48310 Tel (586) 979-4400Fax (586) 979-2970Email [email protected]
COE’S EXCLUSIVE 3-2-1 WARRANTY All COE Equipment is backed by the COE 3-2-1 Warranty – three year limited coverage on components manufactured by COE Press Equipment; two year limited coverage on mechanical components installed by COE Press Equipment; and one year full coverage on the system complete.
At COE Press Equipment, we believe that there is always a better way. Our goal is to make your operations run smoothly and profitably. We apply our engineering knowledge, materials expertise, and industry experience to consistently provide solutions that address your manufacturing challenges and simplify your plant floor operations.
PRESS EQUIPMENT
COE-Certified COE-Certified
INSPECTION AND MAINTENANCE PROGRAM During the COE-Certified inspection, we check all mechanical, electrical and controls components of the coil system from both a visual and operational standpoint. We then document the condition of each critical component in your equipment and fix any immediate issues.
After our inspection visit, COE presents you with a field inspection report that delivers the following information:1. Repairs that were performed on-site during the inspection.2. Actions that should be taken to prevent problems
in the future.3. Upgrades that can be provided to improve your productivity.
Proper maintenance can add years to equipment life, helping to avoid downtime or expensive capital outlay should you have to replace a machine. When you consider these costs, it’s clear that preventative maintenance from COE can provide significant ROI.
On-site RepairsRegular maintenance prevents costly downtime and adds life to your equipment.
Recommended ActionsBy our taking preventative action recommendations, you can improve equipment performance and avoid unplanned downtime.
Productivity GainsSimple upgrades, such as retrofitting your system with COE’s ServoMaster Controller, can improve your coil line productivity.
FIELD INSPECTION REPORT
COE Press Equipment Corp. | 40549 Brentwood, Sterling Heights, MI 48310 | Tel (586) 979-4400 | Fax (586) 979-2970 | Email [email protected] | www.cpec.com
CUSTOMER INFORMATION
Inspection Date
Customer Name
Location
COE Job #
MODEL DESCRIPTION
SERIAL NUMBER
CPRF-660 - 60" Servo Roll Feed
13202-1
CPDTT-6020 - 60" Dual Threading Table
13202-3
CPPS-PO-350-60 - 60" Power Straightener
13202-4
CPR-PO-50060 - 60" Coil Reel w/Coil Car
13202-5
MODEL #:
1. Edge guide rollers are worn with grooves present. We removed the bolts and washers cleaned the area of debris,
and reinstalled the rollers so the lower edge where material rides is clean and smooth. One of the bolts was
bent so we replaced left front guide roller bolt.
2. The entrance and exit edge guides were “re-timed” after the repairs were made.
3. Replaced four missing bolts on top plate of roll feed unit. We also noted that the top plate is warped on the
right side. Upon retightening the top plate pulled down flush.
4. Main servo feed drive belt was loose. Adjusted tension to proper setting.
5. Adjusted offset in BG2 Controller to .0000 from .0009.
6. Filter for control cabinet fan very dirty. Removed and cleaned filter and reinstalled. This needs to be checked
and cleaned on a monthly basis so the electrical system doesn’t overheat.
MODEL #:
1. Trabon unit line was broken and it was pumping grease on the floor inside the machine base. Repaired by
maintenance team however lines need to be bled of air to assure good grease flow.
SECTION ONE: On-site work performed
A general inspection of this line was performed and the following repairs were made onsite:
May 8, 2013
13202
Lakepark Industries
Greenwich, Ohio
FIELD INSPECTION REPORT
COE Press Equipment Corp. | 40549 Brentwood, Sterling Heights, MI 48310 | Tel (586) 979-4400 | Fax (586) 979-2970 | Email [email protected] | www.cpec.com
CUSTOMER INFORMATION
Inspection Date
Customer Name
Location
COE Job #
MODEL DESCRIPTION
SERIAL NUMBER
CPRF-660 - 60" Servo Roll Feed
13202-1
CPDTT-6020 - 60" Dual Threading Table
13202-3
CPPS-PO-350-60 - 60" Power Straightener
13202-4
CPR-PO-50060 - 60" Coil Reel w/Coil Car
13202-5
MODEL #:
1. Edge guide rollers are worn with grooves present. We removed the bolts and washers cleaned the area of debris,
and reinstalled the rollers so the lower edge where material rides is clean and smooth. One of the bolts was
bent so we replaced left front guide roller bolt.
2. The entrance and exit edge guides were “re-timed” after the repairs were made.
3. Replaced four missing bolts on top plate of roll feed unit. We also noted that the top plate is warped on the
right side. Upon retightening the top plate pulled down flush.
4. Main servo feed drive belt was loose. Adjusted tension to proper setting.
5. Adjusted offset in BG2 Controller to .0000 from .0009.
6. Filter for control cabinet fan very dirty. Removed and cleaned filter and reinstalled. This needs to be checked
and cleaned on a monthly basis so the electrical system doesn’t overheat.
MODEL #:
1. Trabon unit line was broken and it was pumping grease on the floor inside the machine base. Repaired by
maintenance team however lines need to be bled of air to assure good grease flow.
SECTION ONE: On-site work performed
A general inspection of this line was performed and the following repairs were made onsite:
May 8, 2013
13202
Lakepark Industries
Greenwich, Ohio
FIELD INSPECTION REPORT
COE Press Equipment Corp. | 40549 Brentwood, Sterling Heights, MI 48310 | Tel (586) 979-4400 | Fax (586) 979-2970 | Email [email protected] | www.cpec.com
CUSTOMER INFORMATION
Inspection Date
Customer Name
Location
COE Job #
MODEL DESCRIPTION
SERIAL NUMBER
CPRF-660 - 60" Servo Roll Feed
13202-1
CPDTT-6020 - 60" Dual Threading Table
13202-3
CPPS-PO-350-60 - 60" Power Straightener
13202-4
CPR-PO-50060 - 60" Coil Reel w/Coil Car
13202-5
MODEL #:
1. Edge guide rollers are worn with grooves present. We removed the bolts and washers cleaned the area of debris,
and reinstalled the rollers so the lower edge where material rides is clean and smooth. One of the bolts was
bent so we replaced left front guide roller bolt.
2. The entrance and exit edge guides were “re-timed” after the repairs were made.
3. Replaced four missing bolts on top plate of roll feed unit. We also noted that the top plate is warped on the
right side. Upon retightening the top plate pulled down flush.
4. Main servo feed drive belt was loose. Adjusted tension to proper setting.
5. Adjusted offset in BG2 Controller to .0000 from .0009.
6. Filter for control cabinet fan very dirty. Removed and cleaned filter and reinstalled. This needs to be checked
and cleaned on a monthly basis so the electrical system doesn’t overheat.
MODEL #:
1. Trabon unit line was broken and it was pumping grease on the floor inside the machine base. Repaired by
maintenance team however lines need to be bled of air to assure good grease flow.
SECTION ONE: On-site work performed
A general inspection of this line was performed and the following repairs were made onsite:
May 8, 2013
13202
Lakepark Industries
Greenwich, Ohio
Complete ReportingWe provide a COE-Certified report of work done, actions that should be taken, and recommended upgrades to improve productivity.