TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Underground logistics
K. Foraz, S. Prodon TS-IC
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Main steps for the magnets transport
Power testsStripping
Fiducialization
Pt18
Storage SMI2Storage
PMI2 &Final position
SMI2
Final preparationFinal checks
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics organization
Planningofficer
Magnetcoordinators
SMI2coordinator
Under. Magnetlogician
LHC Zonemanagers
Surface magnetlogician
Transportsupervisor
Transportcontract
Master Schedule
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics organization
Planningofficer
Magnetcoordinators
SMI2coordinator
Under. Magnetlogician
LHC Zonemanagers
Surface magnetlogician
Transportsupervisor
Transportcontract
SCR
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Magnetcoordinators
SMI2coordinator
LHC Zonemanagers
Transportsupervisor
Logistics organization
Planningofficer
Under. Magnetlogician
Surface magnetlogician
Transportcontract
Weekly meetings
Magnets, slots, resources availabilities
Magnets and resources schedule
For the 3 next weeks
Daily contacts
Solve daily problems (SMI2 crane, resources,…)
Magnetcoordinators
SMI2coordinator
LHC Zonemanagers
Transportsupervisor
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics organization
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics planning
Time table for the magnet transport – baseline take into account:
•Duration of transport, transfer and unloading verified in real conditions
•Resources availability (20 magnets/wk)
•Worksite constraints
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics planning
Interconnections
QRL
EL-QA @ warmCool-down
Powering tests
Magnet transport from TI2Magnet transport from TI2
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics planning
Day: 7h- 18hDay: 7h- 18h
Impossible co-activity for 4 weeksSolutions available
Interference in UJ22 & RA23
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics planning
Extended day: 5h30- 20h30Extended day: 5h30- 20h30
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics planning
•But what will we do if shifts occur ?
It will be difficult !
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Organisation SupervisionTraining
Magnet installation Planning
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• Training– Constructors Session 2 sessions
MAFI vehicles Transfer Tables
2 operators (DBS)
1 transport supervisor (staff)
1 professional trainer
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• Training– Constructors Session
– Training supportConstructor
ManualOperating
Method
Training Supportfor 3 courses
UnloadingDriving Transfer table
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistic Follow-up
• Training– Constructors Session
– Training support
– Training organization
Unloading
Driving
Transfer table
4 operators (+ 1 staff) per session
Requirements:
• 2 days training• 1 empty vehicle
• 2 days training
• 1 magnet (last ½ day)
• 5 days training• 1 table set• 1 magnet
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• Training– Constructors Session
– Training support
– Training organization
– Authorization process
Training session
Authorization with qualified operator
SC Test
Official Authorization
For each qualification:
• Driving
• Unloading
• Transfer table
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• Training– Constructors Session
– Training support
– Training organization
– Authorization process
– Training & test planning
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• Training– Constructors Session
– Training support
– Training organization
– Authorization process
– Training & test planning
– Status Required for 20 magnets / week
Driving
Unloading
Unloading
Transfer tableDriving
Driving
Already trained
20
12
4
26
19
7
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• OrganizationVehicle timetable Operational Organization
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Operators
OperationalOrganization
Vehicles
Preparation
Post-installation• Availibility
- Break-down- Maintenance- Training
• Ordering- Magnet order- Position
• Availibility- Training- Night / day shift
• Working hours- Maxi 10h / day- Maxi 6h without break- Break organization
• Positioning of transfer tables
• Lowering in PMI2
• Transport from PMI2 to furthest point accessible during the day
• Return of empty vehicle back to PMI2
• Installation of central jack
• End-restraints & transport protections logistics
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Example: installation of 4 magnets / day in sector 8-1 (sub-sectors C & F)• Resources
– 4 vehicles– 20 operators:
• 8 drivers• 8 drivers + unloaders• 4 transfer tables operators
• Organization
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Day shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
Night shift
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Logistics Follow-up
• Work supervision– Auto-control foreman during night shift
– Direct supervision by magnet work supervisor• Until operators & process fully operational
• Increase of transport rhythm
• Change of sector
– Stand-by service
TS-IC-LO staff(10 persons)
TS-IC volunteers(15 persons)
+ 2 night inspections / week
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Other Equipment Logistics
• Most of the transports during day shift
• Night shift to cope with crossing constraints (QRL & interconnect worksites)– Individual transports (DFBs, warm magnets,
DQR-DQS) weekly planning according to cryo-magnets installation
– QRL lowering points and timing defined according to cryo-magnets planning
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Other Equipment Logistics
• QRL & cryo-magnets logistics
TS workshop – May 2005 K. Foraz, S. Prodon TS-IC
Status and improvements
21 cryo-magnets in place
First 5 placed under TS-IC-LO team supervision,Others by D.B.S.S
tatu
sS
tatu
sP
rob
lem
sP
rob
lem
s
•Technical: teething problems
•Surface – underground
•Material on passage
•Dependence on QRL (slots availability)
Solved
Solved
Solved