KCI New Terminal Project Update
Transportation, Infrastructure, & Operations / June 17, 2020
6/17/2020
-
Agenda Executive Report Status Update
Project Progress
MWBE & Workforce Participation
Terminal Workforce Enhancement Programs (TWEP)
Upcoming Project Milestones
6/17/20202
-
6/17/2020
New Single Terminal and Parking at KCI
Executive Status ReportMay 2020
-
6/17/202012
-
June/July Procurements
Doors, Frames, Hardware
Loading Dock Equipment
Drywall & Ceilings
Rough Carpentry
Misc. Metals
Communications Ductbank
Airline Tenant Fit-out
6/17/202013
-
New Single Terminal and Parking at KCIConstruction Update
6/17/2020
-
Headhouse Construction
Concourse B Steel Erection
Concourse A Steel Erection
Concourse A Steel Erection Concourse A Foundation Placement
Project Progress Photos
-
New Terminal Construction Status Pile Caps, Grade Beams & Foundation Wall Installations
Multiple Buildings
Underground MEP Work – Ongoing in Multiple Buildings
Slab-on-Grade Buildings 1, 2, 3, 4, 13 & 14 – Complete Buildings 7, 9 & 12A – Finishing in June Buildings 5, 8, 10A & 11A – Finishing in July
Structural Steel Buildings 1, 2 & 14 – Complete Buildings 3, 9 & 13– Finish in July
Elevated Deck Concrete Slabs Metal Decking: Building 1 (June)
Building 14 (July) Podium Deck: Building 12A (July)
6/17/202016
-
6/17/202017
Terminal Site
-
Landside & Airside Civil Projects Utilities
FAA / KCAD Ductbank: Airfield Lighting Cable & Comm. Fiber 16” Waterline: Ongoing – Scheduled Completion 06/2020
Elevated Roadway Pile Cap Placement – Finishing This Week Started Column Placements – 6/02/2020
Box Culvert Ongoing – Complete End of June
Landside Roadways
GSE Fueling Pad U/G Electrical - Complete Place Concrete Pavement – June 2020
Evergy Electric Service Terminal Power Redundant Power
6/17/202018
-
6/17/202019
Terminal Power
Phase 1Evergy Ductbank05/11 – 05/22/20
Phase 2Evergy Ductbank05/11 – 05/29/20
Phase 3Evergy Ductbank06/01 – 06/26/20
-
Project Progress
6/17/202020
-
PARKING GARAGE
ELEVATED ROADWAY
NEW TERMINAL
6/17/202021
-
Auger Cast Piles – Terminal & Elevated Roadway Logistics Trailer Complex
Break Tent New Temporary Terminal Roadway System
6/17/202022
CONSTRUCTION STATUS: Recently Completed
-
Deep Foundation Walls & Concrete Columns
Slab on Grade
Parking Garage Grading6/17/202023
CONSTRUCTION STATUS: Ongoing Work
-
Structural Steel
Elevated Roadway
Box Culvert6/17/202024
CONSTRUCTION STATUS: Ongoing Work
-
PROJECT PARTNER SPOTLIGHT
Owner: Cynthia Smith Scope(s): Trailer Complex KC SPP Graduate, Class 2 Firm’s Services:
Construction Management at Risk (CMAR)
Construction Management Agency (CMA)
General Contracting (GC)
6/17/202025
Universal Construction
-
PROJECT PARTNER SPOTLIGHT
Owner: Daniel Felder Scope(s): 1) Eastern Flow
Roadway; 2) Terminal Concrete Form and Pour
KC SPP Graduate, Class 2 Concrete Services and Paving -
Construction Management and Project Management for Construction Services
6/17/202026
Axiom Construction
-
PROJECT PARTNER SPOTLIGHT
Owner: Paul & Joe Rodriguez Scope(s): Wet Utility Relocations &
Box Culvert Firm’s Services:
Construction Management and Water & Sewer Line installation services
Project Management, Administration -Commercial & Institutional Buildings
Utilities Storm & Sanitary Sewers Water Lines
6/17/202027
Rodriguez Mechanical
-
Recent Awards
Glass and Glazingon Garage
JE Dunn AGP (WBE)
Fire ProtectionAmerican Fire Sprinkler Corp
(WBE)FSC, Inc. (MBE)
Soteria Fire Safety, LLC (WBE)
Elevators, Moving Walkways, and
Escalators
SchindlerRowen Elevator Company (MBE)
SCOPE FIRM(S)
6/17/202028
-
M/WBE & Workforce Participation
6/17/202029
-
BARE Business Basics
Craig T. Watson, AIA
from the ground UP
photography
G&G Mechanical
Hartline Construction
K Ramos Leigh & O’Kane, LLC
Michele & Associates
MJ Builders
Richardson Hauling
Riteway Maintenance &
Supply
Midwest Contracting
Services
M/WBE Partners
EG Tech
Anderson & Sons Trucking
C-Sharp Trucking
Enterprise Control System
Iron Hand KEM Consulting
Priority Engineers
S&S Engineerin
g
Tanner & Son Trucking
Tech. Services to
Go
Transportation Logistics Systems, Inc.
Prudent Technologies
6/17/202030
International Architects Atelier, Inc
-
Letters of Intent (LOI) Status
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
May 11 2020 May 22 2020 May 29 2020 June 5 2020 June 12 2020
Cont
ract
ed A
mou
nt (
$,m
illio
ns)
Total M/WBE Contracted Amounts in B2G
Construction
6/17/202031
91% INCREASE IN 4 WEEKS
-
22
M/WBE Participation Verified Payments
SERVICE TYPE FIRM TYPEFAIRNESS IN
CONSTRUCTION/HRD GOALS
EDGEMOOR DEVELOPER’S
PLEDGE
PAID TO DATEJUNE 15, 2020
Professional Services
MBE 17.0% 20.0% 19.9% $9.1M
WBE 12.0% 15.0% 10.1% $4.6 M
Construction Services
MBE 15.0% 20.0% 17.9% $20.4 M
WBE 9.0% 15.0% 7.7% $8.8 M
Source: B2G Now
6/17/2020
-
Workforce Participation
CONSTRUCTION EMPLOYMENT
WORKFORCE PARTICIPATION GOALS
WORKFORCE TOTALS THROUGH JUNE 12, 2020
Minority Workforce 20.00% 18.98%
Women Workforce 2.75% 4.88%
We anticipate minority workforce participation to increase as additional scopes of work get underway.
Source: B2G Now
6/17/202033
-
Local Participation KC Metro Participation = 79.58% **
Based on MARC: 14 county KS/MO MSA
KCMO Participation = 10.6% *
** Source: E-comply
* Source: B2G
6/17/202034
-
Terminal Workforce Enhancement Programs (TWEP)
6/17/202035
-
Terminal Workforce Enhancement Programs (TWEP) Updates
Workforce Training Program (WTP) Class 3 beginning in summer 2020 Class 3 to be selected July
Kansas City Strategic Partnership Program (KC SPP) recruitment underway Interested individuals may visit cwcjv.com/kcspp to apply.
Application Deadline: July 31
Virtual info sessions: June 15 & July 13 @ 4:00 PM
RSVP: [email protected]
Project Interns 7 interns/associates on the project
6/17/202036
mailto:[email protected]
-
Upcoming Project Milestones
SUMMER 2020 Headhouse Precast Roofing Elevated Roadway Parking Garage Grading Package 8A Bids Due
DrywallCeilingsMisc. MetalsRough Carpentry
WTP Class 3
FALL 2020 Interior Masonry Design Completion KC SPP Class 4
► WINTER 2020/21►Curtain Wall►Building Structure Completion
6/17/202037
-
Stay Tuned
kci-edgemoor.com
cwcjv.comBusiness & Employment Opportunities
buildkci.com
KCI-Edgemoor
KCIAirport
BuildKCI
@kciedgemoor
@kciairport
@BuildKCI
6/17/202038
KCI New Terminal Project UpdateAgendaNew Single Terminal �and Parking at KCI��Executive Status Report� May 2020Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12June/July Procurements New Single Terminal and Parking at KCISlide Number 15New Terminal Construction StatusSlide Number 17Landside & Airside Civil ProjectsSlide Number 19Project ProgressSlide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28M/WBE & Workforce ParticipationSlide Number 30Letters of Intent (LOI) StatusSlide Number 32Workforce ParticipationLocal ParticipationTerminal Workforce Enhancement Programs (TWEP)Terminal Workforce Enhancement Programs (TWEP) UpdatesUpcoming Project MilestonesSlide Number 38