Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and...

62
Kaizen Facilitator Project Slides <Agency/Dept.>

Transcript of Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and...

Page 1: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen Facilitator Project Slides

<Agency/Dept.>

Page 2: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Lean Overview

A quick review of Lean principles, methods, and tools

2

Page 3: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

What is Lean?

• A time-tested method and set of tools to help us improve “how” we produce our products and services.

• Lean is also a mindset, where we ask each day “How can we make our services better for customers?”

3

Page 4: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Lean helps us Understand:

1. What adds value to our customers2. How work gets done3. How we can identify root causes of

problems4. What an “ideal / no waste” process looks

like5. How we can improve performance 6. Whether process changes were successful

4

Page 5: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Lean helps Simplify our Work

• Eliminate tasks that do not add value

• Make things easy and intuitive for customers and staff

• Automate repetitive tasks

• Leverage staff talent

5

Page 6: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

How Do We Define Value?

• Customer is willing to pay for it

• Actually transforms a product or service

• Done correctly the first time

• Consumes resources without creating value for the customer (often CYA)

• Tasks to resolve incomplete and inaccurate information (percent of the time work is complete and accurate (%CA)

• Requires extra time, effort, or resources to fix

Value-added vs. Non Value-added

6

Page 7: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Why Focus on Process?

7

Page 8: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Why Lean?

• Minnesota’s population is getting older

• Increasing customer expectations

• Pressure for greater accountability and transparency

• Tight and shrinking budgets

• Shrinking workforce and increasing need for a more skilled workforce.

8

Lean helps us improve quality, reduce costs, increase customer and employee satisfaction, & capture knowledge

Page 9: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Lean Example

• Meals Per Hour.mp4

9

Page 10: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Lean Principles

10

Page 11: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

PDSA – The Lean Methodology

11

Following the Lean methodology ensures knowledge creation and continuous improvement

Page 12: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Lean Tools

• 7 Wastes • 5S • Error Proofing• Visual Management • Kaizen • Standard Work • 5 Whys• Fishbone Diagram

12

Page 13: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

7 Wastes

1. Defects2. Overproduction3. Waiting4. Non-utilized staff talent5. Transportation6. Inventory7. Motion8. Extra processing

DOWN

TIME

13

Page 14: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Can You SEE the Wastes?

14

Page 15: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

5S

1. Sort2. Set In Order3. Shine4. Standardize5. Sustain6th “S” for “Safety”

15

A simple method for creating a clean, safe, orderly, high performance work environment.

Page 16: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Poka Yoke – Error Proofing

16

Page 17: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Visual Management

A communication device that tells, at a glance, how work should be done.

•Where items belong•How many items•Standard procedure •Work in progress

There is only one place to put each item.17

Page 18: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Visual Management

18

Page 19: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen

A Kaizen event is a facilitated, rapid improvement event that engages the creativity of employees to remove waste from a process.

19

Page 20: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Swim Lane Map

Kaizen events use swim lane maps to document the current and future process

20

Page 21: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Standard Work

The safest, highest quality, and most efficient way to perform a task or process.•Focuses on helping the employee be successful •Reduces variation and increases consistency•Improvements cannot be sustained without it

21

“Where there is no standard, there can be no Kaizen.” Taiichi Ohno, Vice-President Toyota Motor Company

Page 22: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

5 Whys

• 5 Whys is a SIMPLE and POWERFUL technique for uncovering the root cause of a problem when you lack data regarding why the problem is occurring.

• If we don’t solve problems at the level of the root cause, we risk the same problem resurfacing in the future.

22

Page 23: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Fishbone Diagram

• Fishbone diagram or Ishikawa

23

Page 24: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen Agenda

24

Our plan during the event

Page 25: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen “High-Level” Process

25

Page 26: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen Agenda – Day 1

1. Set ground rules2. Identify customer requirements 3. Define success4. Training: Process Mapping5. Map current state process6. Debrief (Plus / Delta)7. Sponsor Check-in meeting

26

Page 27: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen Agenda – Day 2

1. Review agenda, ground rules, and check-in report2. Complete current state map 3. Assign task and wait time and characterize

process4. Identify value added steps, wastes, & pain points5. Identify root causes of problems 6. Brainstorm ideas to improve the process7. Debrief (Plus / Delta)8. Sponsor check-in meeting

27

Page 28: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen Agenda – Day 3

1. Review agenda, ground rules, and check-in report

2. Evaluate and select improvements

3. Take Team photo

4. Map the future state process

5. Assign task and wait time and characterize process

6. Identify performance measures

7. Prepare an Action Plan

8. Debrief (Plus / Delta)

9. Sponsor check-in meeting28

Page 29: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Agenda – Day 4

1. Review agenda, ground rules, and check-in report

2. Finish up work from the prior day

3. If there is time: • Identify project risks and prepare mitigation steps• Revise forms/templates• Prepare communication plan• Implement Quick Hits

4. Prepare report out presentation

5. Deliver report out presentation

6. Celebrate!29

Page 30: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Post Event Work

1. Facilitator follow-up: submit documentation

2. Implement action plan, including training

3. Conduct 30, 60, 90-day status reports

4. Monitor progress and make needed adjustments

5. Document standard work

6. Sustain improvements30

Page 31: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Kaizen Event

31

Working our plan

Page 32: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Customer Requirements

• Who are process suppliers, customers and stakeholders?

• Who is/are the key customer(s)/end user(s)?

• What do they want/need/require?

32

Page 33: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

• Is completed entirely by one person

• Is completed one at a time (no batching)

• Is completed as soon as the request is made

• Is completed without interruption

• Is completed with the information provided

• Is completed correctly

• It never returns

The "Ideal" Process

33

Page 34: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

1. Documents the content, timing, sequence, and outcome of each process step (standard work).

2. Has simple and direct connections between process steps.

3. Involves as few steps and people as necessary.

4. Implements solutions as close to the problem as possible (in time and staff)

5. Engages the people in the process to define and solve problems and make improvements.

Implement “Lean Rules”

34

Page 35: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Vision of Success

If this process was exceptional, what outcomes or results would you see?

Consider:•The needs/requirements of all process customers•Prioritize the needs of end users•The “Ideal” process and Lean Rules

35

Page 36: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Process Mapping

Reasons, formats and steps for documenting a

process

36

Page 37: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

What is a Process?

• Process = a series of steps/tasks to achieve a result.

37

Page 38: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Process Documentation Benefits

1. Staff and customer clarity on the content, timing, sequence, and outcome of each process step (i.e., standard work)

2. Staff clarity on who is responsible for each step and how long it should take to complete each step

3. Standard work makes it easy to deliver consistent services/products to customers

4. Ability to measure progress and performance

5. Easier to onboard/train new employees

6. Easier to improve service quality and efficiency! 38

Page 39: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Process Mapping Formats

Process documentation table• Good for capturing tasks, decisions, and process issues prior to

a process mapping session and good for documenting standard work

Spaghetti map • Good for showing physical movement of people and materials

Flow chart • Good for showing tasks and decision loops

Value stream map• Good for showing where “value” is created, highlighting

improvement opportunities, and is linearSwim lane map

• Combination of a flow chart and value stream map - good for showing who performs which tasks and when

39

Page 40: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Swim Lane Map

Accounting

Customer

Order Entry

Sales

Supplier

Shipping

Customer Service

Customer Calls in order.

Customer Service sends e-mail to Sales

Sales person is assigned to order and delivers paper copy of order to Order Entry

Order is now entered into the company’s data base.

An electronic order is sent to the supplier.

40Time

Page 41: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Swim Lane Map Key

Task

(Time)Decision?

Wait

(Time)

Handoff

Storage Location

41

Page 42: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Mapping Tips

42

• Every time you change lanes, there’s a handoff

• With every handoff, there is almost always a wait

• Putting information into storage requires a task and file/store denoting the storage location

• Every decision should have a task for "yes" and for "no"

• Subsequent tasks appear to the right of the prior task, unless the task occurs simultaneously (e.g., meetings)

Function

or

Position

Function

or

Position

Page 43: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Mapping Tips

• After you have finished mapping assign average times, or use worst and best case scenarios for each wait and each task

• 90:10 Rule - When mapping, consider what happens the majority of the time - don’t focus on the exceptions.

• Identify value added steps43

Page 44: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Process Documentation Questions

1. What is the purpose of the process

2. Who is/are the end-user customer(s) for the process and what are/is their needs or requirements

3. What is the first step What is the next step, etc.

4. Do you use any physical or electronic forms for the step

5. On average, how long does it take to complete the step

6. What percent of information is complete and correct

7. Where does the information go from here

44

Page 45: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Walk the Process

45

From the beginning…. …To the end

Page 46: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Characterize the process

1. What forms, tools, or systems does each step use?

2. How long does each task and wait take?

3. How many steps, waits, storage, handoffs, and decisions are there?

46

Page 47: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Current State

Qty. Time

Tasks

Waits

Handoffs

File/Store

Decisions

Totals

• Lead/Cycle/Elapsed Time: <# unit >• Travel distance:• Percent complete and accurate (%CA)• FTEs: <full-time equivalent staff>• Takt Time:

Process Metrics

47

• Customers served per time period

• Customer satisfaction rate• Transactions per time period: • Others?

Page 48: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Current State

Qty. Time

Tasks

Waits

Handoffs

File/Store

Decisions

Totals

% Change = (Current hours – Future hours)/Current hours) x 100

• [ ] % reduction in lead time • [ ] % reduction in task time

Process Data

48

Page 49: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Process Observations

Strengths• Where does the

process work well? • What are value-

added steps?

Weaknesses / Pain Points• Where are the 7 wastes?1. Defects2. Overproduction3. Waiting4. Non-utilized staff talent5. Transportation6. Inventory7. Motion8. Extra processing

49

Page 50: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Define Future State

50

What we want our process to be

Page 51: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Poor Information •Missing information

•Inaccurate information

•Assumptions

Barriers to the Ideal Process

Poor Information Flow• Hand-offs• Waiting• Poor sequence• Confusion on flow• Linear processing• Organizational structure• Information/Knowledge

silos51

Page 52: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Brainstorm Improvements

Purpose: Leverage the team’s creativity to identify improvement opportunities

Guidelines:•Defer judgment •Strive for quantity:

• No/low cost ideas• Innovative/bold ideas

•Document all unique ideas•Combine and build on ideas

52

Page 53: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Brainstorm Process

1. Silently record as many ideas as you can think of that will help achieve the project objective, remove process wastes, and move the process towards your vision of success (10 minutes).

2. In a round robin fashion, state one of your ideas until the facilitator has documented all unique ideas from the team

3. Remove duplicate ideas from your list once they have been documented by the facilitator

4. Ask questions and build on ideas53

Page 54: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Prioritize Ideas

#

# #

##

####

##

Top Recommendations

(high impact + low difficulty)

Resource Intensive

(high impact + high difficulty)

Poor Ideas

(low impact + high difficulty)

Low Hanging Fruit

(low impact + low difficulty)

#

##

Quick Hit

Quick Hit

54

Page 55: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

What are our Quick Hits?

55

Page 56: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Map Future State

1. Agree on improvements

2. Create Future State Map

3. Assign time to tasks and waits

4. Characterize process (value added steps)

56

Page 57: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Expected Improvement

Current State Future StateQuantity Time Quantity Time

Tasks

Waits

Handoffs

File/Store

Decisions

Totals

% Change = (Current hours – Future hours)/Current hours) x 100

• <> % reduction in lead time • <> % reduction in task time

57

Page 58: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Develop an Action Plan

58

# Action Item (Task) Owner Timeline Status

1.

2.

3.

4.

5.

6.

7.

Page 59: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Establish Performance Measures

• What critical few measures will answer:• Did we achieve our goal?• How well did we do?• Is anyone better off? What was our impact?

• Use measures to:• Validate results• Inform decisions regarding adjustments• Set future targets for improvement• Communicate with stakeholders – share success

and lessons learned59

Page 60: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Develop Standard WorkPROCESS PROFILE

Title: Date:

Department/Office: Owner:

Process Purpose/ Description:

Ideal Process / Desired Future State

Scope: (first and last step in process)

References: (applicable federal, state and district requirements/policies/procedures)

Customers: (from SIPOC Diagram)• Customer Requirements

Suppliers: (from SIPOC Diagram)•Supplier Requirements

Tool/Equipment Requirements Templates and Forms (inputs & outputs)

Process Map/Steps Roles and Responsibilities (RACI Diagram)

Glossary Training

Performance Measures: (2-3 success indicators)

60

Page 61: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

Share Team Recommendations

• Complete and deliver Project Report Out

61

Kaizen Report Out Presentation

Template:

http://mn.gov/admin/lean/resources/ci-t

ools

/

Page 62: Kaizen Facilitator Project Slides. Lean Overview A quick review of Lean principles, methods, and tools 2.

For More Information

62

• Minnesota Office of Continuous Improvement‒ Dept. of Administration, State of Minnesota‒ MN.gov/Lean | [email protected]

• Mary Jo Caldwell |CI Director ‒ Office: 651.201.2560 | [email protected]

• Cristine Leavitt | CI Consultant‒ Office: 651.201.2567 | [email protected]

• Cathy Beil| Improvement Data Coordinator‒ Office: 651.201.2564 | [email protected]

• CI Users Group (MN.gov/Lean)