JW CONTACT PERSON: Nompumezo, e-mail address: …
Transcript of JW CONTACT PERSON: Nompumezo, e-mail address: …
17 Harrison Street
Marshalltown
P O Box 61542
Marshalltown 2107
Tel : (011) 688-1400 Fax : (011) 688-1556
INITIATOR
NONHLANHLA
MOJAGOTLHE
COLLECTIVE NO.
QUOTATION VALIDITY
60 DAYS
QUOTATIONS WILL BE EVALUATED ON THE 80/20 POINT SCORING SYSTEM.80 POINTS WILL BE ALLOCATED TO PRICE
AND THE REMAINING 20 POINTS WILL BE ALLOCATED FOR BBBEE AND PREFERENTIAL PROCUREMENT
ALL SUPPLIERS RESPONDING TO QUOTATIONS SHOULD BE REGISTERED ON CENTRAL SUPPLIER DATABASE(CSD)
ITEM
NO.
DESCRIPTION OF ITEM
OFFEREDUOM
QTY
REQUIRED
PRICE QUOTED EXCL. OF
V.A.T.DIS
1
Cathodic Protection services for new steel pipeline to be installed in Naturena.
(See specification for Bill of Quantities)
For more information contact Nonhlanhla on 011 688 1472
NB: QUOTES SHOULD BE ON PDF(MS WORD,MS EXCEL,PICTURES ARE NOT ALLOWED
NB:COPY OF VALID BBBEE CERTIFCATE OR SWORN AFFIDAVIT TO BE SUBMITTED WITH A QUOTE
letter head not JW Rfq Template AND MAKE SURE THEIR EMAIL ADDRESS
CONDITIONS
Quotations to : [email protected]
QUOTATION REF AS ABOVE: RFQJW…. & COMPANY NAME(ON THE EMAIL SUBJECT LINE)
NB:All suppliers responding to Rfq's should use their own company
Naturena-Daphne Street Cathodic Protection
Submitted quotations to be valid for 2 months from date of submission.
The investigation to be undertaken on a pipeline of approximately 265m
INITIATING DEPARTMENT
CAPEX: ENGINEERING SERVICES UNIT
90 days
QUOTATION REQUESTED FROM
JW CONTACT PERSON: Nompumezo, e-mail address: [email protected]
TELEPHONE NUMBER: 011 688 1656, FAX: 086 611 8167
IS VISIBLE ON THEIR QUOTATION.
4 QUOTATIONS WITHOUT THE SUPPLIER'S AUTHORISED SIGNATURE WILL NOT BE ACCEPTED.
3. PRICES QUOTED MUST BE AS PER THE UNIT INDICATED AND BE EXCLUDED OF VAT
validity
REQUEST FOR QUOTATION
DESCRIPTION
QUOTATION REFERENCE
CATHODIC PROTECTION SERVICE PROVIDER
RFQJW214NM21-BRAAMFISCHER TOPO
PAGE NO.
16 August 2021
CLOSING DATE AND TIME
16:0024-Aug-21
Date of Issue
1
SUPPLIER DETAILS
2. QUOTATIONS WITHOUT BRAND NAMES WHERE REQUIRED WILL NOT BE ACCEPTED
5 ACCEPTANCE OF A QUOTATION WILL BE SUBJECT TO JOHANNESBURG WATER'S SUPPLY CHAIN POLICY
DATE:…………………………………………………………………………………………..
AUTHORISED BY: ……………………………………………………………………OFFICIAL STAMP
SIGNATURE:………………………………………………………………………………
1. QUOTATIONS RECEIVED AFTER CLOSE OF BUSINESS ON THE CLOSING DATE WILL NOT BE ACCEPTED.
Volume 1 2 Quotation Number xxxx Page (1)
Part C1 C2 C3 A Annexure
Professional Topographic Survey Services
**PLEASE NOTE:
1. The above costs must include the Preliminary and General Costs for mobilisation of
resources; scope verification; gathering of desktop information, documents and maps each
time survey is required.
2. Payment will be made upon completion of the work within 30days of submission of statement.
3. The Johannesburg Water Cathodic Protection Specification 2005 shall be generally
applicable.
Notes:
- A normal working day is taken as 8 hours for calculation purposes.
- Should work extend past normal working hours and or on weekends and or public
holidays then the BCEA (Basic Conditions of Employment Act) will apply regarding
reimbursement.
- Should the hours exceed the original quantities quoted or duration of the pipeline
construction, then written approval must be sort first from the client before services
may continue.
C1 SCOPE OF WORK
C1.1 Employer’s Objectives
The objective of the Employer is to appoint an experienced Service Provider to provide a full cathodic
protection consultation as per the provided bill of quantities.. The project shall cover the following
suburb.
PROJECT SURBURB REGION LENGTH (m)
Daphne Street-Naturena Region D 265
GRAND TOTAL
265
Volume 1 2 Quotation Number xxxx Page (2)
Part C1 C2 C3 A Annexure
Professional Topographic Survey Services
Item No.
Description Unit Quantity Rate Amount
1 2.1 Soil resistivity survey and report sum 1
2 2.2 Soil sampling, analysis and report sum 1
3 2.3 Stray current and ground bed survey and report
sum 1
4 2.4 AC interference survey and report sum 1
5 2.5 Survey of existing CP systems on foreign pipes and assess potential integration of new CP system with existing CP system/s and report
sum 1
6 2.6 Liaison with SAECC and Foreign Pipeline Owners regarding CP issues
sum 1
7 2.7 Interference Testing in terms of SAECC requirements
sum 1
8 2.8 External coating and Field joint coating selection, specifications and report
sum 1
9 2.9 Review of construction drawings to ensure CP and AC Mitigation requirements are incorporated
sum 1
10 2.10 Design, specifications, bill of quantities and tender documentation for CP system in accordance with SANS ISO 15589 part 1
sum 1
11 2.11 Design, specifications, bill of quantities and tender documentation for AC mitigation system
sum 1
12 2.12 Facilitation of power supply for CP systems sum 1
13 2.13 Supervision and project management during installation of CP and AC mitigation systems
per day
20
14 2.14 Monitoring of temporary CP and AC mitigation systems during pipeline construction
per day
20
15 2.15 Commissioning of CP and AC mitigation systems.
sum 1
Volume 1 2 Quotation Number xxxx Page (3)
Part C1 C2 C3 A Annexure
Professional Topographic Survey Services
16 2.16 Coating integrity survey (DCVG/PCM) and
report per 100m
2,5
17 2.17 Operation and maintenance manuals sum 1
18 2.18 Quality Assurance Quality Control per day
20
Pipe lining and coating investigation / inspection (factory inspection, post-delivery, storage, construction etc.)
Pipeline construction inspection (welds, third party bonds, trenches, chambers, monitoring points and selective backfill, coating inspection etc.)
2.19a GENERAL(Other activities listed below)
Rates Only
20 3.1 CP Design Engineer (Specialist) per hr. -
21 3.2 CP Engineer / Technologist per hr. -
22 3,3 CP Field Technician per hr. -
23 CP Tester / Technical Assistant per hr. -
24 Electrical Safety Officer per hr. -
27 Travel (as per AA South Africa) per km -
TOTAL EXCLUDING VAT
ADD VAT (15%)
TOTAL AMOUNT
SUPPLIER DETAILS
NAME OF SUPPLIER:
AUTHORISED BY:
SIGNATURE:
OFFICIAL STAMP
1675
1680
1685
110Ømm
110Ø
2
1
6 5
29/319-IQ
2/29
7
27 26
425
47
324
46
2345
2244
28/319-IQ
43
5072
4971
4870 69 68
RE/67
2/67
66 65
74
8R
E/51
1/2973
1/51
28
EXISTING 600Ømm STEEL
PRO
POSED
600Øm
m STEEL API 5L X42 PIPE
EXISTING
RAN
D W
ATER PIPE 1000Ø
STEEL
110Øm
m uPVC
110Øm
m uPVC EXISTIN
G 600Ø
mm
200Ømm 110Ømm
UN
DER
PRESSU
RE
DR
ILLING
Midas Street
Styx RoadStyx Road
Midas StreetSEE CO
NN
ECTIO
ND
ETAIL 2
SEE CO
NN
ECTIO
ND
ETAIL 1
600Øm
m STEEL VALVE
100Ø BY PASS LIN
E & VALVER20 LIFTING HANDLE
500 X 500 X 450D
EEP SUM
P
PLAN VIEW
44153985
3120
2690
AA
PRO
POSED
600Øm
m STEEL
PRO
POSED
600Øm
m STEEL
SCALE 1:40
CO
NN
ECTIO
N D
ETAIL 2
PRO
POSED
600Øm
m STEEL
EXISTING
600Øm
m ST
PRO
POSED
600Øm
m STEEL
EXISTING
600Øm
m ST
EXISTING
600Øm
m STC
ON
NEC
TION
DETAIL 1
EXISTING
RAN
DW
ATER600Ø
mm
VALVEN
EW JW
ATER600Ø
mm
VALVE
SCALE 1:40
SCALE 1:40
NG
L
MESH
REF N
O 617
MIN
CO
VER 50m
mM
IN LAP 500m
m
CO
MPAC
T TO 93%
MO
D.AASH
TO
300mm
STEP IRO
NS TO
BEC
AST INTO
WALL AT 300m
mc/cN
.B STAINLESS STEEL
LADD
ERS
MU
ST BE PRO
VIDED
FOR
DEPTH
S > 2.5 m
NG
L
230
230 170
SECTIO
N A-A
4165
500500
500 X 500 X 450D
EEP SUM
P
PRE-C
ASTC
ON
CR
ETEC
OVER
Ø700
SCALE 1:40
WALL TH
ICKN
ESSD
EPEND
S ON
DEPTH
AND
SOIL
CO
ND
ITION
S
CHAMBER MORE THAN 2mOF DEPTH SHOULD BEREINFORCED CONCRETEWALLS DESIGNED BY ENGINEER
BRICK CHAMBER TO BE 2mMAXIMUM DEPTH
50mm
BLIND
ING
LAYER
REFER
TOD
ETAIL 1
6mm
MALTH
OID
WR
APPING
ARO
UN
D PIPE
PREC
AST SLAB RO
OF R
EINFO
RC
ED W
ITH M
ESH R
EF No. 245
FOR
SIZE
RE
FER
TO R
OO
F SLA
B P
LAN
600
PRO
POSED
600Øm
m STEEL
25mm
BITUM
ENSEALED
JOIN
TS
TOP SU
RFAC
E PAINTED
2C
OATS O
F BITUM
ASTIC PAIN
T
DISTU
RBED
EARTH
,C
OM
PACTED
TO 93%
MO
D.AASTH
O
DETAIL O
F BRIC
K CO
LUM
N BASE
SCALE 1:20
MESH
REF N
O 617
MIN
CO
VER 50m
mM
IN LAP 500m
m
CO
MPAC
T TO 93%
MO
D.AASH
TO
BLIND
ING
LAYER
230
SCALE 1:10
DR
IP MO
ULD
20Ø H
ALF RO
UN
D
100 (TYP)50
DETAIL 1
OF M
ALTHO
IDD
OU
BLE LAYER
25 x 25 CH
AMFER
ALL RO
UN
D
MESH
REF
No. 245
25080
700Ø AC
CESS M
ANH
OLE
SECTIO
N A
PLAN W
ITH C
OVER
IN PO
SITION
700Ø M
ANH
OLE C
OVER
CO
NC
RETE
SCALE 1:10
(SUPPLIED
BY CO
NTR
ACTO
R)
20mm
Ø G
ALV. U BO
LT
GALV. M
20 NU
TS
GALV. 80 x 12 x 190
LG. FLAT W
ITH 2
HO
LES TO SU
IT U
(SUPPLIED
BY CO
NTR
ACTO
R)
120
(SUPPLIED
BY CO
NTR
ACTO
R)
SCALE 1:10
8 No. O
FF
BOLT D
ETAIL
110
20mm
Ø G
ALV. U BO
LT
GALV. M
20 NU
TS
22035255
40
45°
4040 40
4020
11020
40230
CAST IN
TO C
ON
CR
ETE25m
m Ø
SLEEVES TO BE
REC
ESS TO BE FO
RM
EDAN
D PO
SITION
ING
RO
DS
FOR
SLEEVES TO BE LO
CATED
IN FO
RM
WO
RK
SECTIO
N C
- CD
ETAILS OF LIFTIN
G EYE
PLAN
GALV. 80 x 12 x 190
LG. FLAT W
ITH 2
No. 22m
m Ø
HO
LES TO SU
IT UBO
LTS
SCALE 1:10
8 No. O
FFSC
ALE 1:108 N
o. OFF
NATURENA WATER SUPPLY UPGRADES
COPYRIGHT:
This document and all the information thereon remains the property ofJohannesburg W
ater SOC Ltd and may not be copied, reproduced ortransmitted in part or in full without the written consent of JohannesburgW
ater SOC Ltd. This document should not be relied on nor used incircumstances other than those for which it was originally prepared andfor which Johannesburg W
ater SOC Ltd was commissioned, as definedon this drawing. Refer to the contract for full terms and conditions.Johannesburg W
ater SOC Ltd shall not be liable for the consequences ofusing this document other than for the purpose for which it wascommissioned. Any user and any other person using or relying on thedocument for such other purpose will by such use or reliance be taken toconfirm his agreement to indemnify Johannesburg W
ater SOC Ltd for allloss or damage results there from.
AMEN
DM
ENTS
FILE No.
DR
AWIN
G N
o.JW14204-N
AT-LAY-010
UR
1403
DESC
RIPTIO
NR
EV:D
ATE:
PRO
JECT N
o.D
ISCIPLIN
ARY
REV.
SHEET
OF
WATER
OR
IGIN
AL PAGE SIZE
A1
1
12
NATURENAEMERGENCY BULK W
ATER UPGRADESLAYOUT PLAN AND DETAILS
AS SHO
WN
PIPELINE U
PDATED
1JU
LY 2021
APPROVED BY:T.MPANDAGUTA
DESIGNED
DRAWN
CHECKED DATE...................................
ECSA REG. No...................
N.MOJAGOTLHEDATE...................................
M.I.BALLIMDATE...................................
T.MPANDAGUTA
DATE...................................
SIGNATURE.....................................................................................CONSULTING ENGINEERSCAPEX - ENGINEERING SERVICE UNIT86 MAIN ST7TH FLOOR, SW
ISS HOUSEMARSHALLTOW
NJOHANNESBURGTEL: (011) 688 1400FAX: (011) 688 1529
SCALE
SIGNATURE.....................................................................................
SIGNATURE.....................................................................................
GENERAL NOTES: (WATER)
1.ALL PIPES TO BE LAID IN ACCORDANCE W
ITH SANS 1200,LATEST REVISION AND THE REQUIREMENTS OFJOHANNESBURG W
ATER SOC LTD.2.
ALL PIPES TO LAID UNDER TRENCH CONDITIONS UNLESSOTHERW
ISE SHOWN.
3.ALL NEW
FIRE HYDRANTS ARE ABOVE GROUND4.
CONTRACTOR TO CONFIRM LEVELS OF EXISTING PIPESW
ITH ENGINEER BEFORE COMMENCING CONSTRUCTION.5.
POSITIONS OF ALL EXISTING SERVICES AREAPPROXIMATED AND MUST BE VERIFIED ON SITE.
6.ALL CONSTRUCTION W
ORK TO BE CARRYOUT IN STRICTACCORDANCE W
ITH REQUIREMENTS OFJOHANNESBURG W
ATER.7.
THRUST BLOCKS TO BE PLACED AT ALL BENDS ANDCHANGE IN DIRECTION.
LEGENDNEW
110mmØ mPVC CLASS 16 WATER PIPE
NEW FIRE HYDRANT
NEW VALVE
EXISTING WATER PIPE
EXISTING VALVEEXISTING FIRE HYDRANTEXISTING PIPE TO BE DECOMMISSIONED
NEW 160mmØ mPVC CLASS 16 W
ATER PIPE
NEW END CAP
CONTOURSEXISTING PRV CHAMBER