Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent...

29
Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for Control Groups at KEK < kazuro.Furukawa @ kek.jp > October 11, 2010. < kazuro.furukawa @ kek.jp >

Transcript of Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent...

Page 1: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

1

Recent progress at KEKand Plans for SuperKEKB

Kazuro Furukawafor Control Groups at KEK

< kazuro.Furukawa @ kek.jp >

October 11, 2010.

< kazuro.furukawa @ kek.jp >

Page 2: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Accelerators at KEK

2

(Super)KEKB

Mt. Tsukuba

Linac

PF-AR

PF

ATF STF

J-PARC(at Tokai Site)

cERL

Page 3: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

3

Yamamoto/Kamikubota

Page 4: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

4

Feb. 24, 2010 First Neutrino Event from J-PARCobserved at Super Kamiokande

Delivers beam at 50KW to Nu. Exp.

100

80

ビー

ム出

力 

[kW

]

60

40

20

03 月 4 月 5 月 6 月 7 月2 月

100

80

ビー

ム出

力 

[kW

]

60

40

20

03 月 4 月 5 月 6 月 7 月2 月

100

80

60

40

20

0Mar April May June JulyFeb

100

80

60

Beam

Pow

er

[k

W]

40

20

0

Beam Power history of 30GeVMR

2010 Operational Highlights Yamamoto/Kamikubota

Page 5: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Plan for Future

5

ACS: Acceleration Structurefor 400MeV Linac Upgrade

Plan for MR Beam Power for Nu Exp.・ Linac 400 MeV upgrade for Higher RCS beam power・ Higher MR rep. rate

Yamamoto/Kamikubota

Page 6: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Data Archiving in J-PARC MR control system

6

From “DATA ARCHIVE SYSTEM FOR J-PARC MAIN RING” by N. Kamikubota et al.,Proceedings of IPAC’10, Kyoto, Japan

Overview of J-PARC MR data archive system:“cadump” is a program storing snapshot data,including waveform, into disk system. ROOT and SAD data formats are supported. It also use data compression, after Feb. 2010.

Yamamoto/Kamikubota

Page 7: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Control Systems at KEK/Tsukuba (1)SuperKEKB

Will inherit resources from KEKB (and TRISTAN)Partial budget for positron was approved (?)

Linac (electron/positron)Inject beam to (Super)KEKB, PF, PF-AR

Pulse-to-pulse beam modulation

PF (Photon Factory)Moved to EPICS environment

Mainly with Linux-VME

PF-AR (Photon Factory Advanced Ring)Mostly the same environment as KEKB

Many CAMAC installations

7

Page 8: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Control Systems at KEK/Tsukuba (2)ATF (Accelerator Test Facility)

Vista Controls environment with CAMACLinux and socket environment with some EPICS

devices

STF (Superconducting RF Test Facility)Test facility for ILCEPICS with Linux, ATCA test, PLC, …

cERL (Compact ERL)Being built for ERL development May share the resources with other accelerators

Sharing resources as much as possible8

Page 9: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Accelerator ControlsVME + Unix (~1995)

Standard EPICS configurationWith many third layer field networks

Every controller on network (1993~1997)Single layer in physical, two layer logical

Every controller with EPICS IOC (2005~)Channel Access everywhereFor longer term maintenance

9

Page 10: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Transition of Controls

10

Mini Computer

Mini Computer

Mini Computer

Mini Computer

DeviceController

DeviceController

UnixUnix

VMEVME

Device Controller

Device Controller

FieldNetwork

s

FieldNetwork

s

UnixUnix

VME/IOCVME/IOC

Device Controller

Device Controller

TCP/IPTCP/IP

UnixUnix

IOCIOC

Device IOC

Device IOC

ChannelAccess

ChannelAccess

Page 11: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Embedded IOC in Yokogawa’s PLCMore than 150 PLCs were employed at

LinacAll through TCP/IP network since 1993Successful to reduce resource consumption

Now Linux CPU is available (2008~)533MHz PPC, 128MB RAM, 2xEthernet, USBUtilize realtime feature of Kernel 2.6 (J.

Odagiri et al)EPICS PV response time <150sec (incl. module

delay)

Ladder sequence CPU can coexistVariable sharing possible

11

Page 12: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Simpler PLC Usage under EPICS

12

Conventional PLC usage with asynchronous access

FAM3 PLCI/O ModulesFAM3 PLC

I/O ModulesF3RP61

IOCF3RP61

IOC

FAM3 PLCI/O ModulesFAM3 PLC

I/O Modules

LadderCPU

(Logics)

LadderCPU

(Logics)

OPICA Clients

OPICA Clients

IOC(Logics)

IOC(Logics)

OPICA Clients

OPICA Clients

FAM3 PLCI/O ModulesFAM3 PLC

I/O ModulesF3RP61

IOCF3RP61

IOC

If necessary, we can combine

OPICA Clients

OPICA Clients

LadderCPU

LadderCPU

Logics are confined in PLC, and management is easier

Page 13: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Many medium-speed controllers implemented

KEKB, Linac, J-PARC, PF, cERL, …, Taiwan/TLS, (Korea/PAL, Beijing/IHEP)

Image processing module availableDiscussing on EVR module with

SSRF/Shanghai<http://www-linac.kek.jp/cont/epics/

f3rp61/>13

Page 14: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

BPM at Linac and BTBPM need only 0.1mm

resolutionUsing ~30 coefficients per BPM

Many signals are combined into one waveform digitizer

Again reduction of resourcesRecent Embedded IOC Solution

Much helped by Dr. Yong Hu

14

100 BPMs 19 x TDS680B 19 VMEs ~5 Unix Clients

100 BPMs 24 x DPO7104 Clients

Old configuration

Page 15: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

15

BPM DAQTektronix DPO7104 can acquire data at >50Hz.

With embedded EPICS, under pulse-to-pulse beam modulation

Beam modes are recognized by events through CA network.

Missed less than once in million times

Clients can monitor data of an interested beam mode.

24 oscilloscopes are installed for Linac, and 4 for BT.

200 BPMs are synchronized for Linac and BT.

Page 16: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Many other Embedded IOCOther oscilloscope-based IOCs

For pulsed device monitors (M. Satoh et al)

TDC/Linac with Linux/ARM (Armadillo)Timing consistency surveillance (S. Kusano

et al)

MPS manager with Linux/FPGA (Suzaku)For J-PARC and cERL, etc (A. Akiyama et al)

Magnet PS with Linux/ARM(or FPGA)Two prototypes for SuperKEKB (T.

Nakamura et al)16

Page 17: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

17

KEKB Operation Improvement (base of SuperKEKB)

May.2000

Apr.2003Dual Bunch

e+

Feb.2005Continuous

Injections

Dec.2008Crab Cavities and

Simultaneous Injection

Belle/KEK

Page 18: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

SuperKEKB Plan (1)For nano-beam scheme with 40-times higher

luminosity Many new facilities should be required

Start based on the existent environmentWith additional concept of CA everywhere

Help device groups to have better global controlsReplacement of old installations such as CAMACSolusions not only VME but also other types of

controllers, embedded EPICS if possible

Faster networks for the groups who can build controllers by themselves

Better connection to operational environmentsKeeping SAD environment, etcMonitoring at offices

18

Page 19: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

SuperKEKB Plan (2)Archiving scheme and viewer

Maybe existing KEKBlog and channel archiversNew viewer should be developed

Alarm handlerCSS or Python (to simulate KEKBalarm)

Should evaluate soon

Operational LogIn house, two versions with different origins

Postgres + (Python/Zope and Flash/Flex)

ScriptsSADscript/Tk, Python/Tk, (decreasing Tcl/Tk)

DisplaysEdm and/or CSS

19

Page 20: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

SuperKEKB Plan (3)Interviews to each device groups

Planning to have monthly meeting and trainingTo collect user requirements

Partially successful for old hardware replacements

Not yet effective for new functionalitiesWhether both sides do not have experiences

ex. Global orbit feedbackWe don’t need to stabilize the orbit other than the collision

point

Monitor group is basically responsible for thisUnder development with several candidatesBut they still need some data path

20

Page 21: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

21

Simultaneous InjectionSuperKEKB injections with shorter lifetimePF top-up injection for higher quality experiments

Enjoyed Hardware and Software Installation One by oneReduced the Beam Switch Time from 10-120 seconds to 20msBeam currents are kept within 1mA (~0.05% for KEKB), 0.05mA (~0.01%, PF)

Much more complicated with bucket selections at damping ring and main ringShould add PF-AR as well (4rings! with different beams)

Page 22: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

22

Event System for Simultaneous Injection

114.24MHz event rate, 50Hz fiducialsMore than hundred 50Hz-Analog/Timing dataMulti/single-mode fiberTiming precision is < 10ps.

< 1ps with external module.

MRF’s series-230 Event Generator / Receivers VME64x and VxWorks v5.5.1 EPICS R3.14.9 with DevSup v2.4.1 17 event receivers up to now

ARC

e+ Target

e+ BT (KEKB: 3.5GeV, 2nC)

e– BT (KEKB: 8GeV, 2nC, PFAR: 3.0GeV, 0.1nC)

e– BT (PF: 2.5GeV, 0.1nC)

Event Receivers

Event GeneratorEvent Generator

e− Gun

Cont-1Cont-1

KL_51/52KL_51/52

SB_5SB_5SB_4SB_4SB_3SB_3

Cont-5Cont-5Cont-4Cont-4Cont-3Cont-3Cont-2Cont-2

SB_2SB_2

KL_B5/B6KL_B5/B6 SB_ASB_ASB_BSB_B

CentralCentral

Cont-ABCCont-ABC

SB_1SB_1SB_CSB_C

SH_A1SH_A1 InjectionInjection

96ns

>100ns

>100ns96ns

Page 23: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

23

ParametersParameters switched via event system

LLRF phase/timing : 14x4Overall energy profile, dual-bunch energy equalization, final energy adjustment

HP RF timing : ~60Energy profile and backup management

Gun voltages, picosecond delay : 4Beam charge selection, dual bunch selection, bunching

Pulsed magnets/solenoid : 14Beam transport selection, orbit controls, positron focusing

Injection phase interface : 2Bucket selection interface : 2BPM : ~100x3

Sufficient for fast beam mode switchingIntegrity monitors soon

Page 24: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Three Virtual Accelerators Controls and instrumentations are essentially mode-

dependent, and mutually independent Selecting a real machine out of three virtual machines

Managing three parameter sets (four under SuperKEKB environment)

24

ARC

e+ Target

e– BT (PF: 2.5GeV, 0.1nC)e− Gun

ARC

e+ Target

e+ BT (KEKB: 3.5GeV, 0.6nC)

e− Gun

ARC

e+ Target

e– BT (KEKB: 8GeV, 1.2nC)

e− Gun

Event-based Control System

Event-based Control System

PF Injection

KEKB-LER Injection

KEKB-HER Injection

Primary e– (4GeV, 10nC)

Page 25: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

Feedback loop software act on one of three virtual machines

Managing independent parameter sets

Three-fold Independent Closed Loops

25

ARC

e+ Target

e– BT (PF: 2.5GeV, 0.1nC)e− Gun

ARC

e+ Target

e+ BT (KEKB: 3.5GeV, 0.6nC)

e− Gun

ARC

e+ Target

e– BT (KEKB: 8GeV, 1.2nC)

e− Gun

Event-based Control System

Event-based Control System

PF Injection

KEKB-LER Injection

KEKB-HER Injection

Primary e– (4GeV, 10nC)

Page 26: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

SummaryControls Have Interface to Every

System in AcceleratorsWe can Enjoy Accelerator

There should be Room to Establish Further Controls Utilizing Beam Monitors, RF Monitors, and MoreWith Phronesis, Ability to understand the

Universal Truth

26

Page 27: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

27

Thank you

Page 28: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

28

J-PARC Status

@ EPICS collaboration meeting

N. Yamamoto and N. Kamikubota

Page 29: Kazuro Furukawa, KEK, Oct.2010. EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.

Kazuro Furukawa, KEK, Oct.2010.

EPICS Collaboration Meeting / BNL

KEK and SuperKEKB

For the Future (4)More Reliability Improving Facilities

Redundant SystemsFor Maintenance without much Man-power

New TechnologiesSuch as ATCA with Higher Availability Features

Test Systems and Surveillance SystemsIn order to Reduce Failures that should be

Found before the Operation

29