June 8/2006 Detection Conference – Hinton 20061 THERMAL INFRARED PROGRAM HELICOPTER PLATFORMS...

33
June 8/2006 Detection Conference – Hinton 2006 1 THERMAL INFRARED PROGRAM HELICOPTER PLATFORMS Alberta Perspective

Transcript of June 8/2006 Detection Conference – Hinton 20061 THERMAL INFRARED PROGRAM HELICOPTER PLATFORMS...

June 8/2006 Detection Conference – Hinton 2006 1

THERMAL INFRARED PROGRAM

HELICOPTER PLATFORMS

Alberta Perspective

June 8/2006 Detection Conference – Hinton 2006 2

Outline

• Introduction• Why we use IR• Statistics – 1998 - 2005• Present concerns effecting IR use• Completed to date• Future Standards

June 8/2006 Detection Conference – Hinton 2006 3

Background• 1982 with Forest Service

• Over 2200 hours as an IR operator – 1982 – 1989– Level I certification - 2005 - FLIR

• Variety of helicopter platforms – B206, B204, B205, B212, H500

• 3 main IR cameras– AGA 750, AGEMA 782, AGA 110

• Multiple Search /Rescue missions with RCMP

• Team Lead– 2001 – 2004 Provincial Fire Mapping Program Coordinator

– 2005 1/2 – present Provincial IR Program Coordinator

June 8/2006 Detection Conference – Hinton 2006 4

Alberta Forest Protection, a Branch of Alberta Sustainable Resource Development

Responsibility……..

To protect Alberta’s forests and forest communities by preventing and suppressing forest fires

June 8/2006 Detection Conference – Hinton 2006 5

Why Do We Use IR

• ADM believes in the IR program and it’s fiscal use

• Aids in Mop-up operations– Maximizes the effective and efficient use of our ground crews

• Helps to determine areas of little or no fire activity– CAUTION!!!!!

• Tool to determine fire status– OC, BH, UC, EX

• Aids in the determination of hotspots, burning areas, and fire perimeter

June 8/2006 Detection Conference – Hinton 2006 6

Definitions

Hotspot:

Burning Area:

Fire Perimeter:

Area of remnant heat > 300 degrees C. and 25 cm in size

Extensive areas of active burning

Maximum extent of fire destroyed vegetation

June 8/2006 Detection Conference – Hinton 2006 7

EXAMPLES:

Hot Spots

Fire Perimeter

Active BurningArea

June 8/2006 Detection Conference – Hinton 2006 8

• 29 helicopter companies

• 16 different helicopter platforms

• Spent $4,851,149.00

• Utilized 5583 hours helicopter time

• Utilized 3892 hours of IR operator time

Statistics1998 - 2005

June 8/2006 Detection Conference – Hinton 2006 9

YEARHelicopte r

Scanning Hrs He licopte r Scanning $

# He licopte r Com panies

IR Opera tor Hrs

IR Opera tor Costs

# He licopte r IR Opera tors Tota l $

1998 1283 $957,138.00 9 54 $8,796.00 9 $967,289.001999 1495 $777,523.00 8 1492 $326,430.00 4 $1,106,952.002000 151 $87,077.00 7 106 $21,607.00 3 $108,951.002001 865 $641,489.00 16 766 $183,477.00 4 $826,617.002002 1154 $901,655.00 17 991 $239,766.00 5 $1,143,588.002003 295 $258,371.00 14 193 $50,138.00 4 $309,015.002004 263 $234,837.00 10 237 $61,843.00 5 $297,195.002005 77 $76,326.00 6 53 $15,201.00 3 $91,666.00

5583 $3,934,416.00 3892 $907,258.00 $4,851,149.00Average 697.875 486.5 $606,409.13

Helicopter Versus IR Operator Costs

June 8/2006 Detection Conference – Hinton 2006 10

Helicopter Scanning Hours v s Scanning IR Operator Hours

0

200

400

600

800

1000

1200

1400

1600

1998 1999 2000 2001 2002 2003 2004 2005

Helicopter Scanning Hrs IR Operator Hrs

June 8/2006 Detection Conference – Hinton 2006 11

Present Concerns Effecting IR Use• No justification on usage - We just use it• Misconceptions

– Weather plays an important role

• How long after raining do we wait before scanning?

• Does rain or snow interfere with effective operations?

At least 2 days

Drives heat down

It attenuates IR signal

June 8/2006 Detection Conference – Hinton 2006 12

Present Concerns Effecting IR Use• Misconceptions – Con’t

– Time of scan is important

• When is the best time to scan?

• What effect does a sunny day have on the detection capabilities?

• How far underground can I detect heat?

Works best during night operations or early mornings/late evenings

Creates false positives

1/32 inch

June 8/2006 Detection Conference – Hinton 2006 13

Present Concerns Effecting IR Use

Solar Reflectance And

Water Vapour Can be your worst enemies

June 8/2006 Detection Conference – Hinton 2006 14

Present Concerns Effecting IR Use

• Variety of IR equipment– Type III gimbel mount ( > $100,000)

– Handheld (<$100,000)

• Inconsistent end products– Can your IR equipment give us the end products we want?

June 8/2006 Detection Conference – Hinton 2006 15

Present Concerns Effecting IR Use

• Lag time of IR mission results to IC, SITL or GIS team– No accountability to the team

• Varied delivery timesRight after landing

Delivery times sometimes 2 hr late

•Breakfast more important

Never

•Nothing to report

June 8/2006 Detection Conference – Hinton 2006 16

Present Concerns Effecting IR Use• Delivery formats varied

– Flagged nails – Toilet paper – Hand drawn maps with hotspots delineated – Post-it notes

• Numbers transposed wrong • Lost post-it notes

– Cigarette packages– GPS coordinates in different formats

• DD – this what is needed • DM – helicopter operations • DMS- mapping

– Thumb drives sometimes

June 8/2006 Detection Conference – Hinton 2006 17

Present Concerns Effecting IR Use

• IR experience– IR operators experience varied

• None to lots

– Pilot and IR operators out on their own• ICS team member not present

– Misunderstanding of how operation worked• Pilot felt it was important to see hotspots also

June 8/2006 Detection Conference – Hinton 2006 18

Present Concerns Effecting IR Use

• Time of hire– Expectations not conveyed

• Time of release– Exit evaluations not done

IR providers require honest feedback on performance

Upcoming companies are asking for direction

June 8/2006 Detection Conference – Hinton 2006 19

Completedto

Date

June 8/2006 Detection Conference – Hinton 2006 20

Completed to Date

June 8/2006 Detection Conference – Hinton 2006 21

Completedto

Date

P r o v i n c i a l P r i o r i t y #

R e q u e s t N o : T h e r m a l I m a g i n g S e r v i c e R e q u e s t F i r e N o : H e l i c o p t e r / H a n d h e ld F ix e d / H ig h A l t i t u d e D a t e :

W M A : C o n t a c t N a m e : P h o n e N o : F a x :

D a t e o f S e r v i c e : O F F I C E U S E O N L Y L o w L e v e l O n l y : I n d i c a t e s e r v i c e s r e q u i r e d S u p p l i e r N a m e C o n t r a c t R e f e r e n c e

A l l i n c l u s i v e ( a i r c r a f t , e q u i p m e n t a n d p e r s o n n e l ) A i r c r a f t / h e l i c o p t e r o n l y I R O p e r a t o r i n - h o u s e o r c o n t r a c t o r ( c i r c l e o n e ) I n - h o u s e c a m e r a o n l y N / A

H i g h L e v e l O n l y : A l l I n c l u s i v e M i s s i o n T y p e R e s o l u t i o n : o D E T ( . 5 - 1 . 0 m ) D E T ( 1 – 2 m ) M o n ( 3 . 5 – 1 5 m ) e M o n ( 7 – 3 0 m ) A 1 ( . 7 – 1 . 0 m ) ( c h e c k o n l y o n e )

F i r e I n f o r m a t i o n

F i r e N u m b e r : F i r e N a m e : F i r e O r i g i n : ( L a t / L o n g ) L a t i t u d e : L o n g i t u d e : G I S S h a p e f i l e S u b m i t t e d : Y e s N o U n k n o w n E s t i m a t e d S i z e ( h a ) : D i r e c t i o n o f S p r e a d : R a t e o f S p r e a d : F i r e S t a t u s : ( c h e c k o n l y o n e ) O C B H U C E X H i g h e s t I n c i d e n t e l e v a t i o n : S p o t W e a t h e r F o r e c a s t : f o r t h e i n c i d e n t

A t t a c h s k e t c h o f f i r e a r e a a n d h i g h l ig h t s c a n n in g lo c a t io n s S c a n O b j e c t i v e s

C a p t u r e p e r i m e t e r o n l y f o r e n t i r e f i r e - Y e s N o I d e n t i f y / S e c u r e f i r e l i n e o r M o p - u p f o r h o t s p o t s - Y e s N o I d e n t i f y s p o t f i r e s o u t s i d e e x i s t i n g p e r i m e t e r - Y e s N o S h o w e x c u r s i o n s / e s c a p e d p e r i m e t e r – Y e s N o I d e n t i f y p h y s i c a l f e a t u r e s ( i e : d o z e r g u a r d s ) - Y e s N o R e - a f f i r m f i r e s t a t u s – Y e s N o

A d d it io n a l D e s c r ip t io n :

S c a n P r i o r i t y : H i g h M e d i u m L o w P r o d u c t s : I n c lu d e s p e c i a l i n s t r u c t i o n s P a p e r m a p D i g i t a l M a p

( P D F , J P G , B M P ) A r c V i e w s h a p e f i l e s

( p e r i m e t e r a n d / o r h o t s p o t s ) S p e c i a l I n s t r u c t i o n s : D e l i v e r r e s u l t s t o : n a m e / p h o n e / e m a i l

E s t im a t e d d e l iv e r y t im e : E s t im a t e d c o s t : L A T I T U D E / L O N G I T U D E I N F O R M A T I O N N E E D E D F O R E A C H M I S S I O N ( i f s h a p e f i le n o t a v a i l a b le ) M a p p i n g B o x ( D e g r e e s ) N O R T H S O U T H E A S T W E S T S i g n a t u r e s :

D a t e :

I n c i d e n t C o m m a n d e r s i g n a t u r e o r d e s i g n a t e n a m e P r i n t N a m e

A p p r o v a l s :

L o w l e v e l Y e s / N o D a t e :

W M A D O o r d e s i g n a t e s i g n a t u r e P r i n t N a m e

H i g h L e v e l Y e s / N o D a t e :

P A C o r D O s i g n a t u r e P r i n t N a m e

R e v i e w e d b y I R C o o r d i n a t o r S t e v e S i m s e r D a t e :

P F F C I R C o o r d i n a t o r P r i n t N a m e

E a s t

S o u t h

N o r t h

W e s t

June 8/2006 Detection Conference – Hinton 2006 22

Future StandardsSensitivity/File Format/Accuracy

• Ability to detect hotspot targets = > 25sq cm in size

• Ability to provide digital GPS shapefiles of hotspots and flight course taken by helicopter

• The coordinates of targets within a spatial accuracy of 10 meters

June 8/2006 Detection Conference – Hinton 2006 23

Future StandardsFormat of Delivered Data

• Shapefile– Geographic(lat-long) or degree decimal degrees– NAD83 datum– Include - *.dbf, *.shp, *.shx, *.prj files

June 8/2006 Detection Conference – Hinton 2006 24

Future StandardsFormat of Delivered Data-con’t

• Hardcopy maps – 11x17– Quicklook product of identified targets

• JPEG, BMP, PDF format• Must STAND on it’s own

– Scale

– Title

– Author

– North arrow

– Date

June 8/2006 Detection Conference – Hinton 2006 25

Crumb Trail as Evidence of Assessment Coverage

June 8/2006 Detection Conference – Hinton 2006 26

DESIRED PRODUCT - Black Perimeter Trace-GPS Locations of Hotspots-Tabular and digital data

June 8/2006 Detection Conference – Hinton 2006 27

Future StandardsInformation Delivery

• Immediate delivery of shapefile data and maps upon landing– To ground crews via drop tube or landing at camps via

thumb drive• Future

– Downlink capabilities of hotspots to sectors, camps, IC base

– Downlink to simple printer

– Real time downlink of IR images to IC base to aid planning section and IC in decision making

June 8/2006 Detection Conference – Hinton 2006 28

PDA – MOBILE MAPPING

June 8/2006 Detection Conference – Hinton 2006 29

Future StandardsMission Plan

• Include– Where scan took place– Scan objectives– Average height of flight – AGL– Start/stop times– Type of scanner used– Name of pilot and scanner operator– Type and registration of helicopter– Fire number / fire name– Date of flight

June 8/2006 Detection Conference – Hinton 2006 30

Example ofTHERMAL MISSION REPORT

June 8/2006 Detection Conference – Hinton 2006 31

Future StandardsIR Standards for Providers

• Standardize training/certification for IR operators– Need to understand the basics of infrared– Known training companies

• FLIR - [email protected]• Snell infrared - [email protected]

• Minimum on-site training requirements• 20 hours?

• Test IR companies over grid to promote consistency– Must pass to use on fires

June 8/2006 Detection Conference – Hinton 2006 32

Future StandardsPerformance Feedback

• Expectations conveyed– At time of hire– Daily

• Evaluation at time of release - – Evaluations by designated ICS member

– PSC

– SITL

– IR Coordinator?

June 8/2006 Detection Conference – Hinton 2006 33

Steve Simser, GIS/IR SpecialistWildfire Resource InformationWildfire Aviation and GeomaticsForest Protection BranchForestry Division9th Floor, 9920 – 108 St.Edmonton, AlbertaT5K 2M41-780-427-6754 work1-780-819-6754 cellsteve.simser@ gov.ab.ca

Thankyou