B2
1 CHIVOAT JUTE MILL GHAT 22202530.102 BALUR GHAT 34585660.193 KALI BARI GHAT 12643068.934 BURNING GHAT 10800747.575 JHAWTALA GHAT 29105409.716 IRRIGATION GHAT 16465077.677 THANA GHAT 41217469.908 SHIBA TAMPLE GHAT 22778157.289 ALBIAN JUTE MILL GHAT 16151497.0910 ASOKE CLUB GHAT 21253945.6311 ORIENT MORE GHAT 13478698.06
O&M cost for 6 Months 2212199.10242894461.24
COST OF BUDGE BUDGE GHATBUDGE BUDGE
S No Name of Ghats (TENDER COST)
Anexure-1
1.0 River Side Sheet Pile & Concrete Block Pitching Annexure 1A -
2.0 Renovation of Ghat Annexure 1B -
3.0 Electric Post Annexure 1C 10,00,119.77
4.0 Construction of Footpath & Platfrom 499.5 sqm 2,767.16 Annexure 12 13,82,195.00
5.0 Renovation of Road 165 sqm 586.38 Annexure 23 96,751.88
6.0 Sitting Arrangement 5 Nos. 46,547.98 Annexure15 2,32,739.91
7.0 Proposed Gate 1 Nos. 53,184.07 Annexure 22A 53,184.07
8.0 Side Railing 43 M 2,766.66 Annexure 16 1,18,966.27
9.0 Side Wall 50 M 6,572.83 Annexure 17 3,28,641.58
10.0 Water connection 1 nos 25,147.76 Annexure 13&14 25,147.76
11.0 Landscaping 210 sqm 2,167.00 Annexure 18 4,55,070.00
12.0 Proposed change room 1 nos 1,36,947.32 Annexure 20 1,36,947.32
13.0 Construction of toilet 1 nos 12,23,711.16 Annexure 19 12,23,711.16
14.0 Coffer Dam for Construction 10 M 27,481.66 Annexure 21 2,74,816.55
53,28,291.25
CHIVOT JUTE MILL GHAT
Sub Total
Ammount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
1.1
Annexure 1A
BILL OF QUANTITIES
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 126.02 83,950.00 MT Analysis rate 1,05,79,683.32
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and
including carriage of sheet piles up-to work site by trucks,
carts and head load etc. as per direction of the Engineer-in-
charge but the excluding the cost of sheet piles.
1023.75 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl.
No.-2.5, P-58
10,71,259.31
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured
at a height of 1m above ground level and removal of rubbish
upto a distance of 50 m outside the periphery of the area
cleared.
3000.00 642.00 745.94100s
qm
Refer DSR'2014,
Sl. No.-2.31, P-7522,378.19
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
150.00 155.60 180.79 cumRefer DSR'2014,
Sl. No.-2.6, P-7227,118.75
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete
75.00 910.25 1057.62 cumRefer DSR'2014,
Sl. No.-2.27, P-7579,321.46
150.00 377.00 sqm 56,550.00
152.52 377.00 sqm 57,500.04
3.0 Sub-Head-Concrete Work 0.00
CHIVOT JUTE MILL GHAT
Item
No.Description
Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
SOR-2015, PWD-
Govt of WB, Item
Annexure 1A
BILL OF QUANTITIES
CHIVOT JUTE MILL GHAT
Item
No.Description
Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to 1.0
M x 1.0 M with 37.5 mm size well gradeed stone aggregates
of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing ,
compacting and finishing surface of blocks with cement
mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks
should not be less than 25 mm, which subsequently is to be
filled up by packing 20 mm down stone chips, cost of witch is
included in the item.
256.41 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl.
No.-4.23, P-81
14,39,831.00
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete.284.90 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl.
No.-4.26, P-82
6,19,381.46
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm32.08 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
4,523.75
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
0.00
22.50 5,466.30 6351.29 cum 1,42,904.11
22.88 5,466.30 6351.29 cum 1,45,304.90
4.0 Sub-Head-Reinforced Concrete Work 0.00
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20 mm nominal size)
Refer DSR'2014,
Sl. No.-4.1.3, P-85
Annexure 1A
BILL OF QUANTITIES
CHIVOT JUTE MILL GHAT
Item
No.Description
Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
0.00
52.50 8634.05 10031.90 cum 5,26,674.89
22.88 8634.05 10031.90 cum 2,29,509.87
4.3Centering and shuttering including strutting, propping etc.
and removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.175.00 360.80 419.21 sqm
Refer DSR'2014,
Sl. No.-5.9.2, P-9773,362.37
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level.
. 0.00
4.4.1
Thermo-Mechanically Treated bars
5917.17 68.10 79.13 Kg
Refer DSR'2014,
Sl. No.-5.22.6, P-
99
4,68,198.62
1,55,43,502.04
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate
20 mm nominal size)
Refer DSR'2014,
Sl. No.-5.2.1, P-96
Total
Annexure 1B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 4.25 4.25 4918.65 5714.98 24288.66
cum 45.76 45.76 4918.65 5714.98 261517.46
1.2
Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundations and
plinth in :
0.00
1.2.1 cement mortar 1:4 (1 cement : 4 coarse sand) sqm 96.00 96.00 584.75 679.42Refer DSR'2014, Sl.
No.-6.12.2, P-11265224.42
2.0 Sub-Head-Finishing Work 0.00 0.00
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with
a floating coat of neat cement.0.00 0.00
2.1.1 20 mm cement plaster sqm 67.00 67.00 303.60 352.75Refer DSR'2014, Sl.
No.-13.9.2, P-21623634.44
3.0 Sub-Head-Flooring Work 0.00
cum 1.91 1.91 49222.00 94137.08
cum 16.52 16.52 49222.00 813178.20
4.0 Sub-Head-Dismentling & Demolishing Work 0.00
4.1
Demolishing Plaster work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of Engineer-in-charge.
0.00
4.1.1 In cement mortar sqm 67.00 67.00 19.00Refer PWD'2015, Sl.
No.-1b 10, P-91273.00
5 Construction of new cover bin. cum 2 2.00 22,235.45 Analysis Rate 44470.91
7White washing with lime to give an even shade : :new
work(three or more coats)Sqm 67.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
1261.13
8
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
Sqm 67.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
1751.56
13,30,736.85
CHIVOT JUTE MILL GHAT
RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Refference
TOTAL COST =
Ammount (Rs.)
Refer DSR'2014, Sl.
No.-6.1.2, P-111
3.1.175 mm thick Red Sandstone
Analysis Rate
Annexure 1C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C X H J
1
9w Solar LED Street Light system with
a)12w/40Wp SPV module 1 no.; b)12v/40Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 4.5 mts –
1 no.; f) Suitable Battery box- 1 no.; f) Cables
& Wiring materials etc.
12 Item 17328.00 Analysis Rate 0.00 17328.00 207936.00
2
12w Solar LED Street Light system with
a)12w/75Wp SPV module 1 no.; b)12v/75Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 6 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
12 Item 20913.00 Analysis Rate 0.00 20913.00 250956.00
3
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
8 Item 25693.00 Analysis Rate 0.00 25693.00 205544.00
4 Supply of 12 m SWAGGED type Poles 1 Each 10561.54 Analysis Rate 0.00 10561.54 10561.54
5
a) Above 4.5 metre and upto 6.5 metre 24 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 70275.77
b) Above 6.5 metre and upto 8.0 metre 8 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 28341.42
ESTIMATES ON RIVER GHAT LIGHT POST(CHIVOT JUTE MILL GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
nominal size) foundation including excavation & refilling etc. as required.
Annexure 1C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C X H J
ESTIMATES ON RIVER GHAT LIGHT POST(CHIVOT JUTE MILL GHAT)
c) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 4937.70
6
Supply & Wiring with 1.1 KV grade single core
PVC insulated stranded Copper wire in EI
conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI
ECC
70 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 22613.09
7
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as
below and mending good the damages to
original finish incl. removing the rubbish From
2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall
etc.
70 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 9532.97
8
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit
breaker suitable for inductive load of following
poles in the existing MCB DB complete with
connections, testing and commissioning etc. as
required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired
SP&N MCB distribution board of steel sheet for
240 volts on surface/ recess complete with
loose wire box, terminal connectors for all
incoming and outgoing circuits, duly prewired
with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections,
powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2
+ 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
Annexure 1C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C X H J
ESTIMATES ON RIVER GHAT LIGHT POST(CHIVOT JUTE MILL GHAT)
10 Supply of 30 Watt 'MAGNAM' LED flood light
on 12 mt. post4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
11
Fixing outdoor type fluorescent/SV/MV/LED
light fitting on pole including S&F 40 mm dia x
1.68 mts. long GI Pipe (ISI-Medium) bracket
with 40 mmx10 mm thick, MS clamp etc. and
providing wiring with 2x1/1.40 PVC insulated
and sheathed wire (single core) from loop box
at the base of pole to light fiting through pole &
bracket (without control switch) including
making connections & painting - Fixing of 30
Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 863.43
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 863.43
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 575.62
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
13
Earthing with G.I. earth pipe 4.5 metre long, 40
mm dia including accessories, and providing
masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but
without charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
14 Construction of Meter Shade/Room 1 No. 15000.00 Lumpsum 0.00 15000.00 15000.00
909199.7915 90919.98
1000119.77GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination
with GI thimble etc. as required
Sub-Total =
Miscelaneous Items
Annexure-2
1.0 Sheet Piles, Concrete Block Pitching & Ramp Annexure 2A -
2.0 Renovation of Ghat Annexure 2B 6,28,000.52
3.0 Construction of Footpath 549 sqm 2,767.16 Annexure 12 15,19,169.28
4.0 Sitting Arrangement 10 Nos. 46,547.98 Annexure15 4,65,479.82
5.0 Proposed Gate 1 Nos. 1,62,282.51 Annexure 22E 1,62,282.51
6.0 Proposed change room 1 nos 1,36,947.32 Annexure 20 1,36,947.32
7.0 Water Connection 1 Nos. 25,147.76 Annexure 13&14 25,147.76
8.0 Coffer Dam for Construction 15 M 27,481.66 Annexure 21 4,12,224.83
9.0 Side Railing 40 M 2,766.66 Annexure 16 1,10,666.30
10.0 Side Wall 145 M 6,572.83 Annexure 17 9,53,060.57
11.0 Landscaping 220 sqm 2,167.00 Annexure 18 4,76,740.00
12.0 Renovation of toilet Annexure 2C -
13.0 Electric Post Annexure 2D 11,68,440.01
60,58,158.90 Sub Total
BALUR GHAT
Ammount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
2.1
Annexure 2A
BILL OF QUANTITIES
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 249.63 83,950.00 MT Analysis rate 2,09,56,236.72
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and including
carriage of sheet piles up-to work site by trucks, carts and head
load etc. as per direction of the Engineer-in-charge but the
excluding the cost of sheet piles.
2027.84 900.60 1046.41 sqm
Refer SOR 2013-'2014,Govt
of WB, Irrigation &
Waterways Directorate. Sl.
No.-2.5, P-58
21,21,950.44
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured at
a height of 1m above ground level and removal of rubbish upto
a distance of 50 m outside the periphery of the area cleared.
2000.00 642.00 745.94 100sqmRefer DSR'2014, Sl. No.-
2.31, P-7514,918.80
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
297.60 155.60 180.79 cumRefer DSR'2014, Sl. No.-2.6,
P-7253,803.59
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete
148.80 910.25 1057.62 cumRefer DSR'2014, Sl. No.-
2.27, P-751,57,373.78
297.60 377.00 sqm 1,12,195.20
105.78 377.00 sqm 39,879.06
3.0 Sub-Head-Concrete Work 0.00 -
3.1.1
Cast in situ cement concrete block pitching in proportion 1:3:6,
laid in panels of size varying from 0.6 M x 0.6 M to 1.0 M x 1.0
M with 37.5 mm size well gradeed stone aggregates of pakur or
other approved variety including dewatering, dressing, ramming
and preparing bed to poper slope, placing , compacting and
finishing surface of blocks with cement mortar 1:3 at green
stage including necessary shuttering, all leads and lifts
complete. Gap between the adjacent blocks should not be less
than 25 mm, which subsequently is to be filled up by packing 20
mm down stone chips, cost of witch is included in the item.
335.52 4,832.90 5615.35 cum
Refer SOR 2013-'2014,Govt
of WB, Irrigation &
Waterways Directorate. Sl.
No.-4.23, P-81
18,84,061.06
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete. 372.80 1,871.10 2174.03 cum
Refer SOR 2013-'2014,Govt
of WB, Irrigation &
Waterways Directorate. Sl.
No.-4.26, P-82
8,10,478.79
BALUR GHAT
Item No. Description Total Quantity Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4Single brick flat soling of picked jhama bricks including ramming
and dressing bed to proper level and filling joints with local sand
SOR-2015, PWD-Govt of
WB, Item No.1 ( c), P-12
Annexure 2A
BILL OF QUANTITIES
BALUR GHAT
Item No. Description Total Quantity Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm
83.33 141.00 M
SOR-2015, PWD-Govt of
WB,Sanataey & Plumbing
Item No.19( I), P-11
11,750.00
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
0.00
22.50 5,466.30 6351.29 cum 1,42,904.11
15.87 5,466.30 6351.29 cum 1,00,775.98
4.0 Sub-Head-Reinforced Concrete Work 0.00
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
0.00
104.16 8634.05 10031.90 cum 10,44,922.98
15.87 8634.05 10031.90 cum 1,59,176.20
4.3Centering and shuttering including strutting, propping etc. and
removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters, butteresses,
plinth and string courses etc.347.20 360.80 419.21 sqm
Refer DSR'2014, Sl. No.-
5.9.2, P-971,45,550.93
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level.
. 0.00
4.4.1Thermo-Mechanically Treated bars
9422.12 68.10 79.13 KgRefer DSR'2014, Sl. No.-
5.22.6, P-997,45,528.88
2,85,01,506.53
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20
mm nominal size)
Refer DSR'2014, Sl. No.-
4.1.3, P-85
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20
mm nominal size)
Refer DSR'2014, Sl. No.-
5.2.1, P-96
Total
Annexure 2B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 0.50 4918.65 5714.98Refer DSR'2014, Sl. No.-
6.1.2, P-111
2857.49
1.2Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in foundations and plinth in :
0.00
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-112
13588.42
2.0 Sub-Head-Finishing Work 0.00
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat
of neat cement.
0.00
2.1.120 mm cement plaster
sqm 160.00 303.60 352.75Refer DSR'2014, Sl. No.-
13.9.2, P-216
56440.45
3.0 Sub-Head-Flooring Work 0.00 0.00
cum 3.73 49222.00 183659.59
cum 6.50 49222.00 319789.18
4 Construction of new cover bin. cum 2.00 22,235.45 Analysis Rate 44470.91
5White washing with lime to give an even shade : :new work(three or
more coats)Sqm 160.00 16.20 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-2193011.64
6Colour washing such as green, blue or buff to give an even shade New
work (two or more coats) with a base coat of white washing. Sqm 160.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-2194182.84
6,28,000.52
BALUR GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item
No.Description
Unit Total
Quantity
TOTAL
Unit Rate
(INR)
Price
Escalation
Refference Ammount
(Rs.)
3.1.1
75 mm thick Red Sandstone
Analysis Rate
Annexure 2C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)Refference
Amount
(Rs.)
1 Sqm 2 138.00 138.00 16.2DSR-2014,CPWD Building, Code
No.13.37.1, P-2192235.60
2 Sqm 138.00 138.00 22.50DSR-2014,CPWD Building, Code
No.13.39.1, P-2193105.00
3 Cum 2 0.08 91496.9DSR-2014,CPWD Building, Code
No.9.1.1, P-1447136.76
4 Sqm 2 3.68 2689DSR-2014,CPWD Building, Code
No.9.5.1.1, P-1449895.52
22372.88
3622.17
25995.05
BALUR GHAT
RENOVATION FOR TOILET (7MX4.5M)
Brief Description of Item
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
White washing with lime to give an even shade : :new
work(three or more coats)
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
Total =
Price Escalation =
GRAND TOTAL =
Annexure 2D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
28 Item 25693.00Analysis Rate
Annexure-26D0.00 25693.00 719404.00
2 Supply of 12 m SWAGGED type Poles 2 Each 10561.54Analysis Rate
Annexure-26D0.00 10561.54 21123.09
3
a) Above 6.5 metre and upto 8.0 metre 28 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 99194.96
b) Above 11.0 metre and upto 13.0 metre 2 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 9875.40
4
Supply & Wiring with 1.1 KV grade single core
PVC insulated stranded Copper wire in EI
conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI
ECC
120 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 38765.30
5
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as
below and mending good the damages to
original finish incl. removing the rubbish From
2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall
etc.
120 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 16342.24
ESTIMATES ON RIVER GHAT LIGHT POST(BALUR GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
Annexure 2D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(BALUR GHAT)
6
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit
breaker suitable for inductive load of following
poles in the existing MCB DB complete with
connections, testing and commissioning etc. as
required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
7
Supplying and fixing following way prewired
SP&N MCB distribution board of steel sheet for
240 volts on surface/ recess complete with
loose wire box, terminal connectors for all
incoming and outgoing circuits, duly prewired
with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections,
powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2
+ 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
8 Supply of 30 Watt 'MAGNAM' LED flood light
on 12 mt. post8 Each 16966.00
Analysis Rate
Annexure-26D0.00 16966.00 135728.00
9
Fixing outdoor type fluorescent/SV/MV/LED
light fitting on pole including S&F 40 mm dia x
1.68 mts. long GI Pipe (ISI-Medium) bracket
with 40 mmx10 mm thick, MS clamp etc. and
providing wiring with 2x1/1.40 PVC insulated
and sheathed wire (single core) from loop box
at the base of pole to light fiting through pole &
bracket (without control switch) including
making connections & painting - Fixing of 30
Watt LED street Flood light on 12 mt. post
8 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 12727.52
10 Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination
Annexure 2D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(BALUR GHAT)
a) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 2014.67
b) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
11
Earthing with G.I. earth pipe 4.5 metre long, 40
mm dia including accessories, and providing
masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but
without charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
1062218.1912 106221.82
1168440.01GRAND TOTAL =
Sub-Total =
Miscelaneous Items
Annexure-3
1.0 Sheet Piles, Concrete Block Pitching & Ramp Annexure 3A -
2.0 Renovation of Ghat Annexure 3B -
3.0 Electric Post Annexure 3D 9,44,097.54
4.0 Sitting Arrangement 8 Nos. 46,547.98 Annexure 15 3,72,383.86
5.0 Construction of Footpath 115 sqm 2,767.16 Annexure 12 3,18,223.07
6.0 Proposed Gate 1 Nos. 1,06,434.55 Annexure 22C 1,06,434.55
7.0 Side Railing 30 M 2,167.00 Annexure 16 65,010.00
8.0 Landscaping 120 sqm 2,108.86 Annexure 18 2,53,063.13
9.0 Renovation of toilet Annexure 3C -
20,59,212.15 Sub Total
KALIBARI GHATAmmount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
3.1
Annexure 3A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 70.57 70.57 83,950.00 MT Analysis rate 59,24,622.66
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and
including carriage of sheet piles up-to work site by trucks,
carts and head load etc. as per direction of the Engineer-in-
charge but the excluding the cost of sheet piles.
573.30 573.30 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
5,99,905.21
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured
at a height of 1m above ground level and removal of rubbish
upto a distance of 50 m outside the periphery of the area
cleared.
650 650.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-754,848.61
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
84 84.00 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7215,186.50
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete
42 42.00 910.25 1057.62 cumRefer DSR'2014, Sl.
No.-2.27, P-7544,420.02
84 84.00 377.00 sqm 31,668.00
206 206.00 377.00 sqm 77,662.00
3.0 Sub-Head-Concrete Work 0.00 -
KALIBARI GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
SOR-2015, PWD-
Govt of WB, Item
Annexure 3A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
KALIBARI GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to 1.0
M x 1.0 M with 37.5 mm size well gradeed stone aggregates
of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing ,
compacting and finishing surface of blocks with cement
mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks
should not be less than 25 mm, which subsequently is to be
filled up by packing 20 mm down stone chips, cost of witch is
included in the item.
120.78 120.78 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
6,78,221.55
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete.134.20 134.20 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
2,91,754.97
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm20.33 20.33 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
2,867.00
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
0.00
12.6 12.60 5,466.30 6351.29 cum 80,026.30
30.9 30.90 5,466.30 6351.29 cum 1,96,254.98
4.0 Sub-Head-Reinforced Concrete Work 0.00
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20 mm nominal size)
Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure 3A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
KALIBARI GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
0.00
29.4 29.40 8634.05 10031.90 cum 2,94,937.94
30.9 30.90 8634.05 10031.90 cum 3,09,985.79
4.3Centering and shuttering including strutting, propping etc.
and removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.98.0 98.00 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-9741,082.92
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level.
. 0.00
4.4.1
Thermo-Mechanically Treated bars
4733.55 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-993,74,543.99
89,67,988.46
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate
20 mm nominal size)
Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
Annexure 3B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
foundation and plinth in:
1.1.1
Cement mortar 1:4 (1 cement : 4 coarse sand)
cum 3.75 4918.65 5714.98Refer DSR'2014, Sl.
No.-6.1.2, P-11121431.17
1.2
Half brick masonry with common burnt clay
F.P.S. (non modular) bricks of class designation
7.5 in foundations and plinth in :0.00
1.2.1
cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 584.75 679.42Refer DSR'2014, Sl.
No.-6.12.2, P-11213588.42
2.0 Sub-Head-Finishing Work 0.00
2.1
Cement plaster 1:3 (1 cement: 3 coarse sand)
finished with a floating coat of neat cement. 0.00
2.1.1
12 mm cement plaster
sqm 366.47 226.10 262.71Refer DSR'2014, Sl.
No.-13.9.1, P-21696274.77
2.1.2
20 mm cement plaster
sqm 120.00 303.60 352.75Refer DSR'2014, Sl.
No.-13.9.2, P-21642330.34
3.0 Sub-Head-Flooring Work 0.00 0.00
3.1.1 75 mm thick Red Sandstone cum 27.49 49222.00 Analysis Rate 1352893.74
4.0 Sub-Head-Dismentling & Demolishing Work 0.00
4.1
Demolishing Plaster work manually/ by
mechanical means including stacking of
serviceable material and disposal of
unserviceable material within 50 metres lead as
per direction of Engineer-in-charge.
sqm 120.00 19.00Refer PWD'2015, Sl.
No.-1b 10, P-92280.00
4.2
Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within a
lead of 75 m. and stacking the serviceable
materials as directed.
sqm 366.47 35.00Refer PWD'2015, Sl.
No.-1b 9, P-912826.59
5 Construction of new cover bin. cum 2.00 22,235.45 Analysis Rate 44470.91
6White washing with lime to give an even shade
: :new work(three or more coats)Sqm 120.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
2258.73
Ammount (Rs.)
KALIBARI GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Total Quantity Unit Rate
(INR) Price Escalation
Refference
Annexure 3B
Ammount (Rs.)
KALIBARI GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Total Quantity Unit Rate
(INR) Price Escalation
Refference
7
Colour washing such as green, blue or buff to
give an even shade New work (two or more
coats) with a base coat of white washing.
Sqm 120.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
3137.13
15,91,491.80 TOTAL
Annexure 3C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)Refference
Amount
(Rs.)
1 Sqm 2 102.00 102.00 16.2
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
1652.40
2 Sqm 102.00 102.00 22.50
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
2295.00
3 Cum 2 0.08 91496.9
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
7136.76
4 Sqm 2 3.68 2689
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
9895.52
20979.68
3396.61
24376.29
KALIBARI GHAT
RENOVATION FOR TOILET(3MX5.5M)
Brief Description of Item
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
White washing with lime to give an even shade : :new
work(three or more coats)
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
Total =
Price Escalation =
GRAND TOTAL =
Annexure 3D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate (Rs.) Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with a)12w/40Wp SPV module 1
no.; b)12v/40Ah Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic DD CCU – 1no.; d)
MMS; e) Steel Pole 4.5 mts – 1 no.; f) Suitable Battery box- 1
no.; f) Cables & Wiring materials etc.
15 Item 17328.00 Analysis Rate 0.00 17328.00 259920.00
2
12w Solar LED Street Light system with a)12w/75Wp SPV module
1 no.; b)12v/75Ah Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic DD CCU – 1no.;
d) MMS; e) Steel Pole 6 mts – 1 no.; f) Suitable Battery box- 1
no.; f) Cables & Wiring materials etc.
4 Item 20913.00 Analysis Rate 0.00 20913.00 83652.00
3
15w Solar LED Street Light system with a)12w/125Wp SPV
module 1 no.; b)12v/125Ah Tubular plate battery (Exide make)- 1
set; c)12v/15w LED outdoor luminary with automatic DD CCU –
1no.; d) MMS; e) Steel Pole 7 mts – 1 no.; f) Suitable Battery
box- 1 no.; f) Cables & Wiring materials etc.
8 Item 25693.00 Analysis Rate 0.00 25693.00 205544.00
4 Supply of 12 m SWAGGED type Poles 2 Each 10561.54 Analysis Rate 0.00 10561.54 21123.09
5
a) Above 4.5 metre and upto 6.5 metre 19 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 55634.98
b) Above 6.5 metre and upto 8.0 metre 8 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 28341.42
c) Above 11.0 metre and upto 13.0 metre 2 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 9875.40
6
Supply & Wiring with 1.1 KV grade single core PVC insulated
stranded Copper wire in EI conduit/GI conduit and painting - -
4x2.5 sqmm wire in 25 mm conduit incl. S&F 2x10 SWG GI ECC
80 RM 306.00
PWD-2014,
GoWB, Electrical
Works, Item No.
A.1(j), P- E-1
17.04 323.04 25843.54
7
Laying of cable as below, after cutting floor/pavement/wall/ and
making holes incl., embedding the cable at an average depth as
below and mending good the damages to original finish incl.
removing the rubbish From 2.5 sqmm through 20 mm dia GI
conduit at an average depth of 75 mm in floor/pavement/wall etc.
80 RM 129.00
PWD-2014,
GoWB, Electrical
Works, Item No.
5(i), P-F-3
7.19 136.19 10894.82
8
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, “C”
curve, miniature circuit breaker suitable for inductive load of
following poles in the existing MCB DB complete with connections,
testing and commissioning etc. as required - Supply and fixing of
240V, 6A MCB-SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
ESTIMATES ON RIVER GHAT LIGHT POST(KALI BARI GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation
Annexure 3D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate (Rs.) Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(KALI BARI GHAT)
9
Supplying and fixing following way prewired SP&N MCB
distribution board of steel sheet for 240 volts on surface/ recess
complete with loose wire box, terminal connectors for all incoming
and outgoing circuits, duly prewired with suitable size FRLS PVC
insulated copper conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar, detachable gland plate,
interconnections, powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2 + 8 way, Single
door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light on 12 mt. post 8 Each 16966.00Analysis Rate
Annexure-26D0.00 16966.00 135728.00
11
Fixing outdoor type fluorescent/SV/MV/LED light fitting on pole
including S&F 40 mm dia x 1.68 mts. long GI Pipe (ISI-Medium)
bracket with 40 mmx10 mm thick, MS clamp etc. and providing
wiring with 2x1/1.40 PVC insulated and sheathed wire (single
core) from loop box at the base of pole to light fiting through pole
& bracket (without control switch) including making connections
& painting - Fixing of 30 Watt LED street Flood light on 12 mt.
post
8 Set 1507.00
PWD-2015,
GoWB, Electrical
Works, Item No.
H(4), P-H-5
83.94 1590.94 12727.52
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 1079.29
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 287.81
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 575.62
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
13
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including
accessories, and providing masonry enclosure with cover plate
having locking arrangement and watering pipe etc. (but without
charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
858270.4914 85827.05
944097.54GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination with GI thimble etc. as required
Sub-Total =
Miscelaneous Items
Annexure- 4
1.0 Sheet pile & Concrete block pitching Annexure 4A -
2.0 Rrenovation of ghat Annexure 4B -
3.0 Electric Post Annexure 4D 6,21,685.70
4.0 Proposed gate 1 Nos. 53,184.07 Annexure 22A 53,184.07
5.0 Sitting Arrangement 5 Nos. 46,547.98 Annexure15 2,32,739.91
6.0 Side Wall 5 M 6,572.83 Annexure 17 32,864.16
7.0 Landscaping 50 sqm 2,167.00 Annexure 18 1,08,350.00
8.0 Renovation change room 1 Nos - Annexure 4C -
10,48,823.84 Sub Total
BURNING GHAT
Ammount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
4.1
Annexure 4A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 73.60 73.60 83,950.00 MT Analysis rate 61,78,535.06
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and
including carriage of sheet piles up-to work site by trucks,
carts and head load etc. as per direction of the Engineer-in-
charge but the excluding the cost of sheet piles.
597.87 597.87 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
6,25,615.44
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured
at a height of 1m above ground level and removal of rubbish
upto a distance of 50 m outside the periphery of the area
cleared.
918 918.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-756,847.73
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
87.6 87.60 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7215,837.35
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete
43.8 43.80 910.25 1057.62 cumRefer DSR'2014, Sl.
No.-2.27, P-7546,323.73
87.6 87.60 377.00 sqm 33,025.20
48 48.00 377.00 sqm 18,096.00
3.0 Sub-Head-Concrete Work 0.00 -
KALIBARI GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
SOR-2015, PWD-
Govt of WB, Item
Annexure 4A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
KALIBARI GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to 1.0
M x 1.0 M with 37.5 mm size well gradeed stone aggregates
of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing ,
compacting and finishing surface of blocks with cement
mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks
should not be less than 25 mm, which subsequently is to be
filled up by packing 20 mm down stone chips, cost of witch is
included in the item.
165.24 165.24 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
9,27,879.86
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete.183.60 183.60 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
3,99,152.11
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm17.00 17.00 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
2,397.00
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
0.00
13.14 13.14 5,466.30 6351.29 cum 83,456.00
7.2 7.20 5,466.30 6351.29 cum 45,729.32
4.0 Sub-Head-Reinforced Concrete Work 0.00
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
0.00
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20 mm nominal size)
Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure 4A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
KALIBARI GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
30.66 30.66 8634.05 10031.90 cum 3,07,578.14
7.2 7.20 8634.05 10031.90 cum 72,229.70
4.3Centering and shuttering including strutting, propping etc.
and removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.102.2 102.20 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-9742,843.62
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level.
. 0.00
4.4.1
Thermo-Mechanically Treated bars
2972.01 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-992,35,161.45
90,40,707.70
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate
20 mm nominal size)
Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
Annexure 4B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundation
and plinth in:
1.1.1Cement mortar 1:4 (1 cement : 4 coarse sand)
cum 0.50 0.50 4918.65 5714.98Refer DSR'2014, Sl. No.-
6.1.2, P-1112857.49
1.2
Half brick masonry with common burnt clay F.P.S.
(non modular) bricks of class designation 7.5 in
foundations and plinth in :
0.00
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 20.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-11213588.42
2.0 Sub-Head-Finishing Work 0.00
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished
with a floating coat of neat cement.0.00
2.1.120 mm cement plaster
sqm 175.00 175.00 303.60 352.75Refer DSR'2014, Sl. No.-
13.9.2, P-21661731.75
3.0 Sub-Head-Flooring Work 0.00 0.00
3.1.1 75 mm thick Red Sandstone cum 6.40 6.40 49222.00 Analysis Rate 315237.38
4.0 Sub-Head-Dismentling & Demolishing Work 0.00
4.1
Demolishing Plaster work manually/ by mechanical
means including stacking of serviceable material and
disposal of unserviceable material within 50 metres
lead as per direction of Engineer-in-charge.
sqm 175.00 175.00 19.00Refer PWD'2015, Sl. No.-
1b 10, P-93325.00
4.2
Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within a
lead of 75 m. and stacking the serviceable
materials as directed.
sqm 85.39 85.39 35.00Refer PWD'2015, Sl. No.-
1b 9, P-92988.72
5 Construction of new cover bin. cum 2.00 2.00 22,235.45 Analysis Rate 44470.91
6White washing with lime to give an even shade :
:new work(three or more coats)Sqm 175.00 175.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
3293.99
7
Colour washing such as green, blue or buff to give
an even shade New work (two or more coats) with
a base coat of white washing.
Sqm 175.00 175.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
4574.98
Ammount (Rs.)
BURNING GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Refference
Annexure 4B
Ammount (Rs.)
BURNING GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Refference
8
M.S. structural works in roof trusses with tubular
sections conforming to IS: 806-1957 & IS: 1161-
1958 cnnected to one another with bracket, gusset
cleats as per design, direction of Engineer-in-charge
complete including cutting to requisite size,
fabrication with necessary metal arc welding
conforming to IS: 816-1956 & IS: 9595 using
electrodes of approved make and brand conforming
to IS:814- 1957, haulage, hoisting and erection all
complete.
Kg 29.3 29.33 68.64
SOR-2015, PWD-Govt
of WB, Item No.1 (F) 2
i, P-75
2013.56
9
Labour for hoisting and placing in proper position (
up to 1st floor level) departmental R.S. joists,
channels, angles. Tees, plates etc. including fitting
and fixing same with bolts and nuts, if necessary
(but excluding cost of such bolts and nuts)
Kg 29.3 29.33 4.16
SOR-2015, PWD-Govt
of WB, Item No.1 (F) 5,
P-77
122.03
10
Supplying, fitting and fixing glass reinforced
polyester translucent fiber glass sheet to match with
GCI Corrugation as per IS: 12866 - 1989 in roof
fitted and fixed with 10 mm
dia "J" or "L" hook, bolts and nuts, limpet and
bitumen washers and putty with 150mm end lap
and one corrugation minimum side lap complete.
Coloured other than natural white or tinted blue
Sqm 238.0 238.00 907.00
SOR-2015, PWD-Govt
of WB, Item No.1 (E)
25 iii), P-65
215866.00
6,70,070.21 TOTAL
Annexure 4C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
1 Sqm 1 20.28 20.28 353.35 410.56
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
8326.10
2 Sqm 2 81.60 81.60 163.00 189.39
DSR-2014,CPWD
Building, Code
No.13.1.1, P-216
15454.20
3 Sqm 40.80 40.80 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
767.97
4 Sqm 40.80 40.80 22.50 23.75
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
969.13
5 Cum 1 0.04 91496.9 106310.25
DSR-2014,CPWD
Building, Code No.9.1.1,
P-144
4146.10
KALIBARI GHAT
RENOVATION FOR CHANGE ROOM(5.2Mx3.9M)
Brief Description of Item
12 mm cement plaster of mix :
(1:4 cement and Sand mixture)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate) finished with a
floating coat of neat cement, including cement slurry,
but excluding the cost of nosing of steps etc. complete.
# 40 mm thick with 20 mm nominal size stone
aggregate
White washing with lime to give an even shade : :new
work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash
fasteners of required dia & length ( hold fast lugs or
dash fastener shall be paid for separately).
# Second class teak wood
Annexure 4C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
KALIBARI GHAT
RENOVATION FOR CHANGE ROOM(5.2Mx3.9M)
Brief Description of Item
6 Sqm 1 1.84 2689 3124.35
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
5748.80
35412.31
41145.56
41145.56 TOTAL COST =
Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
finished of required size with necessary screws,
excluding panelling which will be paid for separately, all
complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak wood
Total =
Price escalation =
Annexure 4D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with
a)12w/40Wp SPV module 1 no.; b)12v/40Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 4.5 mts –
1 no.; f) Suitable Battery box- 1 no.; f) Cables
& Wiring materials etc.
7 Item 17328.00 Analysis Rate 0.00 17328.00 121296.00
2
12w Solar LED Street Light system with
a)12w/75Wp SPV module 1 no.; b)12v/75Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 6 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
1 Item 20913.00 Analysis Rate 0.00 20913.00 20913.00
3
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
10 Item 25693.00 Analysis Rate 0.00 25693.00 256930.00
4 Supply of 12 m SWAGGED type Poles 1 Each 10561.54 Analysis Rate 0.00 10561.54 10561.54
5
a) Above 4.5 metre and upto 6.5 metre 8 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 23425.26
b) Above 6.5 metre and upto 8.0 metre 10 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 35426.77
c) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 4937.70
ESTIMATES ON RIVER GHAT LIGHT POST(BURNING GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
Annexure 4D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(BURNING GHAT)
6
Supply & Wiring with 1.1 KV grade single core
PVC insulated stranded Copper wire in EI
conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI
ECC
20 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 6460.88
7
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as
below and mending good the damages to
original finish incl. removing the rubbish From
2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall
etc.
20 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 2723.71
8
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit
breaker suitable for inductive load of following
poles in the existing MCB DB complete with
connections, testing and commissioning etc. as
required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired
SP&N MCB distribution board of steel sheet for
240 volts on surface/ recess complete with
loose wire box, terminal connectors for all
incoming and outgoing circuits, duly prewired
with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections,
powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2
+ 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light
on 12 mt. post4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
Annexure 4D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(BURNING GHAT)
11
Fixing outdoor type fluorescent/SV/MV/LED
light fitting on pole including S&F 40 mm dia x
1.68 mts. long GI Pipe (ISI-Medium) bracket
with 40 mmx10 mm thick, MS clamp etc. and
providing wiring with 2x1/1.40 PVC insulated
and sheathed wire (single core) from loop box
at the base of pole to light fiting through pole &
bracket (without control switch) including
making connections & painting - Fixing of 30
Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 503.67
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 719.53
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
13
Earthing with G.I. earth pipe 4.5 metre long, 40
mm dia including accessories, and providing
masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but
without charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
565168.8214 56516.88
621685.70GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination
Sub-Total =
Miscelaneous Items
Annexure- 5
1.0 Sheet Pile & Concrete Block Pitching Annexure 5A -
2.0 Rrenovation of Ghat Annexure 5B -
3.0 Water Connection 1 Nos. 25,147.76 Annexure 13&14 25,147.76
4.0 Electric Post Annexure 5D 6,91,422.86
5.0 Proposed Gate 2 Nos. 1,06,434.55 Annexure 22C 2,12,869.10
6.0 Side Railing 100 M 2,766.66 Annexure 16 2,76,665.74
7.0 Side Wall 26 M 6,572.83 Annexure 17 1,70,893.62
8.0 Coffer Dam for Construction 15 M 27,481.66 Annexure 21 4,12,224.83
9.0 Renovation Footpath 225 sqm 586.38 Annexure 23 1,31,934.38
10.0 Renovation change room 1 M 36,766.46 Annexure 5C 36,766.46
11.0 Construction of toilet 1 nos 12,23,711.16 Annexure 19 12,23,711.16
31,81,635.89 Sub Total
JHAWTALA GHAT
Ammount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
5.1
Annexure 5A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 199.62 199.62 83,950.00 MT Analysis rate 1,67,58,218.38
1.2
Driving M.S.sheet piles (manually/mechanically) by
hammer and/or monkey including drilling holes and
welding of piles as necessary and cutting sheet piles
according to requirement at site, staging, scaffolding,
supply of all equipments and including carriage of sheet
piles up-to work site by trucks, carts and head load etc.
as per direction of the Engineer-in-charge but the
excluding the cost of sheet piles.
1621.62 1621.62 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
16,96,874.75
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation,
grass, brush wood, trees and saplings of girth upto 30
cm measured at a height of 1m above ground level and
removal of rubbish upto a distance of 50 m outside the
periphery of the area cleared.
3600 3600.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-7526,853.83
2.2
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10
sqm on plan) including disposal of excavated earth, lead
upto 50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.
240 240.00 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7243,389.99
2.3
Supplying and filling in plinth with river sand under
floors, including watering, ramming, consolidating and
dressing complete
120 120.00 910.25 1057.62 cumRefer DSR'2014, Sl.
No.-2.27, P-751,26,914.34
237.6 237.60 377.00 sqm 89,575.20
27.3 27.30 377.00 sqm 10,292.10
21.09 21.09 377.00 sqm 7,950.93
3.0 Sub-Head-Concrete Work 0.00 -
JHAWTALA GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4
Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling
joints with local sand
SOR-2015, PWD-
Govt of WB, Item
No.1 ( c), P-12
Annexure 5A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
JHAWTALA GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to
1.0 M x 1.0 M with 37.5 mm size well gradeed stone
aggregates of pakur or other approved variety including
dewatering, dressing, ramming and preparing bed to
poper slope, placing , compacting and finishing surface
of blocks with cement mortar 1:3 at green stage
including necessary shuttering, all leads and lifts
complete. Gap between the adjacent blocks should not
be less than 25 mm, which subsequently is to be filled
up by packing 20 mm down stone chips, cost of witch is
included in the item.
450.00 450.00 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
25,26,905.93
3.1.2
Providing filter on bed and slope of canal with 37.5 mm
down well gradeed jhama Khoa including cost and
carriage of materials to site and preparing bed and
dressing complete.500.00 500.00 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
10,87,015.55
3.1.3
Supplying, fitting and fixing PVC pipes of approved
make of (medium duty) conforming to ASTMD - 1785
and threaded to match with GI Pipes as per IS : 1239
(Part - I). b) For Concealed Work (Dia) 15 mm66.67 66.67 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
9,400.00
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level :0.00
35.64 35.64 5,466.30 6351.29 cum 2,26,360.12
4.095 4.10 5,466.30 6351.29 cum 26,008.55
3.1635 3.16 5,466.30 6351.29 cum 20,092.32
4.0 Sub-Head-Reinforced Concrete Work 0.00
3.2.1
1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size)Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure 5A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
JHAWTALA GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
4.1
Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses,
plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up to floor five level,
excluding cost of centering, shuttering, finishing and
reinforcement
0.00
83.16 83.16 8634.05 10031.90 cum 8,34,253.03
4.095 4.10 8634.05 10031.90 cum 41,080.64
22.878 22.88 8634.05 10031.90 cum 2,29,509.87
4.3Centering and shuttering including strutting, propping
etc. and removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.277.2 277.20 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-971,16,205.99
4.4
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete upto plinth level.
. 0.00
4.4.1
Thermo-Mechanically Treated bars
8323.98 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-996,58,638.40
2,45,35,539.90
4.2
1:1:2 (1 cement : 1 coarse sand : 2 graded stone
aggregate 20 mm nominal size)Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
Annexure 5B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1Brick work with common burnt clay F.P.S. (non modular) bricks of
class designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 3.00 3.00 4918.65 5714.98Refer DSR'2014, Sl.
No.-6.1.2, P-11117144.94
1.2
Half brick masonry with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundations and plinth in : 0.00
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 20.00 584.75 679.42Refer DSR'2014, Sl.
No.-6.12.2, P-11213588.42
2.0 Sub-Head-Finishing Work 0.00
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a
floating coat of neat cement.0.00
2.1.120 mm cement plaster
sqm 200.00 200.00 303.60 352.75Refer DSR'2014, Sl.
No.-13.9.2, P-21670550.57
3.0 Sub-Head-Flooring Work 0.00
cum 5.60
cum 14.34
cum 4.81
4.0 Sub-Head-Dismentling & Demolishing Work 0.00
4.1
Demolishing Plaster work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per direction of
Engineer-in-charge.
sqm 200.00 200.00 19.00Refer PWD'2015, Sl.
No.-1b 19, P-93800.00
74.67
191.18
64.12
5 Construction of new cover bin. cum 2 2.00 22,235.45 Analysis Rate 44470.91
6White washing with lime to give an even shade : :new
work(three or more coats)Sqm 200.00 200.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
3764.56
7
Colour washing such as green, blue or buff to give an even
shade New work (two or more coats) with a base coat of white
washing.
Sqm 200.00 200.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
5228.55
13,88,234.37
JHAWTALA GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total Quantity Unit Rate
(INR) Price Escalation
Refference Ammount (Rs.)
3.1.1
75 mm thick Red Sandstone
24.75 49222.00 Analysis Rate 1218137.44
Refer PWD'2015, Sl.
No.-1b 9, P-911548.99
TOTAL =
4.2
Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within a
lead of 75 m. and stacking the serviceable
materials as directed.
sqm 329.97 35.00
Annexure 5C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
1 Sqm 1 11.10 11.10 353.35 410.56
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
4557.19
2 Sqm 2 81.60 81.60 163.00 189.39
DSR-2014,CPWD
Building, Code
No.13.1.1, P-216
15454.20
3 Sqm 40.80 40.80 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
767.97
4 Sqm 40.80 40.80 22.50 23.75
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
969.13
5 Cum 1 0.04 91496.9 106310.25
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
4146.10
JHAWTALA GHAT
RENOVATION FOR CHANGE ROOM(3.7Mx3M)
Brief Description of Item
12 mm cement plaster of mix :
(1:4 cement and Sand mixture)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate) finished with a
floating coat of neat cement, including cement slurry,
but excluding the cost of nosing of steps etc. complete.
# 40 mm thick with 20 mm nominal size stone
aggregate
White washing with lime to give an even shade : :new
work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash
fasteners of required dia & length ( hold fast lugs or
dash fastener shall be paid for separately).
# Second class teak wood
Annexure 5C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
JHAWTALA GHAT
RENOVATION FOR CHANGE ROOM(3.7Mx3M)
Brief Description of Item
6 Sqm 1 1.84 2689 3124.35
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
5748.80
31643.39
36766.46
36766.46 TOTAL COST =
Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
finished of required size with necessary screws,
excluding panelling which will be paid for separately, all
complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak wood
Total =
Price escalation =
Annexure 5D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with a)12w/40Wp SPV module 1
no.; b)12v/40Ah Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic DD CCU – 1no.; d)
MMS; e) Steel Pole 4.5 mts – 1 no.; f) Suitable Battery box- 1
no.; f) Cables & Wiring materials etc.
7 Item 17328.00 Analysis Rate 0.00 17328.00 121296.00
2
12w Solar LED Street Light system with a)12w/75Wp SPV module
1 no.; b)12v/75Ah Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic DD CCU – 1no.;
d) MMS; e) Steel Pole 6 mts – 1 no.; f) Suitable Battery box- 1
no.; f) Cables & Wiring materials etc.
3 Item 20913.00 Analysis Rate 0.00 20913.00 62739.00
3
15w Solar LED Street Light system with a)12w/125Wp SPV
module 1 no.; b)12v/125Ah Tubular plate battery (Exide make)- 1
set; c)12v/15w LED outdoor luminary with automatic DD CCU –
1no.; d) MMS; e) Steel Pole 7 mts – 1 no.; f) Suitable Battery
box- 1 no.; f) Cables & Wiring materials etc.
10 Item 25693.00 Analysis Rate 0.00 25693.00 256930.00
4 Supply of 12 m SWAGGED type Poles 2 Each 10561.54 Analysis Rate 0.00 10561.54 21123.09
5
a) Above 4.5 metre and upto 6.5 metre 10 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 29281.57
b) Above 6.5 metre and upto 8.0 metre 10 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 35426.77
c) Above 11.0 metre and upto 13.0 metre 2 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 9875.40
6
Supply & Wiring with 1.1 KV grade single core PVC insulated
stranded Copper wire in EI conduit/GI conduit and painting - -
4x2.5 sqmm wire in 25 mm conduit incl. S&F 2x10 SWG GI ECC
20 RM 306.00
PWD-2014,
GoWB, Electrical
Works, Item No.
A.1(j), P- E-1
17.04 323.04 6460.88
7
Laying of cable as below, after cutting floor/pavement/wall/ and
making holes incl., embedding the cable at an average depth as
below and mending good the damages to original finish incl.
removing the rubbish From 2.5 sqmm through 20 mm dia GI
conduit at an average depth of 75 mm in floor/pavement/wall etc.
20 RM 129.00
PWD-2014,
GoWB, Electrical
Works, Item No.
5(i), P-F-3
7.19 136.19 2723.71
ESTIMATES ON RIVER GHAT LIGHT POST(JHAWTALA GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including
Annexure 5D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(JHAWTALA GHAT)
8
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, “C”
curve, miniature circuit breaker suitable for inductive load of
following poles in the existing MCB DB complete with connections,
testing and commissioning etc. as required - Supply and fixing of
240V, 6A MCB-SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired SP&N MCB
distribution board of steel sheet for 240 volts on surface/ recess
complete with loose wire box, terminal connectors for all incoming
and outgoing circuits, duly prewired with suitable size FRLS PVC
insulated copper conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar, detachable gland plate,
interconnections, powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2 + 8 way, Single
door
1 Each 2265.00
DSR- 2013,
Code No. 2.7.2,
P-11
604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light on 12 mt. post 4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
11
Fixing outdoor type fluorescent/SV/MV/LED light fitting on pole
including S&F 40 mm dia x 1.68 mts. long GI Pipe (ISI-Medium)
bracket with 40 mmx10 mm thick, MS clamp etc. and providing
wiring with 2x1/1.40 PVC insulated and sheathed wire (single
core) from loop box at the base of pole to light fiting through pole
& bracket (without control switch) including making connections
& painting - Fixing of 30 Watt LED street Flood light on 12 mt.
post
4 Set 1507.00
PWD-2015,
GoWB, Electrical
Works, Item No.
H(4), P-H-5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 503.67
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 215.86
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 719.53
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
13
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including
accessories, and providing masonry enclosure with cover plate
having locking arrangement and watering pipe etc. (but without
charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
628566.2414 62856.62
691422.86GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination with GI thimble etc. as required
Sub-Total =
Miscelaneous Items
Annexture- 6
1.0 Sheet piles & Concrete block pitching Annexure 6A 1,22,96,437.75
2.0 Rrenovation of ghat Annexure 6B -
3.0 Electric Post Annexure 6C 4,95,338.11
4.0 Side railing 64 M 2,766.66 Annexure 16 1,77,066.08
5.0 Side Wall 40 M 6,572.83 Annexure 17 2,62,913.26
6.0 Coffer dam for construction 4 M 27,481.66 Annexure 21 1,09,926.62
7.0 Water connection 1 nos 25,147.76 Annexure 13&14 25,147.76
8.0 Landscaping 258 sqm 2,167.00 Annexure 18 5,59,086.00
9.0 Proposed change room 1 nos 1,36,947.32 Annexure 20 1,36,947.32
10.0 Construction of toilet 1 nos 12,23,711.16 Annexure 19 12,23,711.16
11.0 Proposed Gate 1 Nos. 53,184.07 Annexure 22A 53,184.07
12.0 Construction of Footpath & Platfrom 61 sqm 2,767.16 Annexure 12 1,68,796.59
13.0 Renovation of Road 210 sqm 586.38 Annexure 23 1,23,138.75
14.0 Sitting Arrangement 3 Nos. 46,547.98 Annexure15 1,39,643.95
1,57,71,337.40 Sub Total
IRRIGATION GHATAmmount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
6.1
Annexure 6A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 112.92 112.92 83,950.00 MT Analysis rate 94,79,396.25
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer and/or monkey
including drilling holes and welding of piles as necessary and cutting sheet piles
according to requirement at site, staging, scaffolding, supply of all equipments
and including carriage of sheet piles up-to work site by trucks, carts and head
load etc. as per direction of the Engineer-in-charge but the excluding the cost of
sheet piles.
873.60 873.60 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
9,14,141.28
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees
and saplings of girth upto 30 cm measured at a height of 1m above ground level
and removal of rubbish upto a distance of 50 m outside the periphery of the area
cleared.
2100 2100.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-7515,664.74
2.2
Earth work in excavation by mechanical means (Hydraulic excavator) / manual
means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on
plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
134.4 134.40 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7224,298.40
2.3
Supplying and filling in plinth with river sand under floors, including watering,
ramming, consolidating and dressing complete 67.2 67.20 910.25 1057.62 cumRefer DSR'2014, Sl.
No.-2.27, P-7571,072.03
134.4 134.40 377.00 sqm 50,668.80
56.1 56.10 377.00 sqm 21,149.70
3.0 Sub-Head-Concrete Work 0.00
3.1.1
Cast in situ cement concrete block pitching in proportion 1:3:6, laid in panels of
size varying from 0.6 M x 0.6 M to 1.0 M x 1.0 M with 37.5 mm size well gradeed
stone aggregates of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing , compacting and
finishing surface of blocks with cement mortar 1:3 at green stage including
necessary shuttering, all leads and lifts complete. Gap between the adjacent
blocks should not be less than 25 mm, which subsequently is to be filled up by
packing 20 mm down stone chips, cost of witch is included in the item.
70.74 70.74 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
3,97,229.61
2.4Single brick flat soling of picked jhama bricks including ramming and dressing bed
to proper level and filling joints with local sand
SOR-2015, PWD-
Govt of WB, Item
IRRIGATION GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
Annexure 6A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
IRRIGATION GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down well gradeed jhama
Khoa including cost and carriage of materials to site and preparing bed and
dressing complete.78.60 78.60 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
1,70,878.84
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of (medium duty)
conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS :
1239 (Part - I). b) For Concealed Work (Dia) 15 mm 28.00 28.00 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
3,948.00
3.2
Providing and laying in position cement concrete of specified grade excluding
the cost of centering and shuttering - All work up to plinth level : 0.00
20.16 20.16 5,466.30 6351.29 cum 1,28,042.09
8.415 8.42 5,466.30 6351.29 cum 53,446.14
4.0 Sub-Head-Reinforced Concrete Work 0.00
4.1
Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement0.00
47.04 47.04 8634.05 10031.90 cum 4,71,900.70
8.415 8.42 8634.05 10031.90 cum 84,418.46
4.3Centering and shuttering including strutting, propping etc. and removal of form
for0.00
4.3.1Walls (any thickness) including attached pilasters, butteresses, plinth and string
courses etc.156.8 156.80 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-9765,732.68
4.4Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.. 0.00
4.4.1
Thermo-Mechanically Treated bars
4353.22 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-993,44,450.03
1,22,96,437.75
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure 6B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1
Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 3.75 4918.65 5714.98Refer DSR'2014, Sl. No.-
6.1.2, P-11121431.17
1.2
Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundations and
plinth in :
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-11213588.42
2.0 Sub-Head-Finishing Work
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a
floating coat of neat cement.
2.1.120 mm cement plaster
sqm 422.00 303.60 352.75Refer DSR'2014, Sl. No.-
13.9.2, P-216148861.70
3.0 Sub-Head-Flooring Work
3.1.1 75 mm thick Red Sandstone cum 9.07 49222.00 Analysis Rate 446412.78
4 Construction of new cover bin. cum 2.00 22,235.45 Analysis Rate 44470.91
5White washing with lime to give an even shade : :new
work(three or more coats)sqm 422.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
7943.21
6
Colour washing such as green, blue or buff to give an even
shade New work (two or more coats) with a base coat of
white washing.
sqm 422.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
11032.24
6,93,740.43 TOTAL COST =
IRRIGATION GHAT
RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Unit Rate
(INR)
Price
Escalation
Refference Ammount (Rs.)
Annexure 6C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with a)12w/40Wp SPV module 1 no.;
b)12v/40Ah Tubular plate battery (Exide make)- 1 set; c)12v/9w LED
outdoor luminary with automatic DD CCU – 1no.; d) MMS; e) Steel Pole 4.5
mts – 1 no.; f) Suitable Battery box- 1 no.; f) Cables & Wiring materials
etc.
10 Item 17328.00 Analysis Rate 0.00 17328.00 173280.00
2
12w Solar LED Street Light system with a)12w/75Wp SPV module 1 no.;
b)12v/75Ah Tubular plate battery (Exide make)- 1 set; c)12v/12w LED
outdoor luminary with automatic DD CCU – 1no.; d) MMS; e) Steel Pole 6
mts – 1 no.; f) Suitable Battery box- 1 no.; f) Cables & Wiring materials
etc.
1 Item 20913.00 Analysis Rate 0.00 20913.00 20913.00
3
15w Solar LED Street Light system with a)12w/125Wp SPV module 1 no.;
b)12v/125Ah Tubular plate battery (Exide make)- 1 set; c)12v/15w LED
outdoor luminary with automatic DD CCU – 1no.; d) MMS; e) Steel Pole 7
mts – 1 no.; f) Suitable Battery box- 1 no.; f) Cables & Wiring materials
etc.
4 Item 25693.00 Analysis Rate 0.00 25693.00 102772.00
4 Supply of 12 m SWAGGED type Poles 1 Each 10561.54 Analysis Rate 0.00 10561.54 10561.54
5
a) Above 4.5 metre and upto 6.5 metre 11 Each 2311.00DSR-2013, Code No.
11.3.1, P- 35617.16 2928.16 32209.73
b) Above 6.5 metre and upto 8.0 metre 4 Each 2796.00DSR-2013, Code No.
11.3.2, P- 35746.68 3542.68 14170.71
c) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code No.
11.3.4, P- 351040.70 4937.70 4937.70
6
Supply & Wiring with 1.1 KV grade single core PVC insulated stranded
Copper wire in EI conduit/GI conduit and painting - - 4x2.5 sqmm wire in
25 mm conduit incl. S&F 2x10 SWG GI ECC
20 RM 306.00
PWD-2014, GoWB,
Electrical Works, Item No.
A.1(j), P- E-1
17.04 323.04 6460.88
7
Laying of cable as below, after cutting floor/pavement/wall/ and making
holes incl., embedding the cable at an average depth as below and
mending good the damages to original finish incl. removing the rubbish
From 2.5 sqmm through 20 mm dia GI conduit at an average depth of 75
mm in floor/pavement/wall etc.
20 RM 129.00
PWD-2014, GoWB,
Electrical Works, Item No.
5(i), P-F-3
7.19 136.19 2723.71
8
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, “C” curve,
miniature circuit breaker suitable for inductive load of following poles in the
existing MCB DB complete with connections, testing and commissioning
etc. as required - Supply and fixing of 240V, 6A MCB-SPN
1 Each 399.00DSR- 2013, Code No.
2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired SP&N MCB distribution board
of steel sheet for 240 volts on surface/ recess complete with loose wire
box, terminal connectors for all incoming and outgoing circuits, duly
prewired with suitable size FRLS PVC insulated copper conductor up to
terminal blocks, tinned copper bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections, powder painted including
earthing etc. as required. (But without MCB/ RCCB/ Isolator) - 2 + 8 way,
Single door
1 Each 2265.00DSR- 2013, Code No.
2.7.2, P-11604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light on 12 mt. post 4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
ESTIMATES ON RIVER GHAT LIGHT POST(IRRIGATION GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including
Annexure 6C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(IRRIGATION GHAT)
11
Fixing outdoor type fluorescent/SV/MV/LED light fitting on pole including
S&F 40 mm dia x 1.68 mts. long GI Pipe (ISI-Medium) bracket with 40
mmx10 mm thick, MS clamp etc. and providing wiring with 2x1/1.40 PVC
insulated and sheathed wire (single core) from loop box at the base of pole
to light fiting through pole & bracket (without control switch) including
making connections & painting - Fixing of 30 Watt LED street Flood light
on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works, Item No.
H(4), P-H-5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code No. 5.7, P-
223.78 28.78 719.53
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code No. 5.7, P-
223.78 28.78 71.95
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code No. 5.7, P-
223.78 28.78 287.81
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code No. 5.7, P-
223.78 28.78 71.95
13
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including
accessories, and providing masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but without charcoal/ coke
and salt ) as required
1 Set 2781.00DSR-2013, Code No. 5.1, P-
22742.67 3523.67 3523.67
450307.3714 45030.74
495338.11GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination with GI thimble etc. as required
Sub-Total =
Miscelaneous Items
Annexuer-7
1.0 Sheet pile,Ramp & Concrete block pitching Annexure 7A -
2.0 Rrenovation of ghat Annexure 7B -
3.0 Landscaping 195 sqm 2,167.00 Annexure 18 4,22,565.00
4.0 Sitting arrangement 5 nos 46,547.98 Annexure 15 2,32,739.91
5.0 Electric Post Annexure 7D 9,33,805.36
6.0 Renovation change room 2 Nos. - Annexure 7C -
7.0 Proposed Gate 1 Nos. 1,06,434.55 Annexure 22C 1,06,434.55
8.0 Side Railing 68 M 2,766.66 Annexure 16 1,88,132.71
9.0 Water connection 1 nos 25,147.76 Annexure 13&14 25,147.76
10.0 Coffer dam for construction 20 M 27,481.66 Annexure 21 5,49,633.10
24,58,458.39 Sub Total
THANA GHATAmmount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
7.1
Annexure-7A
BILL OF QUANTITIES
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 292.37 292.37 83,950.00 MT Analysis rate 2,45,44,865.30
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and
including carriage of sheet piles up-to work site by trucks,
carts and head load etc. as per direction of the Engineer-in-
charge but the excluding the cost of sheet piles.
2375.10 2375.10 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
24,85,321.60
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured
at a height of 1m above ground level and removal of rubbish
upto a distance of 50 m outside the periphery of the area
cleared.
4350 4350.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-7532,448.38
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
348 348.00 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7262,915.49
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete174 174.00 910.25 1057.62 cum
Refer DSR'2014, Sl.
No.-2.27, P-751,84,025.79
348 348.00 377.00 sqm 1,31,196.00
31.71 31.71 377.00 sqm 11,954.67
THANA GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4
Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
with local sand
SOR-2015, PWD-
Govt of WB, Item
No.1 ( c), P-12
Annexure-7A
BILL OF QUANTITIES
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.0 Sub-Head-Concrete Work -
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to 1.0
M x 1.0 M with 37.5 mm size well gradeed stone aggregates
of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing ,
compacting and finishing surface of blocks with cement
mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks
should not be less than 25 mm, which subsequently is to be
filled up by packing 20 mm down stone chips, cost of witch is
included in the item.
651.60 651.60 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
36,58,959.79
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete.724.00 724.00 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
15,73,998.51
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm120.83 120.83 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
17,037.50
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
52.2 52.20 5,466.30 6351.29 cum 3,31,537.55
4.7565 4.76 5,466.30 6351.29 cum 30,209.93 3.2.1
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20 mm nominal size)Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure-7A
BILL OF QUANTITIES
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
4.0 Sub-Head-Reinforced Concrete Work
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
121.8 121.80 8634.05 10031.90 cum 12,21,885.75
4.7565 4.76 8634.05 10031.90 cum 47,716.75
4.3Centering and shuttering including strutting, propping etc.
and removal of form for
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.406.0 406.00 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-971,70,200.69
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level..
4.4.1
Thermo-Mechanically Treated bars
9934.69 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-997,86,085.84
3,52,90,359.53
4.2
1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate
20 mm nominal size)Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
Annexure-7B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1
Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 20.00 20.00 4918.65 5714.98Refer DSR'2014, Sl. No.-
6.1.2, P-111114299.59
1.2
Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundations and
plinth in :
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 20.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-11213588.42
2.0 Sub-Head-Finishing Work
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a
floating coat of neat cement.
2.1.120 mm cement plaster
sqm 400.00 400.00 303.60 352.75Refer DSR'2014, Sl. No.-
13.9.2, P-216141101.14
3.0 Sub-Head-Flooring Work
cum 12.51 37.25 49222.00 1833509.66
cum 24.74 24.74 49222.00 1217653.84
4.0 Sub-Head-Dismentling & Demolishing Work
4.1
Demolishing Plaster work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per direction
of Engineer-in-charge.
sqm 400.00 400.00 19.00Refer PWD'2015, Sl. No.-
1b 19, P-97600.00
166.82
329.84
5Construction of new cover bin.
cum 2.00 2.00 22,235.45 Analysis Rate 44470.91
7White washing with lime to give an even shade : :new
work(three or more coats)Sqm 400.00 400.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
7529.11
8
Colour washing such as green, blue or buff to give an even
shade New work (two or more coats) with a base coat of
white washing.
Sqm 400.00 400.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
10457.10
34,07,592.99
THANA GHAT
RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Refference
Refer PWD'2015, Sl. No.-
1b 9, P-917383.24
TOTAL COST =
Ammount (Rs.)
3.1.175 mm thick Red Sandstone
Analysis Rate
4.2
Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within a
lead of 75 m. and stacking the serviceable
materials as directed.
sqm 496.66 35.00
Annexure - 7C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
1 Sqm 1 6.40 6.40 353.35 410.56
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
2627.57
2 Sqm 2 65.28 65.28 163.00 189.39
DSR-2014,CPWD
Building, Code
No.13.1.1, P-216
12363.36
3 Sqm 32.64 32.64 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
614.38
4 Sqm 32.64 32.64 22.50 23.75
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
775.31
5 Cum 1 0.04 91496.9 106310.25
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
4146.10
6 Sqm 1 1.84 2689 3124.35
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
5748.80
26275.51
30529.52
30529.52
THANA GHATRENOVATION FOR CHANGE ROOM(3.2MX2M)
Brief Description of Item
12 mm cement plaster of mix :
(1:4 cement and Sand mixture)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate) finished with a
floating coat of neat cement, including cement slurry,
but excluding the cost of nosing of steps etc. complete.
# 40 mm thick with 20 mm nominal size stone
aggregate
TOTAL COST =
White washing with lime to give an even shade : :new
work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash
fasteners of required dia & length ( hold fast lugs or
dash fastener shall be paid for separately).
# Second class teak wood
Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
finished of required size with necessary screws,
excluding panelling which will be paid for separately, all
complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak woodTotal =
Price escalation =
Annexure-7D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with
a)12w/40Wp SPV module 1 no.; b)12v/40Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 4.5 mts –
1 no.; f) Suitable Battery box- 1 no.; f) Cables
& Wiring materials etc.
10 Item 17328.00 Analysis Rate 0.00 17328.00 173280.00
2
12w Solar LED Street Light system with
a)12w/75Wp SPV module 1 no.; b)12v/75Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 6 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
2 Item 20913.00 Analysis Rate 0.00 20913.00 41826.00
3
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
15 Item 25693.00 Analysis Rate 0.00 25693.00 385395.00
4 Supply of 12 m SWAGGED type Poles 2 Each 10561.54 Analysis Rate 0.00 10561.54 21123.09
5
a) Above 4.5 metre and upto 6.5 metre 12 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 35137.88
b) Above 6.5 metre and upto 8.0 metre 15 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 53140.16
c) Above 11.0 metre and upto 13.0 metre 2 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 9875.40
ESTIMATES ON RIVER GHAT LIGHT POST(THANA GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
nominal size) foundation including excavation & refilling etc. as required.
Annexure-7D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
ESTIMATES ON RIVER GHAT LIGHT POST(THANA GHAT)
6
Supply & Wiring with 1.1 KV grade single core
PVC insulated stranded Copper wire in EI
conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI
ECC
100 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 32304.42
7
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as
below and mending good the damages to
original finish incl. removing the rubbish From
2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall
etc.
100 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 13618.53
8
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit
breaker suitable for inductive load of following
poles in the existing MCB DB complete with
connections, testing and commissioning etc. as
required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired
SP&N MCB distribution board of steel sheet for
240 volts on surface/ recess complete with
loose wire box, terminal connectors for all
incoming and outgoing circuits, duly prewired
with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections,
powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2
+ 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light
on 12 mt. post4 Each 16966.00
Analysis Rate
Annexure-26D0.00 16966.00 67864.00
Annexure-7D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
ESTIMATES ON RIVER GHAT LIGHT POST(THANA GHAT)
11
Fixing outdoor type fluorescent/SV/MV/LED
light fitting on pole including S&F 40 mm dia x
1.68 mts. long GI Pipe (ISI-Medium) bracket
with 40 mmx10 mm thick, MS clamp etc. and
providing wiring with 2x1/1.40 PVC insulated
and sheathed wire (single core) from loop box
at the base of pole to light fiting through pole &
bracket (without control switch) including
making connections & painting - Fixing of 30
Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 719.53
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 1079.29
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
13
Earthing with G.I. earth pipe 4.5 metre long, 40
mm dia including accessories, and providing
masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but
without charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
14 848913.96
15 84891.4
933805.36GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination
with GI thimble etc. as required
Sub-Total =
Miscelaneous Items
Annexure- 8
1.0 Sheet pile,Ramp & Concrete block pitching Annexure 8A -
2.0 Renovation of ghat Annexure 8B 3,02,830.45
3.0 Electric Post Annexure 8D 3,86,139.48
4.0 Sitting arrangement 4 nos 46,547.98 Annexure 15 1,86,191.93
5.0 Footpath 30 sqm 2,767.16 Annexure 12 83,014.71
6.0 Water connection 1 nos 25,147.76 Annexure 13& 14 25,147.76
7.0 Side railing 40 M 2,766.66 Annexure 16 1,10,666.30
8.0 Landscaping 140 sqm 2,167.00 Annexure 18 3,03,380.00
9.0 Coffer dam for construction 5 M 27,481.66 Annexure 21 1,37,408.28
10.0 Proposed Gate 1 Nos. 1,06,434.55 Annexure 22C 1,06,434.55
11.0 Construction of toilet 1 nos 12,23,711.16 Annexure 19 12,23,711.16
12.0 Renovation change room 1 Nos - Annexure 8C -
28,64,924.62 Sub Total
SHIBA TEMPLE GHATAmmount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
8.1
Annexure-8A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 174.42 174.42 83,950.00 MT Analysis rate 1,46,42,281.71
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and
including carriage of sheet piles up-to work site by trucks,
carts and head load etc. as per direction of the Engineer-in-
charge but the excluding the cost of sheet piles.
1416.87 1416.87 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
14,82,622.88
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured
at a height of 1m above ground level and removal of rubbish
upto a distance of 50 m outside the periphery of the area
cleared.
7000 7000.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-7552,215.79
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
210 210.00 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7237,966.24
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete103.8 103.80 910.25 1057.62 cum
Refer DSR'2014, Sl.
No.-2.27, P-751,09,780.90
207.6 207.60 377.00 sqm 78,265.20
56.575 56.58 377.00 sqm 21,328.78
Ammount (Rs.)Quantity RefferencePrice
Escalation
Unit Total
Quantity
Unit Rate
(INR)
SHIBA TEMPLE GHAT
2.4
Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
with local sand
SOR-2015, PWD-
Govt of WB, Item
No.1 ( c), P-12
Item
No.Description
Annexure-8A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMPAmmount (Rs.)Quantity RefferencePrice
Escalation
Unit Total
Quantity
Unit Rate
(INR) Item
No.Description
3.0 Sub-Head-Concrete Work -
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to 1.0
M x 1.0 M with 37.5 mm size well gradeed stone aggregates
of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing ,
compacting and finishing surface of blocks with cement
mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks
should not be less than 25 mm, which subsequently is to be
filled up by packing 20 mm down stone chips, cost of witch is
included in the item.
221.40 221.40 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
12,43,237.72
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete.246.00 246.00 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
5,34,811.65
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm72.92 72.92 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
10,281.25
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
31.14 31.14 5,466.30 6351.29 cum 1,97,779.29
8.48625 8.49 5,466.30 6351.29 cum 53,898.67
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20 mm nominal size)3.2.1Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure-8A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMPAmmount (Rs.)Quantity RefferencePrice
Escalation
Unit Total
Quantity
Unit Rate
(INR) Item
No.Description
4.0 Sub-Head-Reinforced Concrete Work
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
72.66 72.66 8634.05 10031.90 cum 7,28,918.05
8.48625 8.49 8634.05 10031.90 cum 85,133.23
4.3Centering and shuttering including strutting, propping etc.
and removal of form for
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.242.2 242.20 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-971,01,533.51
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level..
4.4.1
Thermo-Mechanically Treated bars
6369.98 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-995,04,027.20
1,98,84,082.08 Total
Refer DSR'2014, Sl.
No.-5.2.1, P-96
1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate
20 mm nominal size)4.2
Annexure- 8B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1
Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 1 3 0.25 0.75 0.75 4918.65 5714.98Refer DSR'2014, Sl. No.-
6.1.2, P-1114286.23
1.2
Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundations and
plinth in :
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 5 2 10.00 10.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-1126794.21
2.0 Sub-Head-Finishing Work
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a
floating coat of neat cement.
20 mm cement plastersqm 30 2 60.00 60.00 303.60 352.75
Refer DSR'2014, Sl. No.-
13.9.2, P-216
21165.17
3.0 Sub-Head-Flooring Work
cum 3.65 11.15 0.075 3.05
cum 2.2 3.6 0.075 0.59
cum 8.65 2 0.075 1.30
4.0 Sub-Head-Dismentling & Demolishing Work
3.65 11.15 40.70
2.2 3.6 7.92
8.65 2 17.30
5Construction of new cover bin.
cum 1 1.00 22,235.45 Analysis Rate 22235.45
6White washing with lime to give an even shade : :new
work(three or more coats)Sqm 60.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
1129.37
7
Colour washing such as green, blue or buff to give an even
shade New work (two or more coats) with a base coat of
white washing.
Sqm 60.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
1568.57
3,02,830.45
2307.11
75 mm thick Red Sandstone
4.94 49222.00
SHIBA TEMPLE GHAT
Ammount (Rs.) Total
Quantity
RefferencePrice
Escalation
3.1.1 Analysis Rate 243344.34
4.1
Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within a
lead of 75 m. and stacking the serviceable
materials as directed.
sqm
TOTAL COST =
RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Unit Rate
(INR)
Length
m
Width
m
Height
m
65.92 35.00Refer PWD'2015, Sl. No.-
1b 9, P-9
Annexure - 8C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
1 Sqm 1 3.51 3.51 353.35 410.56
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
1441.06
2 Sqm 2 65.28 65.28 163.00 189.39
DSR-2014,CPWD
Building, Code
No.13.1.1, P-216
12363.36
3 Sqm 32.64 32.64 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
614.38
4 Sqm 32.64 32.64 22.50 23.75
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
775.31
5 Cum 1 0.04 91496.9 106310.25
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
4146.10
6 Sqm 1 1.84 2689 3124.35
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
5748.80
25089.00
29150.91
29150.91
SHIBA TEMPLE GHAT
Brief Description of Item
RENOVATION FOR CHANGE ROOM(1.8MX1.95M)
Price escalation =
TOTAL COST =
White washing with lime to give an even shade : :new
work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash
fasteners of required dia & length ( hold fast lugs or
dash fastener shall be paid for separately).
# Second class teak wood
12 mm cement plaster of mix :
(1:4 cement and Sand mixture)
Total =
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate) finished with a
floating coat of neat cement, including cement slurry,
but excluding the cost of nosing of steps etc. complete.
# 40 mm thick with 20 mm nominal size stone
aggregate
Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
finished of required size with necessary screws,
excluding panelling which will be paid for separately, all
complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak wood
Annexure-8D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with
a)12w/40Wp SPV module 1 no.; b)12v/40Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 4.5 mts –
1 no.; f) Suitable Battery box- 1 no.; f) Cables
& Wiring materials etc.
8 Item 17328.00 Analysis Rate 0.00 17328.00 138624.00
2
12w Solar LED Street Light system with
a)12w/75Wp SPV module 1 no.; b)12v/75Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 6 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
1 Item 20913.00 Analysis Rate 0.00 20913.00 20913.00
3
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
2 Item 25693.00 Analysis Rate 0.00 25693.00 51386.00
4 Supply of 12 m SWAGGED type Poles 1 Each 10561.54 Analysis Rate 0.00 10561.54 10561.54
5
a) Above 4.5 metre and upto 6.5 metre 9 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 26353.41
b) Above 6.5 metre and upto 8.0 metre 2 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 7085.35
c) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 4937.70
ESTIMATES ON RIVER GHAT LIGHT POST(SHIBA TAMPLE GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
nominal size) foundation including excavation & refilling etc. as required.
Annexure-8D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
ESTIMATES ON RIVER GHAT LIGHT POST(SHIBA TAMPLE GHAT)
6
Supply & Wiring with 1.1 KV grade single core
PVC insulated stranded Copper wire in EI
conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI
ECC
20 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 6460.88
7
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as
below and mending good the damages to
original finish incl. removing the rubbish From
2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall
etc.
20 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 2723.71
8
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit
breaker suitable for inductive load of following
poles in the existing MCB DB complete with
connections, testing and commissioning etc. as
required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired
SP&N MCB distribution board of steel sheet for
240 volts on surface/ recess complete with
loose wire box, terminal connectors for all
incoming and outgoing circuits, duly prewired
with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections,
powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2
+ 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light
on 12 mt. post4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
Annexure-8D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
ESTIMATES ON RIVER GHAT LIGHT POST(SHIBA TAMPLE GHAT)
11
Fixing outdoor type fluorescent/SV/MV/LED
light fitting on pole including S&F 40 mm dia x
1.68 mts. long GI Pipe (ISI-Medium) bracket
with 40 mmx10 mm thick, MS clamp etc. and
providing wiring with 2x1/1.40 PVC insulated
and sheathed wire (single core) from loop box
at the base of pole to light fiting through pole &
bracket (without control switch) including
making connections & painting - Fixing of 30
Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 575.62
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
13
Earthing with G.I. earth pipe 4.5 metre long, 40
mm dia including accessories, and providing
masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but
without charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
351035.8914 35103.59
386139.48GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination
with GI thimble etc. as required
Sub-Total =
Miscelaneous Items
Annexure- 9
1.0 Sheet pile,Ramp & Concrete block pitching Annexure 9A 1,39,82,418.42
2.0 Renovation of ghat Annexure 9B 11,75,764.10
3.0 Electric Post Annexure 9D 5,08,383.15
4.0 Water connection 1 Nos 25,147.76 Annexure 13&14 25,147.76
5.0 Sitting arrangement 3 Nos 46,547.98 Annexure 15 1,39,643.95
6.0 Side railing 40 M 2,766.66 Annexure 16 1,10,666.30
7.0 Side Wall 20 M 6,572.83 Annexure 17 1,31,456.63
8.0 Landscaping 20 sqm 2,167.00 Annexure 18 43,340.00
9.0 Renovation change room 1 Nos 34,677.08 Annexure 9C 34,677.08
1,61,51,497.38 Sub Total
ALBIAN JUTE MILL GHATAmmount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
9.1
Annexure 9A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 115.94 115.94 83,950.00 MT Analysis rate 97,33,308.65
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer and/or
monkey including drilling holes and welding of piles as necessary and
cutting sheet piles according to requirement at site, staging,
scaffolding, supply of all equipments and including carriage of sheet
piles up-to work site by trucks, carts and head load etc. as per
direction of the Engineer-in-charge but the excluding the cost of sheet
piles.
941.85 941.85 900.60 1046.41 sqm
Refer SOR 2013-'2014,Govt of
WB, Irrigation & Waterways
Directorate. Sl. No.-2.5, P-58
9,85,558.56
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass, brush
wood, trees and saplings of girth upto 30 cm measured at a height of
1m above ground level and removal of rubbish upto a distance of 50
m outside the periphery of the area cleared.
3600 3600.00 642.00 745.94 100sqmRefer DSR'2014, Sl. No.-2.31, P-
7526,853.83
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in depth. 1.5
m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled
and neatly dressed.
4320 4320.00 155.60 180.79 cum Refer DSR'2014, Sl. No.-2.6, P-72 7,81,019.88
2.3
Supplying and filling in plinth with river sand under floors, including
watering, ramming, consolidating and dressing complete 69 69.00 910.25 1057.62 cumRefer DSR'2014, Sl. No.-2.27, P-
7572,975.74
138 138.00 377.00 sqm 52,026.00
28.35 28.35 377.00 sqm 10,687.95
3.0 Sub-Head-Concrete Work 0.00 -
3.1.1
Cast in situ cement concrete block pitching in proportion 1:3:6, laid in
panels of size varying from 0.6 M x 0.6 M to 1.0 M x 1.0 M with 37.5
mm size well gradeed stone aggregates of pakur or other approved
variety including dewatering, dressing, ramming and preparing bed to
poper slope, placing , compacting and finishing surface of blocks with
cement mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks should not
be less than 25 mm, which subsequently is to be filled up by packing
20 mm down stone chips, cost of witch is included in the item.
153.72 153.72 4,832.90 5615.35 cum
Refer SOR 2013-'2014,Govt of
WB, Irrigation & Waterways
Directorate. Sl. No.-4.23, P-81
8,63,191.07
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down well
gradeed jhama Khoa including cost and carriage of materials to site
and preparing bed and dressing complete.170.80 170.80 1,871.10 2174.03 cum
Refer SOR 2013-'2014,Govt of
WB, Irrigation & Waterways
Directorate. Sl. No.-4.26, P-82
3,71,324.51
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of (medium
duty) conforming to ASTMD - 1785 and threaded to match with GI
Pipes as per IS : 1239 (Part - I). b) For Concealed Work (Dia) 15
mm
41.67 41.67 141.00 M
SOR-2015, PWD-Govt of
WB,Sanataey & Plumbing Item
No.19( I), P-11
5,875.00
3.2
Providing and laying in position cement concrete of specified
grade excluding the cost of centering and shuttering - All work up to
plinth level :
0.00
20.7 20.70 5,466.30 6351.29 cum 1,31,471.79
4.2525 4.25 5,466.30 6351.29 cum 27,008.88
4.0 Sub-Head-Reinforced Concrete Work 0.00
ALBIAN JUTE MILL GHAT
Item No. DescriptionQuantity Total Quantity Unit Rate
(INR)
Price Escalation Unit Refference Ammount (Rs.)
2.4Single brick flat soling of picked jhama bricks including ramming and
dressing bed to proper level and filling joints with local sand
SOR-2015, PWD-Govt of WB,
Item No.1 ( c), P-12
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)
Refer DSR'2014, Sl. No.-4.1.3, P-
85
Annexure 9A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
ALBIAN JUTE MILL GHAT
Item No. DescriptionQuantity Total Quantity Unit Rate
(INR)
Price Escalation Unit Refference Ammount (Rs.)
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string courses,
fillets, columns, pillars, piers, abutments, posts and struts etc. up to
floor five level, excluding cost of centering, shuttering, finishing and
reinforcement
0.00
48.3 48.30 8634.05 10031.90 cum 4,84,540.90
4.2525 4.25 8634.05 10031.90 cum 42,660.67
4.3Centering and shuttering including strutting, propping etc. and
removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters, butteresses, plinth
and string courses etc.161.0 161.00 360.80 419.21 sqm
Refer DSR'2014, Sl. No.-5.9.2, P-
9767,493.38
4.4
Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level. . 0.00
4.4.1Thermo-Mechanically Treated bars
4125.37 68.10 79.13 KgRefer DSR'2014, Sl. No.-5.22.6, P-
993,26,421.61
1,39,82,418.42
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm
nominal size)
Refer DSR'2014, Sl. No.-5.2.1, P-
96
Total
Annexure 9B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1Brick work with common burnt clay F.P.S. (non modular) bricks of
class designation 7.5 in foundation and plinth in:
1.1.1Cement mortar 1:4 (1 cement : 4 coarse sand)
cum 3.24 3.24 4918.65 5714.98Refer DSR'2014, Sl. No.-
6.1.2, P-11118516.53
1.2
Half brick masonry with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundations and plinth in : 0.00
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 20.00 20.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-11213588.42
2.0 Sub-Head-Finishing Work 0.00
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a
floating coat of neat cement.0.00
2.1.120 mm cement plaster
sqm 200.00 200.00 303.60 352.75Refer DSR'2014, Sl. No.-
13.9.2, P-21670550.57
3.0 Sub-Head-Flooring Work 0.00
cum 17.01 18.96 49222.00 933249.12
cum 1.95 1.95 49222.00 95982.90
4.0 Sub-Head-Dismentling & Demolishing Work 0.00
4.1
Demolishing Plaster work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per direction of
Engineer-in-charge.
sqm 200.00 200.00 19.00Refer PWD'2015, Sl. No.-
1b 10, P-93800.00
226.80
26.00
5 Construction of new cover bin. nos. 1.00 1.00 22,235.45 Analysis Rate 22235.45
7White washing with lime to give an even shade : :new
work(three or more coats)Sqm 200.00 200.00 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
3764.56
8
Colour washing such as green, blue or buff to give an even
shade New work (two or more coats) with a base coat of white
washing.
Sqm 200.00 200.00 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
5228.55
11,75,764.10
ALBIAN JUTE MILL GHAT
BILL OF QUANTITIES RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total Quantity Unit Rate
(INR) Price Escalation
Refference
Refer PWD'2015, Sl. No.-
1b 9, P-98848.00
TOTAL
Ammount (Rs.)
3.1.175 mm thick Red Sandstone with laying
Analysis Rate
4.2Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within asqm 252.80 35.00
Annexure 9C
Sl. No. Unit Quantity Total QuantityRate
(Rs.)Price Escalation Refference
Amount
(Rs.)
1 Sqm 6.72 6.72 353.35 410.56DSR-2014,CPWD Building,
Code No.11.3.1, P-1822758.95
2 Sqm 81.60 81.60 163.00 189.39DSR-2014,CPWD Building,
Code No.13.1.1, P-21615454.20
3 Sqm 40.80 40.80 16.2 18.82DSR-2014,CPWD Building,
Code No.13.37.1, P-219767.97
4 Sqm 40.80 40.80 22.50 23.75DSR-2014,CPWD Building,
Code No.13.39.1, P-219969.13
5 Cum 0.04 91496.9 106310.25DSR-2014,CPWD Building,
Code No.9.1.1, P-1444146.10
6 Sqm 1.84 2689 3124.35DSR-2014,CPWD Building,
Code No.9.5.1.1, P-1445748.80
29845.15
34677.08
34677.08
ALBIAN JUTE MILL GHAT
RENOVATION FOR CHANGE ROOM(3.2MX2.1M)
Brief Description of Item
12 mm cement plaster of mix : (1:4
cement and Sand mixture)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate) finished with a floating coat of neat
cement, including cement slurry, but excluding the cost of nosing
of steps etc. complete.
# 40 mm thick with 20 mm nominal size stone aggregate
TOTAL COST =
White washing with lime to give an even shade : :new
work(three or more coats)
Colour washing such as green, blue or buff to give an even
shade New work (two or more coats) with a base coat of white
washing.
Providing wood work in frames of doors, windows, clerestory
windows and other frames, wrought framed and fixed in position
with hold fast lugs or with dash fasteners of required dia &
length ( hold fast lugs or dash fastener shall be paid for
separately). #
Second class teak wood
Providing and fixing panelled or panelled and glazed shutters for
doors, windows and clerestory windows, including ISI marked
M.S. pressed butt hinges bright finished of required size with
necessary screws, excluding panelling which will be paid for
separately, all complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak wood
Total =
Price escalation =
Annexure 9D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
15w Solar LED Street Light system with a)12w/125Wp SPV module 1
no.; b)12v/125Ah Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic DD CCU – 1no.; d)
MMS; e) Steel Pole 7 mts – 1 no.; f) Suitable Battery box- 1 no.; f)
Cables & Wiring materials etc.
12 Item 25693.00 Analysis Rate 0.00 25693.00 308316.00
2 Supply of 12 m SWAGGED type Poles 1 Each 10561.54 Analysis Rate 0.00 10561.54 10561.54
3
a) Above 6.5 metre and upto 8.0 metre 12 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 42512.13
b) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 4937.70
4
Supply & Wiring with 1.1 KV grade single core PVC insulated stranded
Copper wire in EI conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI ECC
30 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 9691.33
5
Laying of cable as below, after cutting floor/pavement/wall/ and
making holes incl., embedding the cable at an average depth as
below and mending good the damages to original finish incl. removing
the rubbish From 2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall etc.
30 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 4085.56
6
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, “C”
curve, miniature circuit breaker suitable for inductive load of following
poles in the existing MCB DB complete with connections, testing and
commissioning etc. as required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
7
Supplying and fixing following way prewired SP&N MCB distribution
board of steel sheet for 240 volts on surface/ recess complete with
loose wire box, terminal connectors for all incoming and outgoing
circuits, duly prewired with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper bus bar, neutral link,
earth bar, din bar, detachable gland plate, interconnections, powder
painted including earthing etc. as required. (But without MCB/ RCCB/
Isolator) - 2 + 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
8 Supply of 30 Watt 'MAGNAM' LED flood light on 12 mt. post 4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
ESTIMATES ON RIVER GHAT LIGHT POST(ALBIAN JUTE MILL GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation
Annexure 9D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price Escalation
(Rs.)
Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(ALBIAN JUTE MILL GHAT)
9
Fixing outdoor type fluorescent/SV/MV/LED light fitting on pole
including S&F 40 mm dia x 1.68 mts. long GI Pipe (ISI-Medium)
bracket with 40 mmx10 mm thick, MS clamp etc. and providing wiring
with 2x1/1.40 PVC insulated and sheathed wire (single core) from
loop box at the base of pole to light fiting through pole & bracket
(without control switch) including making connections & painting -
Fixing of 30 Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 6363.76
10
a) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 863.43
b) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
11
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including
accessories, and providing masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but without charcoal/
coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
462166.5012 46216.65
508383.15GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination with GI thimble etc. as
Sub-Total =
Miscelaneous Items
Annexure- 10
1.0 Sheet pile,Ramp & Concrete block pitching Annexure 10A -
2.0 Renovation of ghat Annexure 10B -
3.0 Sitting arrangement 10 nos 46,547.98 Annexure 15 4,65,479.82
4.0 Footpath 250 sqm 2,767.16 Annexure 12 6,91,789.29
5.0 Coffer dam for construction 7 M 27,481.66 Annexure 21 1,92,371.59
6.0 Electric Post Annexure 10D 8,90,192.34
7.0 Water connection 1 nos 25,147.76 Annexure 13& 14 25,147.76
8.0 Landscaping 60 sqm 2,167.00 Annexure 18 1,30,020.00
9.0 Side railing 30 M 2,766.66 Annexure 16 82,999.72
10.0 Side Wall 110 M 6,572.83 Annexure 17 7,23,011.47
12.0 Renovation change room 2 M - Annexure 10C -
13.0 Proposed Gate 1 Nos. 1,14,943.60 Annexure 22D 1,14,943.60
33,15,955.58 Sub Total
ASOKE CLUB GHATAmmount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
10.1
Annexure 10A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 145.18 145.18 83,950.00 MT Analysis rate 1,21,87,795.18
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer and/or
monkey including drilling holes and welding of piles as necessary and
cutting sheet piles according to requirement at site, staging,
scaffolding, supply of all equipments and including carriage of sheet
piles up-to work site by trucks, carts and head load etc. as per direction
of the Engineer-in-charge but the excluding the cost of sheet piles.
1179.36 1179.36 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
12,34,090.72
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass, brush
wood, trees and saplings of girth upto 30 cm measured at a height of
1m above ground level and removal of rubbish upto a distance of 50 m
outside the periphery of the area cleared.
1300 1300.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-759,697.22
2.2
Earth work in excavation by mechanical means (Hydraulic excavator)
/ manual means over areas (exceeding 30cm in depth. 1.5 m in width
as well as 10 sqm on plan) including disposal of excavated earth, lead
upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly
dressed.
174 174.00 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7231,457.75
2.3
Supplying and filling in plinth with river sand under floors, including
watering, ramming, consolidating and dressing complete 87 87.00 910.25 1057.62 cumRefer DSR'2014, Sl.
No.-2.27, P-7592,012.89
172.8 172.80 377.00 sqm 65,145.60
36.6 36.60 377.00 sqm 13,798.20
3.0 Sub-Head-Concrete Work 0.00
3.1.1
Cast in situ cement concrete block pitching in proportion 1:3:6, laid in
panels of size varying from 0.6 M x 0.6 M to 1.0 M x 1.0 M with 37.5
mm size well gradeed stone aggregates of pakur or other approved
variety including dewatering, dressing, ramming and preparing bed to
poper slope, placing , compacting and finishing surface of blocks with
cement mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks should not
be less than 25 mm, which subsequently is to be filled up by packing
20 mm down stone chips, cost of witch is included in the item.
277.20 277.20 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
15,56,574.05
ASOK CLUB GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
2.4Single brick flat soling of picked jhama bricks including ramming and
dressing bed to proper level and filling joints with local sand
SOR-2015, PWD-
Govt of WB, Item
Annexure 10A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
ASOK CLUB GHAT
Item
No.Description
Quantity Total
Quantity
Unit Rate
(INR)
Price
Escalation
Unit Refference Ammount (Rs.)
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down well
gradeed jhama Khoa including cost and carriage of materials to site
and preparing bed and dressing complete.308.00 308.00 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
6,69,601.58
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of (medium
duty) conforming to ASTMD - 1785 and threaded to match with GI
Pipes as per IS : 1239 (Part - I). b) For Concealed Work (Dia) 15 mm 36.00 36.00 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
5,076.00
3.2
Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level :
0.00
25.92 25.92 5,466.30 6351.29 cum 1,64,625.54
5.49 5.49 5,466.30 6351.29 cum 34,868.60
4.0 Sub-Head-Reinforced Concrete Work 0.00
4.1
Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets,
columns, pillars, piers, abutments, posts and struts etc. up to floor five
level, excluding cost of centering, shuttering, finishing and
reinforcement
0.00
60.48 60.48 8634.05 10031.90 cum 6,06,729.47
5.49 5.49 8634.05 10031.90 cum 55,075.15
4.3Centering and shuttering including strutting, propping etc. and
removal of form for0.00
4.3.1Walls (any thickness) including attached pilasters, butteresses, plinth
and string courses etc.201.6 201.60 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-9784,513.45
4.4
Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level. . 0.00
4.4.1
Thermo-Mechanically Treated bars
5178.65 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-994,09,762.31
1,72,20,823.71
3.2.11:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)
Refer DSR'2014, Sl.
No.-4.1.3, P-85
4.21:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm
nominal size)
Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
Annexure 10B
RENOVATION OF EXISTING GHAT
1.0 Sub-Head-Brick Work
1.1Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 1.22 1.22 4918.65 5714.98Refer DSR'2014, Sl. No.-6.1.2,
P-111
6972.27
1.2Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundations and plinth in :
0.00
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 40.00 40.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-112
27176.84
2.0 Sub-Head-Finishing Work 0.00
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat
cement.
0.00
2.1.120 mm cement plaster
sqm 75.00 75.00 303.60 352.75Refer DSR'2014, Sl. No.-
13.9.2, P-216
26456.46
3.0 Sub-Head-Flooring Work 0.00
cum 8.49
cum 2.04
cum 0.75
4.0 Sub-Head-Dismentling & Demolishing Work 0.00
113.16
27.20
10.00
5.0 Construction of new cover bin. cum 1 1.00 22,235.45 Analysis Rate 22235.45
6.0White washing with lime to give an even shade : :new work(three or more
coats)Sqm 75.00 75.00 16.2 18.82
DSR-2014,CPWD Building,
Code No.13.37.1, P-2191411.71
7.0Colour washing such as green, blue or buff to give an even shade New work
(two or more coats) with a base coat of white washing. Sqm 75.00 75.00 22.50 26.14
DSR-2014,CPWD Building,
Code No.13.39.1, P-2191960.71
6,46,533.91
ASOKE CLUB GNAT
RENOVATION OF EXISTING GHAT
Item No. DescriptionUnit Quantity Total Quantity Unit Rate
(INR)
Price Escalation Refference Ammount (Rs.)
3.1.1
75 mm thick Red Sandstone
11.28 49222.00 Analysis Rate 555058.04
Refer PWD'2015, Sl. No.-1b 9,
P-95262.43
TOTAL COST =
4.1
Dismantling Chunar stone flooring carefully
including removing rubbish to anywhere within a
lead of 75 m. and stacking the serviceable
materials as directed.
sqm 150.36 35.00
Annexure 10C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
1 Sqm 1 8.06 8.06 353.35 410.56
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
3309.09
2 Sqm 2 81.60 81.60 163.00 189.39
DSR-2014,CPWD
Building, Code
No.13.1.1, P-216
15454.20
3 Sqm 40.80 40.80 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
767.97
4 Sqm 40.80 40.80 22.50 23.75
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
969.13
5 Cum 1 0.04 91496.9 106310.25
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
4146.10
ASOKE CLUB GHAT
RENOVATION FOR CHANGE ROOM(3.1MX2.6M)
Brief Description of Item
12 mm cement plaster of mix :
(1:4 cement and Sand mixture)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate) finished with a
floating coat of neat cement, including cement slurry,
but excluding the cost of nosing of steps etc. complete.
# 40 mm thick with 20 mm nominal size stone
aggregate
White washing with lime to give an even shade : :new
work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a base
coat of white washing.
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash
fasteners of required dia & length ( hold fast lugs or
dash fastener shall be paid for separately).
# Second class teak wood
Annexure 10C
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefference
Amount
(Rs.)
ASOKE CLUB GHAT
RENOVATION FOR CHANGE ROOM(3.1MX2.6M)
Brief Description of Item
6 Sqm 1 1.84 2689 3124.35
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
5748.80
30395.30
35316.29
35316.29 TOTAL COST =
Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
finished of required size with necessary screws,
excluding panelling which will be paid for separately, all
complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak wood
Total =
Price escalation =
Annexure 10D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference Schedule Price Escalation (Rs.)Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic DD
CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1 no.;
f) Suitable Battery box- 1 no.; f) Cables & Wiring
materials etc.
24 Item 25693.00 Analysis Rate 0.00 25693.00 616632.00
2 Supply of 12 m SWAGGED type Poles 1 Each 10561.54 Analysis Rate 0.00 10561.54 10561.54
3
a) Above 6.5 metre and upto 8.0 metre 24 Each 2796.00DSR-2013, Code No.
11.3.2, P- 35746.68 3542.68 85024.25
b) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code No.
11.3.4, P- 351040.70 4937.70 4937.70
4
Supply & Wiring with 1.1 KV grade single core PVC
insulated stranded Copper wire in EI conduit/GI
conduit and painting - - 4x2.5 sqmm wire in 25 mm
conduit incl. S&F 2x10 SWG GI ECC
20 RM 306.00
PWD-2014, GoWB,
Electrical Works, Item
No. A.1(j), P- E-1
17.04 323.04 6460.88
5
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as below
and mending good the damages to original finish
incl. removing the rubbish From 2.5 sqmm through
20 mm dia GI conduit at an average depth of 75 mm
in floor/pavement/wall etc.
20 RM 129.00
PWD-2014, GoWB,
Electrical Works, Item
No. 5(i), P-F-3
7.19 136.19 2723.71
6
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit breaker
suitable for inductive load of following poles in the
existing MCB DB complete with connections, testing
and commissioning etc. as required - Supply and
fixing of 240V, 6A MCB-SPN
1 Each 399.00DSR- 2013, Code No.
2.10.2, P-12106.55 505.55 505.55
ESTIMATES ON RIVER GHAT LIGHT POST(ASOKE CLUB GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation
Annexure 10D
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference Schedule Price Escalation (Rs.)Final Rate
(Rs.)Amount (Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
ESTIMATES ON RIVER GHAT LIGHT POST(ASOKE CLUB GHAT)
7
Supplying and fixing following way prewired SP&N
MCB distribution board of steel sheet for 240 volts on
surface/ recess complete with loose wire box,
terminal connectors for all incoming and outgoing
circuits, duly prewired with suitable size FRLS PVC
insulated copper conductor up to terminal blocks,
tinned copper bus bar, neutral link, earth bar, din
bar, detachable gland plate, interconnections,
powder painted including earthing etc. as required.
(But without MCB/ RCCB/ Isolator) - 2 + 8 way,
Single door
1 Each 2265.00DSR- 2013, Code No.
2.7.2, P-11604.87 2869.87 2869.87
8 Supply of 30 Watt 'MAGNAM' LED flood light on 12
mt. post4 Each 16966.00 Analysis Rate 0.00 16966.00 67864.00
9
Fixing outdoor type fluorescent/SV/MV/LED light
fitting on pole including S&F 40 mm dia x 1.68 mts.
long GI Pipe (ISI-Medium) bracket with 40 mmx10
mm thick, MS clamp etc. and providing wiring with
2x1/1.40 PVC insulated and sheathed wire (single
core) from loop box at the base of pole to light fiting
through pole & bracket (without control switch)
including making connections & painting - Fixing of
30 Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works, Item
No. H(4), P-H-5
83.94 1590.94 6363.76
10
a) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code No.
5.7, P-223.78 28.78 1726.86
b) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code No.
5.7, P-223.78 28.78 71.95
11
Earthing with G.I. earth pipe 4.5 metre long, 40 mm
dia including accessories, and providing masonry
enclosure with cover plate having locking
arrangement and watering pipe etc. (but without
charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code No.
5.1, P-22742.67 3523.67 3523.67
809265.7612 80926.58
890192.34GRAND TOTAL =
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination with GI thimble etc. as
Sub-Total =
Miscelaneous Items
Annexure-11
1.0 Sheet pile,Ramp & Concrete block pitching Annexure 11A -
2.0 Counstruction of ghat Annexure 11B -
3.0 Electric Post Annexure 11C 5,38,356.28
4.0 Sitting arrangement 7 nos 46,547.98 Annexure 15 3,25,835.88
5.0 Construction of Footpath & Platfrom 286 sqm 2,767.16 Annexure 12 7,91,406.94
6.0 Water connection 1 nos 25,147.76 Annexure 13&14 25,147.76
7.0 Coffer dam for construction 8 M 27,481.66 Annexure 21 2,19,853.24
8.0 Side railing 15 M 2,766.66 Annexure 16 41,499.86
9.0 Side Wall 55 M 6,572.83 Annexure 17 3,61,505.73
10.0 Landscaping 50 sqm 2,167.00 Annexure 18 1,08,350.00
11.0 Construction of toilet 1 nos 12,23,711.16 Annexure 19 12,23,711.16
12.0 Proposed change room 1 nos 1,36,947.32 Annexure 20 1,36,947.32
13.0 Proposed Gate 1 nos 1,06,434.55 Annexure 22C 1,06,434.55
38,79,048.72
ORIENT MORE GHAT
Sub Total
Ammount (Rs.)Quantity RefferenceItem
No.Description
Unit Rate
(INR) Unit
11.1
Annexure-11A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
1.0 Sheet piling work
1.1 Supply of MS sheet piles(ISPS 1421 Z) with 5% wastage 80.66 80.66 83,950.00 MT Analysis rate 67,70,997.32
1.2
Driving M.S.sheet piles (manually/mechanically) by hammer
and/or monkey including drilling holes and welding of piles as
necessary and cutting sheet piles according to requirement at
site, staging, scaffolding, supply of all equipments and
including carriage of sheet piles up-to work site by trucks,
carts and head load etc. as per direction of the Engineer-in-
charge but the excluding the cost of sheet piles.
655.20 655.20 900.60 1046.41 sqm
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
2.5, P-58
6,85,605.96
2.0 Sub-Head-Earth Work
2.1
Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth upto 30 cm measured
at a height of 1m above ground level and removal of rubbish
upto a distance of 50 m outside the periphery of the area
cleared.
350 350.00 642.00 745.94100s
qm
Refer DSR'2014, Sl.
No.-2.31, P-752,610.79
2.2
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth. 1.5 m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.
96 96.00 155.60 180.79 cumRefer DSR'2014, Sl.
No.-2.6, P-7217,356.00
2.3
Supplying and filling in plinth with river sand under floors,
including watering, ramming, consolidating and dressing
complete48 48.00 910.25 1057.62 cum
Refer DSR'2014, Sl.
No.-2.27, P-7550,765.73
96 96.00 377.00 sqm 36,192.00
17.2 17.20 377.00 sqm 6,484.40
21 21.00 377.00 sqm 7,917.00
ORIENT MORE GHAT
2.4
Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
with local sandSOR-2015, PWD-
Govt of WB, Item
No.1 ( c), P-12
Item
No.Description
Ammount (Rs.)Quantity RefferencePrice
Escalation
Unit Total
Quantity
Unit Rate
(INR)
Annexure-11A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
Item
No.Description
Ammount (Rs.)Quantity RefferencePrice
Escalation
Unit Total
Quantity
Unit Rate
(INR)
3.0 Sub-Head-Concrete Work
3.1.1
Cast in situ cement concrete block pitching in proportion
1:3:6, laid in panels of size varying from 0.6 M x 0.6 M to 1.0
M x 1.0 M with 37.5 mm size well gradeed stone aggregates
of pakur or other approved variety including dewatering,
dressing, ramming and preparing bed to poper slope, placing ,
compacting and finishing surface of blocks with cement
mortar 1:3 at green stage including necessary shuttering, all
leads and lifts complete. Gap between the adjacent blocks
should not be less than 25 mm, which subsequently is to be
filled up by packing 20 mm down stone chips, cost of witch is
included in the item.
59.40 59.40 4,832.90 5615.35 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.23, P-81
3,33,551.58
3.1.2
Providing filter on bed and slope of canal with 37.5 mm down
well gradeed jhama Khoa including cost and carriage of
materials to site and preparing bed and dressing complete.66.00 66.00 1,871.10 2174.03 cum
Refer SOR 2013-
'2014,Govt of WB,
Irrigation &
Waterways
Directorate. Sl. No.-
4.26, P-82
1,43,486.05
3.1.3
Supplying, fitting and fixing PVC pipes of approved make of
(medium duty) conforming to ASTMD - 1785 and threaded to
match with GI Pipes as per IS : 1239 (Part - I). b) For
Concealed Work (Dia) 15 mm17.50 17.50 141.00 M
SOR-2015, PWD-
Govt of
WB,Sanataey &
Plumbing Item
No.19( I), P-11
2,467.50
3.2
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
14.4 14.40 5,466.30 6351.29 cum 91,458.63
3.44 3.44 5,466.30 6351.29 cum 21,848.45
6.3 6.30 5,466.30 6351.29 cum 40,013.15
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20 mm nominal size)3.2.1
Refer DSR'2014, Sl.
No.-4.1.3, P-85
Annexure-11A
BILL OF QUANTITIES SHEET PILES,CONCRETE BLOCK PITCHING & RAMP
Item
No.Description
Ammount (Rs.)Quantity RefferencePrice
Escalation
Unit Total
Quantity
Unit Rate
(INR)
4.0 Sub-Head-Reinforced Concrete Work
4.1
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement
33.6 33.60 8634.05 10031.90 cum 3,37,071.93
2.58 2.58 8634.05 10031.90 cum 25,882.31
3.15 3.15 8634.05 10031.90 cum 31,600.49
4.3Centering and shuttering including strutting, propping etc.
and removal of form for
4.3.1Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.112.0 112.00 360.80 419.21 sqm
Refer DSR'2014, Sl.
No.-5.9.2, P-9746,951.91
4.4
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level..
4.4.1
Thermo-Mechanically Treated bars
2884.88 68.10 79.13 KgRefer DSR'2014, Sl.
No.-5.22.6, P-992,28,266.86
88,80,528.08
4.2Refer DSR'2014, Sl.
No.-5.2.1, P-96
Total
1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate
20 mm nominal size)
Annexure-11B
1.0 Sub-Head-Brick Work
1.1
Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
1.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 8.00 4918.65 5714.98 45719.84
cum 28.13 4918.65 5714.98 160733.80
1.2
Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundations and
plinth in :
1.2.1cement mortar 1:4 (1 cement : 4 coarse sand)
sqm 50.00 584.75 679.42Refer DSR'2014, Sl. No.-
6.12.2, P-11233971.05
2.0 Sub-Head-Finishing Work
2.1Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a
floating coat of neat cement.
2.1.112 mm cement plaster
sqm 72.00 226.10 262.71Refer DSR'2014, Sl. No.-
13.9.1, P-21618914.80
3.0 Sub-Head-Flooring Work
cum 3.94 49222.00 193811.63
cum 4.50 49222.00 221499.00
4Construction of new cover bin.
cum 2.00 22,235.45 Analysis Rate 44470.91
719121.02 TOTAL
Refference
BILL OF QUANTITIES
Item No. DescriptionUnit Quantity Unit Rate
(INR)
Price
Escalation
Refer DSR'2014, Sl. No.-
6.1.2, P-111
Analysis Rate 75 mm thick Red Sandstone
3.1.1
ORIENT MORE GHAT
Ammount (Rs.)
Annexure-11C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
[A] [B] [C] [D] [E] [F] [G] [H] = E+G [I] = C XH J
1
9w Solar LED Street Light system with
a)12w/40Wp SPV module 1 no.; b)12v/40Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/9w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 4.5 mts –
1 no.; f) Suitable Battery box- 1 no.; f) Cables
& Wiring materials etc.
13 Item 17328.00 Analysis Rate 0.00 17328.00 225264.00
2
12w Solar LED Street Light system with
a)12w/75Wp SPV module 1 no.; b)12v/75Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/12w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 6 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
1 Item 20913.00 Analysis Rate 0.00 20913.00 20913.00
3
15w Solar LED Street Light system with
a)12w/125Wp SPV module 1 no.; b)12v/125Ah
Tubular plate battery (Exide make)- 1 set;
c)12v/15w LED outdoor luminary with automatic
DD CCU – 1no.; d) MMS; e) Steel Pole 7 mts – 1
no.; f) Suitable Battery box- 1 no.; f) Cables &
Wiring materials etc.
2 Item 25693.00 Analysis Rate 0.00 25693.00 51386.00
4 Supply of 12 m SWAGGED type Poles 1 Each 10561.54Analysis Rate
Annexure-26D0.00 10561.54 10561.54
5
a) Above 4.5 metre and upto 6.5 metre 14 Each 2311.00DSR-2013, Code
No. 11.3.1, P- 35617.16 2928.16 40994.20
b) Above 6.5 metre and upto 8.0 metre 2 Each 2796.00DSR-2013, Code
No. 11.3.2, P- 35746.68 3542.68 7085.35
c) Above 11.0 metre and upto 13.0 metre 1 Each 3897.00DSR-2013, Code
No. 11.3.4, P- 351040.70 4937.70 4937.70
ESTIMATES ON RIVER GHAT LIGHT POST(ORIENT MORE GHAT)
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
nominal size) foundation including excavation & refilling etc. as required.
Annexure-11C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
ESTIMATES ON RIVER GHAT LIGHT POST(ORIENT MORE GHAT)
6
Supply & Wiring with 1.1 KV grade single core
PVC insulated stranded Copper wire in EI
conduit/GI conduit and painting - - 4x2.5 sqmm
wire in 25 mm conduit incl. S&F 2x10 SWG GI
ECC
100 RM 306.00
PWD-2014, GoWB,
Electrical Works,
Item No. A.1(j), P-
E-1
17.04 323.04 32304.42
7
Laying of cable as below, after cutting
floor/pavement/wall/ and making holes incl.,
embedding the cable at an average depth as
below and mending good the damages to
original finish incl. removing the rubbish From
2.5 sqmm through 20 mm dia GI conduit at an
average depth of 75 mm in floor/pavement/wall
etc.
100 RM 129.00
PWD-2014, GoWB,
Electrical Works,
Item No. 5(i), P-F-3
7.19 136.19 13618.53
8
Supplying and fixing 5 amps to 32 amps rating,
240/415 volts, “C” curve, miniature circuit
breaker suitable for inductive load of following
poles in the existing MCB DB complete with
connections, testing and commissioning etc. as
required - Supply and fixing of 240V, 6A MCB-
SPN
1 Each 399.00DSR- 2013, Code
No. 2.10.2, P-12106.55 505.55 505.55
9
Supplying and fixing following way prewired
SP&N MCB distribution board of steel sheet for
240 volts on surface/ recess complete with
loose wire box, terminal connectors for all
incoming and outgoing circuits, duly prewired
with suitable size FRLS PVC insulated copper
conductor up to terminal blocks, tinned copper
bus bar, neutral link, earth bar, din bar,
detachable gland plate, interconnections,
powder painted including earthing etc. as
required. (But without MCB/ RCCB/ Isolator) - 2
+ 8 way, Single door
1 Each 2265.00DSR- 2013, Code
No. 2.7.2, P-11604.87 2869.87 2869.87
10 Supply of 30 Watt 'MAGNAM' LED flood light
on 12 mt. post4 Each 16966.00
Analysis Rate
Annexure-26D0.00 16966.00 67864.00
Annexure-11C
Sl. No. Particulars Quantity Unit Rate (Rs.) Refference
Schedule
Price
Escalation
(Rs.)
Final Rate
(Rs.)
Amount
(Rs.)
ESTIMATES ON RIVER GHAT LIGHT POST(ORIENT MORE GHAT)
11
Fixing outdoor type fluorescent/SV/MV/LED
light fitting on pole including S&F 40 mm dia x
1.68 mts. long GI Pipe (ISI-Medium) bracket
with 40 mmx10 mm thick, MS clamp etc. and
providing wiring with 2x1/1.40 PVC insulated
and sheathed wire (single core) from loop box
at the base of pole to light fiting through pole &
bracket (without control switch) including
making connections & painting - Fixing of 30
Watt LED street Flood light on 12 mt. post
4 Set 1507.00
PWD-2015, GoWB,
Electrical Works,
Item No. H(4), P-H-
5
83.94 1590.94 6363.76
12
a) With 4.5 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 935.38
b) With 6 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
c) With 7 meter Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 143.91
d) With 12 meter SWAGGED Pole 2.5 Meter 25.00DSR-2013, Code
No. 5.7, P-223.78 28.78 71.95
13
Earthing with G.I. earth pipe 4.5 metre long, 40
mm dia including accessories, and providing
masonry enclosure with cover plate having
locking arrangement and watering pipe etc. (but
without charcoal/ coke and salt ) as required
1 Set 2781.00DSR-2013, Code
No. 5.1, P-22742.67 3523.67 3523.67
489414.8014 48941.48
538356.28GRAND TOTAL =
Miscelaneous Items
Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/termination
with GI thimble etc. as required
Sub-Total =
Annexure-12
Sl.
No.Particulars Unit Quantity Rate (Rs.) Reference
Ammount
(Rs.)
1
Surface dressing of the ground in any kind of soil
including removing vegetation inequalities not
exceeding 15cm depth and disposal of the
rubbish with a lead upto 75m as directed
Sqm 22.5 11.00
SOR-2015, PWD,
GoWB, Item No. 1(A)
1, P-1
247.50
2
Earth work in excavation of foundation trenches
or drains, in all sorts of soil (including mixed soil
but excluding laterite or sandstone) including
removing, spreading or stacking the spoils within
a lead of 75 m. as directed. The item includes
necessary trimming the sides of trenches,
levelling, dressing and ramming the bottom,
bailing out water as required complete.
Cum 13.50 120.47
SOR-2015, PWD,
GoWB, Item No. 1(A)
2a, P-1
1626.35
3
Filling in foundation or plinth by silver sand in
layers not exceeding 150mm as directed and
consolidating the same by thorough saturation
with water raming complete including the cost of
supply of sand
Cum 6.45 985.24
SOR-2015, PWD-
GoWB, Section 1(A),
Item No. 4 (A), P-2
6354.80
4
Single brick flat soling of picked jhama bricks
including ramming and dressing bed to proper
level and filling joints with local sand
Sqm 22.50 377.00
SOR-2015, PWD-Govt
of WB, Item No.1 (
c), P-12
8482.50
5
Providing ordinary cement concrete (mix 1:2:4)
at the top layer of the road with approved quality
graded stone chips (20 mm nominal size) as per
IS code
Cum 4.00 4603.00
SOR-2015, PWD-Govt
of WB, Item No.1 ( c)
5a, P-12
18412.00
6
20 mm. thick (finished) terrazo work with precast
tiles set on 20 mm avg thick cement mortar (1:3)
and sides with admixture of pigment and
white/grey cement as necessary in
floor, dado, skirting, staircase etc. laid in panels
or in patterns including high polishing, raking out
joints, roughening of concrete surface &
application of cement slurry before flooring
works using cement @ 1.75 kg. per sq.m. all
complete including all materials & labour.
Sqm 20.00 1011.00
SOR-2015, PWD-Govt
of WB, Item No.1 (D)
7Ai), P-44
20220.00
55343.14
2767.16
ESTIMATE OF INTERNAL ROAD
(For 10 M Length)
Sub Total =
Cost per SQM=
12.1
Annexure-13
Sl.
No.Quantity Unit
Rate
(Rs.)
Price
EscalationReferance
Amount
(Rs.)
1
a) 50 M 127.55 148.20 7410.02
2
a) 1 Nos. 336.80 391.33 391.33
3
a) 2.16 m3 112.40 130.60 282.70
4
a) 0.22 Sqm 1276.10 1482.70 326.19
5 50.00 M 160.00 185.90DSR-2014, Code No.
1547, P-2969295.20
17705.44
Providing GI Pipe of 25 mm Dia
Total Cost
Supplying tools and cutting road as well as restoring the same as per
specification and direction of E/I
25 mm
Water Bound macadam road for cutting roads as per requirment
Rate Analysis for Laying of House Connection MDPE Pipe
Brief Description of Item
25 mm
Excavating trenches of required width for pipes, cables etc including exavation
for socket, dressing of sides, ramming of bottoms, depth upto 1.5 m including
getting out the excavated soil, and then returning the soil as required , in layer
not exiding 20cm in depth including consolidating each deposited layer by
ramming, watering,etc. and disposing of surplus excavated soil as directed with a
DSR-2014, Code No.
2.10.1.1, P-73
Filling available excavated earth(excluded rock) in trenches , plinth sides of
foundations etc. in layers not exceeding 20cm in depth consoliding each
deposited layer by r5amming and watering, lead upto 50m, and lift upto 1.5m
DSR-2014, Code No.
16.14, P-257
DSR-2014, Code No.
18.20.3, P-314
DSR-2014, Code No.
2.25, P-75
25 mm
Providing and fixing brass ferrule with CI mouth cover including all
25 mm
13.1
Annexure-14
Sl.
No.
Quantity Unit Rate
(In Rs.)Price
Escalation
Refference Amount
(Rs.)
0.506 Cum
0.131 Cum
0.048 Cum
0.685 Cum 155.60 180.79
2 0.685 Cum 153.07 177.85DSR-2014, CPWD,
Item No. 1.1.2, P-62 121.83
1.960 Sqm 377.00 738.92
0.750 Sqm 377.00 282.75
0.156 Cum 6570.00 7633.68 1192.76
0.020 Cum 6570.00 7633.68 151.72
0.078 Cum 6570.00 7633.68 591.75
5 0.056 Cum 5466.30 6351.29DSR-2014, Code No.
4.1.3, P-85 357.26
6 0.500 Sqm 821.00
SoR-2015, PWD-
GoWB, Item No. 1C
30, P- 32
410.50
0.30 196.45 228.26 68.48
0.38 196.45 228.26 85.60
0.98 196.45 228.26 223.69
0.79 196.45 228.26 179.18
4
DSR-2014, Code No.
5.2.3, P-96
For R.C.C. (75mm x 75mm) concerte Edge
DSR-2014, Code No.
4.3.1, P-86
For R.C.C. Stand post
7 Sqm
Cosntruction and Installation of Single Mouth Stand Post
1
DSR-2014, Code No.
2.6, P-72123.84
In drain
3 Providing designation 100 A one brick flat soling joints with local sand including
cost of watering, taxes, royalty all complete as per building specification and
direction of E/I.
Platform with 2 meter Long Masonary Drain
Brief Description of Item
Earthwork in excavation in foundation trenches or drains (not exceeding 1.5 m in
width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift
upto 1.5 m including getting out the excavated soil and disposal of surplus In Plartform
Total
Surplus Earth Removal
Reinforced cement concrete work in wall (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, coloumns pillers piers
abutments, posts and struts etc up to floor five level excluding cost of centering
shuttering finishing and reinforcement. 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20 mm nominal size)
For R.C.C. platform 100 mm thick
In Standpost
In Plartform
SOR-2015, PWD-Govt
of WB, Item No.1 ( c),
P-12In drain
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - all work upto plinth level, - 1:2:4 (1
cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) at surface drain
over BFS
Brick Work of class designation 100A cement
morter 1:3 (1 cement : 3 coarse sand) in suface
drain
centering and shuttering including strutting,
propping etc. for removal of from for Foundation
footings, bases of columns etc. for mass concrete
14.1
Annexure-14
Sl.
No.
Quantity Unit Rate
(In Rs.)Price
Escalation
Refference Amount
(Rs.)
Brief Description of Item
8
a) 7.787 Kg 64.95 75.47 587.62
b) 3.786 Kg 64.95 75.47 285.72
c) 2.717 Kg 64.95 75.47 205.01
1.185 Sqm 172.30 200.20 237.23
1.57 Sqm 172.30 200.20 314.31
1.5625 Sqm 41.40 48.10 75.16
1.185 Sqm 41.40 48.10 57.00
0.75 Sqm 41.40 48.10 36.08
11
a) 3 M 265.00
SOR-2015, Vol. 2,
Sanitary & Plumbing
Works, Section A(II),
Item No. 1.B.a, P-2
795.00
b) 2 Each 14.00
SOR-2015, Vol. 2,
Sanitary & Plumbing
Works, Section A(II),
Item No. 19 iii) C, P-12
28.00
c) 1 Each 12.00
SOR-2015, Vol. 2,
Sanitary & Plumbing
Works, Section A(II),
Item No. 19 iii) F, P-13
12.00
d) 2 Each 11.00
SOR-2015, Vol. 2,
Sanitary & Plumbing
Works, Section A(II),
Item No. 19 iii) B, P-12
22.00
e) 1 Each 195.00
SOR-2015, Vol. 2,
Sanitary & Plumbing
Works, Section A(II),
Item No. 7 G i), P-6
195.00
f) 1 Each 55.00 63.90DSR-2014, Code No.
1641, P-29663.90
7442.31
9
In Standpost
Reinforcement for R.C.C. work including strainghtening, cutting, beinding, placing
in position and binding all complete
8mm dia main rod in standpost 6 nos
15 mm PVC Socket
Drain surface10
DSR-2014, Code No.
13.4.1, P-216
DSR-2014, Code No.
5.22.1, P-99
Sub Total =
DSR-2014, Code No.
13.18, P-217
15 mm PVC Elbow
15 mm PVC Nipple
15 mm G.I. pipe
Supply fitting and fixing the following G.I. fitting, all complete
Supplying, fitting and fixing alloy iron with brass
spindle bib cock/stop cock of approved brand and
make, spray painted and tested to 21 kg
per sq. cm
Net cement punning
15 mm Union Socket
2m long drain area
12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand)
In drain surface
6mm dia main rod at platform
6mm dia ring rod at standpost 13 nos
14.2
Annexure - 15
Sl.
No.Description of items Quantity Unit Rate (Rs.) Reference. Amount (Rs.)
1
Earth work excavation in foundation trenches including
dressing of all sides, watering and ramming including disposal
of excavated earth upto 30m lead and lift upto 1.5m, disposed
earth to be leveled and neatly dressed as per the direction of
engineer-in-Charge all complete.
SOR-2015; PWD
Building, GoWB,
Sec-1(A), Item
No. 2(a), P-1
a) For Bench 2.30 Cum 120.47 277.08
b) Roof 0.85 Cum 120.47 101.80
2
Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints with
local sand
SOR-2015, PWD-
Govt of WB,
Item No.1 ( c), P-
a) For Bench 1.62 Sqm 377.00 610.74
b) Roof 0.85 Sqm 377.00 318.57
3 Brick work with 1st class bricks in cement mortar (4:1) 1.944 Cum 6,068.00
SOR-2015, PWD
Building, GoWB,
Sec-1(C) Item
No. 21(a), P-30
11,796.19
4
Sand and cement plaster including rounding off or chamfering
corners as directed and raking out joints where necessary with
20mm thick plaster (1:4)
8.64 Sqm 206.0
SOR-2015, PWD-
Govt of WB,
Item No.I 2.ii)a),
P-164
1,779.84
5 Neat cement punning 8.64 Sqm 38.00
SOR-2015, PWD-
Govt of WB,
Item No.I. 8, P-
166
328.32
6
Painting with best quality synthetic enemel paint of approved
make including smoothening surface by sand papering on
plastered surface.
8.64 Sqm 33.33
SOR-2015, PWD-
Govt of WB,
Item No.14 a),
i), P-171
287.97
7
Ordinary Cement concrete (mix 1:2:4) with graded stone chips
(20 mm nominal size) excluding shuttering and reinforcement,if
any, in ground floor as per relevant IS codes. - Pakur Variety -
for bench
0.375 Cum 4603.00
SOR-2015, PWD-
Govt of WB,
Item No. 1C,
5.a), P-12
1,726.13
8
Controlled Cement concrete with well graded stone chips (20
mm graded nominal size) excluding shuttering and
reinforcement with complete design of concrete as per IS : 456
and relevant special publications, submission of job mix
formula after preliminary mix design after testing of concrete
cubes as per direction of Engineer-in charge. Consumption of
cement will not be less than 300 Kg of cement with Super
plasticiser per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary test
and job mix foumula. In ground floor and foundation. [using
concrete mixture] (a) M 20 Grade - Pillar
1.375 Cum 5402.00
SOR-2015, PWD-
Govt of WB,
Item No. 1C,
6.a)i), P-13
7,427.75
9
Controlled Cement concrete with well graded stone chips (20
mm graded nominal size) excluding shuttering and
reinforcement with complete design of concrete as per IS : 456
and relevant special publications, submission of job mix
formula after preliminary mix design after testing of concrete
cubes as per direction of Engineer-in charge. Consumption of
cement will not be less than 300 Kg of cement with Super
plasticiser per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary test
and job mix foumula. In ground floor and foundation. [using
concrete mixture] (a) M 20 Grade - Roof
0.225 Cum 5402.00
SOR-2015, PWD-
Govt of WB,
Item No. 1C,
6.a)i), P-13
1,215.45
10
Reinforcement for reinforced concrete work in all sorts of
structures including distribution bars,stirrups,binders,etc initial
straightening and removal of loose rust (if necessary)cutting to
requisite length,hooking and bending to correct shape, placing
in proper position and binding.
256.75 Kg 61.94
SOR-2015, PWD-
Govt of WB,
Item No.1C
15.a)i), P-28
15,902.07
COSTRUCTION OF SITTING PLACE WITH SHADE
15.1
Annexure - 15
Sl.
No.Description of items Quantity Unit Rate (Rs.) Reference. Amount (Rs.)
COSTRUCTION OF SITTING PLACE WITH SHADE
11
Hire and labour charges for suttering with centering and
necessary staging upto 4 m using approved stout props and
thick hard wood plank of approved thick ness with required
bracing for concrete slabs, beamsand columns, lintets curved
or straight including fitting, fixingand striking out after
completion of work(upto roof of ground level
3.025 Sqm 225.00
SOR-2015, PWD-
Govt of WB,
Item No.1C 12.f)
680.63
12
Sand and cement plaster including rounding off or chamfering
corners as directed and raking out joints where necessary with
20mm thick plaster (1:4)
14.8 Sqm 206.0
SOR-2015, PWD-
Govt of WB,
Item No.I 2.ii)a),
P-164
3,048.80
13 Neat cement punning 14.8 Sqm 38.00
SOR-2015, PWD-
Govt of WB,
Item No.I. 8, P-
166
562.40
14
Painting with best quality synthetic enemel paint of approved
make including smoothening surface by sand papering on
plastered surface.
14.8 Sqm 33.33
SOR-2015, PWD-
Govt of WB,
Item No.14 a),
i), P-171
493.28
15
Removal of rubbish, earth etc. from the working site and
disposal of the same beyond the compound in conformity with
the municipal /corporation rules for such disposal loading into
truck and cleaning the site in all respect as per direction of the
Engineer-in-Charge.
2.2015 Cum 168.00
SoR-2015, PWD
Building, Govt. of
WB, Section
1(B), Item No.
13, P-10
369.85
46,547.98TOTAL =
15.2
Annexure-16
Sl.
No.Particulars Unit Nos Quantity Rate (Rs.)
Price
EscalationReference
Ammount
(Rs.)
1
Earth work in excavation of foundation trenches
or drains, in all sorts of soil (including mixed soil
but excluding laterite or sandstone) including
removing, spreading or stacking the spoils within
a lead of 75 m. as directed. The item includes
necessary trimming the sides of trenches,
levelling, dressing and ramming the bottom,
bailing out water as required complete.
Cum 7 0.19 155.60 180.79Refer DSR'2014, Sl. No.-
2.6, P-7234.17
2
Single brick flat soling of picked jhama bricks
including ramming and dressing bed to proper
level and filling joints with local sand
Sqm 7 0.63 377.00
SOR-2015, PWD-Govt
of WB, Item No.1 ( c),
P-12
237.51
3
Providing ordinary cement concrete (mix 1:2:4) at
the top layer of the road with approved quality
graded stone chips (20 mm nominal size) as per
IS code
Cum 7 0.19 5466.30 6351.29Refer DSR'2014, Sl. No.-
4.1.3, P-851200.39
4Providing Railing both side of the stair with G.I.
pipe (TATA make) 40mm dia.m 28.75 334.15 388.25
Refer DSR'2014, Sl. No.-
18.12.5, P-31311162.16
5
Making connection by providing and fixing tee,
including cutting and threading the pipe
etc. complete :
each 35 35.00 367.75 427.29Refer DSR'2014, Sl. No.-
18.13.1, P-31414955.11
6
Colour washing such as green, blue or buff to
give an even shade New work (two or more
coats) with a base coat of white washing.
Sqm 3.14 3.611 21.39
SOR-2015, PWD
Building, GoWB,Sec -
1(J ), Item No. 5(b)(i),
P-169
77.24
27666.57
2766.66Cost per Meter =
ESTIMATE OF SIDE RAILING(one side)
(For 10 M Length)
Sub Total =
16.1
ANNEXURE-17
Sl.
No.Unit NO Quantity
Rate (Rs.) Price
EscalationRefference
Amount
(Rs.)
Cum 1 9.00 155.60 180.79 1627.12
Cum 6 4.86 155.60 180.79 878.65
2 Cum 3.47 112.40 130.60
DSR-2014,CPWD
Building, Code
No.2.25, P-75
452.52
Sqm 1 2.50 377.00 942.50
Sqm 1 0.81 377.00 305.37
Cum 6 0.73 5,466.30 6351.29Refer DSR'2014, Sl.
No.-4.1.3, P-854630.09
Cum 6 0.97 6,450.0 7494.26 7284.42
Cum 6 0.61 6,450.0 7494.26 4566.81
Cum 1 0.63 6,450.0 7494.26 4683.91
Cum 1 0.38 6,450.0 7494.26 2810.35
RATE ANALYSIS FOR CONSTRUCTION OF SIDE WALL
10 m Length
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.
4
Brief Description of Item
1
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as
10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed
earth to be levelled and neatly dressed.
DSR-2014,CPWD
Building, Code
No.2.6, P-72
3
For colum
Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,
buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain
window sills, fillets, sunken floor,etc., up to floor five level, excluding the cost of
centering, shuttering and finishing:l
(a) 1:2:4 proportion
Single Brick Flat Soling of picked jhama
bricks including ramming and dressing bed
to proper level and filling joints with local
sand.
PWD (WB)SoR
Building 2015, Pg-
12, Sec-1(C), It-1
5
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size)
For foundation
Top of wall
For tie beam
17.1
ANNEXURE-17
Sl.
No.Unit NO Quantity
Rate (Rs.) Price
EscalationRefference
Amount
(Rs.)Brief Description of Item
2 4.00 360.00 418.28 1673.14
6 9.75 360.00 418.28 4078.27
2 5.00 360.00 418.28 2091.42
2 3.00 360.00 418.28 1254.85
7 Kg 1.0 209.22 68.10 79.13
DSR-2014,CPWD
Building, Code
No.5.22A.6, & 5.22.6
P-99
16554.52
8 Cum 1 1.81 5667.55 6585.13
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
11894.38
65728.326572.83
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above/above plinth level.
Sqm
Centering and shuttering including strutting, propping
etc. and emoval of form work for : (upto roof of
ground floor)Retaining walls, return walls, walls (any
thickness) including attached pilasters, buttresses,
plinth and string courses fillets, kerbs and steps etc.
Total Cost of 10 m Length =
Rate/ Meter=
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
6
17.2
Annexure-18
Sl.
No.Particulars
Quantity
CalculationQuantity Unit
Scheduled
Rate (Rs.) Refference Schedule
Price
Escalation
Amount
(Rs.)
1
Cleaning of jungle including uprooting of rank vegetation,
grass, bush, trees and removal of rubbish upto a distance
of 50 m
10 X 8 80.0 Sqm 6.42 DSR-2014, Code No. 2.31, P-75 7.46 596.75
2
Trenching in ordinary soil upto a depth of 60 cm including
removal and stacking of serviceable materials and then
disposing of by spreadind and neatlt levelling with in a led
of 50m and making up the trenched area to proper levels
by filling with earth or earth mixed with sludge or/and
manure before and after flooding trench with water
(excluding cost of import earth, sludge or manure)
10 x 8 x 0.6 48 Cum 155.60 DSR-2014, Code No. 2.6, P-72 180.79 8678.00
3Supplying and stacking of good earth at site including
royalty and carriage upto 1 km 10 x 8 x 0.9 72 Cum 116.00
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
3.01 & 3.02) i) & iii), P-234
0.00 8352.00
4
Supplying and stacking at site dump manure from
approved source, including carriage up to 1 km and
screened through sieve of I.S. designation 20mm
- 36 Cum 116.00
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
3.01 & 3.02) i) & iii), P-234
0.00 4176.00
5Rough dressing the trenched ground including breaking
clods10 X 8 80.0 Sqm 20.20
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
9.02), P-269
0.00 1616.00
6 Spreading of good earth of 30cm thickness 10 x 8 x 0.3 24 Cum 19.80
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
9.01), P-269
0.00 475.20
7 Mixing earth and manure in 2:1 proportion - 72 Cum 19.80
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
9.01), P-269
0.00 1425.60
8 Spreading of mixed material of 35 cm thickness 10 x 8 x 0.35 28 Cum 19.80
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
9.01), P-269
0.00 554.40
RIVER FRONT DEVELOPMENT - LANDSCAPING 10M X8M
18.1
Annexure-18
Sl.
No.Particulars
Quantity
CalculationQuantity Unit
Scheduled
Rate (Rs.) Refference Schedule
Price
Escalation
Amount
(Rs.)
RIVER FRONT DEVELOPMENT - LANDSCAPING 10M X8M
9
Edging with bricks laid dry length wise including
excavation, refilling, consolidating with hand packing and
spreading neatly surplus earth within a lead of 50m- for 75
class designation
2 x (10 + 8) 36 Meter 34.30
SOR-2015, PWD, Road & Bridge
Work, Govt. of WB, Vol. 3, Item No.
9.09), P-270
0.00 1234.80
10SOR-2015, PWD, Building Works,
GoWB, Section 1 (U)
a)Furcaria veriegated 10-12 leaves in height 20-30cm in
earthen pots of size 25cm.30 Nos. 162.00 Item No. 48) i), P-271 0.00 4860.00
b)Ficus bengalensis (variegated) of height 60-75cm in
earthen pots size 30cm24 Nos. 185.00 Item No. 48) ix), P-271 0.00 4440.00
c)Ficus regnold well branched (bushy) of height 120cm-
135cm in cement pots of size 35cm.24 Nos. 142.00 Item No. 48) xiii), P-271 0.00 3408.00
d)Adenium obesum of height 90cm-60cm in earthen pots of
size 25cm18 Nos. 207.00 Item No. 48) xvi), P-272 0.00 3726.00
e)Areca Palm 4 - 5 suckers of height 120 cm to 135 cm in
earthen pots of size 25 cm.18 Nos. 163.00 Item No. 48) xxvii), P-272 0.00 2934.00
f) China palm of leaves 4-5 in earthen pots size 25cm 12 Nos. 1893.00 Item No. 48) viii), P-271 0.00 22716.00
g)Dracaena Victoria of height 30 cm to 90 cm in earthen
pots of size 25 cm. - 36 Nos. 83.00 Item No. 48) xxxv), P-273 0.00 2988.00
h)Ficus elastica Decora ( Rubber plant ) of height 90cm-
60cm in each earthen pot of size 25cm.30 Nos. 69.00 Item No. 48) xi), P-273 0.00 2070.00
i)Hibiscus Variegated of height 60 cm to 75 cm in earthen
pots of size 25 cm.12 Nos. 65.00 Item No. 48) xxv), P-272 0.00 780.00
Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum
height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying
presticide and fertilizer etc.
18.2
Annexure-18
Sl.
No.Particulars
Quantity
CalculationQuantity Unit
Scheduled
Rate (Rs.) Refference Schedule
Price
Escalation
Amount
(Rs.)
RIVER FRONT DEVELOPMENT - LANDSCAPING 10M X8M
11
Maintanance of trees for one year (Avenue Plants)
including watering, trimming, manuring, spraying
insecticide and guarding as required. This includes supply
of labour, tools & plants including materials
- 204 Nos. 482.00
SOR-2015, PWD, Building Works,
GoWB, Section 1 (U), Item No. 47,
P-271
0.00 98328.00
173358.75
2167.00
Total =
COST PER SQ M
18.3
Annexure - 19
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)Refarance
Amount
(Rs.)
1
1.a Cum 9 20.50
1.b Cum 1 5.62
1.c Cum 1 7.02
2 Cum 1 36.11 36.11 112.40
DSR-2014,CPWD
Building, Code
No.2.25, P-75
4059.05
3
3.a Sqm 9 9.00
3.b Sqm 1 72.23
3.c Sqm 1 4.68
3.d Sqm 1 10.23
4
4.a Cum 9 0.51
4.b Cum 1 7.22
4.c Cum 1 1.40
5 Cum 1 7.67 7.67 5667.55
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
43463.02
6 Sqm 1 10.23 10.85 314.85
DSR-2014,CPWD
Building, Code
No.4.11, P-87
3416.12
7
7.a Sqm 1 69.55
7.b Sqm 1 4.68
7.c Sqm 1 3.90
Floor area
Steps (for tread)
Providing and laying damp-proof course 50 mm thick
with cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate
20 mm nominal size
Estimation of Sulabha Complex
Brief Description of Item
5157.65
Column Footings
Plinth Beams
Steps
33.15 155.60
SOR-2015,PWD
Building, GoWB,
Sec- 1(A),Item
No.2(a),P-1
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
96.13 377.00
Plinth Beams
Room Floors
Steps
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.
Steps (for riser)
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level
in all shapes and sizes in :
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with
a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc.
complete. # 40 mm thick with 20 mm nominal size stone
aggregate
Column Footings
Room Floors
Steps
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
SOR-2015,PWD
Building, GoWB,
Sec- 1(C ), Item
No.1,P-12
36241.01
58906.24
3031.74
8.58 353.35
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
9.13 6450.00
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level
and filling joints with local sand
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:
(a) 1:2:4 proportion
19.1
Annexure - 19
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)Refarance
Amount
(Rs.)
Estimation of Sulabha Complex
Brief Description of Item
8 Cum 1 10.23
8.a Cum 12 1.35
8.b Cum 2 0.45
Cum 1 1.30
9
9.a Sqm 8 28.80
9.b Sqm 6 26.10
9.c Sqm 1 54.60
9.e Sqm 4 8.00
9.f Sqm 8 12.00
10
Sqm 1 147.73
Sqm 1 209.40
Sqm 12 20.40
Sqm 4 30.00
Sqm 8 16.00
Sqm 16 24.00
Cum 24 3.24
Cum 4 4.80
Cum 2 20.80
10.b Sqm 1 83.01
40381.29
Deduction for the openings . Rolling shutter
7.13 5667.55
DSR-2014,CPWD
Building, Code
No.6.4.1 & 6.5, P-
111
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
uperstructure above plinth level up to floor V level in
all shapes and sizes in :
# Cement mortar 1:4
421.70
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
15 mm cement plaster on the rough side of single or half brick wall of mix : (Ground floor).
# 1:4 (1 cement: 4 fine sand)
79701.77
59517.50
189.00
Ceilling
Partition wall of toilet 2
89.50 665.00
Deduction for the openings . Window
Deduction for the openings . Rolling shutter
Partition wall of toilet 1
D/d for opening Door ( D2)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level.
# Cement mortar 1:4 (1 cement :4 coarse sand)
Partition wall of sweeper room
D/d for opening Door ( D1)
Deduction for the openings . Ventilation
DSR-2014,CPWD
Building, Code
No.6.13.2, P-112
10.a
Walls
D/d for opening Door ( D1)
D/d for opening Door ( D2)
Deduction for the openings . Ventilation
Deduction for the openings . Window
19.2
Annexure - 19
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)Refarance
Amount
(Rs.)
Estimation of Sulabha Complex
Brief Description of Item
11
11.a Cum 9 0.76
11.b Cum 9 2.63
Cum 6 1.46
Cum 6 2.41
Cum 6 0.98
Cum 6 1.61
11.e Cum 1 9.96
11.f Cum 1.00 1.53
11.g Cum 1 1.42
12 Kg 1 1820.3 68.10
DSR-2014,CPWD
Building, Code
No.5.22A.6 &
5.22.6A , P-99
123963.32
13
13.a Sqm 36 42.08
Sqm 12 11.70
Sqm 12 19.26
Sqm 18 11.70
Sqm 18 19.26
13.d Sqm 2 12.27
13.e Sqm 1 83.01
14
14.a Sqm 16 54.40
Sqm 16 44.80
14.b Sqm 8 12.00
15
15.a Cum 2 0.03
15.b Cum 4 0.10
15.c Cum 8 0.19
DSR-2014,CPWD
Building, Code
No.11.38, P-187
0.31
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
87.20 940.45
Door ( D2)
91496.9Door ( D1)
82007.24
Gents & ladies toilet
22.75
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
146762.74Columns
13.c
71739.9013.b
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:l (a) 1:2:4 proportion
Column Footings
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
6450.00
199.28 360.00
Plinth Beams
Centering and shuttering including strutting, propping etc. and emoval of form work for : (upto roof
of ground floor)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
Beam
Column
Window (W1)
11.c
11.d Beam
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above plinth level.
For chajja
Slabs
D/d opening
28547.03
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought
framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold
fast lugs or dash fastener shall be paid for separately). # Second class
teak wood
Lintel
Lintel
Plinth Beams
SlabsProviding and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the
manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades,
except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1
Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigments
etc., complete.
19.3
Annexure - 19
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)Refarance
Amount
(Rs.)
Estimation of Sulabha Complex
Brief Description of Item
16
16.a Sqm 8 9.78
16.b Sqm 4 6.98
16.c Sqm 12 1.62
16.d Sqm 2 2.60
Sqm 1 10.40 2142.10
18 Sqm 1 147.73 16.2
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
2393.23
19 Sqm 1 273.97 22.50
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
6164.38
874150.60
141524.98
1015675.58
20 101567.56
21 76175.67
22 101567.56
23 Nos. 1 38572.46 As per analysis 38572.46
24 M 10 3167.73 As per analysis 31677.33
1223711.16
12.24Total Cost Rs. in Lakh =
Sub Total =
10% of Civil Cost
7.5 % of Civil Cost
10% of Civil CostProvision for providing external electrification.
Prvision for providing, fitting & fixing of water supply
& sanitary installation.
Provision for providing internal electrification.
Price Escalation @16.19% for 1 Year =
Sub-Total with Price Escalation =
Colour washing such as green, blue or buff to give
an even shade New work (two or more coats) with a
base coat of white washing.
White washing with lime to give an even shade :
:new work(three or more coats)
Total Cost =
Construction of Manhole
Pipe laing for sewer connection200mm Diameter
RCC Pipe
Size : L-1.2m x W-
1.2m x D-1.5m
Ventilator
Windows
Door ( D2)
56419.52
DSR-2014,CPWD
Building, Code
No.10.6.1, P-176
22277.84
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory
windows, including ISI marked M.S. pressed butt hinges bright finished of required size with
necessary screws, excluding panelling which will be paid for separately, all complete as per direction
ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked
together through their entire length and jointed together at the end by end locks, mounted on
specially designed pipe shaft with brackets, side guides and arrangements for inside and outside
locking with push and pull operation complete, including the cost of providing and fixing necessary
27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength
conforming to IS: 4454 -
part 1 and M.S. top cover of required thickness for rolling shutters.
#80x1.25 mm M.S. laths with 1.25 mm thick top cove
17
Door ( D1)2689
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
20.98
19.4
Annexure-20
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)Refarance
Price Escalation
(Rs.)
Escalated
Price (Rs.)
Amount
(Rs.)
1
1.a Cum 4 2.25
1.b Cum 1 0.84
1.c Cum 1 0.15
2
2.a Sqm 4 2.25
2.b Sqm 1 4.32
2.c Sqm 1 0.75
2.d Sqm 1 2.10
3
3.a Cum 4 0.45
3.b Cum 1 0.43
3.c Cum 1 0.11
4 Cum 1 0.95 0.95 5667.55
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
917.58 6,585.13 6222.94
5 Sqm 1 4.32 4.32 353.35
DSR-2014,CPWD
Building, Code
No.11.3.1, P-182
57.21 410.56 1773.61
3.24
9.42 Room Floors
509.38
941.93 6,759.93
180.79
70.98
COST ESTIMATE FOR CHANGE ROOM
Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars,
posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets, sunken floor,etc., up to floor five level,
excluding the cost of centering, shuttering and finishing:
(a) 1:3:6 proportion6722.75
DSR-2014,CPWD
Building, Code
No.2.6.1, P-72
585.76
4798.33 438.40
25.19
Steps
DSR-2014,CPWD
Building, Code
No.4.2.5, P-86
5818.00
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate) finished with a
floating coat of neat cement, including cement slurry,
but excluding the cost of nosing of steps etc.
complete. # 40 mm thick with 20 mm nominal size
stone aggregate
DSR-2014,CPWD
Building, Code
No.16.12 , P-257
155.60
0.99
Earth work in excavation by mechanical means (Hydraulic excavator) / manual
means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm
on plan) including disposal of excavated earth, lead upto 50m and lift upto
1.5m, disposed earth to be levelled and neatly dressed.
Dry brick pitching half brick thick in drains including supply of bricks and
preparing the surface complete :
# With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Plinth Beams
Column Footings
Room Floors
Steps
Brief Description of Item
Column Footings
Steps
Plinth Beams
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in (with 1:4 cement sand mortar)
20.1
Annexure-20
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)Refarance
Price Escalation
(Rs.)
Escalated
Price (Rs.)
Amount
(Rs.)
COST ESTIMATE FOR CHANGE ROOM
Brief Description of Item
6 Cum 1 5.04
6.a Cum 1 0.53
7
7.a Sqm 1 20.16
i Sqm 1 2.10
7.b Sqm 1 30.68
i Sqm 1 2.10
8 Sqm 1 4.32 4.32 163.00
DSR-2014,CPWD
Building, Code
No.13.1.1, P-216
26.39 189.39 818.16
9
9.a Cum 4 0.34
9.b Cum 4 0.91
9.c Cum 1 0.53
9.d Cum 1 0.05
9.e Cum 1 0.67
Sqm 16 1.80
Sqm 16 14.50
Sqm 2 4.20
Sqm 2 0.70
Sqm 1 6.67
Sqm 2 1.04
11 Kg 1 88.80 68.10
DSR-2014,CPWD
Building, Code
No.5.22A.6, P-99
11.03 79.13 7026.33
12 Sqm 1 24.51 24.51 16.2
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
2.62 18.82 461.35
30.60 219.60
1,044.26 7,494.26
58.28 418.28
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
46.64 189.0
15 mm cement plaster on the rough side of single or half brick wall of mix :
(Ground floor). # 1:4 (1 cement: 4
fine sand)
360.00
Centering and shuttering including strutting, propping
etc. and emoval of form work for : (upto roof of
ground floor)Retaining walls, return walls, walls (any
thickness) including attached pilasters, buttresses,
plinth and string courses fillets, kerbs and steps etc.
Deduction for the door openings .
10242.10
917.584.52 5667.55 29731.85 6,585.13
White washing with lime to give an even shade : :new
work(three or more coats)
Plinth Beams
Lintel Beams & chajja
External surface of wall
Deduction for the door openings .
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete above plinth level.
Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars,
posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets, sunken floor,etc., up to floor five level,
excluding the cost of centering, shuttering and finishing: (a) 1:2:4 proportion
2.49
Column Footings
Column
12 mm cement plaster of mix :
(1:4 cement and Sand mixture)
Internal surface of wall
Deduction for the door openings .
12092.59
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
18647.58
Roof slab
10
6450.00
28.91
20.2
Annexure-20
Sl.
No.Unit No Quantity
Total
Quantity
Rate
(Rs.)Refarance
Price Escalation
(Rs.)
Escalated
Price (Rs.)
Amount
(Rs.)
COST ESTIMATE FOR CHANGE ROOM
Brief Description of Item
13 Sqm 1 20.64 20.64 22.50
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
3.64 26.14 539.59
14 Cum 1 0.04 0.04 91496.9
DSR-2014,CPWD
Building, Code
No.9.1.1, P-144
14813.35 1,06,310.25 4146.10
15 Sqm 1 1.84 1.84 2689.00
DSR-2014,CPWD
Building, Code
No.9.5.1.1, P-144
435.35 3124.35 5748.80
109557.85
10955.79
16433.68
136947.32
1.37
Grand Total for Change Room =
Total Cost in Lakh =
Carraiage of Materials @10% of the Total Cost =
Cost for electrical work, @ 15% of the Grand Total =
Total =
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a
base coat of white washing.
Providing wood work in frames of doors, windows,
clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash
fasteners of required dia & length ( hold fast lugs or
dash fastener shall be paid for separately). # Second
class teak wood
Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
including ISI marked M.S. pressed butt hinges bright
finished of required size with necessary screws,
excluding panelling which will be paid for separately,
all complete as per direction ofEngineer-in-charge.
In Ground Floor:
(ii) 35mm Thick shutter.
(a) Second class teak wood
20.3
Annexure-21
Sl.
No.Items Quantity Unit
Rate
(Rs.)Reference
Price Escalation
(Rs.)
Escalated
Price (Rs.)
Ammount
(Rs.)
1
Supply, carriage and stacking at site
Jhaw / Eucalyptus bullah, each of length
upto 6.0 m including sizing and
sharpening one end for driving and
dressing the other end of 20 cm
diameter
345 Meters 305.00
SOR-2015, Road &
Bridge, PWD, GoWB,
Vol. 3, Item No. 18.18,
P-324
0.00 305.00 105225.00
2
Labour for driving Sal-bullah /
Eucalyptus bullah piles by monkey in
sorts of soil including hoisting and
placing piles in position, protecting the
pile head with iron ring and cutting and
shaping heads before and after driving
and including hire and labour for
necessary driving appliances and all
tackles - 20 cm dia
173 Meters 119.00
SOR-2015, Road &
Bridge, PWD, GoWB,
Vol. 3, Item No. 18.17,
P-324
0.00 119.00 20527.50
3
Joining Sal-bullah / Eucalyptus bullah
pile of 20 cm. to 30 cm. diameter with
half lap joints (lap length at least 90 cm
long) with 3 nos. of collars made of 50
mm. x 6 mm. M.S. Flat, clamps, bolts
and nuts and washers as per approved
drawing and design
50 Each 581.00
SOR-2015, Road &
Bridge, PWD, GoWB,
Vol. 3, Item No. 18.20,
P-325
0.00 581.00 29050.00
4Supplying empty Cement bags in good
condition1035 Nos. 3.30
SOR-2015, Road &
Bridge, PWD, GoWB,
Vol. 3, Item No. 18.28,
P-325
0.00 3.30 3415.50
5 Supply of River Sand 36.2 Cum 700.00
SOR-2015, Road &
Bridge, PWD, GoWB,
Vol. 3, Table 1, Sl.
No.4, P-219
0.00 700.00 25357.50
6
Filling empty Cement bags with dry
earth or sand, stitching the bag (cost of
thread included) and carrying and
placing them in position and all
incidental charges complete but
excluding cost of sand and gunny bags.
1035.0 Nos. 3.50
SOR-2015, Road &
Bridge, PWD, GoWB,
Vol. 3, Item No. 18.29,
P-325
0.00 3.50 3622.50
ESTIMATES FOR CONSTRUCTION COFFER DAM FOR CONSTRUCTION UNDER RIVER WATER
10m Length
21.1
Annexure-21
7Dumping in position earth / sand filled
polybags inclusive of all leads and lifts1035.0 Each 2.30
SOR-2013-14,
Irrigation & Waterways
Directorate, Greater
Calcutta Drainage
Circle, GoWB, Item No.
4.20, P-80
0.61 2.91 3016.22
8
Taking out bullah wailing pieces after
removing nut & bolts and iron nails and
stacking the same with 150 m from the
site of work including sorting out
serviceable materials
345.0 Meters 7.80
SOR-2013-14,
Irrigation & Waterways
Directorate, Greater
Calcutta Drainage
Circle, GoWB, Item No.
4.9, P-78
2.08 9.88 3409.64
9
Bailling out water by Pump including all
leads and lifts including making
arrangements for disposal
180.0 HP-Hr 356.00
SOR-2013-14,
Irrigation & Waterways
Directorate, Greater
Calcutta Drainage
Circle, GoWB, Item No.
1.10, P-56
95.07 451.07 81192.69
274816.5527481.66For 1 METER LENGTH =
GRAND TOTAL FOR 10 M Length =
21.2
Annexure-22A
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
1
1.a Cum 2 2.00 2.00 155.60 180.79
2 Cum 0.40 0.40 112.40 130.60
DSR-2014,CPWD
Building, Code
No.2.25, P-75
52.24
3
3.a Sqm 2 2.00 2.00 377.00
4
4.a Cum 2 0.25 0.25 6450.00 7494.26
5 Cum 2 0.72 0.72 5667.55 6585.13
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
4741.29
6
6.a Cum 2 0.40
6.b Cum 2 0.64
6.c Cum 1 0.22
6.d Cum 1 0.35
6.e Cum 2 0.27
7 Kg 1 150.3 68.10 79.13
DSR-2014,CPWD
Building, Code
No.5.22A.6 &
5.22.6A , P-99
11895.71
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
14083.58
Columns
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:l (a) 1:2:4 proportion
Column Footings
6450.001.88
Estimation of GATE-3M span
Brief Description of Item
361.58
Column Footings
DSR-2014,CPWD
Building, Code
No.2.6, P-72
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
Column Footings
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
SOR-2015,PWD
Building, GoWB,
Sec- 1(C ), Item
No.1,P-12
7494.26
754.00
1873.56
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and
filling joints with local sand
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:
(a) 1:2:4 proportion
Beam
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above plinth level.
For chajja
Slabs
22A.1
Annexure-22A
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
Estimation of GATE-3M span
Brief Description of Item
8
8.a Sqm 8 10.20
Sqm 2 1.75
Sqm 1 1.20
Sqm 4 8.40
Sqm 2 0.61
Sqm 2 7.00
Sqm 2 0.20
9
Sqm 8 8.00
Sqm 2 0.00
Sqm 1 2.10
Sqm 4 8.40
Sqm 2 0.61
Sqm 2 7.00
Sqm 1 0.88
10 Sqm 1 26.99 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
508.05
11 Sqm 1 26.99 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
705.62
53184.07
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a
base coat of white washing.
White washing with lime to give an even shade :
:new work(three or more coats)
Slabs
Total Cost =
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
Centering and shuttering including strutting, propping etc. and emoval of form work for : (upto roof
of ground floor)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
8.b
189.00 219.60
15 mm cement plaster on the rough side of single or half brick wall of mix : (Ground floor).
# 1:4 (1 cement: 4 fine sand)
5927.20
12281.24
For chajja
Slabs
360.00
26.99
Column
Beam
Beam
Column
8.c
8.d
For chajja29.36 418.28
22A.2
Annexure-22B
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
1
1.a Cum 2 2.00 2.00 155.60 180.79
2 Cum 0.40 0.40 112.40 130.60
DSR-2014,CPWD
Building, Code
No.2.25, P-75
52.24
3
3.a Sqm 2 2.00 2.00 377.00
4
4.a Cum 2 0.25 0.25 6450.00 7494.26
5 Cum 2 0.72 0.72 5667.55 6585.13
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
4741.29
6
6.a Cum 2 0.40
6.b Cum 2 0.64
6.c Cum 1 0.28
6.d Cum 1 0.45
6.e Cum 2 0.35
7 Kg 1 169.6 68.10 79.13
DSR-2014,CPWD
Building, Code
No.5.22A.6 &
5.22.6A , P-99
13418.08
Estimation of GATE-4M span
Brief Description of Item
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
DSR-2014,CPWD
Building, Code
No.2.6, P-72
361.58
Column Footings
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and
filling joints with local sand
SOR-2015,PWD
Building, GoWB,
Sec- 1(C ), Item
No.1,P-12
754.00
Column Footings
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:
(a) 1:2:4 proportion
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
1873.56
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:l (a) 1:2:4 proportion DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
15885.95Column Footings
2.12 6450.00 7494.26Columns
Beam
Slabs
For chajja
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above plinth level.
22B.3
Annexure-22B
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
Estimation of GATE-4M span
Brief Description of Item
8
8.a Sqm 8 10.20
Sqm 2 2.25
Sqm 1 1.60
Sqm 4 10.80
Sqm 2 0.74
Sqm 2 9.00
Sqm 2 0.20
9
Sqm 8 8.00
Sqm 2 0.00
Sqm 1 2.80
Sqm 4 10.80
Sqm 2 0.74
Sqm 2 9.00
Sqm 1 0.88
10 Sqm 1 32.22 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
606.49
11 Sqm 1 32.22 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
842.35
60163.76
Centering and shuttering including strutting, propping etc. and emoval of form work for : (upto roof
of ground floor)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
14552.52
Column
34.79 360.00 418.28
8.b Beam
8.c For chajja
8.d Slabs
7075.70
Column
32.22 189.00 219.60
Beam
For chajja
Slabs
White washing with lime to give an even shade :
:new work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a
base coat of white washing.
Total Cost =
15 mm cement plaster on the rough side of single or half brick wall of mix : (Ground floor).
# 1:4 (1 cement: 4 fine sand)
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
22B.4
Annexure-22C
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
1
1.a Cum 2 6.75 6.75 155.60 180.79
2 Cum 1.35 1.35 112.40 130.60
DSR-2014,CPWD
Building, Code
No.2.25, P-75
176.31
3
3.a Sqm 2 4.50 4.50 377.00
4
4.a Cum 2 0.56 0.56 6450.00 7494.26
5 Cum 2 0.72 0.72 5667.55 6585.13
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
4741.29
6
6.a Cum 2 0.90
6.b Cum 2 1.63
6.c Cum 1 0.93
6.d Cum 1 0.58
6.e Cum 2 0.45
7 Kg 1 359.4 68.10 79.13
DSR-2014,CPWD
Building, Code
No.5.22A.6 &
5.22.6A , P-99
28437.03
Estimation of GATE_5m span
Brief Description of Item
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
DSR-2014,CPWD
Building, Code
No.2.6, P-72
1220.34
Column Footings
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and
filling joints with local sand
SOR-2015,PWD
Building, GoWB,
Sec- 1(C ), Item
No.1,P-12
1696.50
Column Footings
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
4215.52
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:l (a) 1:2:4 proportion DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
33667.19Column Footings
4.49 6450.00 7494.26Columns
Beam
Slabs
For chajja
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above plinth level.
22C.5
Annexure-22C
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
Estimation of GATE_5m span
Brief Description of Item
8
8.a Sqm 8 16.32
Sqm 2 4.64
Sqm 1 2.00
Sqm 4 13.92
Sqm 2 0.91
Sqm 2 11.60
Sqm 2 0.20
9
Sqm 8 12.80
Sqm 2 0.00
Sqm 1 3.50
Sqm 4 13.92
Sqm 2 0.91
Sqm 2 11.60
Sqm 1 0.88
10 Sqm 1 43.61 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
820.86
11 Sqm 1 43.61 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
1140.09
106434.55
Centering and shuttering including strutting, propping etc. and emoval of form work for : (upto roof
of ground floor)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
20742.70
Column
49.59 360.00 418.28
8.b Beam
8.c For chajja
8.d Slabs
9576.72
Column
43.61 189.00 219.60
Beam
For chajja
Slabs
White washing with lime to give an even shade :
:new work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a
base coat of white washing.
Total Cost =
15 mm cement plaster on the rough side of single or half brick wall of mix : (Ground floor).
# 1:4 (1 cement: 4 fine sand)
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
22C.6
Annexure-22D
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
1
1.a Cum 2 6.75 6.75 155.60 180.79
2 Cum 1.35 1.35 112.40 130.60
DSR-2014,CPWD
Building, Code
No.2.25, P-75
176.31
3
3.a Sqm 2 4.50 4.50 377.00
4
4.a Cum 2 0.56 0.56 6450.00 7494.26
5 Cum 2 0.72 0.72 5667.55 6585.13
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
4741.29
6
6.a Cum 2 0.90
6.b Cum 2 1.63
6.c Cum 1 1.09
6.d Cum 1 0.68
6.e Cum 2 0.53
7 Kg 1 386.4 68.10 79.13
DSR-2014,CPWD
Building, Code
No.5.22A.6 &
5.22.6A , P-99
30576.58
Estimation of GATE
Brief Description of Item
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
DSR-2014,CPWD
Building, Code
No.2.6, P-72
1220.34
Column Footings
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and
filling joints with local sand
SOR-2015,PWD
Building, GoWB,
Sec- 1(C ), Item
No.1,P-12
1696.50
Column Footings
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
4215.52
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:l (a) 1:2:4 proportion DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
36200.25Column Footings
4.83 6450.00 7494.26Columns
Beam
Slabs
For chajja
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above plinth level.
22D.7
Annexure-22D
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
Estimation of GATE
Brief Description of Item
8
8.a Sqm 8 16.32
Sqm 2 5.68
Sqm 1 2.40
Sqm 4 16.32
Sqm 2 0.98
Sqm 2 13.60
Sqm 2 0.20
9
Sqm 8 12.80
Sqm 2 0.00
Sqm 1 4.20
Sqm 4 16.32
Sqm 2 0.98
Sqm 2 13.60
Sqm 1 0.88
10 Sqm 1 48.78 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
918.08
11 Sqm 1 48.78 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
1275.11
114943.60
Centering and shuttering including strutting, propping etc. and emoval of form work for : (upto roof
of ground floor)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
23212.67
Column
55.50 360.00 418.28
8.b Beam
8.c For chajja
8.d Slabs
10710.95
Column
48.78 189.00 219.60
Beam
For chajja
Slabs
White washing with lime to give an even shade :
:new work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a
base coat of white washing.
Total Cost =
15 mm cement plaster on the rough side of single or half brick wall of mix : (Ground floor).
# 1:4 (1 cement: 4 fine sand)
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
22D.8
Annexure-22E
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
1
1.a Cum 3 10.13 10.13 155.60 180.79
2 Cum 2.03 2.03 112.40 130.60
DSR-2014,CPWD
Building, Code
No.2.25, P-75
264.46
3
3.a Sqm 3 6.75 6.75 377.00
4
4.a Cum 3 0.84 0.84 6450.00 7494.26
5 Cum 3 0.72 0.72 5667.55 6585.13
DSR-2014,CPWD
Building, Code
No.6.4.1, P-111
4741.29
6
6.a Cum 3 1.35
6.b Cum 3 2.45
6.c Cum 1 1.49
6.d Cum 1 0.93
6.e Cum 2 0.73
7 Kg 1 555.3 68.10 79.13
DSR-2014,CPWD
Building, Code
No.5.22A.6 &
5.22.6A , P-99
43939.28
Estimation of GATE
Brief Description of Item
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
DSR-2014,CPWD
Building, Code
No.2.6, P-72
1830.52
Column Footings
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and
filling joints with local sand
SOR-2015,PWD
Building, GoWB,
Sec- 1(C ), Item
No.1,P-12
2544.75
Column Footings
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:
DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
6323.28
Column Footings
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up
to floor five level, excluding the cost of centering, shuttering and finishing:l (a) 1:2:4 proportion DSR-2014,CPWD
Building, Code
No.4.2.3, P-85
52020.62Column Footings
6.94 6450.00 7494.26Columns
Beam
Slabs
For chajja
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete above plinth level.
22E.9
Annexure-22E
Sl.
No.Unit No. Quantity
Total
Quantity
Rate
(Rs.)
Price
EscalationRefarance
Amount
(Rs.)
Estimation of GATE
Brief Description of Item
8
8.a Sqm 12 24.48
Sqm 2 7.44
Sqm 1 3.40
Sqm 4 22.32
Sqm 2 1.37
Sqm 2 18.60
Sqm 2 0.20
9
Sqm 12 19.20
Sqm 2 0.00
Sqm 1 5.95
Sqm 4 22.32
Sqm 2 1.37
Sqm 2 18.60
Sqm 1 0.88
10 Sqm 1 68.32 16.2 18.82
DSR-2014,CPWD
Building, Code
No.13.37.1, P-219
1285.88
11 Sqm 1 68.32 22.50 26.14
DSR-2014,CPWD
Building, Code
No.13.39.1, P-219
1785.94
162282.51
Centering and shuttering including strutting, propping etc. and emoval of form work for : (upto roof
of ground floor)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc.
DSR-2014,CPWD
Building, Code
No.4.3.2, P-86
32544.59
Column
77.81 360.00 418.28
8.b Beam
8.c For chajja
8.d Slabs
15001.91
Column
68.32 189.00 219.60
Beam
For chajja
Slabs
White washing with lime to give an even shade :
:new work(three or more coats)
Colour washing such as green, blue or buff to give an
even shade New work (two or more coats) with a
base coat of white washing.
Total Cost =
15 mm cement plaster on the rough side of single or half brick wall of mix : (Ground floor).
# 1:4 (1 cement: 4 fine sand)
DSR-2014,CPWD
Building, Code
No.13.2.1, P-216
22E.10
Annexure-23
Sl.
No.Particulars Unit Quantity Rate (Rs.) Reference
Ammount
(Rs.)
1
Surface dressing of the ground in any kind of soil
including removing vegetation inequalities not
exceeding 15cm depth and disposal of the
rubbish with a lead upto 75m as directed
Sqm 100 11.00
SOR-2015, PWD,
GoWB, Item No. 1(A)
1, P-1
1100.00
2
Providing ordinary cement concrete (mix 1:2:4)
at the top layer of the road with approved quality
graded stone chips (20 mm nominal size) as per
IS code
Cum 12.50 4603.00
SOR-2015, PWD-Govt
of WB, Item No.1 ( c)
5a, P-12
57537.50
58637.50
586.38
RENOVATION OF INTERNAL ROAD
(For 10 M Length)
Sub Total =
Cost per SQM=
23.1