Kanban Production Control System

14
Kanban Production Control System MF assembly CC cell Withdrawal Kanban Production Kanban

description

Kanban Production Control System. CC cell. MF assembly. Withdrawal Kanban. Production Kanban. Kanban Production Control System. T=0. CC cell. MF assembly. Withdrawal Kanban. Production Kanban. Kanban Production Control System. T=1. CC cell. MF assembly. Withdrawal Kanban. - PowerPoint PPT Presentation

Transcript of Kanban Production Control System

Page 1: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

Page 2: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=0

Page 3: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=1

Page 4: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=1

CT of 1st lot=1+4

Page 5: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=2

CT of 1st lot=1+4

Page 6: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=2

CT of 1st lot=1+4

CT of 2nd lot=2+4

Page 7: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=3

CT of 1st lot=1+4

CT of 2nd lot=2+4

Page 8: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=3

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

Page 9: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=4

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

Page 10: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=4

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 11: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=5

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 12: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=5

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 13: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=6

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 14: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=6

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

CT of 5th lot=6+4