Katris architects pty ltd · 2020. 9. 22. · Katris architects pty ltd CLIENT SECTION 4.55...
Transcript of Katris architects pty ltd · 2020. 9. 22. · Katris architects pty ltd CLIENT SECTION 4.55...
-
Katris architects pty ltd
CLIENT
SECTION 4.55 APPLICATION
Date:
P 02 9744 5421
www.katris.com.a
level 1, 3-5 burwood road, concord 2137 nsw po box 703 burwood 1805 nsw
FOR:
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
MR R LAVIANO AND MR A BROMBAL (RA PROPERTYSERVICES PTY LTD)
Proposed relocation and construction of new Joe andSons (Builders Hardware and Landscaping SupplyCentre) at 33-35 Queens road, Five Dock to 177
Parramatta road, Homebush West (cnr of Bedford road)Lot 5 DP 596728 and Lot 2 DP 210783.
04.09.2020
ISSUE M
SHEET DRAWING TITLE ISSUE
M000 TITLE MM101 GROUND FLOOR PLAN MM103 MEZZANINE MM105 ROOF PLAN MM106 NORTH AND SOUTH ELEVATIONS MM107 WEST AND EAST ELEVATIONS MM108 SECTION M
1:200 @ A3IMPORTANT NOTETHESE DRAWINGS HAVE BEEN ISSUED FORDEVELOPMENT APPLICATION PURPOSESONLY. THEY ARE NOT ISSUED FORCONSTRUCTION OR CONSTRUCTIONCERTIFICATE OR FOR THE PURPOSES OFPRICING BY ANY CONTRACTOR
ARCHITECTURAL DRAWING SCHEDULE
CLOUDS INDICATE AMENDMENTS
-
REF.UP
5D P 5 9 6 7 2 8
2312.3m2
EXISTING CONCRETE DRIVEWAY
NO. 177
3.89
N E W D R I V E W A Y
P R O P O S E D N E W D R I V E W A Y
BULKY GOODS RETAIL SALES
W A R E H O U S E S T O R A G E
GENERAL COUNTERSERVERY AREA AS SELECTED
BY PROPRIETOR
OFFICE 2
OFFICE 1
C E M E N T S H E D & W A R E H O U S E S T O R A G E
STAFF ROOM
1.
2.
3.
4.
5.
6.
7.
8.9.
LIN
E O
F M
EZZA
NIN
E LE
VEL
ABO
VE
S A N D S T O R A G E A R E A
OVERNIGHT TRUCK PARKING AND INCIDENTAL TRUCK PARKING DURING THE DAY
SLIDING GATE
C A R P A R K I N G A R E A
1. 2. 3.4. 5. 6. 7. 8. 9. 10. 11.
MALE WC
FEMALE WC
DIS WC
ACTUAL BOUNDARY OF SITE
DISABLED PERSONS CAR
SPACE
DISABLED PERSONS CAR
SPACE
SHARED ZONE
MEZZANINE ABOVE SHOWN DOTTED
PROPOSED LANDSCAPED AREA
11.
2000
12.
P R O P O S E D N E W D R I V E W A Y
N E W D R I V E W A Y
BEDFORD ROAD
PAR
RAM
ATTA
RO
AD
18380
16290
A
M108
A
M108
SLIDING GATE
OFFICE AREA = 25.7m²
13.
14.
10.LINE OF ROOF OVER
RAM
P U
P @
1:2
0
FFL RL 5.00
FFL RL 5.00
FFL RL 4.90
FFL RL 4.90
CREST RL 4.8 AS PER ENGS
DETAILS
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
PROPOSEDFCGL RL 4.9
PROPOSEDFCGL RL 4.7
PROPOSED FENCEPR
OPO
SED
FEN
CE
PROPOSED FENCE
PROPOSED FENCE
FFL RL 4.90
PROPOSEDFCGL RL 4.90
BIN
BIN
SHAD
E T
REE
S TO
CO
MPL
Y W
ITH
PA
RT
D 2
.10
(13-
14) S
CD
CP
2M WIDE LANDSCAPE STRIP TO COMPLY WITH PART D 2.10.1(6) SCDCP
2M WIDE LANDSCAPE STRIP TO COMPLY WITH PART D 2.10.1(6) SCDCP
+ 5.30 + 5
.30 + 5.30 + 5
.30 + 5.
30
+ 5.30 + 5
.30
+ 5.30
+ 5.30
+ 5.30
+ 5.30
+ 5.30
1:20 ramp up
RL 4.0
RL 4.76
RL 4.90
RL 4.9
+ 4.9
+ 4.75
RAMP
UP @
1:40
+ RL 4.90
+ RL 4.90
NEW ALUMINIUM FRAMED WINDOW(S) AS SEL. BY THE PROPRIETORSAND TO CONFORM WITH THE BASIXCERTIFICATE
NEW ALUMINIUM FRAMED WINDOW(S) AS SEL. BY THE PROPRIETORS
AND TO CONFORM WITH THE BASIXCERTIFICATE
PROVIDE ROLLER DOOR TO MANUFACTURERS REQUIREMENTS.
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
1
1
A
B
C
D
fwfw
fw
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
AS2890.6 CLEAR SPACE 2400W X 5400L X 2500H
WT2
B
WT2
WHEEL STOPS (WS) TO AS 2890.1
CAR
SPAC
E 8
2500
CAR
SPAC
E 7
2500
CAR
SPAC
E 6
2500
CAR
SPAC
E 5
2500
2500
CAR
SPAC
E 4
2500
CAR
SPAC
E 3
2500
CAR
SPAC
E 2
2500
CAR
SPAC
E 1
2500
S
S
S
AS2890.6 CLEAR SPACE 2400W X 5400L X 2500H
AS2890.6 CLEAR SPACE 2400W X 5400L X 2500H
200mm CONCRETE BLOCK WALL TO ENGINEERS DETAILS. CONTRACTOR MUST ENSURE THIS WALL HAS A FIRE RATING OF 90/90/90
2400WTYPE 1 DOOR
2400
HC
HC HC
HC
HC
HC
HWU
BOLLARDS AS PER D1.10 OF NCC
BOLLARDS AS PER D1.10 OF NCC
FIRE HOSE REEL & HYDRANT AS PER HYDRAULIC ENGS
DETAILS
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
FLAT TOP WITH CRANE SPACE
SMALL TIPPER 1
SMALL TIPPER 2
SMALL TIPPER 3
HINO TIPPER
RIGID TRUCK BOGIE SPACE
FLAT TOP WITH CRANE SPACE
C A R P A R K I N G A R E A
15.
16.
6000
6000
4000
2600
2600
2600
2600
2600
2710
2500
2800
1256
5
PROPOSED WALL & GARAGE ROLLER DOOR
+ RL 4.68
+ 4.75 + 4.90+ 5.13 + 5.05
+ 4.80 - AS PER ENGS DETAILS
18.
17.
1.
2.
3.
4.
5.
6.
7.
WS
820
WS
820
WS 820
WS 820
WS
WS
WS
WS
WS
WS
B
M108
B
M108
A TOTAL OF EIGHTEEN (18) OFF- STREET PARKING SPACES AND SEVEN (7) LOADING BAYS, HARDPAVED, LINEMARKED, LABELLED AND DRAINED, SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED PLANS AS PER CONDITION NO.14
BOLLARD
DA CONDITION 43A(b) TO BE DELETED AND TWO (2) CANOPY TREES NOT TO BE PLANTED.
REFER TO STATEMENT OF ENVIRONMENTAL EFFECTS AND ARBORIST STATEMENT
PREPARED BY TALC DATED 27 AUG 2020.
2700
BOARD SEWER AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
DP AS PER ENGINEERS DETAILS
DP AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
FRL
90/9
0/90
FRL
90/9
0/90
1168
5
5400 6300
2500
2500
5500
5700
6000
8000
10500
5400
64006100
61006400
12
12
11
11
10
10
FWFW
FW FW FW FW FW FW FW FW FW
ABOVE GROUND OSD BASIN
ALL PITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS3500.3 AS PER ENGS DETAILS
ALL PITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS3500.3 AS PER ENGS DETAILS
PITS TO ENGS DETAILS
GRATED DRAIN TO ENGS DETAILS
GRATED DRAIN TO ENGS DETAILS
GRATED DRAIN TO ENGS DETAILS
FWFW
STORMWATER FILTER CHAMBER TO ENGS DETAILS
2.4M CEILING HEIGHT UNDER MEZZANINE
BOX GUTTER OVER BOX GUTTER OVERBOX GUTTER OVER
DPDPDPDPDP
DPDP
DP DP
DP
DP
3.79
3.77
3.703.74
EXIST RL
EXIST RLEXIST RL
4.63EXIST RL
EXIST RL4.60
ALL PITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS3500.3 AS PER ENGS DETAILS
CREST RL 4.8 AS PER ENGS
DETAILS
ALL PITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS3500.3 AS PER ENGS DETAILS
ALL PITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS3500.3 AS PER ENGS DETAILS
ALL PITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS3500.3 AS PER ENGS DETAILS
RAM
P U
P 1:
20
3000
5010
0050
COLUMN.
COLUMN. COLUMN. COLUMN. COLUMN.
COLUMN.
COLUMN. COLUMN. COLUMN.
COLUMN.
COLUMN.
COLUMN.
COLUMN.
COLUMN.
COLUMN. COLUMN.
COLUMN.
COLUMN.
COLUMN.
COLUMN.
COLUMN.
COLUMN. COLUMN.
COLUMN.
COLUMN.
COLUMN. COLUMN. COLUMN.
LINE OF ROOF OVER
COLUMN.
COLUMN. COLUMN. COLUMN. COLUMN. COLUMN. COLUMN. COLUMN. COLUMN.
COLUMN.
COLUMN.
COLUMN. COLUMN.
COLUMN. COLUMN. COLUMN. COLUMN. COLUMN.
COLUMN. COLUMN.
COLUMN. COLUMN.
COLUMN.
1000
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020GROUND FLOOR PLAN M101 M
CK M
MF 30.10.15 D ISSUE FOR STORMWATER & TRAFFIC ENGINEER
MF 16.11.15 E ISSUE FOR DA CONSULTANTS MF 18.11.15 F ISSUE FOR DA CONSULTANTS - PARKING
MF 01.12.15 G ISSUE FOR DA
MF 15.12.15 H ISSUE FOR ADDITIONAL INFORMATION
MF 01.06.16 I ISSUE TO ADDRESS COUNCILS DA RESPONSE LETTER DATED
MF 10.06.16 J ISSUE TO INCLUDE UPDATED STORMWATER
JN 27.3.17 K ISSUE FOR CC
HC = DENOTES HOSECOCKS. REFER TO ARCH SPECHWU = DENOTES HOT WATER UNIT. REFER TO ARCH SPEC.
CT 07.06.19 L ISSUE FOR MODIFIED CC
SECTION 4.55 SUBMISSIONCLOUDS INDICATE AMENDMENTS
CK 04.09.2020 M ISSUE FOR SECTION 4.55 SUBMISSION CK
1 : 100GROUND FLOOR WITH NOTES
1
-
4.60LP
STORMWATER CHANNEL / CULVERT
3.74
3.273.27
GRASS
RIDGE
ROOF
ROOF R
ROOF
ROOF
4.68
2.36
2.352.30
2.34
2.33
3.413.47
3.52
3.593.66
3.78
3.413.47
3.52
3.593.66
3.78
4.60
4.63
4.60
UPA
M108
A
M108
2 3 4 5 6 7 8 91
A
B
C
D
MEZZANINE LEVEL -WAREHOUSE STORAGE
COVERED LOADING AREA FOR SMALL RIGID DELIVERY TRUCKS (BELOW)
ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES REMOVED
5D P 5 9 6 7 2 8
2312.3m2
EXIS
TIN
G C
ON
CR
ETE
DR
IVEW
AY T
O B
E R
EDU
CED
TOP
OF
0.15
m K
ERB
& G
UTT
ER
CO
NC
RET
E PA
THC
ON
CR
ETE
PATH
EXISTING CONCRETE DRIVEWAY TO BE REDUCED
EXISTING CONCRETE DRIVEWAY EXISTING CONCRETE
DRIVEWAY TO BE REDUCED
0.23
w R
END
. BR
ICK
WAL
L
0.23w BRICK WALL0.23w BRICK RETAINING W
ALL
0.23w BRICK RETAINING WALL0.23w BRICK RETAINING WALL
0.23w BRICK RETAINING WALL
NO. 177
GRASS
3.89
P R O P O S E D N E W D R I V E W A Y
P R O P O S E D N E W D R I V E W A Y
C E M E N T S H E D & W A R E H O U S E S T O R A G E
1.
2.
3.
4.
5.
6.
7.
8. 9.
OVERNIGHT TRUCK PARKING AND INCIDENTAL TRUCK PARKING DURING THE DAY
SLIDING GATE. AS SEL. BY PROP. AND AS PER ARCH. SPEC
C A R P A R K I N G A R E A
ACTUAL BOUNDARY OF SITE
11.
12.
BEDFORD ROADPA
RR
AMAT
TA R
OAD
SLIDING GATE
13.
14.
10.
EXIST RL
EXIST RL
EXIST RL
EXIST RL
EXIST RL EXIST RL
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
PROPOSEDFCGL RL 4.77
EXIST RL
DR
AING
E G
RAT
E TO
ST
OR
MW
ATER
ENG
INEE
RS
SPEC
IFIC
ATIO
NS
PRO
POSE
D F
ENC
EPR
OPO
SED
FEN
CE
PROPOSED FENCE PROPOSED FENCE
FFL RL 4.77
SHADE TREES TO COMPLY WITH PART D 2.10 (13-14) SCDCP
2M WIDE LANDSCAPE STRIP TO COMPLY WITH PART D 2.10.1(6) SCDCP
2M WIDE LANDSCAPE STRIP TO COMPLY WITH PART D 2.10.1(6) SCDCP PROVIDE ALUMINIUM FRAMED 'BREEZEWAY'
MANUAL LOUVRES AS SPECIFIED BY MANUFACTURER AND IN ACCORDANCE WITH THE
ARCHITECTURAL SPECIFICATION
ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES REMOVED
STEEL FRAMED STAIRS TO ENGINEERS DETAILS
PROVIDE ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES
S
DASHED LINE INDICATES SAND STORAGE BELOW
FALL
4.2
5°FA
LL 4
.25°
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WSWHEEL STOPS (WS) TO AS 2890.1
PROVIDE METAL 'KLIP-LOK' ROOF SHEETING.REFER TO ARCH. SPEC
DOTTED LINE INDICATES BLOCKWORK BELOW
DOTTED LINE INDICATES BLOCKWORK BELOW
THESE STOCKPILES ARE TO BE COVERED USING TARPAULIN AND WEIGHTS ( TO HOLD THE TARPAULIN IN PLACE) WHEN ACCESS IS NOT REQUIRED AS PER COND.
93. WHEN THE STOCKPILES ARE EXPOSED, THE PERMANENTLY INSTALLED IRRIGATION SYSTEM SHALL BE
UTILISED.
SOLAR VOLTAIC COLLECTOR
SOLAR VOLTAIC COLLECTOR
STRIPS OF TRANSLUCENT ROOF SHEETING
STRIPS OF TRANSLUCENT ROOF SHEETING
PROPOSED GARAGE ROLLER DOOR
B
M108
B
M108
WS
N E W D R I V E W A Y
+ RL 4.68
+ 4.75 + 4.90+ 5.13 + 5.05
+ 4.80 - AS PER ENGS DETAILS
GALVANISED METAL BOX GUTTER 800MM WIDE x 200MM DEEP AS PER STORMWATER ENGINEERS
DETAILS REFER TO ARCHITECTURAL SPECS
GALVANISED METAL BOX GUTTER 800MM WIDE x 200MM DEEP AS PER STORMWATER ENGINEERS
DETAILS REFER TO ARCHITECTURAL SPECS
FRL
90/9
0/90
FRL
90/9
0/90
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
DP AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
DP AS PER ENGINEERS DETAILS DP AS PER ENGINEERS
DETAILS
FFL RL 8.06
121110
DP AS PER ENGINEERS DETAILS
C1
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
DP TO ENGINEERS DETAILS
1256
5
ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES REMOVED
RWH AS PER ENGINEERS DETAILS
1000
LOWER METAL ROOF
2 CANOPY TREES TO BE REMOVED
HC
HC
HC
COLUMN.
COLUMN.
COLUMN. COLUMN. COLUMN.
COLUMN. COLUMN.
COLUMN. COLUMN.
LINE OF ROOF OVER
BOX GUTTER OVER BOX GUTTER OVERBOX GUTTER OVERDP
W A R E H O U S E S T O R A G E B E L O W
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020MEZZANINE M103 M
MF M
1 : 100MEZZANINE LEVEL
1
STAIR NOTER.C STAIRS MUST CONFORM WITH BUILDING CODE OF AUSTRALIA AND AS PER THE ARCHITECTURAL SPECIFICATION
MF 30.10.15 D ISSUE FOR STORMWATER & TRAFFIC ENGINEER
MF 16.11.15 E ISSUE FOR DA CONSULTANTS MF 18.11.15 F ISSUE FOR DA CONSULTANTS - PARKING
MF 01.12.15 G ISSUE FOR DA
MF 15.12.15 H ISSUE FOR ADDITIONAL INFORMATION
MF 01.06.16 I ISSUE TO ADDRESS COUNCILS DA RESPONSE LETTER DATED
MF 10.06.16 J ISSUE TO INCLUDE UPDATED STORMWATER
JN 27.3.17 K ISSUE FOR CC
CT 07.06.19 L ISSUE FOR MODIFIED CC
GRIDS (2 - 8) & (10 - 11) = CENTERLINE OF MEMBERSGRIDS 1, 9, 12 = EXTERNAL FACE OF MEMBERS / CONCRETE WALL GRIDS (2 - 8) & (10 - 11) = CENTERLINE OF MEMBERS
SECTION 4.55 SUBMISSIONCLOUDS INDICATE AMENDMENTS
CK 04.09.2020 M ISSUE FOR SECTION 4.55 SUBMISSION CK
-
4.60LP
MH
PIT
MH
PIT
4.07
4.67
4.60
3.98MH4.77
26°40'50" 26°40'50"
116°
44' 5
0" 3
5.01
5
205°37'20"205°37'20"
203°43'40"
295°
51'4
0"
37.
485
2D P 4 4 1 6 0 2 D
D P 5 3 1 8 1 71
STORMWATER CHANNEL / CULVERT
STORMWATER CHANNEL / CULVERT
STORMWATER CHANNEL / CULVERT
SSM 71408
4.69
4.71
3.27
2.16
2.182.27
2.31
4.85
4.804.72 4.54
4.414.20 4.15 4.09
4.04
3.97
4.84
4.68
4.57
4.61
4.59
4.64
4.78
4.87
4.88
4.58
2.36 2.39 2.372.28
2.24
2.222.262.32
2.38
2.352.30
2.34
2.33
BOLLARDBOLLARD 4.48
4.52
4.634.73
4.745.034.995.095.14
3.813.63 3.53
3.513.43 3.38
3.363.41
3.473.52
3.593.66
3.783.70
4.10
4.60
4.63
4.05
RL. 4.05 (AHD)GIN TOP OF KERBBM
FALL 6 DEGREES
NEW COLORBOND METAL ROOF NEW COLORBOND METAL ROOF (UPPER ROOF)
PROPOSED SIGNAGE
FALL 6 DEGREES FALL 4.25 DEGREES
FALL 4.25 DEGREES
A
M108
A
M108
FALL 6 DEGREES
FALL 6 DEGREES
FALL 6 DEGREES
PROPOSED NEW COLORBOND METAL ROOF
RWH DP
COVERED LOADING AREA FOR SMALL RIGID DELIVERY TRUCKS (BELOW)
5D P 5 9 6 7 2 8
2312.3m2
TOP
OF
0.15
m K
ERB
& G
UTT
ER
CO
NC
RET
E PA
THC
ON
CR
ETE
PATH
EXISTING CONCRETE DRIVEWAY TO BE REDUCED
EXISTING CONCRETE DRIVEWAY
EXISTING CONCRETE DRIVEWAY TO BE REDUCED
0.23
w R
END
. BR
ICK
WAL
L
0.23w BRICK WALL0.23w BRICK RETAINING W
ALL
0.23w BRICK RETAINING WALL0.23w BRICK RETAINING WALL
0.23w BRICK RETAINING WALL0.23w BRICK RETAINING WALL
NO. 177
GRASS
P R O P O S E D N E W D R I V E W A Y
P R O P O S E D N E W D R I V E W A Y
1.
2.
3.
4.
5.
6.
7.
8. 9.
S A N D S T O R A G E A R E A B E L O W
SLIDING GATE
C A R P A R K I N G A R E A
ACTUAL BOUNDARY OF SITE
DISABLED PERSONS CAR
SPACE
DISABLED PERSONS CAR
SPACE
COMMON AREA
11.
12.
N E W D R I V E W A Y
BEDFORD ROADPA
RR
AMAT
TA R
OAD
SLIDING GATE
13.
10.
EXIST RL
EXIST RL
EXIST RL
EXIST RL
EXIST RL
EXIST RL EXIST RL
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
FALLS TO SUMPS IN ACCORDANCE WITH STORM WATER ENGINEERS DRAWINGS
PROPOSEDFCGL RL 4.77
EXIST RL EXIST RL
EXIST RL
DR
AING
E G
RAT
E TO
ST
OR
MW
ATER
ENG
INEE
RS
SPEC
IFIC
ATIO
NS
PROPOSED FENCE
PRO
POSE
D F
ENC
EPR
OPO
SED
FEN
CE
PROPOSED FENCE PROPOSED FENCE
2M WIDE LANDSCAPE STRIP TO COMPLY WITH PART D 2.10.1(6) SCDCP
2 3 4 5 6 7 8 91
A
B
C
D
walls below shown dashed
walls below shown dashed
walls below shown dashed
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
RIDGE R.L 9.56
RIDGE R.L 12.03
NEW COLORBOND METAL ROOF
THESE STOCKPILES ARE TO BE COVERED USING TARPAULIN AND WEIGHTS ( TO HOLD THE TARPAULIN IN PLACE) WHEN ACCESS IS NOT REQUIRED AS PER COND.
93. WHEN THE STOCKPILES ARE EXPOSED, THE PERMANENTLY INSTALLED IRRIGATION SYSTEM SHALL BE
UTILISED.
SOLAR VOLTAIC COLLECTOR
SOLAR VOLTAIC COLLECTOR
STRIPS OF TRANSLUCENT ROOF SHEETING
STRIPS OF TRANSLUCENT ROOF SHEETING
SOLAR VOLTAIC COLLECTOR STRIPS OF TRANSLUCENT ROOF SHEETING SOLAR VOLTAIC COLLECTOR SOLAR VOLTAIC COLLECTOR
B
M108
B
M108
N E W D R I V E W A Y
14.
+ RL 4.68
+ 4.75 + 4.90+ 5.13 + 5.05
+ 4.80 - AS PER ENGS DETAILS
WS
PROPOSED LANDSCAPED AREA
2M WIDE LANDSCAPE STRIP TO COMPLY WITH PART D 2.10.1(6) SCDCP
RWH DP
RWH
RWH RWH RWH RWH RWH
STRIPS OF TRANSLUCENT ROOF SHEETINGSOLAR VOLTAIC
COLLECTOR
STRIPS OF TRANSLUCENT ROOF SHEETING
EAVES GUTTER
PARAPET TO ENGINEERS DETAILS
121110
GALVANISED METAL BOX GUTTER 800MM WIDE x 200MM DEEP AS PER STORMWATER ENGINEERS
DETAILS REFER TO ARCHITECTURAL SPECS
GALVANISED METAL BOX GUTTER 800MM WIDE x 200MM DEEP AS PER STORMWATER ENGINEERS
DETAILS REFER TO ARCHITECTURAL SPECS
GALVANISED METAL BOX GUTTER 800MM WIDE x 200MM DEEP AS PER STORMWATER ENGINEERS
DETAILS REFER TO ARCHITECTURAL SPECS
12.03
12.18PARAPET RL
BOX GUTTER BOX GUTTER
BOX GUTTERBOX GUTTER
LOWER ROOF
12.03
2 CANOPY TREES TO BE REMOVED
RWH
PROVIDE ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES AS SPECIFIED BY
MANUFACTURER AND IN ACCORDANCE WITH THE ARCHITECTURAL SPECIFICATION
PROVIDE ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES AS SPECIFIED BY MANUFACTURER AND IN ACCORDANCE WITH THE ARCHITECTURAL SPECIFICATION
DP DP DPEAVES GUTTEREAVES GUTTER
DP
EAVES GUTTER
CREST RL 4.8 AS PER ENGS
DETAILS
CREST RL 4.8 AS PER ENGS
DETAILS
BOX GUTTER
BOX GUTTER
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020ROOF PLAN M105 M
MF M
MF 30.10.15 D ISSUE FOR STORMWATER & TRAFFIC ENGINEER
MF 16.11.15 E ISSUE FOR DA CONSULTANTS MF 18.11.15 F ISSUE FOR DA CONSULTANTS - PARKING
MF 01.12.15 G ISSUE FOR DA
MF 15.12.15 H ISSUE FOR ADDITIONAL INFORMATION
MF 01.06.16 I ISSUE TO ADDRESS COUNCILS DA RESPONSE LETTER DATED
MF 10.06.16 J ISSUE TO INCLUDE UPDATED STORMWATER
JN 27.3.17 K ISSUE FOR CC
IMPORTANT NOTE - WALL TYPE 1The air-cell insulation proposed to Wall Type 1 must achieve a Spread of flame index not more than 9 and a Smoke-developed Index not more than 8 if the Spread-of-flame is more than 5 Sarking. The Contractor must provide evidence of compliance in accordance with Spec C1.10 Clause 7: Other Materials.
CT 07.06.19 L ISSUE FOR MODIFIED CC
CK 04.09.2020 M ISSUE FOR SECTION 4.55 SUBMISSION
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020ROOF PLAN M105 M
MF M
SECTION 4.55 SUBMISSIONCLOUDS INDICATE AMENDMENTS
CK
-
GROUND FFL5.00
GROUND FFL5.00
MAXIMUM BUILDING HEIGHT DCP - 10 METRE HEIGHT LIMIT
B O
U N
D A
R Y
AT
SOU
TH-W
EST
ELE
VATI
ON
MAXIMUM BUILDING HEIGHT LEP - 16 METRE HEIGHT LIMIT
MEZZANINE LEVEL.8.06
MEZZANINE LEVEL.8.06
3969
3060
ROOF LINE12.03
ROOF LINE12.03
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
PROVIDE ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND
MATERIALS AND FINISHES SCHEDULE.
GALAVANISED STEEL FENCE. REFER TO ARCH. SPEC
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND
MATERIALS AND FINISHES SCHEDULE.
1860
1000
2180 1
630
700
1630
700
1630
700
PROVIDE 'DECO-WOOD' RED CEDAR HORIZONTAL COMPOSITE TIMBER FINISH OR SIMILAR. REFER TO MANUFACTUERS DETAILS
AND THE ARCHITECTURAL SPECIFICATION
NEW ALUMINIUM FRAMED WINDOW(S) AS SEL. BY THE PROPRIETORS AND TO CONFORM WITH THE BASIX CERTIFICATE
R.L 9.70
2035
300mm BLOCKWORK TO ENGINEERS DETAILS
NEW ALUMINIUM FRAMED WINDOW(S) AS SEL. BY THE PROPRIETORS AND TO CONFORM WITH THE BASIX CERTIFICATE
3970
3060
B O
U N
D A
R Y
AT
SOU
TH-W
EST
ELE
VATI
ON
R.L 6.93
METAL AWNING. REFER TO ARCH. SPEC.
4.25
°
ROOF SHOWN DASHEDROOF SHOWN DASHED
THESE STOCKPILES ARE TO BE COVERED USING TARPAULIN AND WEIGHTS ( TO HOLD THE TARPAULIN IN PLACE) WHEN ACCESS IS NOT REQUIRED AS PER COND. 93. WHEN THE STOCKPILES ARE EXPOSED, THE PERMANENTLY INSTALLED IRRIGATION SYSTEM AS PER COND. 81 SHALL BE UTILISED.
GLAZING REFLECTIVITYA GLAZING REFLECTIVITY INDEX OF LESS THAN 20% MUST BE PROVIDED FOR CERTIFICATION AS PER CONDITION 67.
RWH TO ENGINEERS DETAILS.
RWH TO ENGINEERS DETAILS.
RWH TO ENGINEERS DETAILS.
RWH TO ENGINEERS DETAILS.
ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES REMOVED
ROOF SHOWN DASHED
11.35
12.18
COLUMNS BEHIND
ROOF SHOWN DASHED
4600
650
BUILDING IN THE DISTANCE
DA CONDITION 43A(b) TO BE DELETED AND TWO (2) CANOPY TREES NOT TO BE PLANTED.
REFER TO STATEMENT OF ENVIRONMENTAL EFFECTS AND ARBORIST STATEMENT
PREPARED BY TALC DATED 27 AUG 2020.
GROUND FFL5.00
GROUND FFL5.00
MAXIMUM BUILDING ENVELOPE DCP - 10 METRE HEIGHT LIMIT
B O
U N
D A
R Y
AT
NO
RTH
-EAS
T EL
EVAT
ION
B E D F O R D R O A D
MAXIMUM BUILDING ENVELOPE LEP - 16 METRE HEIGHT LIMIT
MEZZANINE LEVEL.8.06
MEZZANINE LEVEL.8.06
ROOF LINE12.03
ROOF LINE12.03
3060
3970
B O
U N
D A
R Y
AT
NO
RTH
-EAS
T EL
EVAT
ION
3060
3970
RIDGER.L 12.03
FIRE RATED 200mm wall
METAL 'KLIP-LOK' ROOF
FIRE RATED 200mm wall
RWH TO ENGINEERS DETAILS.
RWH TO ENGINEERS DETAILS.
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020NORTH AND SOUTH ELEVATIONS M106 M
MF M
GLAZING REFLECTIVITY NOTE:THE CONTRACTOR MUST ENSURE THAT THE EXTERNAL GLASS USED IN THE BUILDING HAS A REFLECTIVITY INDEX OF LESS THAN 20% AS PER CONDITION 67. REFER TO ARCH SPEC AND SECTION J REPORT PREPARED BY PARTNERS ENERGY DATED 30/03/2017.
1 : 100SOUTH WEST ELEVATION
1
1 : 100NORTH EAST ELEVATION
2
MF 30.10.15 D ISSUE FOR STORMWATER & TRAFFIC ENGINEER REVIEW
MF 16.11.15 E ISSUE FOR DA CONSULTANTS MF 18.11.15 F ISSUE FOR DA CONSULTANTS - PARKING CHANGE
MF 01.12.15 G ISSUE FOR DA
MF 15.12.15 H ISSUE FOR ADDITIONAL INFORMATION
MF 01.06.16 I ISSUE TO ADDRESS COUNCILS DA RESPONSE LETTER DATED 18.05.2016
MF 10.06.16 J ISSUE TO INCLUDE UPDATED STORMWATER DETAILS
JN 27.3.17 K ISSUE FOR CC
CT 07.06.19 L ISSUE FOR MODIFIED CC
SECTION 4.55 SUBMISSIONCLOUDS INDICATE AMENDMENTS
CKCK 04.09.2020 M ISSUE FOR SECTION 4.55 SUBMISSION
-
GROUND FFL5.00
RL
PROPOSED SIGNAGE. REFER TO ARCH. SPEC.
B O
U N
D A
R Y
B O
U N
D A
R Y
C A R P A R
MAXIMUM BUILDING HEIGHT LEP - 16 METRE HEIGHT
MAXIMUM BUILDING HEIGHT DCP - 10 METRE HEIGHT
MEZZANINE LEVEL.8.06
ROOF LINE12.03
23456789 1
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
METAL 'KLIP-LOK' ROOF TO ENGINEERS DETAILS.
740
740
PROVIDE 'STEEL-LINE' OR SIMILAR ROLLER DOOR TO MANUFACTURERS REQUIREMENTS.
REFER TO ARCHITECTURAL SPECIFICATION
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND
MATERIALS AND FINISHES SCHEDULE.
METAL 'KLIP-LOK' ROOF TO ENGINEERS DETAILS.
GALAVANISED STEEL FENCE. REFER TO ARCH. SPEC
300mm BLOCKWORK TO ENGINEERS DETAILS (WT2)
GALVANISED STEEL FENCE. REFER TO ARCH. SPEC
R.L 9.70
R.L 7.90
3060
3970
COLORBOND GUTTERS & DOWNPIPES & CONNECTED TO STORMWATER LINES AS PER THE STORMWATER ENG. DETAILS.
REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
ROOF RIDGER.L 9.56
FIRE RATED 200mm BLOCKWORK TO ENGINEERS DETAILS (WT2B)
(WT2
B)
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS RWH AS PER ENGINEERS DETAILS
RWH AS PER ENGINEERS DETAILS
12 11 10
44384900444047184834631664325664543054315430
ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES REMOVED
9283516136 8303516118
12.1812.03
EQEQEQ
CENTRE LINE BETWEEN RAINWATER HEADS
4776 4776
650650
1500
GROUND FFL5.00
RL 3.74N A T U R A L G R O U N D L I N E
B O
U N
D A
R Y
B O
U N
D A
R Y
MAXIMUM BUILDING HEIGHT LEP - 16 METRE HEIGHT LIMIT
MAXIMUM BUILDING HEIGHT DCP - 10 METRE HEIGHT LIMIT
MEZZANINE LEVEL.8.06
ROOF LINE12.03
2 3 4 5 6 7 8 91
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC
AND MATERIALS AND FINISHES SCHEDULE.
GALAVANISED STEEL FENCE. REFER TO ARCH. SPEC
ROOF RIDGER.L 9.56
4500
METAL KLIP-LOK SKILLION ROOVE TO COVER "OPEN AIR" LANDSCAPE MATERIAL HOLDING AREA TO STRUCTURAL ENGINEERS DETAILS AS PER PART B CLAUSE 4 IN THE NOTICE OF DETERMINATION
NEW ALUMINIUM FRAMED WINDOW(S) AS SEL. BY THE PROPRIETORSAND TO CONFORM WITH THE BASIX CERTIFICATE
NEW ALUMINIUM FRAMED DOOR WITH FIXED WINDOWS AS SEL. BY THE PROPRIETORS AND TO CONFORM WITH THE BASIX CERTIFICATE
200mm BLOCKWORK TO ENGINEERS DETAILS
COLORBOND GUTTERS & DOWNPIPES & CONNECTED TO STORMWATER LINES AS PER THE STORMWATER ENG. DETAILS.
REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
METAL 'KLIP-LOK' ROOF TO ENGINEERS DETAILS.
COLORBOND GUTTERS & DOWNPIPES & CONNECTED TO STORMWATER LINES AS PER THE STORMWATER ENG. DETAILS. REFER TO ARCH SPEC
AND MATERIALS AND FINISHES SCHEDULE.
1400
1000
1400
1000
690
20552
745
PROVIDE 'STEEL-LINE' OR SIMILAR ROLLER DOOR TO MANUFACTURERS REQUIREMENTS. REFER TO ARCHITECTURAL SPECIFICATION300mm BLOCKWORK TO ENGINEERS DETAILS
3970
3060
3000
2075
100
RWH AS PER ENGINEERS DETAILS
121110
RWH AS PER ENGINEERS DETAILS
DP AS PER ENGINEERS DETAILSDP AS PER ENGINEERS DETAILS
4438 4900 4440 4718 4834 6316 6432 5664 5430 5431 5430
9.70
12.18
EAVE GUTTERS EAVE GUTTERS
DA CONDITION 43A(b) TO BE DELETED AND TWO (2) CANOPY TREES NOT TO BE PLANTED.
REFER TO STATEMENT OF ENVIRONMENTAL EFFECTS AND ARBORIST STATEMENT
PREPARED BY TALC DATED 27 AUG 2020.
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020WEST AND EAST ELEVATIONS M107 M
MF M
1 : 100NORTH WEST ELEVATION
1
1 : 100SOUTH EAST ELEVATION
2
MF 30.10.15 D ISSUE FOR STORMWATER & TRAFFIC ENGINEER
MF 16.11.15 E ISSUE FOR DA CONSULTANTS MF 18.11.15 F ISSUE FOR DA CONSULTANTS - PARKING
MF 01.12.15 G ISSUE FOR DA
MF 15.12.15 H ISSUE FOR ADDITIONAL INFORMATION
MF 01.06.16 I ISSUE TO ADDRESS COUNCILS DA RESPONSE LETTER DATED
MF 10.06.16 J ISSUE TO INCLUDE UPDATED STORMWATER
JN 27.3.17 K ISSUE FOR CC
CT 07.06.19 L ISSUE FOR MODIFIED CC
SECTION 4.55 SUBMISSIONCLOUDS INDICATE AMENDMENTS
CKCK 04.09.2020 M ISSUE FOR SECTION 4.55 SUBMISSION
-
GROUND FFL5.00BEDFORD ROAD ENTRANCE/EXIT
OFFICEW.C.STAFF ROOM.WAREHOUSE STORAGE
BEDFORD ROAD ENTRANCE/EXIT
MAXIMUM BUILDING ENVELOPE LEP - 16 METRE HEIGHT LIMIT
MAXIMUM BUILDING ENVELOPE DCP - 10 METRE HEIGHT LIMIT
MEZZANINE LEVEL.8.06
ROOF LINE12.03
23456789 1
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
METAL 'KLIP-LOK' ROOF TO ENGINEERS DETAILS.
PROVIDE GALVANISED STEEL C-CHANNEL PURLINS REFER TO STRUCTURAL ENGINEERS DETAILS
GALVANIZED STEEL COLUMN (C1) TO ENGINEERS DETAILS
GALVANIZED STEEL BEAM TO STRUCTURAL ENGINEERS DETAILS
R.L 9.70
1000
1400
WT1B
C1 C1C1
WT3WT2 WT3
1100
C1
WT1
A
WT2
PROVIDE 'STEEL-LINE' OR SIMILAR ROLLER DOOR TO MANUFACTURERS REQUIREMENTS.
REFER TO ARCHITECTURAL SPECIFICATION
PROVIDE GALVANISED STEEL C-CHANNEL PURLINS REFER TO STRUCTURAL ENGINEERS DETAILS
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
STEEL FRAMED STAIRS TO ENGINEERS DETAILS
NEW ALUMINIUM FRAMED DOOR WITH FIXED WINDOWS AS SEL. BY THE PROPRIETORS AND TO CONFORM WITH THE BASIX CERTIFICATE
R.L 7.90
R.C SLAB TO ENGINEERS DETAILS
BLOCKWORK TO ENGINEERS DETAILS (WT2)
NEW ALUMINIUM FRAMED WINDOW (S) AS SEL. BY THE PROPRIETORS AND TO CONFORM WITH THE BASIX CERTIFICATE
MEZZANINEFFL. 8.06
FFL. 5.00
GALVANIZED STEEL BEAM TO STRUCTURAL ENGINEERS DETAILS
PROVIDE MINI ORB EXTERNAL WALL CLADDING AS PER MANUFACTURERS REQS. REFER TO ARCH SPEC AND MATERIALS AND FINISHES SCHEDULE.
GALVANISED STEEL BEAM TO STRUCTURAL ENGINEERS DETAILS
GALVANISED STEEL TRUSS TO STUCTURAL ENGINEERS DETAILS
C1C1C1
3060
3970
PROVIDE FULL HEIGHT OFFICE JOINERY. REFER TO ARCH. SPEC.
FIRE RATED 200mm WALL CONTRACTOR MUST ENSURE THAT THIS WALL IS TO HAVE A FIRE RATING ON 90/90/90
METAL AWNING ABOVE WINDOWS. REFER TO ARCH . SPEC.
WATERPROOF WALLS & FLOORSOF ALL WET AREAS AS PER THEARCHITECTURAL SPECIFICATION
R.C FOOTING TO STRUCT.ENGINEERS. DETAILS
R.C FOOTING TO STRUCT.ENGINEERS. DETAILS
FFL. 5.00
WT1B
DASHED LINE INDICATES FLOOR OF CARPARKING AREA (FFL. 4.90)
WT2
GLAZING REFLECTIVITYA GLAZING REFLECTIVITY INDEX OF LESS THAN 20% MUST BE PROVIDED FOR CERTIFICATION AS PER CONDITION 67.
IMPORTANT DOOR NOTE:EACH DOOR ON THE GROUND FLOOR OF THE BUILDING MUST HAVE A CLEAR WIDTH NOT LESS THAN 850MM, REQUIRING A 920MM DOORWAY
RC PILES TO ENGINEERS DETAILSRC PAD TO ENGINEERS DETAILS
R.C FOOTING TO STRUCT.ENGINEERS. DETAILS
RC PILES IN DISTANCE SHOWN DOTTED TO ENGINEERS DETAILS
GALVANISED STEEL BEAM TO STUCTURAL ENGINEERS DETAILS
12 11 10
12.18
4.72
THIS RC SLAB REPRESENTS THE 1:20 RAMP AS PER ENGS DETAILS 5.00
280
RET. WALL TO ENGS DETAILS
GROUND FFL5.00
MEZZANINE LEVEL.8.06
ROOF LINE12.03
RC FOOTING TO ENGINEERS DETAILSRC FOOTING TO ENGINEERS DETAILS RC SLAB TO ENGINEERS DETAILS RC SLAB TO ENGINEERS DETAILSNGL
BULKY GOODS RETAIL SALES
MEZZANINE
STOCKPILESSAND STORAGE AREA
DRIVEWAY
NEW COLORBOND METAL ROOF
SOLAR VOLTAIC COLLECTOR
3969
3060
12.03
PROVIDE ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES
PROVIDE ALUMINIUM FRAMED 'BREEZEWAY' MANUAL LOUVRES REMOVED
NGL
STEEL FRAMED STAIRS TO ENGINEERS DETAILS
RWH AS PER STORMWATER ENGINEERS DETAILS
2400
2400
4500
12.18Parapet RL
11.35
1500
katris architects pty ltd
JOB No.DRAWN
CLIENT
ARCHITECT'S APPROVAL
DRAWING No ISSUESCALEDATE
PROJECT
TITLE
AMENDMENTDATE ISSUEARCHITECTURAL - GENERAL NOTESA1 All dimensions are to be confirmed on site by the builder/subcontractor, any incongruencies must be reported to the Architect before commencement of any workA2 The Builder/subcontractor will be held responsible for any construction details which have not been approved by the Architect.A3 In the event of encountering any discrepencies on these drawings, specification or subsequent instructions issued, the Builder/Subcontractor shall contact the Architect before proceeding further with any work.A4 The Builder/Subcontractor will be held responsible for the watertightness of the whole building for a minimum period of two years after the date of practical completion.A5 It is the contractor's responsibilty to have all Architectural & Structural documentation, including all site instructions any any details issued during the course of construction, approved by the relevent authorities including the local Council & the Water Board before any work may be proceeded with.A6 All construction, control joints and expansion joints in the wall, floors, & other locations shall be in strict accordance with Architectural and/or Structural Engineering details. Nojoints or breakes other than specified, are allowed without written permission from the Architect and/or Engineer.A7 Measurements for the fabrication of secondary components such as, windows, doors,internal frames, structural steel components and the like, are not to be taken from thesedocuments. Mearurements must be taken on site to suit the work as constructed.A8 All structural components shall be in strict accordance to details and specifications as prepared by a structural engineer, and those details from part of the total specification.A9 All existing structures need to be examined for structural adequacy, and it is the Contractor's responsibillty to ensure that a certificate of structural adequacy is available prior to the start of any work.A10 No construction work shall commence until a site survey has been completed. This work must be performed by a registered Surveyor.A11 Foundation set-out, is to be performed by the Surveyor mentioned in 'A10' and recovery pegs must be protected during construction.A12 All timber work is to comply with the requirments of the 'Light Timber Framing Code' S.A.A. Codes and Structural Engineer's details and specification.A13 Copyrights of all documentation and designs relating to both Architectural and Structural Engineering, are retained by this office. Written authority is required for any reproduction.A14 All Architectural documentation to be read in conjunction with the Structural Engineer's details and specification.A15 Comply with the 'hazardous materials' clause of the specification
DRAWN
f 02 9747 5046abn 79 001 639 970
p 02 9744 5421level 1 3-5 burwood road, concord nsw 2137PO Box 703 burwood 1805 nsw australia
IMPORTANT NOTEIt is the Tenderer's & Contractor's responsibility to check that all Architectural, Structural and all other job related documentation's have been recieved before tendering and/or construction may commence. Should there be any doubt to the availability of such document's the Architect should be notified before further details be needed, the tenderer and/or Contractor shall obtain such details before signing of contract documents. Failure to adhere to these conditions, the Tenderer and/or Contractor nullifies any right or claim for extras, due to interpretation of documentation, and the Architect's &/or Engineer's direction shall be carried out at no extra cost.
www.katris.com.au
TN
Nominated Architects Chris Katris (reg 9724), Nick Katris (reg 3878), Peter Katris (reg 4569)
1 : 100
MR R LAVIANO AND MR A BROMBAL (RA PROPERTY SERVICES PTY LTD)Proposed relocation and construction of new Joe and Sons (Builders Hardwareand Landscaping Supply Centre) at 33-35 Queens road, Five Dock to 177Parramatta road, Homebush West (cnr of Bedford road) Lot 5 DP 596728 andLot 2 DP 210783. 1153-11
04.09.2020SECTION M108 M
MF M
1 : 100Section A - A
A
MF 30.10.15 D ISSUE FOR STORMWATER & TRAFFIC ENGINEER
MF 16.11.15 E ISSUE FOR DA CONSULTANTS MF 18.11.15 F ISSUE FOR DA CONSULTANTS - PARKING
MF 01.12.15 G ISSUE FOR DA
MF 15.12.15 H ISSUE FOR ADDITIONAL INFORMATION
MF 01.06.16 I ISSUE TO ADDRESS COUNCILS DA RESPONSE LETTER DATED
MF 10.06.16 J ISSUE TO INCLUDE UPDATED STORMWATER
JN 27.3.17 K ISSUE FOR CC
External walls provided with external cladding finishLocation: Refer to the architectural documentation.Provide the external cladding system nominated on the Schedule of Finishes and the Architectural drawings and fixed to the exterior of the Masonry and/or timber wall in strict accordance with the manufacturers details and specifications.
The selected prefinished materials and colours of the external cladding are to be confirmed in writing by the Proprietors prior to the signing of any Building Works Contract.Each cladding system is to be fixed to the required substrate material in strict accordance with the manufacturers details and specifications.It is the sole responsibility of the Building Contractor to allow for the preparation of the substrate and all materials required for the fixing of the selected cladding systems.The Building Contractor must also ensure that the finished cladding system is secure, stable and watertight.The substrate system for the cladding finish is to be constructed in a position as to allow for the fixing of the cladding so that the finished exterior face of the cladding system does not encroach on the specific Council required minimum setbacks and/or encroachments on the boundaries.
1 : 100Section B - B
B
CT 07.06.19 L ISSUE FOR MODIFIED CC
SECTION 4.55 SUBMISSIONCLOUDS INDICATE AMENDMENTS
CKCK 04.09.2020 M ISSUE FOR SECTION 4.55 SUBMISSION
M000 - TITLESheetsM000 - TITLE
M101 - GROUND FLOOR PLANSheetsM000 - TITLEM101 - GROUND FLOOR PLANM103 - MEZZANINEM105 - ROOF PLANM106 - NORTH AND SOUTH ELEVATIONSM107 - WEST AND EAST ELEVATIONSM108 - SECTION
M103 - MEZZANINESheetsM000 - TITLEM101 - GROUND FLOOR PLANM103 - MEZZANINEM105 - ROOF PLANM106 - NORTH AND SOUTH ELEVATIONSM107 - WEST AND EAST ELEVATIONSM108 - SECTION
M105 - ROOF PLANSheetsM000 - TITLEM101 - GROUND FLOOR PLANM103 - MEZZANINEM105 - ROOF PLANM106 - NORTH AND SOUTH ELEVATIONSM107 - WEST AND EAST ELEVATIONSM108 - SECTION
M106 - NORTH AND SOUTH ELEVATIONSSheetsM000 - TITLEM101 - GROUND FLOOR PLANM103 - MEZZANINEM105 - ROOF PLANM106 - NORTH AND SOUTH ELEVATIONSM107 - WEST AND EAST ELEVATIONSM108 - SECTION
M107 - WEST AND EAST ELEVATIONSSheetsM000 - TITLEM101 - GROUND FLOOR PLANM103 - MEZZANINEM105 - ROOF PLANM106 - NORTH AND SOUTH ELEVATIONSM107 - WEST AND EAST ELEVATIONSM108 - SECTION
M108 - SECTIONSheetsM000 - TITLEM101 - GROUND FLOOR PLANM103 - MEZZANINEM105 - ROOF PLANM106 - NORTH AND SOUTH ELEVATIONSM107 - WEST AND EAST ELEVATIONSM108 - SECTION