KCI New Terminal Project Update · 6/17/2020  · Executive Status Report May 2020. 12 6/17/2020....

38
KCI New Terminal Project Update Transportation, Infrastructure, & Operations / June 17, 2020 6/17/2020

Transcript of KCI New Terminal Project Update · 6/17/2020  · Executive Status Report May 2020. 12 6/17/2020....

  • KCI New Terminal Project Update

    Transportation, Infrastructure, & Operations / June 17, 2020

    6/17/2020

  • Agenda Executive Report Status Update

    Project Progress

    MWBE & Workforce Participation

    Terminal Workforce Enhancement Programs (TWEP)

    Upcoming Project Milestones

    6/17/20202

  • 6/17/2020

    New Single Terminal and Parking at KCI

    Executive Status ReportMay 2020

  • 6/17/202012

  • June/July Procurements

    Doors, Frames, Hardware

    Loading Dock Equipment

    Drywall & Ceilings

    Rough Carpentry

    Misc. Metals

    Communications Ductbank

    Airline Tenant Fit-out

    6/17/202013

  • New Single Terminal and Parking at KCIConstruction Update

    6/17/2020

  • Headhouse Construction

    Concourse B Steel Erection

    Concourse A Steel Erection

    Concourse A Steel Erection Concourse A Foundation Placement

    Project Progress Photos

  • New Terminal Construction Status Pile Caps, Grade Beams & Foundation Wall Installations

    Multiple Buildings

    Underground MEP Work – Ongoing in Multiple Buildings

    Slab-on-Grade Buildings 1, 2, 3, 4, 13 & 14 – Complete Buildings 7, 9 & 12A – Finishing in June Buildings 5, 8, 10A & 11A – Finishing in July

    Structural Steel Buildings 1, 2 & 14 – Complete Buildings 3, 9 & 13– Finish in July

    Elevated Deck Concrete Slabs Metal Decking: Building 1 (June)

    Building 14 (July) Podium Deck: Building 12A (July)

    6/17/202016

  • 6/17/202017

    Terminal Site

  • Landside & Airside Civil Projects Utilities

    FAA / KCAD Ductbank: Airfield Lighting Cable & Comm. Fiber 16” Waterline: Ongoing – Scheduled Completion 06/2020

    Elevated Roadway Pile Cap Placement – Finishing This Week Started Column Placements – 6/02/2020

    Box Culvert Ongoing – Complete End of June

    Landside Roadways

    GSE Fueling Pad U/G Electrical - Complete Place Concrete Pavement – June 2020

    Evergy Electric Service Terminal Power Redundant Power

    6/17/202018

  • 6/17/202019

    Terminal Power

    Phase 1Evergy Ductbank05/11 – 05/22/20

    Phase 2Evergy Ductbank05/11 – 05/29/20

    Phase 3Evergy Ductbank06/01 – 06/26/20

  • Project Progress

    6/17/202020

  • PARKING GARAGE

    ELEVATED ROADWAY

    NEW TERMINAL

    6/17/202021

  • Auger Cast Piles – Terminal & Elevated Roadway Logistics Trailer Complex

    Break Tent New Temporary Terminal Roadway System

    6/17/202022

    CONSTRUCTION STATUS: Recently Completed

  • Deep Foundation Walls & Concrete Columns

    Slab on Grade

    Parking Garage Grading6/17/202023

    CONSTRUCTION STATUS: Ongoing Work

  • Structural Steel

    Elevated Roadway

    Box Culvert6/17/202024

    CONSTRUCTION STATUS: Ongoing Work

  • PROJECT PARTNER SPOTLIGHT

    Owner: Cynthia Smith Scope(s): Trailer Complex KC SPP Graduate, Class 2 Firm’s Services:

    Construction Management at Risk (CMAR)

    Construction Management Agency (CMA)

    General Contracting (GC)

    6/17/202025

    Universal Construction

  • PROJECT PARTNER SPOTLIGHT

    Owner: Daniel Felder Scope(s): 1) Eastern Flow

    Roadway; 2) Terminal Concrete Form and Pour

    KC SPP Graduate, Class 2 Concrete Services and Paving -

    Construction Management and Project Management for Construction Services

    6/17/202026

    Axiom Construction

  • PROJECT PARTNER SPOTLIGHT

    Owner: Paul & Joe Rodriguez Scope(s): Wet Utility Relocations &

    Box Culvert Firm’s Services:

    Construction Management and Water & Sewer Line installation services

    Project Management, Administration -Commercial & Institutional Buildings

    Utilities Storm & Sanitary Sewers Water Lines

    6/17/202027

    Rodriguez Mechanical

  • Recent Awards

    Glass and Glazingon Garage

    JE Dunn AGP (WBE)

    Fire ProtectionAmerican Fire Sprinkler Corp

    (WBE)FSC, Inc. (MBE)

    Soteria Fire Safety, LLC (WBE)

    Elevators, Moving Walkways, and

    Escalators

    SchindlerRowen Elevator Company (MBE)

    SCOPE FIRM(S)

    6/17/202028

  • M/WBE & Workforce Participation

    6/17/202029

  • BARE Business Basics

    Craig T. Watson, AIA

    from the ground UP

    photography

    G&G Mechanical

    Hartline Construction

    K Ramos Leigh & O’Kane, LLC

    Michele & Associates

    MJ Builders

    Richardson Hauling

    Riteway Maintenance &

    Supply

    Midwest Contracting

    Services

    M/WBE Partners

    EG Tech

    Anderson & Sons Trucking

    C-Sharp Trucking

    Enterprise Control System

    Iron Hand KEM Consulting

    Priority Engineers

    S&S Engineerin

    g

    Tanner & Son Trucking

    Tech. Services to

    Go

    Transportation Logistics Systems, Inc.

    Prudent Technologies

    6/17/202030

    International Architects Atelier, Inc

  • Letters of Intent (LOI) Status

    $40.00

    $50.00

    $60.00

    $70.00

    $80.00

    $90.00

    $100.00

    May 11 2020 May 22 2020 May 29 2020 June 5 2020 June 12 2020

    Cont

    ract

    ed A

    mou

    nt (

    $,m

    illio

    ns)

    Total M/WBE Contracted Amounts in B2G

    Construction

    6/17/202031

    91% INCREASE IN 4 WEEKS

  • 22

    M/WBE Participation Verified Payments

    SERVICE TYPE FIRM TYPEFAIRNESS IN

    CONSTRUCTION/HRD GOALS

    EDGEMOOR DEVELOPER’S

    PLEDGE

    PAID TO DATEJUNE 15, 2020

    Professional Services

    MBE 17.0% 20.0% 19.9% $9.1M

    WBE 12.0% 15.0% 10.1% $4.6 M

    Construction Services

    MBE 15.0% 20.0% 17.9% $20.4 M

    WBE 9.0% 15.0% 7.7% $8.8 M

    Source: B2G Now

    6/17/2020

  • Workforce Participation

    CONSTRUCTION EMPLOYMENT

    WORKFORCE PARTICIPATION GOALS

    WORKFORCE TOTALS THROUGH JUNE 12, 2020

    Minority Workforce 20.00% 18.98%

    Women Workforce 2.75% 4.88%

    We anticipate minority workforce participation to increase as additional scopes of work get underway.

    Source: B2G Now

    6/17/202033

  • Local Participation KC Metro Participation = 79.58% **

    Based on MARC: 14 county KS/MO MSA

    KCMO Participation = 10.6% *

    ** Source: E-comply

    * Source: B2G

    6/17/202034

  • Terminal Workforce Enhancement Programs (TWEP)

    6/17/202035

  • Terminal Workforce Enhancement Programs (TWEP) Updates

    Workforce Training Program (WTP) Class 3 beginning in summer 2020 Class 3 to be selected July

    Kansas City Strategic Partnership Program (KC SPP) recruitment underway Interested individuals may visit cwcjv.com/kcspp to apply.

    Application Deadline: July 31

    Virtual info sessions: June 15 & July 13 @ 4:00 PM

    RSVP: [email protected]

    Project Interns 7 interns/associates on the project

    6/17/202036

    mailto:[email protected]

  • Upcoming Project Milestones

    SUMMER 2020 Headhouse Precast Roofing Elevated Roadway Parking Garage Grading Package 8A Bids Due

    DrywallCeilingsMisc. MetalsRough Carpentry

    WTP Class 3

    FALL 2020 Interior Masonry Design Completion KC SPP Class 4

    ► WINTER 2020/21►Curtain Wall►Building Structure Completion

    6/17/202037

  • Stay Tuned

    kci-edgemoor.com

    cwcjv.comBusiness & Employment Opportunities

    buildkci.com

    KCI-Edgemoor

    KCIAirport

    BuildKCI

    @kciedgemoor

    @kciairport

    @BuildKCI

    6/17/202038

    KCI New Terminal Project UpdateAgendaNew Single Terminal �and Parking at KCI��Executive Status Report� May 2020Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12June/July Procurements New Single Terminal and Parking at KCISlide Number 15New Terminal Construction StatusSlide Number 17Landside & Airside Civil ProjectsSlide Number 19Project ProgressSlide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28M/WBE & Workforce ParticipationSlide Number 30Letters of Intent (LOI) StatusSlide Number 32Workforce ParticipationLocal ParticipationTerminal Workforce Enhancement Programs (TWEP)Terminal Workforce Enhancement Programs (TWEP) UpdatesUpcoming Project MilestonesSlide Number 38