KBE Shaping Futures K -12
Transcript of KBE Shaping Futures K -12
shaping futures k-12
C o n n e c t i c u t | N o r t h e a s t R e g i o n • M a r y l a n d | M i d - A t l a n t i c R e g i o n
w w w . k b e b u i l d i n g . c o m
For more information:Cora HarkinsManager of Business Development
30 Batterson Park RoadFarmington, CT [email protected]
north haven high schoolnorth haven, ct
owner Town of North Haven, CT
architect Kaestle Boos Architects, Inc.
New Britain, CT
size 245,000 sf
cost $58 million
services Construction Manager at Risk
This $58 million high school project included construction of the new
school, along with associated sitework, new and renovated athletic fields,
abatement, and demolition of the existing high school.
“The construction of the new North Haven High School has been a very
exciting and challenging endeavor. As our Construction Manager, KBE
Building Corporation has been a valuable asset at every step of the way,
supporting the Building Committee throughout the process...the result is
a truly exceptional and functional facility that will serve our community for
years to come.”
-Radha Prasad, Chairman, North Haven High School Building Committee
hamden middle schoolhamden, ct
owner Town of Hamden, CT
architect Tai Soo Kim Partners
Hartford, CT
size 196,000 sf - new construction
cost $44.4 million
services Construction Manager at Risk
The uniquely designed building is set on approximately 25
acres and features many sustainable design features. Its unusual
footprint breaks down the scale of the building into five
separate, two-story wings, each of which contains a cluster of
classrooms designed for different types of course work.
beverly high schoolbeverly, ma
owner City of Beverly, MA
architect Mount Vernon Group
Woburn, MA
size 175,000 sf addition &
110,000 sf renovation
cost $67.6 million
services General Contractor (Joint Venture of KBE
Building Corp. & CTA Construction Co.)
The Beverly High School project encompasses approximately 175,000
sf, 4-story wing of new construction and a phased renovation of
approximately 110,000 sf of the existing High School’s common
spaces. The project is participating in the Massachusetts Collaborative
for High Performance schools (MA CHP’s).
valley regional high schooldeep river, ct
owner Regional School District # 4
Deep River, CT
architect C.J. Lawler Associates Architects
West Hartford, CT
size 130,000 sf renovations and additions
cost $17.3 million
services General Contractor
Two state-of-the art additions were the heart of an extensive two-
year renovation and upgrade project: a new performance auditorium
and a new, fully equipped computer and multi-media center. M/E/P
and fire safety system upgrades were additional improvements made
to this occupied high school.
e.c. goodwin technical high schoolnew britain, ct
owner Connecticut Department of
Public Works
architect Kaestle Boos Architects
New Britain, CT
size 176,000 sf renovation
64,000 sf addition
cost $48.5 million
services General Contractor
The seven-phase addition and renovation project includes new and
renovated academic classrooms, technical shop space, administrative
areas and support space, new athletic fields, and new parking lots.
norwich technical high schoolnorwich, ct
owner State of Connecticut
Department of Public Works
Hartford, CT
architect Moser Pilon Nelson Architects
Wethersfield, CT
size 208,000 sf renovations and additions
cost $46.2 million
services General Contractor
KBE converted an existing 100,000 sf community college into
a 200,000 sf state-of-the-art technical high school. The facility
remained fully operational during this phased construction
project. The school includes more than 15 technical education
and science labs, full academic facilities, auditorium, media
center, gymnasium, and cafeteria and dining facilities. M/E/P
and data systems were also upgraded throughout.
kaynor technical high schoolwaterbury, ct
owner Connecticut Department of Public Works
Hartford, CT
architect S/L/A/M Collaborative
Glastonbury, CT
size 116,329 sf renovation
100,000 sf addition
cost $47.4 million
services General Contractor
The renovation and addition project improved site circulation, upgraded
the school’s vocational shops, and implemented high-tech, fully digital
academic classrooms and laboratories. The existing classroom wing was
demolished and replaced with a new, three-story academic wing and
gymnasium. Complete renovation of the trade classrooms and upgrading
of all building systems. The school remained fully operational
throughout the multi-phased construction.
owner Regional School District #4
Deep River, CT
architect C.J. Lawler Associates Architects
West Hartford, CT
size 118,000 sf
cost $12 million
services General Contractor
To improve efficiency and decrease operating costs, KBE upgraded all
mechanical, electrical and fire safety systems throughout the school. The
modernization also included a new administration wing, extensive site
work, parking lot expansion, full code updates, and new septic and
stormwater systems. Temporary classrooms were set up to accommodate
students during the two-year project.
john winthrop junior high schooldeep river, ct
wells road intermediate schoolgranby, ct
40,000 sf single story addition and 15,000 sf renovation for classrooms, music and science
rooms, media center, kitchen-cafeteria and gymnasium.
The addition and renovation to this private day school include a commercial
kitchen, dining rooms, library / media center, science lab, classrooms and locker /
shower facilities. The Beit Tefillah (chapel) includes 12 high windows facing the
courtyard representing the 12 tribes of Israel. 7 round columns symbolize the 7
arms of the Menorah, each with light fixture.
owner Wells Road Intermediate School
Granby, CT
architect Bianco, Giolitto, Weston Architects
Middletown, CT
size 40,000 sf renovation
15,000 sf addition
cost $10.3 million
services General Contractor
owner The Solomon Schechter Day School
of Greater Hartford
architect Jacunski Humes Architects, LLC
Berlin, CT
size 32,000 sf addition &
school-wide renovations
cost $7.6 million
services Construction Manager at Risk
the solomon schechter day schoolwest hartford, ct
c o n n e c t i c u t | n o r t h e a s t r e g i o n • m a r y l a n d | m i d - a t l a n t i c r e g i o n
w w w . k b e b u i l d i n g . c o m
B u i l d i n g E x c e l l e n c e To g e t h e r