Kandy Transport Improvement Project (KTIP) Ministry of ... › 2015 › 03 › 2014... · Issue #2:...
Transcript of Kandy Transport Improvement Project (KTIP) Ministry of ... › 2015 › 03 › 2014... · Issue #2:...
Under Strategic Cities Development Project
(SCDP)
Ministry of Defense & Urban Development
Amal S. Kumarage
May 2014
Kandy Transport Improvement Project
(KTIP)
• Map 3-1 Survey Locations add animations
showing the traffic flows at both
boundaries and then another animation
showing passenger flows at both
boundaries in thousands in one direction,
growth from 2002 (Jayatileke)
V: 21,306
V: 20,486
V: 19,407
V: 4,282
V: 4,051 V: 34,317
V: 20,109 V: 8,281
V: 18,865
V: 20,171
V: 28,828
V: 28,830
P:
125,284
P:
127,581
P:
103,958
P:
11,604
P: 8,310 P:
217,678
P:
42,030
P:
136,915
P:
194,580
P: 45,759
P:
163,728
P:
132,871
Average Daily Vehicle & Passenger Flow
Vehicle Passenger
Study Area (DSD) Cordon
112,170 636,485
CBD Cordon (including Minor Roads)
149,918 762,502
Variation of Traffic Flow Rate at Study Area Cordon (12 hrs) DSD Cordon (On a Weekday)
CBD Cordon (On a Saturday)
CBD Cordon (On a Weekday) 1
2,0
00
10,0
00
3,5
00
x1
0
4,5
00
12
Trip purpose Distribution
DSD Cordon (On a Weekday) CBD Cordon (On a Weekday)
CBD Cordon (On a Saturday)
Work Work
Work
Education
Education Education
• Map 4-1 superimposed to same position
Road Speeds
Main Roads – 25.7 km/hr
Peak – 16.7 km/hr
Link Speed – from 4 km/hr
Bypass Traffic
ADT: 5,257
ADT: 11,178
ADT: 12,217
SA Through Traffic:
PV-11.6%, GV-
16.9%
SA Through Traffic:
PV-17.5%, GV-
35.5%
SA Through Traffic:
PV-15.5%, GV-
39.4%
SA Through Traffic:
PV-18.9%, GV-
38.2%
SA Through
Traffic:
PV-22.1%, GV-
0%
SA Through Traffic:
PV-21.8%, GV-
44.2%
SA Through Traffic:
PV-3.7%, GV-
21.1%
School Transport
Mode Share (%)
Walk 8.0
Bicycle 0.0
3 Wheeler 10.5
Private vehicles 15.7
Public bus 23.8
School van 33.9
Motor Cycles 4.5
Train 0.5
School bus 3.1
100.0
Modal Split
Schools in
SA (Nos.)
Students
(Nos.)
Major 23 63,000
Minor &
International 12 Appr. 7,000
Total 35 Appr.70,000
Profile
1,000 school vans carry 20,000 students
10,000 private vehs carry 20,000 students
300 buses carry 15,000 students
Bus Transport
3 Terminals- 600 m
apart
4,800 carry 200,000
people a day
Only 100 buses ply
through the city
80,000 access bus
stands by walking
120,000 access by bus
50,000 have both trip
ends outside the
DSD
Railway
• Peradeniya to Katugastota is 11 km with
11 km -Peradeniya to
Katugastota
9 stations
20 trains/day
Speeds comparable to road
Carried 1% of traffic
Kandy traffic 3,000
Only 300 school children
Railway
Parking
Issue #1: Land Use in a Heritage City
• Land Use Issues
Issue #2: Inadequate Road Space
• Traffic and Passenger Counts at DSD Cordon
– 1998 30,000 vehicles (with 4,800 buses) carry320,000 passengers.
– 2011 56,000 vehicles (with 4,800 buses) carry 320,000 passengers.
• This reflects a growth rate of 5% per annum or a doubling of
road space required every 14 years.
• School vans do not show a significant change.
• Public transport has fallen from 67% (1998) to 64% (2011)
• If Public Transport Share falls to 50%, the vehicle inflow will
increase to 100,000 vehicles OR
• If maximum vehicle inflow is 75,000, buses must carry 55%
share.
Issue #3:Inefficient Bus Operations
• Buses provide the bulk of the transport requirement carrying 64% of
passengers at the DSD and 56% at the CBD.
• Termination of Services and Lack of Through Services -100% of local and
90% of provincial services terminate in centre.
• Over 2x80,000 pedestrian movements plus 2x50,000 bus to bus transfers
are caused daily.
• No proper Terminal – handles 400,000 passengers
• No Integration of Terminals, generates large pedestrian flows
• One-way System increases bus circulation and pedestrian access.
• No Short Run Urban Routes
Bus Flows at CBD Nov 2013
Locations
Date
13 (W) 14 (Th) 16 (Sa) 17 (Su) 18 (M) 19 (Tu) 22 (F)
In Out In Out In Out In Out In Out In Out In Out
WGM 969 1,050 1,068 966 1,019 1,097 865 801 934 1,174 1,133 870 1,101 977
SBM 1,075 1,200 1,168 1,228 1,040 1,096 743 752 1,147 1,230 1,141 1,215 1,171 1,272
A9 (Trinity) 1,494 1,487 1,503 1,611 1,322 1,438 1,039 1,089 1,403 1,527 1,438 1,580 1,439 1,549
A26 (Lake
Round) 1,047 991 1,116 1,053 993 980 708 675 1,114 1,025 1,083 1,050 1,122 1,084
Total 4,585 4,728 4,855 4,858 4,374 4,611 3,355 3,317 4,598 4,956 4,795 4,715 4,833 4,882
0
1,000
2,000
3,000
4,000
5,000
Mon Tue
Wed Thu
Fri Sat
Sun
WGM, 2,003
SBM, 2,211
A9 (Trinity),
2,846
A26 (Lake
Round), 2,006
WGM
SBM
A9 (Trinity)
A26 (Lake Round)
Bus Passengers at CBD- Nov 2013
Bus Passenger Flows at CBD Cordon
Locations
Date
13 (W) 14 (Th) 16 (Sa) 17 (Su) 18 (M)
In Out In Out In Out In Out In Out
SD LD Total SD LD Total SD LD Total SD LD Total
WGM 18,698 17,945 36,643 9,936 19,829 29,765 17,925 18,010 35,935 10,167 20,520 30,687
SBM 32,046 2,104 34,150 34,586 526 35,112 27,870 2,598 30,468 34,719 242 34,961
A9 (Trinity) 38,792 16,560 55,352 50,839 6,625 57,464 37,975 17,173 55,148 45,087 10,404 55,491
A26 (Lake
Round) 37,281 4,395 41,676 34,956 4,034 38,990 37,359 4,480 41,839 36,148 3,841 39,989
Total 126,817 41,004 167,821 130,317 31,014 161,331 121,129 42,261 163,390 126,121 35,007 161,128 0 0 0 0 0 0
Pedestrian Flows to GSBS
Time
Interval
Goods Shed Clock Tower /
Torrington
P1 P2 P3 P4 P5 P6 P7 Total Max/15
20/11
Wed 2,263 4,857 4,086 15,330 23,689 8,553 9,468 68,246 1006
21/11
Thu 2,288 5,623 4,362 14,764 36,761 8,380 9,664 81,842 1149
23/11 Sat 2,254 8,909 5,726 16,792 35,460 9,171 11,865 90,177 1172
240,26
5
pedestrian counts total 68,000 to 90,000 arrivals per 12 hours
maximum hourly demand seems to be around 4,000 passengers
On-Street Bus Parking
0
50
100
150
200
250
6.0
0
6.3
0
7.0
0
7.3
0
8.0
0
8.3
0
9.0
0
9.3
0
10.0
0
10.3
0
11.0
0
11.3
0
12.0
0
12.3
0
13.0
0
13.3
0
14.0
0
14.3
0
15.0
0
15.3
0
16.0
0
16.3
0
17.0
0
17.3
0
18.0
0
14/11 Thu
16/11 Sat
22/11 Fri
0
10
20
30
40
50
60
70
80
6.0
0
6.3
0
7.0
0
7.3
0
8.0
0
8.3
0
9.0
0
9.3
0
10.0
0
10.3
0
11.0
0
11.3
0
12.0
0
12.3
0
13.0
0
13.3
0
14.0
0
14.3
0
15.0
0
15.3
0
16.0
0
16.3
0
17.0
0
17.3
0
18.0
0
Gannoruwa
WGM
Bogambara
Goods Shed
Torrington
Bogambara Off street bus parking
0
20
40
60
80
100
120
Nu
mb
er
of
Bu
ses
Storage (15 Minute) Saturday Thursday Friday
Parking Duration- Bogambara
0
5
10
15
20
25
30
<5
5-1
0
10-2
0
20-3
0
30-6
0
60-9
0
90
-120
120-1
50
150-1
80
180-2
10
210-2
40
>240
Perc
en
t b
y T
ota
l V
eh
.
Duration (minutes)
Vehicles (%) by Parking Duration (Interval)
Vehicles (17th) Vehicles (20th) Vehicles (23rd)
0
20
40
60
80
100
120
<5
<10
<20
<30
<60
<90
<120
<150
<180
<210
<240
<660
Perc
en
t b
y T
ota
l V
eh
.
Duration (minutes)
Vehicles (%) by Parking Duration (Agregated)
Vehicles (17th) Vehicles (20th) Vehicles (23rd)
Issue #3:Inefficient Bus Operations
• Buses provide the bulk of the transport requirement carrying 64% of
passengers at the DSD and 56% at the CBD.
• Termination of Services and Lack of Through Services -100% of local and
90% of provincial services terminate in centre.
• Over 2x80,000 pedestrian movements plus 2x50,000 bus to bus transfers
are caused daily.
• No proper Terminal – handles 400,000 passengers
• No Integration of Terminals, generates large pedestrian flows
• One-way System increases bus circulation and pedestrian access.
• No Short Run Urban Routes
Issue #4: Excessive Pedestrian Activity in
CBD
Issue #5:Underutilisation of the Railway
Network
Issue #6: School Transport
The UT Policy Options
for next 20 years
• Promote Private or Public Transport?
WB letter to MOT 9th Jan 2014
World Bank Strategy
• Development of by-pass roads
• Integrated Public Transport Terminal
• Improvement of Bus Transport Services
• Development of Railway Stations
Proposed PT Improvements Group (Short Term) Implementation in
2014
Group (Medium Term)
Implementation after 2014 Public Transport Infrastructure Improvements
PT1. New Bus Terminal/Park at Getambe PT5. New Kandy Multimodal Transport Terminal
(KMTT)
PT2. New Bus Terminal/Park at Nittawela PT6. Upgrade of Railway Stations and improving access
PT4. Tourist Bus/Vehicle Park at Tomlin Park PT3. New Bus Terminal/Park at Tennekumbura
Public Transport Service Delivery Improvements
PT7. Public Transport Development & Management Plan
o Design of PT Management Structures
o Design of New Bus Routes
o Design of New Bus Dispatching System
PT 8. Multi Modal Terminal Operating System
o Implement IT based Ticketing System
o Implement Bus Dispatching System
PT9 Institutional Capacity Development of CPRPTA
o Implement Bus Dispatching and Monitoring System
o Human Resource Training
o Institutional Process Re-engineering
PT10. Strengthen Capacity of Transport Service Providers
o Upgrade of Public transport fleets
o Human Resource Training of Service Providers
o Management Assistance/Training for Service
Providers
o Incentive Schemes for start up of new services
o Re-organize School Transport services/3 Wheeler
taxis
Proposed Bus Service Distribution
Summary of Terminal Utilization (12H, One-way Trips)
Service Type
Terminals
TOTAL
Nitta
we
la (
N)
Te
nn
eku
mb
ura
(T)
Ga
tem
be
(G
)
CB
D (
C )
Local Routes (L) Terminated at Closer Peripheral Terminal 108 82 88 278
Regional -High Frequency (R) Terminated at the CBD (Kandy City) 1621 1621
Regional-Low Frequency (R) Terminated at Further Peripheral Terminal 410 321 607 1338
Provincial-CBD (P)
Terminated at CBD (without extending to
FTP) 842
842
TOTAL 518 403 695 2463 4079
Traffic Demand Management Group (Short Term) Implementation in 2014 Group (Medium Term) Implementation after 2014
Traffic Demand Management Plan
TM1: TA to Develop a Traffic Demand Management (TDM) Strategy
Design of pedestrian facilities
Design of traffic circulation plan for CBD, major corridors and re-
design of intersections
Locating and design of off-street car parks
Reduce traffic delays due to Railway gate closures.
Recommendation of long term TDM measures including road pricing
system and parking controls.
Design of bus stops on major corridors.
Plan to manage goods transport vehicles in CBD.
Safety enhancements to all road sections
Traffic Management Infrastructure
TM2: Improve Roads to be developed as by-passes to the CBD
Western Bypass: Guhagoda Rd as well as Dharmasoka Mawatha
North-Eastern Outer Bypass: (Katugastota to Digana)
South-Eastern Outer Bypass (tunnel trace being studied by RDA or
alternate trace)
East-West New Connection- from Thennekumbura along river to
Nittawela
TM3: Redesign Roads to improve free flow access to Kandy City
Bus Priority Measures to be incorporated in rehabilitation of
WGM/SBM/A9
New Road Links to connect WGM/SBM and reduce distance on Sri
Sangaraja/A26
TM4: Implement Traffic Circulation System for CBD (as per strategy in
TM1
Traffic Circulation System for CBD including one way roads, bus
routing, bus stops etc.
TM5: Implementation of TDM Strategy for City(as per TA from TM1)
Solutions for
Railway crossings
Pedestrian facilities in CBD
Off street Car Parks
Long-Term TDM measure including road user pricing
Goods delivery systems
Kandy Multi Modal Transport Terminal
KMTT –Design
KMTT – Cost Estimate
ITEM Rs Mn
Preliminaries 7.00
Site preparation 36.00
Construction of main structure with filing 913.00
Facility area 447.00
Common area 60.00
Miscellaneous works 168.00
Sub total 1,631.00
Add :10% contingencies 163.10
Total [excluding vat] 1,794.10
ADD 12% of VAT 215.29
Total [including vat] 2,009.39
USD mn 15.46
Getambe
Nittawela
Thennekumbura
OCC- Operational Control Centre
Proposed Cost Estimates
Benefit Analysis
• The existing transport system returns a cost increase from
Rs.6,482 million per year to Rs.19,997 mn in constant
values by 2025.
• This means that transport cost in real terms will increase
on average by 8% per year.
• The annual average cost of a person arriving in the CBD
throughout the year would increase from Rs. 19,943 in
2011 to Rs 41,109 by 2025. This would constitute the
doubling of transport costs in 14 years.
• Under the intervention proposed, the cost of a person
travelling to CBD will be only Rs.23,852 per year by 2025,
thus reducing the cost increase to 1% per year.
• The net reduction is therefore a saving of Rs 8,369 million
annually and a BCR of 8.5 over 14 years.
PT Project Outline
• PMU set up by M/D&UD to take lead
• Set up Steering Committee of Sector Agencies
• Obtain Technical Assistance to design
– Ownership
– Operational
– Financial Structure
• Stakeholder Agreement
• Procure Services for Design of
– Terminal &
– Bus Routing and
– TOD Systems
– Monitoring and Audit System
• Procure Services for Capacity Building
– Regulators
– Operators (SLR, SLTB, Private)