Judicial Recovery Plan
Transcript of Judicial Recovery Plan
-
8/9/2019 Judicial Recovery Plan
1/253
FINAL VERSION
1
PLAN FOR COURT-SUPERVISED REORGANIZATION
OF ENEVA S.A. – UNDER COURT-SUPERVISED REORGANIZATION
ENEVA S.A. – under Court-Supervised Reorganization, a corporation with head
offices at Praia do Flamengo, nº 66, 9º andar, Flamengo, Rio de Janeiro/RJ, CEP nº22.210-903, registered under Corporate Taxpayer Number (CNPJ nº)
04.423.567/0001-21, and ENEVA PARTICIPAÇÕES S.A. – under Court-
Supervised Reorganization, a corporation with head offices at Praia do
Flamengo, nº 66, Room 901 parte, Flamengo, Rio de Janeiro/RJ, CEP 22.210-903,
registered under Corporate Taxpayer Number (CNPJ nº) 15.379.168/0001-27,
hereafter referred to individually and respectively as “Eneva” and “Eneva
Participações”, or jointly as “Companies Under Reorganization”, present in the
records of the court-supervised reorganization process, registered under nº
0474961-48.2014.8.19.0001, currently pending before the 4th Commercial Court
of the Capital of the State of Rio de Janeiro, the following plan for court-supervised
reorganization, in compliance with the provision of article 53 of the LRJ (Court-
Supervised Reorganization Law).
1. INTRODUCTION
1.1. Background. Eneva was formed in 2001, under the name MPX Energia S.A.,
to operate with a focus on the generation and commercialization of energy,possessing complementary businesses in electrical generation, coal mining and the
exploration and production of natural gas in Brazil and in other countries of South
America.
The company was the operational arm of the EBX Group in the energy generation
and commercialization sector, and is currently the largest private generator of
thermal energy in Brazil.
In the context of a highly favorable economic scenario, as a means of capitalizing in
order to develop its projects and obtain new sources of funding, in December 2007
Eneva held a public share offering (IPO) in the New Market sector of the BM&F
BOVESPA stock exchange, embarking on a new phase in Eneva's relationship with
its shareholders and investors. Around one month later, the option for the
subscription of a supplementary batch of ordinary shares granted to the
coordinating banks was exercised. As a result of these two operations,
approximately R$2 billion of funds were raised with new shareholders..
-
8/9/2019 Judicial Recovery Plan
2/253
FINAL VERSION
2
Spurred by the new investments, Eneva did not simply continue to pursue projects
currently underway but embarked on the execution of other projects in the energy
sector, both inside and outside Brazil - such as the Pecém II Thermoelectric Power
Plant (Ceará), the construction of Thermoelectric Power Plants in the Parnaíba
Basin (Maranhão), the largest thermal energy generation project in Chile(Termoelectrica Castilla) and the extraction of coal in Colombia.
In order to obtain new sources of funding, from 2009 the Eneva Group contracted
short-, medium- and long-term loans with financial institutions and development
banks, for the development of new projects and the expansion of existing ventures.
In 2011, through the issuance of bonds convertible into ordinary shares, Eneva
also raised funds with BNDESPar, Gávea Investimentos and their then controller,
Mr. Eike Batista, in the sum total of approximately R$1.4 billion, to be used on a
priority basis to expand the exploration of natural gas in the Parnaíba Basin in the
state of Maranhão, which process began the following year, and in the extraction of
coal in Colombia. In the middle of 2012, 99.9% of these bonds were converted into
shares in Eneva and the coal operations in Colombia were spun-off to a new
company called CCX Carvão da Colômbia S.A., in which Eneva did not possess a
stake.
It is important to highlight that these funding measures, and those whichsucceeded them in the following years, were assumed under wholly normal market
conditions and at leverage levels which were compatible with the evaluation of
each project by the funders.
In August of 2011, ANEEL approved the transference of the authorizations of the
Parnaíba I TPP from Bertin Energia e Participações S.A. to Eneva, relating to energy
projects contracted at the A-5 auction of 2008, totaling 450 average MW. The
fourth and fifth turbine of this TPP received authorization to begin commercial
operations on 12.04.2013, proceeding to generate 676 MW, the project ’s having
been financed by BNDES in the approximate value of R$671 million.
Also in 2011, the Parnaíba II TPP, with a capacity of 517 MW, was victorious at the
A-3 new energy auction and, in April 2013, Eneva informed the market that it had
concluded the acquisition of the total stockholders' capital of Parnaíba III
(formerly UTE MC2 Nova Venécia), consolidating the Parnaiba Complex as the
largest “gas to wire” project in Brazil, where the power plant s are strategically
located over the gas fields and under the transmission lines.
-
8/9/2019 Judicial Recovery Plan
3/253
FINAL VERSION
3
At the start of 2012, Eneva announced its intention to form a joint venture with the
E.ON Group, one of the largest private energy and gas groups in the world. The aim
was simple and clear: the companies could exploit their complementary activities
and characteristics to accelerate the growth and development of a comprehensive
energy project in Brazil.
Thus, in April 2012, the definitive documents of this operation were signed, by
which Eneva raised R$1 billion through an increase in subscribed capital by DD
Brazil Holdings S.à.r.l., an investment vehicle controlled by the German company
E.ON SE, which holds interests in the companies of the Eneva Group, the object of
the investment. Following this increase, E.ON attained an interest of 11.75 in
Eneva. On 17.04.2012, Eneva signed the definitive agreements for the formation of
a joint venture with E.ON, which was concluded on 25.05.2012, in the form of the
company Eneva Participações S.A, which is also under court-supervised
reorganization.
The structure of Eneva Participações was conceived with the aim of optimizing the
complementarities of the two groups. According to the expectations shared by
both, this partnership could lead to the efficient development, execution and
operation of energy generating projects with a total capacity of 20 GW, including
thermal and renewable generation. The management of Eneva Participações
combines high profile and experienced international executives from E.ON and agroup of executives from Eneva with a profound knowledge of the Brazilian
electrical sector.
In May 2013, following the verification or waiver of all the precedent conditions
foreseen in an investment accord signed months previously, E.ON acquired
141,544,637 shares issued by Eneva and held by Mr. Eike Batista and by certain
shareholders, who held share options, representing 24.47% of its capital. As a
result of this operation, E.ON proceeded to hold approximately 38% of Eneva's
capital, having signed a Shareholders' Agreement with Mr. Eike Batista to exercise
shared control. Moreover, on May 12th 2014, the implementation of an increase of
private capital was announced, regarding Eneva, in the value of up to
R$1,500,000.00 (one billion, five hundred million reais). The price per share
regarding this increase was fixed at R$1.27 (one real and twenty seven cents), as
approved by Eneva’s board of directors. E.ON undertook to subscribe part of the
shares, in the limited sum of R$120,000,000.00 (one hundred and twenty million
reais). As a result of the share subscription by E.ON, the latter proceeded to hold
approximately 42% of Eneva’s capital and, furthermore, to share control with Mr.Eike Batista.
-
8/9/2019 Judicial Recovery Plan
4/253
FINAL VERSION
4
Eneva has always sought to pursue economically viable projects, with a view to
ensuring the highest standards of efficiency - in a creative and innovative manner,
supported by cutting-edge technology - without neglecting its socio-environmentalcommitments.
Moreover, it possesses a team of associates who are highly trained and whose
record is distinguished by the capacity to integrate activities, eliminating
production costs, signing and respecting partnerships and identifying good
business opportunities.
Eneva operates under the highest standards of corporate governance, and is listed
on the New Market of the BM&F BOVESPA stock exchange, which, in itself,
indicates that its operations are characterized by outstanding levels of
management. Each of the company's actions is — and always has been —
profoundly and broadly disclosed to the market with the maximum transparency.
It was in this manner that, in a short time, the Eneva Group emerged in the market
as one of the most important companies in the energy sector, principally as the
largest private company in the thermal generation sector, whose growth is so
essential to Brazil within a secure energy matrix, as has been made clear by recentevents. If, on the one hand, recent events concerning atypically low rainfall levels
underlined the importance of Eneva, as well as of the generation of thermal energy in
general, on the other, the pressure on Eneva was increased, notably by the high
unavailability charge imposed on Eneva through the increase in the DSP (Differences
Settlement Price), resulting in material negative impacts for the Eneva Group.
However, external and unforeseeable factors, indicated in clause 1.3, meant that
some projects underway had their conclusions delayed, altering projections
concerning the start up of energy generation, as well as the operation's
profitability program. These factors had negative impacts on the operational
companies controlled directly or indirectly by the Companies Under
Reorganization, which ultimately adversely affected their cash flow, preventing
them from punctually honoring their payments to suppliers and financial
institutions. As a result of the combination of these delays and the exceptionally high
DSP prices, the Companies Under Reorganization were exposed to severe losses and
impacts on their cash balances which, collectively, had negative consequences for the
companies.
-
8/9/2019 Judicial Recovery Plan
5/253
FINAL VERSION
5
Despite being pure holding companies — and, thus, without the capacity to
generate income through their own activities —, Eneva and Eneva Participações’
debt to their creditors has risen to a total of more than R$2.3 billion, which has
made it impossible to pay it off on the conditions originally contracted, for thereasons which will be given below.
The crisis has affected Eneva and Eneva Participações and, to some extent, the
operational companies in which it has an interest, although the economic-financial
circumstances are particular. Nevertheless, the crisis should soon pass, as the
projects developed by the operational companies are substantial and will tend to
become more profitable in the medium/long term. Furthermore, the Companies
Under Reorganization have concluded all their principal projects and construction
activities in such a manner as to prevent their exposure to future risks regarding
constructions, postponements and delays, as in the past.
In the light of the economic-financial crisis faced by the companies under
reorganization, it has become necessary to adopt measures essential to the
maintenance of Eneva’s and Eneva Participações’ activities, including the
renegotiation of their debts with creditors, in accordance with this Plan.
1.2. Corporate and operational structure. The corporate and operational
structure of the Eneva Group is represented in the corporate organogram attached
to this Plan as Annex 1.2. The Eneva Group is structured based on the holding
company Eneva, a public corporation with shares traded on the stock exchange,
whose social object is the generation, distribution and commercialization of
electrical energy and interest, as a partner, member or shareholder, in the capital
of other companies, in Brazil and abroad.
The Eneva Group possesses diversified operations in the electrical energy
generation and commercialization sectors, with complementary businesses in the
exploration and production of natural gas. Its energy generation base is focused on
thermal sources (coal, natural gas and diesel oil), and it also develops
complementary sources, such as solar energy and wind generation projects.
In Brazil, the activities pursued by the operational companies directly or indirectly
controlled by Eneva are distributed throughout various Brazilian states.
-
8/9/2019 Judicial Recovery Plan
6/253
FINAL VERSION
6
The figure below shows the focuses of operation and the geographical positions of
the ventures and projects (the red marks indicate the ventures in activity or under
construction and the blue marks the projects in operation);
1.3.
The causes which led to the crisis experienced by the companies underreorganization directly impacted the cash flow of the operational companies,
causing the cash of the companies under reorganization to be drastically affected.
One of the factors which dramatically affected the cash situation of the companies
being reorganized was the financial crisis of the Maire Tecnimont Group, which
belonged to the MABE Brasil Consortium, which signed an EPC contract with Eneva
for the construction of the Pecém I, Pecém II and Itaqui Thermoelectric Power
Plants. The crisis in the Italian group prevented the MABE Consortium from
executing the contracts satisfactorily, which is why it became delinquent in
relation to the obligations contracted with its subcontractors and with Eneva itself,
causing an accumulated delay of 529 days at the Pecém I TPP and 650 days at the
-
8/9/2019 Judicial Recovery Plan
7/253
FINAL VERSION
7
Itaqui TPP. The delays had damaging consequences for the companies under
reorganization, inasmuch as the time of exposure of these companies to fixed and
variable costs was increased and the date for initiating the generation of income
was postponed, preventing regular and punctual compliance with the obligations
assumed with the suppliers and banks.
Elsewhere, the enormous financial exposure of the operational companies,
deriving from the need to buy ballast, also had a severe impact on the cash
situation of the companies undergoing reorganization. Once the date of energy
generation was postponed, as a means of complying with the contracts regulated
by ANEEL, the operational companies in which the companies undergoing
reorganization have an interest were obliged to acquire energy in the spot market
precisely when its (DSP) price reached the highest levels of the past 13 years. The
current energy price levels are mainly the result of atypically low rainfall levels
over a long period of time and, consequently, of the critically low levels of the
reservoirs, which factors have overloaded the power plants in Brazil and caused
the price of energy to reach its highest levels of the past 13 years. While this
situation reveals a general need for dispatchable energy generation and, thus, for
companies with a portfolio of plants like Eneva’s, the same scenario – combined
with the regulations and their erroneous interpretation, as will be explained below
– has exposed the Companies Under Reorganization to severe losses and a need for
cash.
Some of the operational companies suffered heavy sanctions from ANEEL, as a
result of the use of erroneous methods for measuring the so-called unavailability
periods of the plants (ADOMP). The new calculation method used, unlike that
foreseen in the contracts which compose the bid notices and also foreseen in
ANNEL RESOLUTION n° 169/2005, resulted in the imposition of sanctions in the
order of hundreds of millions of reais, ensuring that these operational companies
did not generate satisfactory results, frustrating the receipt of income by the
companies undergoing reorganization. This matter is currently the subject of
litigation through actions nos. 184-82.2014.4.01.3400 (action filed by Itaqui and
Pecém I, currently pending at the 15th Federal Court of the Judicial District of the
Federal District) and 0043145-38.2014.4.01.3400 (action filed by Pecém II,
Parnaíba I and Parnaíba III, currently pending at the 7th Federal Court of the
Judicial District of the Federal District), with initial rulings from the judicial branch
which were favorable to the companies controlled by the companies under
reorganization. In this regard, it is important to stress that Itaqui and Pecém I have
already been reimbursed sums that were unduly overpaid (approximatelyR$108,000,000.00 and R$260,000,000.00, respectively) in November 2014.
-
8/9/2019 Judicial Recovery Plan
8/253
FINAL VERSION
8
It is also worth registering the fact that, on 25.08.2014, the Pecém I Thermoelectric
Power Plant recorded a three-phase short-circuit in one its turbines, which
resulted in the disconnection of all the generators. The plant operated at only half
capacity until the beginning of December 2014, for a period of 87 days. Thisprevented it from generating the contracted energy (forcing it to buy ballast at
extremely high prices) and also made it subject to new contingencies for
reimbursement due to unavailability from January 2016 for a period of 60 months,
with such reimbursement being covered by insurance for loss of profits from the
61st day until the 87th day.
In addition to this, the companies undergoing reorganization were affected by the
crisis of the OGX Group, as all the gas-fired plants of the Parnaíba Thermoelectric
Complex are supplied by Parnaíba Gás Natural (the former OGX Maranhão Petróleo
e Gás S.A.). The lack of investments in Parnaíba Gás Natural resulted in additional
delays at the Parnaíba II Thermoelectric Plant and in problems in the regulatory
sphere, which forced the companies undergoing reorganization to bear high
unscheduled costs.
In addition to the above factors, which were completely beyond the control of the
companies under reorganization, and which caused energy-generation starting
dates to be postponed, the companies under reorganization signed variouscontracts with financial institutions to finance their energy generating and trading
projects which currently total approximately R$2.3 billion. The group's total debt,
taking into account the debts contracted with the operational companies, amounts
to around R$10 billion.
Finally, the companies under reorganization also granted guarantees for loans
from operational companies, without, however, possessing any cash-generating
activity of their own to honor the payments which may be required of them.
1.4. Previously adopted measures. In order to restore its financial health, in
recent months, the companies under reorganization have embarked on the project
of internal reorganization, implanting more appropriate management practices
and adopting measures designed to rebalance its cash flow.
In order to reduce fixed costs, they have sought to reduce their management
structures and pare down their workforces. They have simultaneously initiated theprocess of renegotiating their debts and contracts with financial creditors and
-
8/9/2019 Judicial Recovery Plan
9/253
FINAL VERSION
9
suppliers, scaled down their original business plans and proceeded to adopt a
series of management practices designed to control the cash situation.
It may be seen, for example, that as a result of operational problems and others in
the regulatory sphere which affected the cash balances of the operationalcompanies, Eneva saw its borrowing grow substantially between 2013 and 2014.
Measures were then put into place to obtain new funding, as a way of extending
Eneva's debt and allowing the process of deleveraging in the years 2014 and 2015.
This was made possible by tough negotiations with the main creditors, whose aim
was to reduce the level of borrowing of the companies under reorganization.
Regarding the debt with suppliers, the companies under reorganization have
already achieved success in renegotiating the payment of approximately R$460
million.
Simultaneously, the criteria for the application of sanctions by ANEEL have been
challenged, and legal judgments have been obtained (though not yet res judicata)
in favor of the companies Itaqui, Pecém I, Pecém II, Parnaíba I and Parnaíba III for
the regulatory penalties to be applied taking into account the contracted criteria,
and not the new and inappropriate calculation methodology put into practice by
ANEEL. These favorable judgments represent a reimbursement for the Eneva
Group of approximately R$300 million, without taking into account the possibility
of sums already paid being subsequently charged in accordance with ANEEL'sdeterminations based on criteria whose inappropriateness the judicial branch has
already recognized.
In addition to this, since March 2014, the companies under reorganization have
adopted other measures to balance their cash, through the search for investors, a
process which is still underway. Also since March, they have been making every
effort to seek parties interested in acquiring certain assets, having implemented
rigorous processes to ensure that the best proposal is chosen.
Moreover, in order to increase the availability of cash and strengthen its capital
and balance sheet structure, in May 2014 Eneva signed an agreement with E-ON
and a group of funder creditors which provided for (i) an increase in private
capital of up to R$1.5 billion, to be carried out in 2 stages; (ii) the sale of 50% to
100% of its interest in Pecém II through the initiation of an open and competitive
process for interested investors; (iii) the granting of a bridging loan in the sum of
R$100 million; (iv) the granting of a long term loan in the sum of R$150 million for
Pecém II, as well as (v) the extension by 5 years of the maturity date of certainloans.
-
8/9/2019 Judicial Recovery Plan
10/253
FINAL VERSION
10
Throughout recent months, in the context of the efforts made by the management
of the companies undergoing reorganization to consolidate their financial stability,
significant advances have been made, in particular (i) an increase in Eneva's
private capital, in the total of approximately R$175 million; (ii) the sale of 50% ofthe shares issued by Pecém II and loans in the sum of R$408 milhões; (iii) the
alteration of the form of verifying and paying for the unavailability (ADOMP) of the
plants and the reimbursement to Eneva of the excess sums paid by the
thermoelectric power plants Pecém I and Itaqui, totalling over R$360 million; (iv)
the signing of an agreement with ANEEL to modify the obligations for the supply of
energy by the Parnaíba II power plant, together with the conclusion of the works
and start of test operations at the cited plant; (v) the signing of a contract for the
sale of Eneva's interest in Pecém I to EDP – Energias do Brasil S.A. (“EDP”) for
R$300 million; (vi) significant improvements in the availability of the operations of
the plants controlled by the companies undergoing reorganization; (vii) a
significant reduction in the operational costs of the companies undergoing
reorganization, among other measures.
It is important to stress that, since the first signs of the crisis began to appear, the
companies undergoing reorganization — through their executives and, more
recently, with the assistance of renowned consultants specializing in the
restructuring of companies in crisis — have made every effort to stabilize theircash situation. As may be seen above, important results have been obtained, which
have prevented the Eneva Group from suffering further losses.
1.5. Economic and operational viability. The financial crisis currently
experienced by the companies undergoing reorganization is the product of a series
of factors which occurred in recent years and which adversely affected their cash
flow, preventing the continuity of punctual payment of all their obligations to their
suppliers and financial institutions.
Despite the fact that they are experiencing a challenging time of financial
difficulties, the companies undergoing reorganization are viable, profitable entities
which possess much added value in their assets and technologies. In addition to
this, they are unquestionably sources for the generation of tens of thousands of
direct and indirect jobs and the payment of substantial taxes. The companies
undergoing reorganization are the principal private investors in Brazil in the
important activity of thermal energy generation — without which the already
grave current situation of the Brazilian energy sector would undoubtedly reach
-
8/9/2019 Judicial Recovery Plan
11/253
FINAL VERSION
11
even more critical levels —, operating in areas which suffer significant regional
imbalances.
The companies undergoing reorganization hold interests (wholly-owned or with
partners) in thermoelectric plants in the states of Amapá, Ceará and Maranhãowith high production capacity. Each TPP is equipped with turbines and other
highly valuable assets, which means that these operational units, in which the
companies undergoing reorganization have significant holdings, possess equally
significant added value.
To obtain the right to sell the energy produced by each of these TPPs, the
companies which control them were victorious at New Energy Auctions held by
the CCEE since the year 2007, which allows them to sign contracts with periods of
validity from 15 to 20 years, with a guarantee of income at significant levels. The
contracts signed are of long duration and allow for the receipt of a fixed annual
income and a variable income. These resources are substantial and compatible
with the significance and scale of the projects undertaken by these companies,
with the TPPs controlled by the Eneva Group predicted to enjoy a fixed income of
R$2.3 billion for the year 2015.
As a consequence, the companies undergoing reorganization should benefit from
the results of each of these surplus operations, inasmuch as they proceed toreceive the dividends due to them in their capacity as direct or indirect
shareholders.
2. DEFINITIONS AND RULES OF INTERPRETATION
2.1. Definitions. The terms and expressions which appear in lowercase letters,
whenever mentioned in the plan, will have the meanings attributed to them in this
clause 2. These terms will be used, where appropriate, in their singular or plural
form, and in the masculine or feminine form, without losing the meaning assigned
to them.
2.1.1. “Controlling Shareholders”: are, collectively, Eike Batista and E.ON.
2.1.2. “Bankruptcy Trustee": is Deloitte Touche Tohmatsu Consultores
Ltda., appointed by the Reorganization Court , as per the terms of
Chapter II, Section III, of the LRJ, or whoever may replace it fromtime to time.
-
8/9/2019 Judicial Recovery Plan
12/253
FINAL VERSION
12
2.1.3. "Verification of the Percentage Reductions of the Unsecured Claims":
the procedure during the creditors' meeting when voting on the plan
takes place, by which (i) it will be verified whether the weighted
average of the proposed percentage reductions of the unsecuredclaims informed by the unsecured creditors achieves the percentage
or not of the minimum reduction of the unsecured claims; and, if not,
(ii) the unsecured creditors who remain below the weighted average
obtained will be advised that the respective proposed percentage
reduction of the unsecured claim may be increased, at the exclusive
discretion of the companies under reorganization, to allow the
attainment of the minimum reduction of the unsecured claims. Once
the procedure for verifying the reduction percentages of the
unsecured claims has been concluded, the respective definitive
percentage reductions of the unsecured claims will be determined
and, for each unsecured creditor entitled to the privilege foreseen in
clause 5.3.5, it will be informed whether they wish to exercise, or
not, the right to the optional increase in the definitive percentage
reductions of their unsecured claims. For the purposes of clarity,
regarding each unsecured creditor whose claim exceeds
R$250,000.00 (two hundred and fifty thousand reais), the calculation
for the verification of the percentage reductions of the unsecuredclaims will consist, of the weighted average obtained from (i) the
multiplication of (a) the proposed percentage reduction of the
unsecured claim informed by the respective unsecured creditor by
(b) the value of the respective unsecured claim and (ii) the division
(a) of this figure by (b) the total value of the unsecured claims
(following the deduction of the R$250,000.00 (two hundred and fifty
thousand reais) per unsecured creditor paid in accordance with clause
5.3.1 ) as per the formula described and exemplified in Annex 2.1.3.
2.1.4. “ANEEL”: Brazilian Electrical Energy Agency.
2.1.5. “Anniversary”: is the date which corresponds to the 360th day after
the Date of Ratification.
2.1.6. “ANP”: Brazilian Oil, Natural Gas and Biofuels Agency.
2.1.7.
"Investment in specie": the sum equivalent to the subscription andpayment in specie of shares in the context of the capital increase. For
-
8/9/2019 Judicial Recovery Plan
13/253
-
8/9/2019 Judicial Recovery Plan
14/253
FINAL VERSION
14
corresponding to the global value of the assets which may be
invested in Eneva's capital in order to pay for the new shares. For the
purposes of this plan, we estimate the value of the capital increase at
R$3,300,000,000.00 (three billion, three hundred million reais, to be
subscribed and paid for by the shareholders, unsecured creditors,investors and by the owners of other property and rights which may
be accepted by Eneva for the purposes of subscription/underwriting
(according to their own exclusive criteria of convenience and
opportuneness, and always with reference to the aims of the plan),in
observance of the following reference values by mode, which may
vary, up or down, depending (i) on the number of Eneva's
shareholders who exercise their respective preemptive and/or
priority right, depending on the case, in the subscription of the
capital increase and the respective form of subscription adopted: (ii)
on the volume of capitalization of the claims by the unsecured
creditors; and (iii) on the approval at the shareholders' meeting of
the evaluation report regarding each of the assets owned by the
shareholders, investors and/or unsecured creditors who opt to
participate in the capital increase through underwriting with the
assets.
Form of participation
in the capital increase
Estimated reference values for thepurposes of participation in the
capital increase
(in millions of R$)
Investment in specie 600
Capitalization of the
claims1,100
Underwriting with assets 1,300
Total 3,000
2.1.12. “BNDES”: is the Brazilian Bank of Social and Economic Development.
2.1.13. “BNDESPar”: is BNDES Participações S.A. – BNDESPar, a corporation
with head offices at Centro Empresarial Parque Cidade, Setor
Comercial Sul – SCS, Quadra 9, Torre C, 12º andar, Brasília/DF, and a
service office and tax domicile at Avenida República do Chile, nº 100-
parte, Centro, Rio de Janeiro/RJ, registered under Corporate
Taxpayer Number (CNPJ) 00.383.281/0001-09.
-
8/9/2019 Judicial Recovery Plan
15/253
FINAL VERSION
15
2.1.14. “CADE”: Administrative Council of Economic Defense.
2.1.15. “Capitalization of Claims”: is the procedure, regarding each
unsecured creditor, by which up to 45% (forty five percent) of the
value of the unsecured claims (following the deduction of theR$250,000.00 (two hundred and fifty thousand reais) paid in
accordance with the terms foreseen in clause 5.3.1, per unsecured
creditor - will be converted, in the sphere of the capital increase, as
per the terms foreseen in clauses 4.4 and 5.3 of this Plan and in
accordance with article 171, item 2, of the business corporation act
and the other applicable legal provisions,.
2.1.16. “CDI”: is the variation of the average reference rates of the Interbank
Deposits (CDI Extragrupo) verified and published by the CETIP on its
webpage (www.cetip.com.br), expressed as a percentage per year.
2.1.17. “Precedent Conditions”: are the suspensive conditions for the
realization of the capital increase and for the implementation of the
other provisions contained in this plan as foreseen in clause 4.1.
2.1.18.
“Claims”: are the claims and obligations held by the creditors againstEneva and Eneva Participações, whether outstanding or not yet due,
materialized or contingent, liquid or illiquid, the object or not of a
legal dispute or arbitral procedure, existing on the request date or
whose taxable event is prior to or coincides with the request date,
and which may or may not be subject to the effects of the plan.
2.1.19. “Capitalized Claims”: correspond to the fraction of the unsecured
claims which are the object of the capitalization of the claims as
described in clause 2.1.15.
2.1.20. “Secured Claims”: are the claims assured by security interest (such as
a pledge or mortgage) granted by one of the companies under
reorganization, up to the limit value of the respective asset, as per
the terms of article 41, item II, of the LRJ.
2.1.21. “Pre-bankruptcy Claims”: are the claims held by the pre-bankruptcy
creditors.
-
8/9/2019 Judicial Recovery Plan
16/253
FINAL VERSION
16
2.1.22. "Micro-Business and Small Business Claims": are the claims held by
micro-business and small business creditors.
2.1.23. “First Priority Claims”: are the claims held by first priority creditors.
2.1.24. "Suretyship, Accommodation, or Joint and Several Obligation
Claims": are the claims deriving from operations contracted directly
by subsidiaries of the companies under reorganization
headquartered in Brazil, through operations in which the companies
under reorganization feature as sureties, accommodation parties,
joint and several debtors or in any other codebtor relationship
regarding the payment of the debt contracted directly by one their
subsidiaries headquartered in Brazil.
2.1.25. “Unsecured Claims”: are the unsecured claims as foreseen in articles
41, item III, and 83, item VI, of the LRJ.
2.1.26. “Labor Claims”: are the claims and rights deriving from labor
legislation or workplace accidents, as per the terms of Article 41,
item I, of the LRJ, and the claims and rights consisting of lawyers' fees
recognized by the companies under reorganization or fixed by a legal
judgment which has become res judicata by the date of the claim.
2.1.27. “Creditors”: are individuals or legal entities which hold claims,
whether or not they are included in the list of creditors.
2.1.28. “Secured Creditors”: are the pre-bankruptcy creditors who hold
secured claims.
2.1.29. “Pre-bankruptcy Creditors”: are creditors who hold claims and rights
which may be altered by this plan, as per the terms of the LRJ.
2.1.30. “First Priority Creditors”: are creditors who own claims which are
not subject to court-supervised reorganization, as per the terms of
articles 49, §§ 3º and 4º, and 67 of the LRJ.
2.1.31. “Funding Creditors”: are the creditors who opt to grant new funding,
as per the terms foreseen in clause 6a of this plan. The fact that a
creditor may opt to participate in the capital increase through an
-
8/9/2019 Judicial Recovery Plan
17/253
FINAL VERSION
17
investment in specie and/or underwriting with the assets will not
make it a funding creditor.
2.1.32. "Micro-Business and Small Business Creditors": are creditors
incorporated as micro-businesses and small businesses, as definedby Supplementary Law No. 123, of December 14th 2006.
2.1.33. "Suretyship, Accommodation, or Joint and Several Obligation
Creditors": are the holders of claims deriving from operations
contracted directly by subsidiaries of the companies under
reorganization headquartered in Brazil, through operations in which
the companies under reorganization appear as sureties,
accommodation parties, joint and several debtors or in any other co-
debtor relationship regarding the payment of the debt contracted
directly by one their subsidiaries headquartered in Brazil.
2.1.34. “Unsecured Creditors”: are the pre-bankruptcy creditors who hold
unsecured claims.
2.1.35. "Late Creditors": are creditors who, due to the filing of late claims on
an administrative or judicial basis, were included by the bankruptcy
trustee in the list of creditors after its publication in the officialgazette, in accordance with the provision of article 7, item 2 of the
LRJ.
2.1.36. “Labor Creditors”: are the pre-bankruptcy creditors who hold labor
claims.
2.1.37. “Ratification Date”: The date of the publication of the judicial
ratification of the plan proffered by the court of reorganization,
against which there is no interlocutory appeal pending judgment of
the merits in the State Appellate Court of Rio de Janeiro, in
accordance with the terms of article 59 of the LRJ.
2.1.38. “Request Date”: 09/12/2014, the date on which the request for
court-supervised reorganization was filed by the companies under
reorganization.
2.1.39.
“Working Day”: for the purposes of this plan, a working day will beany day other than Saturday, Sunday or a national or municipal
-
8/9/2019 Judicial Recovery Plan
18/253
FINAL VERSION
18
holiday in the cities of São Paulo or Rio de Janeiro or on which, for
any reason, the banks are not open in the cities of São Paulo or Rio de
Janeiro.
2.1.40.
"Eike Batista": is Mr. Eike Fuhrken Batista, registered underIndividual Taxpayer Identification Number (CPF/MF) 664.976.807-
30 and bearer of identify card nº 05.541.92-2, resident and domiciled
in the city of Rio de Janeiro, state of Rio de Janeiro, with offices at
Praia do Flamengo, nº 154, 10º andar, and his controlled companies,
which have a direct or indirect interest in Eneva.
2.1.41. “Eneva”: is Eneva S.A. - under court-supervised reorganization, a
corporation with head offices at Praia do Flamengo, nº 66, 9º andar,
Flamengo, Rio de Janeiro/RJ, CEP nº 22.210-903, registered under
Corporate Taxpayer Number (CNPJ) 04.423.567/0001-21.
2.1.42. “Eneva Participações”: is Eneva Participações S.A. - undergoing
court-supervised reorganization, a corporation with head offices at
Praia do Flamengo, nº 66, 9º andar, Flamengo, Rio de Janeiro/RJ, CEP
22.210-030, registered under Corporate Taxpayer Number (CNPJ)
15.379.168/0001-27, resulting from the joint venture formed
between E.ON and Eneva.
2.1.43. “E.ON”: is DD Brazil Holdings S.àR.L. (a company incorporated under
the laws of Luxemburg, with head offices at Boulevard Prince Henri,
nº 17, 1.724, Luxemburg), an investment vehicle controlled by the
Germany company E.ON SE which holds interests in the companies
of the Eneva Group which is the object of the investment.
2.1.44. “Shared Guarantees”: are the part of the accounts receivable of the
R$300,000,000.00 (three hundred million reais) deriving from the
alienation, by Eneva, of its entire interest in the capital of Pecém I in
favor of EDP – Energias do Brasil S.A., in accordance with the terms
of the contract for the purchase and sale of shares, a copy of which
forms Annex 7.1 of this plan. These accounts receivable may be
shared with the funding creditors, under the same conditions of
seniority, as per the terms foreseen in this plan and in accordance
with the contractual instrument(s) which may be signed for this
purpose between the funding creditors and Eneva.
-
8/9/2019 Judicial Recovery Plan
19/253
FINAL VERSION
19
2.1.45. “Eneva Group”: the group composed of the companies which are
directly or indirectly controlled by Eneva, in accordance with the
corporate organogram attached to this plan as Annex 1.2.
2.1.46.
“Judicial Ratification of the Plan”: is the judicial decision proffered bythe court of reorganization which grants the court-supervised
reorganization, as per the terms of article 58, head provision, and/or
article 58, Item1º, of the LRJ.
2.1.47. “ICVM 476/09”: is Instruction n.º 476, of the Securities and Exchange
Commission, of January 16th 2009.
2.1.48. "Investor": is any individual or legal entity which decides to
participate in the capital increase through an investment in specie
and/or underwriting with the assets, in the form foreseen in this
plan and in accordance with the other applicable legal provisions.
2.1.49. “Itaqui”: is Itaqui Geração de Energia S.A., a corporation with head
offices at Avenida dos Portugueses s/n, módulo G BR 135, São
Luís/MA, CEP nº 65.085-582, registered under Corporate Taxpayer
Number (CNPJ) 08.219.477/0001-74.
2.1.50. “Court of Reorganization”: is the 4th Commercial Court of the Judicial
District of the Capital of the State of Rio de Janeiro.
2.1.51. “Reports”: are the economic-financial reports which demonstrate the
economic viability of the companies under reorganization and
evaluate their goods and assets, as per the terms of article 53, III, of
the LRJ, attached to this plan as Annex 2.1.51.
2.1.52.
“Business Corporation Act ”: is Federal Law nº 6.404, of December
15th 1976.
2.1.53. “LRJ (Court-Supervised Reorganization Act)”: is Federal Law nº
11.101, of February 9th 2005.
2.1.54. “List of Creditors”: Consolidated list of creditors of the companies
under reorganization drafted by the bankruptcy trustee and
amended from time to time by the res judicata judicial or arbitraljudgments which recognized the new pre-bankruptcy claims or
-
8/9/2019 Judicial Recovery Plan
20/253
FINAL VERSION
20
altered the legitimacy, classification or value of the pre-bankruptcy
claims already recognized.
2.1.55. “New Shares”: are the ordinary, registered, book-entry shares
without nominal value which will be issued by Eneva in the contextof the capital increase, and delivered to the respective subscriber,
free and unencumbered of any burden. The issuance cost of each
new share will be determined and approved at Eneva’s shareholders’
meeting, which we assert, for the purposes of this plan, will be
R$0.15 (fifteen cents), fixed in accordance with the terms of article
170 of the business corporation act, and in observance of the
provision of clause 4.11 of this plan.
2.1.56. “New Funds”: is the money to be granted to Eneva by the funding
creditors, as per the terms provided for in the plan.
2.1.57. “Parnaíba Gás Natural”: is Parnaíba Gás Natural S.A. (formerly OGX
Maranhão Petróleo e Gás S.A.), a corporation with head offices at
Praia de Botafogo, nº 228, Ala A, 13º andar, Botafogo, Rio de
Janeiro/RJ, CEP 22.250-906, registered under Corporate Taxpayer
Number (CNPJ) 11.230.122/0001-90.
2.1.58. “Parnaíba I”: is Parnaíba I Geração de Energia S.A., a corporation with
head offices at Estrada de Acesso a BR 135/Km 277, Santo Antônio
dos Lopes/MA, CEP nº 65.730-000, registered under Corporate
Taxpayer Number (CNPJ) 11.744.699/0001-10;
2.1.59. “Parnaíba II”: is Parnaíba II Geração de Energia S.A., a corporation
with head offices at Estrada de Acesso a BR 135/Km 277, Santo
Antônio dos Lopes/MA, CEP nº 65.730-000, registered under
Corporate Taxpayer Number (CNPJ) 14.578.002/0001-77.
2.1.60. “Parnaíba III”: is Parnaíba III Geração de Energia S.A., a corporation
with head offices at Estrada de Acesso a BR 135/Km 277, Santo
Antônio dos Lopes/MA, CEP nº 65.730-000, registered under
Corporate Taxpayer Number (CNPJ) 10.536.701/0001-01.
2.1.61. “Parnaíba IV”: is Parnaíba IV Geração de Energia S.A., a corporation
with head offices at Estrada de Acesso a BR 135/Km 277, Santo
-
8/9/2019 Judicial Recovery Plan
21/253
FINAL VERSION
21
Antônio dos Lopes/MA, CEP nº 65.730-000, registered under
Corporate Taxpayer Number (CNPJ) 15.842.091/0001-80.
2.1.62. “Plan”: This is the plan of court-supervised reorganization, as
amended, modified or altered.
2.1.63. “Pecém I”: is the Porto do Pecém Geração de Energia S.A., a
corporation with head offices at Rodovia CE-085, KM 37,5, Complexo
Industrial e Portuário de Pecém, Caixa Postal 11, São Gonçalo do
Amarante/CE, CEP 62.670-000, registered under Corporate
Taxpayer Number (CNPJ) 08.976.495/0001-09.
2.1.64. “Pecém II”: is Pecém II Geração de Energia S.A., a corporation with
head offices at Rua Marcos Macedo, nº 1.333, sala 2.118, Aldeota,
Fortaleza/CE, CEP 60.150-190, registered under Corporate Taxpayer
Number (CNPJ) 10.471.487/0001-44.
2.1.65. “Definitive Percentage Reduction of the Unsecured Claim": will be, in
relation to each unsecured claim, (i) the same proposed percentage
reduction of the unsecured claim, if this is equal to or greater than
the minimum reduction percentage of the unsecured claims; or (ii)
the same proposed percentage reduction of the unsecured claims, inthe event that, during the verification of the percentage reductions of
the unsecured claims, it is determined that the minimum reduction
of the unsecured claims has been reached or (iii) the proposed
percentage reduction of the unsecured claim potentially increased, at
the exclusive discretion of the companies under reorganization, to
achieve the minimum reduction of the unsecured claims, in
accordance with the procedure for verifying the reduction
percentages of the unsecured claims described in clause 5.3.2.4.
2.1.66. “Proposed Percentage Reduction of the Unsecured Claim”: is,
regarding each unsecured creditor, any percentage from a minimum
of 30% (thirty percent) to a maximum of 45% (forty five percent) of
the value of the unsecured claim (following the discount of
R$250,000.00 (two hundred and fifty thousand reais) paid in
accordance with clause 5.3.1 by the unsecured creditor), in
observance of the provision of clause 5.3.5 of this plan, which must
be informed by the respective unsecured creditor during the
-
8/9/2019 Judicial Recovery Plan
22/253
FINAL VERSION
22
creditors' meeting at which the plan is to be voted, as per the terms
and conditions hereby established.
2.1.67. “Lock -Up Period”: corresponds to the period of six months counted
from the date of ratification of the increase of capital by ENEVA’sboard of directors, during which time the new shares held by the
unsecured creditors will be subject to the restrictions foreseen in
clause 4.11 of this plan.
2.1.68. “Court-supervised reorganization”: is the process of court-
supervised reorganization filed by Eneva and Eneva Participações on
09/12/2014, registered in the records under nº 0474961-
48.2014.8.19.0001 and assigned to the 4th Commercial Court of the
Judicial District of the Capital of the State of Rio de Janeiro.
2.1.69. “Companies under court-supervised reorganization”: they are Eneva
and Eneva Participações.
2.1.70. "Minimum Reduction of the Unsecured Claims": is the minimum
reduction of the unsecured claims as described in clause 3.2.1 of this
plan.
2.1.71. “Unconverted Balance of the Unsecured Claims”: corresponds, in
relation to each unsecured creditor, to the eventual balance of the
value of the unsecured claims following (i) the deduction of the sum
of R$250,000.00 (two hundred and fifty thousand reais), to be paid
in accordance with the provision of clause 5.3.1, per unsecured
creditor, and (ii) the payment of part of these unsecured claims into
Eneva's capital, through the capitalization of the claims procedure,
and/or the granting of a waiver as foreseen in clause 5a.
2.1.72. “Underwriting with the Assets”: procedure by which some of the
new shares to be issued will be paid for through underwriting with
assets, in accordance with the provisions of this plan and in
conformity with article 171, § 2º, of the business corporation act and
the other applicable legal provisions.
2.2. Clauses and Annexes. Except where stated otherwise, all the clauses and
annexes mentioned in this plan refer to the clauses and annexes of this plan, just as
-
8/9/2019 Judicial Recovery Plan
23/253
FINAL VERSION
23
the references to the clauses or items of this plan also refer to the respective sub-
clauses and sub-items.
2.3. Titles. The titles of the chapters and clauses of this plan were included
solely for reference and should not influence its interpretation or the content of itsprovisions.
2.4. Terms. The terms “include”, “including” and similar terms should be
interpreted as if accompanied by the expression, "but not limited to".
2.5. References. References to any documents or instruments include all the
respective amendments, consolidations and additions, except if expressly stated
otherwise.
2.6. Legal Provisions. References to legal provisions and laws shall be
interpreted as references to such provisions as valid on that date or on a date
which is specifically determined by the context.
2.7. Terms. All the terms foreseen in this plan will be counted in accordance
with the form determined in article 132 of the Civil Code, ignoring the start date
but including the maturity date. Any terms in this plan (whether counted in
working days or not) whose final term falls on a day which is not a working daywill automatically be extended to the first subsequent working day.
3. GENERAL OVERVIEW OF THE REORGANIZATION MEASURES
3.1. Objective of the Plan. The plan seeks to allow Eneva and Eneva
Participações to overcome their economic-financial crises, adopt the additional
measures necessary for their operational reorganization, and preserve the direct
and indirect jobs and the rights of their creditors and shareholders.
3.2. Restructuring of the Claims. In order that the companies under
reorganization may achieve their desired financial and operational recovery, it is
essential to restructure the claims, which process will basically occur through (i)
the capitalization of the claims held by the unsecured creditors who select this
option, (ii) a waiver in relation to some of the unsecured creditors, and (iii) re-
profiling of the debt for payment of the remaining balance of the unsecured claims,
among other measures foreseen in this plan.
-
8/9/2019 Judicial Recovery Plan
24/253
FINAL VERSION
24
3.2.1. Minimum Reduction of the Unsecured Claims. The economic
projections on which the payment proposals in this plan were based
took as a premise the fact that a minimum of 40% (forty percent) of the
total value of the unsecured claims would be reduced through a
combination of the results obtained through the capitalization of theclaims and the granting of the waiver foreseen in clause 5a ("Minimum
Reduction of the Unsecured Claims"). In the event that, during the
verification of the percentage reduction of the unsecured claims, it was
determined that the minimum reduction of the unsecured claims was
not achieved, based on the proposed percentage reductions in the
unsecured claims advised, the unsecured creditors who find themselves
below the weighted average obtained will have the respective proposed
percentage reduction of the unsecured claim increased, by the
companies under reorganization, at their sole discretion, in order to
allow the attainment of the minimum reduction of the unsecured claims,
in accordance with the terms of clause 5.4.3.2.4.
3.3. Re-profiling of the liability of the operational companies of the Eneva
Group. In parallel to this plan, the companies under reorganization will make
every effort to renegotiate new conditions and terms with the creditors of the
operational companies of the Eneva Group which are not undergoing court-
supervised reorganization, in such a manner as to adapt the payment of theliability of each company to the generation of cash obtained through the operation
of the respective venture.
3.4. Strengthening of Eneva S.A.'s capital and balance sheet structure
through a Capital Increase. In order to strengthen its capital and balance sheet
structure, reduce its borrowing and receive assets capable of contributing to its
cash generation and/or its strategic positioning, Eneva will arrange a capital
increase, through the issuance of new shares at the unit cost of R$0.15 (fifteen
cents) for each new share, to be subscribed by the shareholders, unsecured
creditors, investors and the owners of other property and rights which may be
accepted by the companies under reorganization for the purposes of
underwriting/subscription (in accordance with their exclusive criteria of
convenience and opportuneness), and paid for through (i) investment in specie, (ii)
capitalization of the claims and (iii) underwriting with the assets, in accordance
with the terms foreseen in this plan.
3.5.
Strengthening of Eneva S.A.'s capital and balance sheet structurethrough the attainment of New Funds. To reestablish the working capital
-
8/9/2019 Judicial Recovery Plan
25/253
FINAL VERSION
25
necessary for the continuation of its activities, payment of claims and the
development of its business plan, Eneva will seek to obtain new funding, in
accordance with the terms of articles 67, 84, II, and 149 of the LRJ, as described in
more detail in clause 6 of this plan. In this context, Eneva invites the unsecured
creditors to grant new funding, which will be paid for and guaranteed inaccordance with the terms foreseen in this plan. The creditors who grant new
funding, thus becoming funding creditors, will receive the unconverted balance of
the unsecured claims in more favorable conditions than those creditors which
opted not to grant new funding, as detailed in clause 6ª.
3.6. Corporate Restructuring. The companies under reorganization may also
arrange for the corporate restructuring of the Eneva Group, in order to achieve a
corporate structure better suited to the development of its activities as rescaled in
the context of the court-supervised reorganization and the business plan resulting
from the implementation of this plan. Bearing in mind that the cited corporate
restructuring will occur in the sphere of the fulfillment of this plan and always in
the best interests of the companies under reorganization and of the success of the
court-supervised reorganization, it may be carried out without the need for prior
authorization by any creditor, provided that all the applicable legal, regulatory and
contractual provisions are observed.
3.7.
Alienation and/or encumbrance of the permanent asset. The companiesunder reorganization may arrange for the alienation and/or encumbrance of any
assets which are free and unencumbered (or through the consent of the creditor
who holds any guarantee on the asset), whether part of the permanent asset or
not, as expressly authorized by the court of reorganization in accordance with
article 66 of the LRJ or by this plan, whilst respecting the limits observed in the
LRJ, in this plan and in the other contracts in force signed by the Eneva Group with
creditors not subject to court-supervised reorganization.
4.
CAPITAL INCREASE
4.1. Precedent Conditions. The following precedent conditions must be
cumulatively fulfilled and/or waived by the companies under reorganization (and
only by them, depending on the case) for the realization of the capital increase and
the implementation of the other provisions contained in this plan: (i) the judicial
ratification of the plan; and (ii) a commitment from the controlling shareholders,
on an irrevocable and irreversible basis, to freely assign their respective
preemptive rights and/or renounce their priority rights, depending on the case, inwhole or in part, in favor of the unsecured creditors and/or investors who wish to
-
8/9/2019 Judicial Recovery Plan
26/253
FINAL VERSION
26
participate in the capital increase through underwriting with the assets, in order
that the capital increase may occur as provided for in this plan; and (iii) the
obtention of the pertinent legal, regulatory and contractual approvals.
4.2.
Commitment to realize the Capital Increase. Eneva undertakes, on anirrevocable and irreversible basis, through this plan, to ensure that a special
meeting of Eneva’s shareholders is held, within 30 (thirty) days of the date on
which the precedent conditions were fulfilled and/or waived, for the purposes of
voting on the capital increase, through the issuance of new shares, to be paid for by
investment in specie, through the capitalization of the claims and underwriting
with the assets, as foreseen in this plan.
4.3. Value of the Capital Increase. The total value of the capital increase will be
equal to the sum (i) of the quantity which may comprise the investment in specie,
(ii) the totality of the capitalized claims and (iii) the sum corresponding to the
global value of the assets to be underwritten. The unit cost of each new share
issued will be R$0.15 (fifteen cents).
4.3.1. Underwriting with Assets. In the event of Eneva's accepting , for the
purposes of subscribing to the capital increase, in accordance with its
exclusive criteria of convenience and opportuneness, assets and rights
which may contribute to its cash generation and/or strategicpositioning, as many new shares as are necessary, in the light of the
value of the underwritten asset, will be delivered in exchange for the
underwriting, in observance of the provision of article 8 of the business
corporation act and provided that the precedent conditions are satisfied
and/or waived for the realization of the increase of capital.
4.3.1.1. Communication by the party interested in underwriting with
assets. Creditors, shareholders and investors who wish to
participate in the capital increase by underwriting with assets must
communicate their intention to Eneva at, the creditors' meeting at
which the approval of the plan is to be voted on, through the
completion of the appropriate form, a model of which comprises
Annex 4.3.1.1 of this plan. This communication must be
accompanied by evaluation reports drafted by first rate evaluation
companies, and comply with the provision of article 8 of the business
corporation act. In the hypothesis of a capital increase by
underwriting with the assets, Eneva reserves the right, when it
-
8/9/2019 Judicial Recovery Plan
27/253
FINAL VERSION
27
considers it opportune, to perform a legal, accounting, commercial,
financial, environmental and business audit of the respective assets.
4.4. Limitation regarding the consolidation of absolute shareholder
control over Eneva. In order to avoid, as a result of the capital increase, anyunsecured creditor's consolidating absolute shareholder control over Eneva, which
is to say, of directly or indirectly assuming a shareholding interest in Eneva equal
to or greater than 50% (fifty percent), the exercise of the options foreseen in this
plan will be limited in the following manner: the fraction of the definitive
percentage reduction of the unsecured claim allocated for the purposes of the
capitalization of the claims which may result in consolidated control, will be
automatically waived, in accordance with clause 5a of this plan. For the purposes
of limitation foreseen in this clause, only firm expressions of interest, received
from the unsecured creditors, in participating in the capital increase through the
capitalization of credits, investment in specie and/or underwriting with assets will
be considered up to the creditors’ meeting. Expressions of interest from any other
investors, whether firm or otherwise, will not be considered.
4.5. Same rights. The new shares issued by Eneva in the context of the capital
increase will confer on their holders the same rights assigned to the other shares
issued up till today by Eneva, including the dividends and interest on theshareholders' equity which may be declared by Eneva after the date of ratification
of the capital increase, and in observance of the provision of clause 4.11
4.6. Bonuses, division and grouping of shares. The number of new shares to
be delivered in compliance with this plan will be simultaneously and
proportionally adjusted to the capital increases through the giving of bonuses, and
the division and grouping of shares which may occur as of this date, without any
charge to the beneficiary and in the same proportion established for such events.
Thus, by way of example, (i) in the case of grouping of shares, the number of new
shares to be delivered shall be divided by the same factor as the grouping of the
shares; and (ii) in the case of the division of shares or bonuses, the number of new
shares to be delivered shall be multiplied by the same factor as the division of the
shares or by the same factor used in the giving of bonuses.
4.7. Assignment of the preemptive right and/or waiver of the right of
priority. If the capital increase is carried out by private subscription, Eneva
undertakes to make every effort to obtain from the controlling shareholders acommitment, on an irrevocable and irreversible basis, to assign their respective
-
8/9/2019 Judicial Recovery Plan
28/253
FINAL VERSION
28
preemptive rights to the investors and/or unsecured creditors, in whole or in part,
in order that the capital increase may occur as per the terms foreseen in this plan.
Similarly, if the capital increase is realized through a public offering with restricted
placement efforts, in accordance with the terms of ICVM 476/09, Eneva
undertakes to make every effort to obtain a commitment from the controllingshareholders, on an irrevocable and irreversible basis, to assign their respective
preemptive right and/or waive their respective priority right in favor of the
investors and/or unsecured creditors, in whole or part, so that the capital increase
may be implemented as foreseen in this plan.
4.8. New shares deriving from the capitalization of the claims and the
respective release. The effective delivery of the new shares resulting from the
capitalization of the claims, represents the payment of the capitalized claims, with
a full, broad, general and unlimited release being granted, as a matter of law,
between the companies under reorganization, on one side, and the respective
unsecured creditor, on the other, regarding this fraction of the claim, for all legal
effects and purposes.
4.9. Mandate. Enevais hereby mandated and authorized, on an irrevocable and
irreversible basis, by force of this plan, in accordance with the terms of article 684
of the Civil Code, to represent, jointly or singly, the beneficiaries of the new shares
on the signing of all the documents necessary to implement and effect the deliveryof the new shares, including, but not limited to, the subscription form before the
bookkeeping institution of the shares issued by Eneva.
4.10. Other procedures. The other terms and procedures related to the increase
of capital, in addition to those already foreseen in this plan, will be timely disclosed
in accordance with the business corporation act and the LRJ, where applicable and
if necessary.
4.11.
Lock-Up Period. During the Lock-Up Period, the unsecured creditors will
be prohibited from offering, selling, contracting to sell, promising to sell, loaning,
granting on a fiduciary basis or, in any other manner, trading or transferring the
ownership, offering a call option (exercisable during the lock-up period), short-
selling or disposing in any other way, of the new shares received in the sphere of
the increase of capital. The cited restriction is expressly agreed to prevent the
unsecured creditors, during the lock-up period, from participating in any hedge or
other transaction which may be conceived in order, or which may lead, to or result
in, the alienation of the new shares held by them during the lock-up period, even ifsuch new shares are alienated by a party other than the unsecured creditor during
-
8/9/2019 Judicial Recovery Plan
29/253
FINAL VERSION
29
the lock-up period. The cited prohibition on hedging or transactions includes any
short-selling or any purchase, sale or granting of any right (including any call or
sale option, without limitation) regarding, or referred to in, any of the new shares
owned by the unsecured creditor, or in relation to any other security which
includes, whether related to, or referred to in, or which derives from anysignificant part of, the value of such shares, including total return swaps or other
derivative operations involving exclusively financial liquidation.
5. REESTRUCTURING AND LIQUIDATION OF THE DEBTS
5.1. Payment of the Labor Claims. The claims held by the labor creditors will
be paid in — without discount — in 2 (two) equal and successive installments,
without adjustment for inflation or interest, to be paid on the 30th (thirtieth) and
60th (sixtieth) days after the Ratification Date.
5.2. Payment of the secured creditors. Companies under reorganization do
not recognize the existence of secured creditors on the request date and, up to the
present time, no secured creditor has been included on the list of creditors by the
bankruptcy trustee. In the event of the secured creditors being included on the list
of creditors by a judicial or arbitral ruling, or by agreement between the parties,
the cited secured creditors will receive their secured claims under the same
conditions as the unsecured claims of over R$250,000.00 (two hundred and fiftythousand reais) held by the unsecured creditors, in accordance with the terms of
clause 5.3 of this plan.
5.3. Payment of unsecured creditors. The payment of unsecured creditors will
observe the provisions of the clauses below:
5.3.1. Linear payment of up to R$250 thousand to all unsecured
creditors. The sum of up to R$250,000.00 (two hundred and fifty
thousand reais), will be paid in full - without discount - to each of the
unsecured creditors, limited to the value of the respective unsecured
claim, in 2 (two) equal and successive installments, without the
application of inflation adjustment or interest, to be paid on the 30th
(thirtieth) and 60th (sixtieth) days following the Ratification Date.
5.3.2. Obligatory Reduction of the Value of the Unsecured Claims. The
approval of the plan necessarily implies a reduction, regarding each
unsecured creditor, of from 30% (thirty percent) to 45% (forty five
percent) of the value of the unsecured claim, on sums greater thanR$250,000.00 (two hundred and fifty thousand reais), which will be
-
8/9/2019 Judicial Recovery Plan
30/253
FINAL VERSION
30
paid as per the terms of clause 5.3.1 above, its being the responsibility
of each unsecured creditor to indicate (i) the respective proposed
percentage reduction of the unsecured claim and (ii) the preferred form
for the reduction of its unsecured claim chosen from the following
options: (a) the capitalization of the total value of the unsecured claimcorresponding to the percentage reduction of the unsecured claim; (b)
the granting of a full waiver of the unsecured claim corresponding to the
definitive percentage reduction of the unsecured claim; or (c) a
combination of alternatives (a) and (b) above, in such case informing the
exact percentage which its intends to waive and the exact percentage
which it intends to capitalize in the capital increase..
5.3.2.1. Formalization of the Indication. The proposed percentage
reduction of the unsecured claim and the chosen form for the
reduction of the unsecured claim, as provided for in clause 5.3.2
above must be advised by each of the unsecured creditors during the
creditors' meeting at which the plan is to be voted on, through the
completion of the form, the model for which comprises Annex
5.3.2.1 of this plan.
5.3.2.2. Non-Formalization. Failure to issue a statement during the
creditors' meeting at which the plan is to be voted on, will beinterpreted as (i) the unsecured creditor's indicating a preference
for the minimum of 30% (thirty percent) as the proposed percentage
reduction of the unsecured claim; and (ii), the unsecured creditor's
lack of interest in participating in the capital increase, resulting in
the granting of a full waiver of the value of the unsecured claim
corresponding to the proposed reduction percentage of the
unsecured claim, without prejudice to the respective unsecured
creditor's being subject to the increase procedure foreseen below, in
the case of non-attainment of the minimum reduction of the
unsecured claims, which will be subject to the same treatment as
item (ii) of this clause 5.3.2.2.
5.3.2.3. Verification of the percentage reductions of the unsecured
claims. After the unsecured creditors have advised their respective
proposed percentage reductions of the unsecured claim and the
chosen form of reduction of the unsecured claim, the weighted
average of these percentages will be calculated, in order to verify if
-
8/9/2019 Judicial Recovery Plan
31/253
FINAL VERSION
31
the minimum reduction of the unsecured claims (40%) was or
wasn't achieved.
5.3.2.4. Non-attainment of the Minimum Reduction of the Unsecured
Claims and the consequent Compulsory Increase of theProposed Percentage Reduction of the Unsecured Claims. As
explained in this plan, the economic projections which provided the
basis for the payment proposals took as their premise the fact that a
minimum of 40% (forty percent) of the total value of the unsecured
claims would be capitalized and/or waived, depending on the case.
Thus, in the event that the combination of results verified at the
creditors' meeting does not achieve the minimum percentage of 40%
(forty percent) above, the unsecured creditors who potentially
remain below the weighted average obtained will be informed that
the respective proposed percentage reduction of the unsecured
claim will be increased, in accordance with the formula foreseen in
Annex 2.1.3, until the minimum reduction of the unsecured claims is
achieved. The increase in each proposed percentage reduction will
be communicated to all those present at the creditors' meeting, and
this will become the definitive reduction percentage for the
unsecured claims, for all legal purposes and effects, and subject to
the provision of clause 5.3.5 of this plan.
5.3.2.4.1 As a means of encouraging the granting of a larger
proposed percentage reduction of the unsecured claim,
independently of the form of reduction of the unsecured credit
chosen by each unsecured creditor, in accordance with clause 5.3.2
above, the additional percentage reduction alone, corresponding to
the difference verified between the definitive percentage reduction
of the unsecured claim (obtained through the increase procedure
described in clause 5.3.2.4) and the proposed percentage reduction
of the unsecured claim, will be compulsorily waived by the
respective unsecured creditor.
5.3.3. Payment of the Remaining Balance of the Unsecured Claims in
accordance with the terms of instruments A and B. The remaining
balance of the unsecured claims will be paid, without any discount,
through instruments A and B, in accordance with the following terms:
5.3.3.1. Instrument A. Instrument A will have the following characteristics:
-
8/9/2019 Judicial Recovery Plan
32/253
-
8/9/2019 Judicial Recovery Plan
33/253
FINAL VERSION
33
higher percentage reduction of the unsecured claim, the plan provides, in relation
to each unsecured creditor, for the allocation to instrument A of 1% (one percent)
of the value of the unsecured claim(following the discount of the R$250,000.00
paid in accordance with clause 5.3.1) for each 1% (one percent) of the definitive
percentage reduction of the unsecured claim fixed above the minimum reductionpercentage of the unsecured claim of 30% (thirty percent). The remaining balance
of the unsecured claims not allocated to instrument A above will automatically be
allocated for payment in accordance with instrument B.
5.3.4.4 Global limitation of the value designated to instrument A. Companies
under reorganization will designate the maximum and unalterable sum of up to
R$460,000,000.00 (four hundred and sixty million reais) for the purposes of
allocation under the terms of instrument A. Only the following parties will qualify
for the terms foreseen in instrument A: (i) unsecured creditors whose definitive
percentage reduction of the unsecured claims is set above the minimum of 30%
(thirty percent), in accordance with the terms of clause 5.3.4.3; and (ii) Funding
Creditors, as provided for in clause 6a of the plan.
5.3.5. Optional Increase in the Definitive Percentage Reduction of the
Unsecured Claim and allocation of the Remaining Balance of the Unsecured
Claims to Instrument C. Furthermore, as a means of encouraging a greater
reduction in the unsecured claims, the unsecured creditors who granted adefinitive percentage reduction equal to or greater than 40% (forty percent), will
be granted the exclusive option of increasing by a further 20% (twenty percent)
the respective definitive percentage reductions of their unsecured claims,
exclusively by waiver of debt, in order that they may be entitled to the full
allocation of the remaining balances of their unsecured claims to Instrument C. In
other words, in this case, the remaining balance of the unsecured claims of the
respective unsecured creditor will not be allocated to instruments A or B, but
exclusively to instrument C, independently of whether the respective unsecured
creditor granted new funding or not.
5.3.5.1. Instrument C: Instrument C will have the following
characteristics:
Interest : 100% (one hundred percent) of the IDC plus interest of
2.5% (two point five percent) per year, payable from the date of
ratification.
Grace Period: Grace period for the amortization of the principal of
8 (eight) years and for the payment of interest of 6 (six) years,counted from the date of ratification.
-
8/9/2019 Judicial Recovery Plan
34/253
FINAL VERSION
34
Payment of interest: The interest foreseen in the plan will be paid
every month between the 7th
(seventh) and 8th
(eighth) year
following the date of ratification.
Amortization of the principal and payment of interest :
Amortization of the principal and interest payments will be madeevery month in the period between the 9 th (ninth) and 14th
(fourteenth) years following the date of ratification, in accordance
with the following timetable of payment:
9th Year 10th Year 11th Year 12th Year 13th Year 14th Year
10% 15% 15% 15% 20% 25%
5.3.5.2. Formalization of the option regarding the optional
increase. The decision, by each unsecured creditor, to exercise the
option to increase their respective definitive percentage reduction of
the unsecured claim by an additional 20% (twenty percent), in
accordance with the terms foreseen in clause 5.3.5 above, must be
communicated during the creditors' meeting at which the plan is
voted on, on the conclusion of the procedure for verifying the
percentage reductions of the unsecured claims, through the
completion of the appropriate form, a model of which comprises Annex 5.3.5.2 of this plan.
5.4. Payment of Micro-Business and Small Business Creditors. The claims
held by the micro-business and small business creditors will be paid in full -
without discount - in 2 (two) equal and successive installments, without
adjustment for inflation or interest, to be paid on the 30th (thirtieth) and 60th
(sixtieth) days after the Ratification Date.
5.5.
Payment of Late Creditors. The claims held by late creditors will be paid in
10 (ten) monthly installments, without the application or capitalization of interest,
with the first payment becoming due after the first month subsequent to the
settlement of all the other pre-bankruptcy claims and first priority claims.
5.6. Form of Payment . The claims will be paid to the creditors through the
direct transference of funds to the bank account of the respective creditor, through
a wire transfer (DOC) or an Electronic Funds Transfer (TED). Eneva may contract a
payment agent to effect such payments to the creditors. The deposit slip of the sum
-
8/9/2019 Judicial Recovery Plan
35/253
FINAL VERSION
35
paid to each creditor will serve as proof of the settlement of the respective
payment.
5.7. Creditors’ Bank Accounts. Creditors must inform their respective bank
account details for this purpose, through written communication addressed toEneva, in accordance with the terms of clause 9.4. Payments which are not made
due to the creditors' not having informed their bank details within a minimum of
30 (thirty) days of the projected date of payment will not be considered as non-
compliance events in relation to the plan. In this case, and at the discretion of the
companies under reorganization, the payments due to the creditors who did not
inform their bank details may be made in court, at the expense of the creditor, who
will be answerable for any added costs arising from the use of the judicial channel
to make the deposit. There will be no application of interest, fines, late payment
charges or breach of this plan if the payments were not made as a result of the
creditors not having timely informed their bank account details.
5.8. Increases in the Values of the Claims. In the hypothesis that there is any
increase in the value of any claim deriving from a res judicata court judgment or
agreement between the parties, the increased value of the claim will be paid in the
form foreseen in this plan, based on the res judicata court judgment or signing of
the agreement between the parties. In this case, the rules of payment of the
increased value of such claims, particularly regarding the application of interest,will be applicable only as of the cited res judicata court judgment or the date of the
signing of the agreement between the parties.
6. GRANTING OF NEW FUNDING
6.1. Granting of new funding. As indicated by the companies under
reorganization in their invitation-petition submitted to the records of the court-
supervised reorganization together with this plan, the companies under
reorganization ratify the invitation presented to the unsecured creditors to grant
new funding to Eneva, with a view to strengthening the capital structure of the
company, in the minimum sum of R$10,000,000.00 (ten million reais) per
unsecured creditor, and respecting the global limit of R$100,000,000.00 (one
hundred million reais). The granting of new funding must reflect the proportion of
the respective unsecured creditor's interest in the total sum of the unsecured
claims. If any unsecured creditor does not participate in the provision of new
funding, the granting unsecured creditors may proportionately increase their
interest in the new funding to be granted whilst observing, in any scenario, theglobal limit of R$100,000,000.00 (one hundred million reais). The granting
-
8/9/2019 Judicial Recovery Plan
36/253
FINAL VERSION
36
unsecured creditors must communicate their firm proposal to grant new funding
within a term of 30 (thirty) consecutive days counted from the date of submission
of this plan in court, in accordance with the terms of clause 9.4, with express
stipulation of the value to be granted. After the 30th (thirtieth) day counted from
the date of submission of this plan in court, a term of fifteen consecutive days willbegin to run for the unsecured creditor to effectively grant the new funding, within
the limits already indicated, through a deposit in a bank account owned by Eneva
S.A., under court-supervised reorganization, held with Banco Itaú Unibanco S.A.
(341), Agency 0911, Account Number 07727-9.
6.2. Conditions of payment of the New Funding. The new funding will be
repaid to the Funding Creditors on the following conditions:
Interest : 100% (one hundred percent) of the IDC plus interest of 3%
(three percent) per year, applicable as of the date of the respective
disbursement.
Payment Term: 360 (three hundred and sixty) days counted from
the disbursement of the new funding or on the date when the price
of the alienation of Eneva's interest in Pecém I is deposited in favor
of Eneva, whichever of the two occurs first.
Amortization of the principal and payment of interest: in a single
installment, up front, to be made within the payment term above.
6.3. Guarantees. The new funding will be guaranteed by the shared guarantees,
through the signing of a contractual instrument, specific for this purpose, between
the funding creditors and Eneva.
6.4. Priority in the allocation of the sum designated to instrument A.
Following the effective release of the new funding in favor of Eneva, the funding
creditors will have proportionally reserved for themselves the sum of up to
R$100,000,000.00 (one hundred million reais) of the maximum sum of
R$460,000,000.00 (four hundred and sixty million reais) designated for the
payment of the unsecured creditors in accordance with instrument A. For this
purpose, each R$1.00 (one real) of new money granted will confer on the funding
creditor the right to reserve R$1.00 (one real) proportionately for itself.
Not withstanding the provisions of the sub-clauses of this chapter 6, if the funding
creditor exercises the option foreseen in clause 5.3.5 of this plan, the totality of
the respective remaining balance of its unsecured claims will be exclusively
allocated to Instrument C and no longer to Instruments A and B, independently ofthe limit foreseen in clause 6.4.
-
8/9/2019 Judicial Recovery Plan
37/253
FINAL VERSION
37
7. ALIENATION OF ENEVA'S INTEREST IN PECÉM I
7.1. Alienation of Pecém I to EDP. As disclosed to the market through a
relevant fact dated 09/12/2014, in order to resolve its immediate need for cash,Eneva signed a contract for the purchase and sale of the totality of its interest in its
subsidiary company Pecém I with EDP – Energias do Brasil S.A.,