Export Control Processes For Sponsored Projects. Proposal Phase.
Kee Safety Export Projects
-
Upload
leonie-powell -
Category
Sales
-
view
410 -
download
0
Transcript of Kee Safety Export Projects
Sample of Kee Safety Export
Projects
PROJECTS
Kee Guard - Free Standing Rail
Project: MASDAR City Location: Abu Dhabi, UAE Year: 2010 Contractor: Al Ahmadiah Hip Hing Supplied: 1km Kee Guard handrails
Kee Guard - Free Standing Rail
Project: Al Zeina, Raha Beach Location: Abu Dhabi, UAE Year: 2010 / 2011 Contractor: Laing O’Rourke Supplied: 3.1km Kee Guard handrails
Kee Guard - Free Standing Rail
Project: ICLDC Diabetes Centre Tawam Hospital Location: Al Ain, UAE Year: 2011 Contractor: Brookfield Multiplex Supplied: 200m Kee Guard handrails
Kee Guard - Free Standing Rail
Project: Morgan Stanley Childrens Hospital Location: Harlem, New York Year: 2015 Supplied: KeeGuard
Kee Guard - Free Standing Rail
Project: Kellogs HQ Dublin Location: Dublin, Ireland Year: January 2016 Supplied: KeeGuard
Kee Gate - Fall Protection
Project: Kellogs HQ Dublin Location: Dublin, Ireland Year: January 2016 Supplied: Kee Gate
Kee Gate – Fall Protection
Contractor: Semco Maritime Location: Denmark Year: 2015 Supplied: 18 No. Self – Closing Safety Gates Info: Gates used to secure access to specific platforms used to transport wind turbine propeller / blades via road
Kee Line – Fall Protection
Project: Al Zeina, Raha Beach Location: Abu Dhabi, UAE Year: 2010 / 2011 Contractor: Laing O’Rourke Supplied: 6.4km Kee Line systems
Kee Line – Fall Protection
Project: Allahamah STP Location: Al Ain, UAE Year: 2012 Sub-Contractor: Kee Safety LLC Supplied: Kee Line system
Kee Line – Fall Protection
Project: Al Wathba STP Location: Abu Dhabi, UAE Year: 2012 Sub-Contractor: Kee Safety LLC Supplied: 2 x Kee Line systems
Kee Line – Fall Protection
Project: Sheraton Park Hotel Qatar Location: Doha - Qatar Year: 2015 Supplied: Kee Line
Kee Line layout has been designed in fall restraint due to the low ground clearance
and close proximity to the edge of the roof.
1m restraint lanyards supplied.
Project information
Two additional S5 clamps were added to the start and end baseplates to achieve a Factor of Safety of 3 as required by the consultant.
The roof slope is 11º
Project information
Kee Line – Fall Protection
Customer: Faurecia Location: Germany Year: 2015 Supplied: 5 No. KeeLine Systems
Kee Line – Fall Protection
Customer: MRT Malaysia Location: Kuala Lumpur, Malaysia Year: 2015 Supplied: Kee Line- 2 Lines of 120m
Info: Powder coated to match roof surface finish
Kee Walk – Fall Protection
Customer: Faurecia Location: Germany Year: 2015 Supplied: 2 No. KeeWalk Systems
Kee Walk – Fall Protection
Project: Vasilikos Power Station Location: Cyprus Year: 2012 Contractor: Iacovou Group Supplied: 776m Kee Line systems 264m Kee Line Overhead 406m Kee Walk
Kee Walk – Fall Protection
Project: Alte Oper Location: Frankfurt am
Main Year: 2014 Supplied: 23 Meters Kee Walk
Kee Walk – Fall Protection
Project: Ballymena Health Centre Location: Co Antrim, Northern Ireland Year: 20145 Supplied: Kee Walk & Access Ladders
Initial Access Design
Kee Walk® Design
Kee Walk® EN 516:2006 Compliant
Safe, Anti-slip, Level Walkway
Kee Walk & Kee Guard TopFix – Fall
Protection
Project: Keppel Merlimau Cogen II Location: Singapore Year: 2012 Contractor: Alstom Supplied: 350m Kee Guard TopFix 350m Kee Walk
Kee Guard Premium– Fall Protection
Project: REC Solar Module Location: Singapore Year: 2014 Supplied: 274m Kee Guard systems
Kee Dome– Fall Protection
Project: Alcoa Location: France Year: 2013 Contractor: Kee Safety Supplied: 40 pcs Kee Dome
Kee I-Bolt
Project: Le Meridien Hotel Al Aqa Beach Location: Fujairah, UAE Year: 2010 / 2011 Client: Meridien Group Supplied: 31 Ringanka I-Bolts
Kee Lite – Aluminium Handrails
Project: Al Wathba Sewage Treatment Plant Location: Abu Dhabi, UAE Year: 2010 / 2011 Contractor: Six Construct Supplied: 5.9km handrails Staircase railings Access Gates
Kee Lite – Aluminium Handrails
Project: Allahamah Sewage Treatment Plant Location: Al Ain, UAE Year: 2010 / 2011 Contractor: Six Construct Supplied: 4.1km handrails Staircase railings Access Gates
Kee Lite – Aluminium Handrails
Project: Dibba STP Location: Sharjah, UAE Year: 2009 / 2010 Sub-Contractor: Corodex Supplied: 300m handrails Staircase railings Access Gates
Kee Lite – Aluminium Handrails
Project: Fujairah Sewage Treatment Plant Location: Fujairah, UAE Year: 2009 Contractor: Passavant Roediger Supplied: 1km handrails Staircase railings
Kee Lite – Aluminium Handrails
Project: Ras Abu Fontas A1 Desalination Plant Location: Doha, Qatar Year: 2010 Contractor: Fisia Italimpianti Supplied: 200m handrails Staircase railings
Kee Lite – Aluminium Handrails
Project: PGA Arena Stadium Location: Poland Year: June 2011 Contractor: BS Aspio Supplied: 1500 Meters KeeLite Powder Coated
Kee Klamp – Galvanised Handrails
Project: Jumeirah Palm Water Cooling Plant Location: Dubai, UAE Year: 2009 Contractor: Shinryo, Japan Supplied: 500m handrails Staircase railings
Kee Klamp – Galvanised Handrails
Project: UK Ministry of Defence Location: Musanah, Oman Year: 2010 / 2011 Contractor: Douglas OHI Supplied: 600m handrails 5 Staircases
Kee Klamp – Galvanised Handrails
Project: GTC177 Location: Doha, Qatar Year: 2010 / 2011 Contractor: Qatar Building Company Supplied: Handrails Staircase Handrails Chamber Covers
Kee Klamp – Galvanised Handrails
Project: Pump House Location: Doha, Qatar Year: 2010 Client: Kahramma Supplied: Handrails Staircase Handrails
Kee Klamp – Window Displays
Project: Window Displays Location: Singapore Year: 2015 Client: Vision Display Supplied: Kee Klamp
Kee Klamp – Bespoke Access Platforms
Project: Michelin Location: Paris, France Year: 2014 Client: Factory Supplied: Bespoke Access Platforms
Transnet - South Africa
Mobile Access Platforms
Transnet - South Africa
Mobile Access Platforms
Reading Busses - UK
Mobile Access Platforms
Reading Busses - UK
Mobile Access Platforms
Volkeswagen - UK
3 Day turnaround
Mobile Access Platforms
Tegral - Ireland
Mobile Access Platforms
Mercedes - Germany
Before
After
Static Access Platforms
Southfields College - UK
Static Access Platforms
Kee Klamp – Bespoke Step-Overs
Project: Asquith House Apartment Development Location: Leeds, UK Year: 2015 Client: phd1 Construction Supplied: Bespoke Step-Overs
Beam Clamp – Safe Connections
Project: Arenco Tower Sheikh Zayed Road Location: Dubai, UAE Year: 2009 Client: Private Supplied: Beamclamp Connections for Cradle workers & Cladding Hoist
Beam Clamp – Safe Connections
Project: BeamClamp Location: Russia Year: 2015 Client: Private Supplied: Beamclamp Connections
Box Bolt – Blind Steelwork Fixing
Project: Al Zeina, Raha Beach Location: Abu Dhabi, UAE Year: 2011 Contractor: Laing O’Rourke Supplied: 1,000+ Box Bolts for Cladding fixing
Kee Safety Export
Cradley Business Park
Overend Road
Cradley Heath, B64 7DW, UK
Tel: +44 (0) 1384 632 398
Fax: +44 (0) 1384 632 399
E-mail: [email protected]
Website: www.keesafety.co.uk
Contact: Leonie Powell/ E-Mail: [email protected]