KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.
-
Upload
samson-newman -
Category
Documents
-
view
214 -
download
1
Transcript of KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.
![Page 1: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/1.jpg)
KARMJIT SINGHCHAIRMAN CILT SINGAPORE
4 JULY 2014
Singapore – Infrastructure Projects
![Page 2: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/2.jpg)
Agenda
1. Changi Airport East Industrial / Logistics Project
2. Project Jewel at Changi Airport
3. Relocation of PSA Container Port to Pasir Panjang
(Phase 1) and Tuas (Phase 2)
4. Development and Expansion of Seletar Airport &
Aerospace Park
5. New International Cruise Terminal
![Page 3: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/3.jpg)
Agenda
6. E-Freight and IoT (Internet of Things)
7. High Speed Rail between SIN-KUL
8. Expansion of MRT Rail Network
9. New Generation of Logistics / Warehouses
10. Development of Modern Industrial Parks in Iskandar
(South Johore)
11. Development of Industrial Parks in Bintan and Batam
![Page 4: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/4.jpg)
1. Changi Airport East Industrial / Logistics Project
Project description: New airfreight terminals, cargo centre for forwarders, logistics park and mail control
Expected completion date: 2020 – 2022
Budget: SGD 1 Billion
Project Owner: Changi Airport Group
Capacity: 4.5 – 5.5 million tonnes
![Page 5: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/5.jpg)
2. Project Jewel at Changi AirportProject description:
World-class lifestyle destination for global travelers. The complex will offer aviation facilities, retail offerings and unique leisure attractions.
Expected completion date: 2018
Budget: SGD 1.47 Billion
Project Owner: Changi Airport Group
Capacity: 24 million passengers per annum
![Page 6: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/6.jpg)
3. Relocation of PSA to Pasir Panjang (Phase 1) & Tuas (Phase 2)
Project description: PSA port to be relocated in two phases: (1) Pasir Panjang Port and (2) Tuas Port
Expected completion date: 2020
Budget: SGD 4.5 Billion
Operated by: PSA
Capacity: Additional 15 new berths
![Page 7: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/7.jpg)
4. Development & Expansion of Seletar Airport & Aerospace Park
Project description: Development of Seletar Airport designed to support industrial and business aviation activities.
Expected completion date: End of 2014
Budget: SGD 60 Million
Project Owner: JTC & EDB
Capacity: 30 aerospace companies & an 1,800 m runway
![Page 8: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/8.jpg)
5. New International Cruise TerminalProject
description: Development of the Marina Bay Cruise Terminal Singapore for international passenger traffic.
Completion date: 2012
Budget: SGD 450 Million
Operated by: SATS
Capacity: Able to berth two 3,000 pax cruise ships
![Page 9: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/9.jpg)
6. E-Freight & IoT (Internet of Things)Project
description: Using RFID to improve land/sea/freight information flow and productivity
Expected completion date: 2017
Project Owner: CAAS & IDA
![Page 10: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/10.jpg)
6. E-Freight & IoT (Internet of Things)Project
description: Using RFID to improve land/sea/freight information flow and productivity
Expected completion date: 2017
Project Owner: CAAS & IDA
![Page 11: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/11.jpg)
7. High Speed Rail between SIN-KULProject
description: High Speed Rail (HSR) between Singapore and Malaysia to improve SIN-KUL intercity connectivity
Expected completion date: 2024
Budget: SGD 15 Billion
Operated by: ?
![Page 12: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/12.jpg)
8. Expansion of MRT Rail NetworkProject
description: Expansion and development of MRT rail network to serve extended areas and a greater number of commuters.
Expected completion date: 2025
Budget: SGD 60 Billion
Operated by: LTA
Capacity: Increase from 160 to 320 km of track
![Page 13: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/13.jpg)
8. Expansion of MRT Rail NetworkProject
description: Expansion and development of MRT rail network to serve extended areas and a greater number of commuters.
Expected completion date: 2025
Budget: SGD 60 Billion
Operated by: LTA
Capacity: Increase from 160 to 320 km of track
![Page 14: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/14.jpg)
9. New Generation of Logistics / Warehouses (Green Logistics)Project description:
Improve productivity and develop green buildings, green transport, green ports and green freight and logistics.
By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and 11% increase in public transport usage.
Expected completion date: On-going
![Page 15: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/15.jpg)
9. New Generation of Logistics / Warehouses (Green Logistics)Project description:
Improve productivity and develop green buildings, green transport, green ports and green freight and logistics.
By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and 11% increase in public transport usage.
Expected completion date: On-going
![Page 16: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/16.jpg)
10. Development of Modern Industrial Parks in Iskandar (South Johore)
Project description: Joint Malaysian and Singapore government collaboration
Expected completion date: On-going
![Page 17: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/17.jpg)
10. Development of Modern Industrial Parks in Iskandar (South Johore)
Project description: Joint Malaysian and Singapore government collaboration
Expected completion date: On-going
![Page 18: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/18.jpg)
10. Development of Modern Industrial Parks in Iskandar (South Johore)
Project description: Joint Malaysian and Singapore government collaboration
Expected completion date: On-going
![Page 19: KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects.](https://reader034.fdocuments.us/reader034/viewer/2022051618/56649ce35503460f949af03d/html5/thumbnails/19.jpg)
11. Development of Industrial Parks in Bintan and BatamProject
description: Development of Bintan Industrial Estate and Batamindo Industrial Park for manufacturing companies.
Expected completion date: On-going