Karagandy – Transit Airport 1
Karagandy International Airport – New Transit Cargo-hub in Central Asia
Karagandy – Transit Airport 2
Karagandy – Transit Airport 3
Karagandy
Plan: KGF intends to attract air cargo carriers to become the meeting point between Europe and Asia
Karagandy – Transit Airport 4
Purpose of the Briefing
Inform Airline of the potential role of Karagandy International Airport as a cargo transit airport for flights between Asia and Europe
Karagandy – Transit Airport 5
Route Economic Study:- Shanghai to Frankfurt
Karagandy – Transit Airport 6
Route Economic Study (cont’d)- Shanghai to Frankfurt
Note: This example does not take into consideration possible additional transit cost (eg. crew change, etc.)
$21,581,350
350
$61,661
$170,647
$121,467
$292,113
200,000
12:17
5160
Transit
Sary-Arka
$2,466,800
350
$7,048
$7,047
-$7,048
-
-
-0:21
-188
Difference
Sary-Arka vs. Almaty
$218,694Potential revenue (USD)
11:30Total flight time
Potential additional yearly revenue (USD)
Number of flights per year (approx.)
Potential additional revenue (USD)
$108,986Net revenue (USD)
$109,708Total cost (USD)
149,732Potential payload (Lbs)
4953Total distance (NM)
Non-Stop
Karagandy – Transit Airport 7
Regular transit landings of MK Airlines crafts (since 20.03.2007)
Karagandy – Transit Airport 8
Regular landings of Tesis Cargo crafts (since 14.04.2007)
Karagandy – Transit Airport 9
Transit flight «Lufthansa Cargo»
MD - 11
Karagandy – Transit Airport 10
Hong Kong - Luxembourg
4 flights per week
Transit flights of «Cargolux» (since 18.10.2007)
Karagandy – Transit Airport 11
Seoul - Moscow
5 flights per week
Commercial flights of Aeroflot Cargo (since 18.10.07)
Karagandy – Transit Airport 12
Shenzhen - Amsterdam 4 flights per week
Transit flights of «JADE Cargo» (since 28.08.2008)
Karagandy – Transit Airport 13
2. Karaganda Region
Karagandy – Transit Airport 14
Karaganda Region
Territory: 428,000 square km. Population: 1,331,700 Region center: Karaganda city Population of region center: 750,000
Karaganda City
Karagandy – Transit Airport 15
Karaganda Region (cont’d)- Economy
53,3%3,6%
12,8%
4,3%
12,4%13,6%
Industry Building Other Rural Economy Transportation Trade
Karagandy – Transit Airport 16
Karaganda Region (cont’d) Large scale enterprises with foreign participation “Mittal Steel Temirtau” (“Mittal Steel”, Great Britain) “Kazakhmys” Ltd “Karaganda margarine factory” (“Ursem Holding”, Switzerland) “Konfety Karagandy” (U.I.G. Limited, Great Britain) “Efes Karaganda pivovarennyj zavod” (“Efes„ Turkey) “International coal technologies” (Eurasian group, Russia) “ Zhairemskyj GOK” (Eurasian group, Russia) “Central Asia Cement” (Malaysia) “Nova Zinc” (Nova-trading & Commerce AG) “Karaganda -Zhily” (“Enrhost. Ltd.” Great Britain) “Shubarkul coal plant” (Eurasian group, Russia) “Saranrezinotechnica” (“ECM Wertpapierdienstleistungs GmbH” Germany) “Karagandarezinotechnica„(“Sibhimimpex„ Russia)
Karagandy – Transit Airport 17
3. Airport Infrastructure
Karagandy – Transit Airport 18
Karagandy Airport
Modern facilities meeting international standards Yearly capacity of 2.5 millions passengers, 18,000 tons of cargo
and 7,000 tons of mail
Karagandy – Transit Airport 19
Location
KaragandyKaragandy
Astana
Almaty
Position 49° 40' 15.00" N 073° 20' 04.00" E
Karaganda City 22 km NW 108 NM (200 km) from
Astana 409 NM (755 km) from
Almaty
Karagandy – Transit Airport 20
Airport Data Privately owned by Sky Service ICAO code UAKK IATA code KGF Elevation 538 meters (1,765 feet) Magnetic variation 008° E Time UTC+6 300 hectare surface Operates 24 hours No night curfew
Karagandy – Transit Airport 21
Maneuvering Area and Apron Runway 05/23 concrete surface 3,300 meters (10,831 feet) X 60 meters (Up to 3600 meters in 2008) Runway PCN 43/R/A/X/T
(Permission for 2 landing MD-11 and 8 landing B747 per day) Upgrade to Runway PCN 68 by 2010 3 taxiways 23 parking places
PCN 43 PCN 10PCN 4
3
Karagandy – Transit Airport 22
Weather Services
Available 24 hours Service in 2 languages Located in terminal building Pre-flight briefings METAR TAF Possible alternates (Astana, Almaty and Bishkek)
Karagandy – Transit Airport 23
Weather Conditions Located in the depth of mainland, in the steppe area,
which causes the sharp continental climate Coldest month: January (average -15˚ C) Hottest month: July (average +20˚ C) Average yearly precipitations: 315 mm Snow from 15 November to 1 April (layer 8-21 cm) Prevailing winds:
October - March: south west April - December: north east
Karagandy – Transit Airport 24
Weather Conditions (cont’d) No suspended aircraft operations due to fog Airport accessibility:
CAT I: 99,62% CAT II: would be 99,95%
In the last 5 years aircraft operations were suspended only 158 hours due to ice
Source: Karagandy
Karagandy – Transit Airport 25
Hangar 4662 square meters Height 21 meters Steel framework Can accommodate A310
Karagandy – Transit Airport 26
Cargo TerminalS -3456 m2
Capacity – 40 000 ton/year
All types of Cargo
Fire safety system, 3 temperature modes
Auto-control WMS system, Customs service
Karagandy – Transit Airport 27
Firehouses
2 firehouses 5 fire vehicles and a
control center 9 categories for fire
safety
Karagandy – Transit Airport 28
Fuel Supply Arrives into Karaganda City by
rail Stocked at a facility near the
railway line Delivered to the airport by
tanker trucks Systematic quality checks,
prior to storage Delivery into plane by tanker
trucks Airport storage capacity of
4,575 m³ 1 tanker (80 m³), 2 tankers (60
m³) and 4 fuel tanker trucks
(22 m3) at the airport
Karagandy – Transit Airport 29
Terminal Building
30,000 square meters Planning for 1,200 passengers
per hour Peak passenger flow 250
passengers 9 manual check-in positions 8 boarding gates VIP area Immigration service
Karagandy – Transit Airport 30
Passenger:
Almaty (daily) Moscow (Domodedovo - 4 flights per
week) St. Petersburg (2 flights per week) Frankfurt (Kostanay – 1 flight per week) Hannover (Kostanay - 1 flight per week) Antalya (1 flight per week) Minsk (1 flight per week) Novosibirsk (1 flight per week) Istanbul (planned) Sharja (planned) Urumqi (planned)
Cargo:
Macao (2 flights per week) Hong Kong (2 flights per week) Luxembourg (2 flights per week) Shanghai ( 2 flights per week) Tyanzin (3 flights per week) Tallin (3 flights per week) Moscow (Sheremetevo 3 flights per
week) Hahn (Frankfurt 3 flights per week) Seoul (3 flights per week) Sharja (planned) Istanbul (planned) Pekin (planned) Amsterdam (planned) London (planned)
Destinations
Karagandy – Transit Airport 31
Downtown Hotels COSMONAUT http://www.hotelcosmonaut.kz ALATAU http://www.hotel-alatau.kz CHAIKA
http://chaika.karaganda.kz DOSTAR ALEM http://www.dostar-alem.kz
Karagandy – Transit Airport 32
The Cosmonaut Hotel ****
Telecommunication services High speed internet Satellite TV Gym Pool Bar Restaurant Outdoor terraces Park http://www.hotelcosmonaut.kz
Karagandy – Transit Airport 33
In 2006-2007 Karagandy International Airport received an input of over 40 mln USD of
investments.
We have always welcomed and will always welcome airlines to audit our airport, such as Lufthansa, Cargolux, Austrian Airlines, Air Astana, KLM and also Shanghai Airlines.
We want to be compliant with your safety, operational and infrastructure requirements
Investments
Karagandy – Transit Airport 34
2008 New Technical Center created for MD-11 & Boeing 747Line Maintenance
Today there are 6 educated engineers available in the airport (5 of those are certified for В1 и В2 to service MD-11, 2 for Boeing 747-200,300)
We have 5 more who on Lufthansa Training now and starting on October we have certified specialists for Boeing 747-200,300,400.
Technical center
Karagandy – Transit Airport 35
Lufthansa Consulting provided with ground handling trainings and trained Karagandy Airport staff for fuelling, de-icing aircrafts and DGR
The training program is based on IATA recommendations widely recognized by international aviation community. After these trainings 28 employees have received the official IATA Certificates.
Trainings
Karagandy – Transit Airport 36
We waiting for your
aircrafts in our airport!Thank you!