    1Saving in Everything W e Do Sep-2010

    JSW Steel Ltd(A Unit of O.P. Jindal Group of Companies)

    A fastest Growing Steel plant in the country

    Achieved annual turnover of Rs.19457crores

    Won Prestigious Steel Ministers Trophy awardfor its Excellence in steel industry

    On completion of Project Falcon, JSW Steelwill become largest steel plant in single

    location

    2Saving in Everything W e Do Sep-2010

    HSM CRM

    Billet Caster

    Non - coking coal Coking coalIron ore

    Fluxes

    Coke oven

    Converter LHF, RH Slab Caster

    Sintering

    HMPT

    Pelletization

    Beneficiation

    Corex Blast furnace

    Lumpore

    Lumpore

    JSW : Process Flow

    Wire Rod / Re Bar Mill

  • 8/6/2019 JSW Steels Limited

    2/18

    2

    3Saving in Everything W e Do Sep-2010

    100% stamping in both recovery and non recovery type Coke

    oven batteries

    Energy Efficient Corex hot metal makin g unit

    Highest No. of gas holders (6 No.s)

    Largest Corex gas holde r (capacity: 1,00,000Nm3)

    Handling 4 types of Gases

    Common CV of 1850kcal/ Nm3 for all units

    Captive power plant based on Waste heat generating 65MW

    power

    Captive power plant based on 100% byproduct gases

    Zero consumption of Petroleum fuel for Iron ma king

    Hot charging of slabs more than 65% in Hot strip Mill furnace

    All 3 furnaces operating with Pulverized coal injection

    Only Steel plant to deliver CDM benefits

    Largest Blast furnace , Largest HSM in India

    Uniqueness

    4Saving in Everything W e Do Sep-2010

    Sp Energy Consumption

    6.4956.704Gcal/TcsSpecific Energy Rate1

    13531475Rs/-Gcal Cost3

    52572863082142TonsTotal Crude Steel Produced2

    UOM

    v Savings with respect to Energy Consumption over 2008-2009 is Rs 148.68 Cr

    DescriptionSl No 2009-20102008-2009

    Cost Analysis

    6.98

    6.847

    6.704

    6.495

    6.2

    6

    6.2

    6.4

    6.6

    6.8

    7

    7.2

    2006- 07 2007-08 2008- 09 2009- 10 Ex pec ted

    2010-11

    Year

    G

    c

    a

    Reduction in Sp EnergyConsp over 2008-09 is3.12%

  • 8/6/2019 JSW Steels Limited

    3/18

    3

    5Saving in Everything W e Do Sep-2010

    Gap Analysis w .r.t Global Best

    1.295 Gcal/ TcsGap

    6.495Gcal/ TcsSp. Energy of Similar plant

    JSW Steel, VijayanagarWorks

    5.20Gcal/TcsSp. Energy of Similar plant

    POSO, South Korea

    Gap Analysis

    6Saving in Everything W e Do Sep-2010

    Gap Analysis (Contd..)

    1.011Gcal/Tcs

    TotalGap

    Project are underimplementation

    0.123100%Ni l100%

    Heat recovery

    from flue gasstoves and

    sinter cooler

    4

    Project are underimplementation

    0.186100%Ni l100%CDQ in recovery

    type cokeoven

    3

    Projects are on forimplementation

    in boilers0.32217%83%100%

    BF gasUtilization

    2

    To reduce hot metalrate JSW Steel is

    installing DRIPlant

    0.3894

    Kg/TLS1027933Hot Metal rate1

    RemarksEffect in

    Gcal/TcsGapJSWPOSCODescription

    SlNo

  • 8/6/2019 JSW Steels Limited

    4/18

    4

    7Saving in Everything W e Do Sep-2010

    Coke ratio at Corex was lowered by 6.7% . This was achieved bybetter heating regime and consistent coal availability.

    Coke rate at blast furnace was low ered by 9.3% by increasing thePCI. This was achieved by increased availability of Blast furnaceoperation.

    LCP heat rate was low ered by 5.6% and powe r rate was lowered by6.8%. This has been achieved by increased availability of gases toCalcining plant.

    LD gas recovery at BOF has improved by 1.7%. It was possible by100% gas holder availability and installation of gas boosters.

    5. HSM heat rate was lowered by 4.2% and power rate w as loweredby 11.9% . This was achieved by eliminating idle hours of HSM due tonon availability of gas and by ensuring more availability of gas toreheating furnace.

    Mills have stabilized its operation due to over all increase in valueadded products. Power rate of CRM has lowered by 13.25%

    Corex gas utilization has improved from 97% to 97.94% by bettergas management.

    Waste heat utilization at non-recovery type coke ovens waste heatrecovery power plant was improved and there was increase in powergeneration from 72.39MWh to 106.23MWh also with increased by-product gas utilization

    Gas based captive power generation has increased with better gasmanagement.

    Energy Conservation Initiatives 2009-10.

    8Saving in Everything W e Do Sep-2010

    Energy Saving Projects

    TotalAnnu

    al

    Savi

    ng s

    Invest .

    Ma d

    e

    Units

    Million

    Rs

    Milli

    on

    In terms

    of

    Quantity

    or

    Gcal/Tcs.

    Rs

    Milli

    on

    Rs

    Millio

    n

    Rs

    Millio

    n

    1

    Third Booster to

    improve LD gas

    recovery.

    2007-08 - -

    105 Gcal

    of energy

    recovered

    98 98 45

    2 Sand heating in BOF. 2007-08 - -

    Annually

    550 tons

    of LPG is

    being

    saved.

    24.8 24.8 0.12

    3

    Replace of LPG by

    Byproduct gas inBoiler Burners.

    2007-08 - -

    Annually

    730 tons

    of LPG isbeing

    saved.

    3 2.9 3 2.9

    4

    BF Gas Holder for

    improving utilization

    of BF Gas

    2007-08

    30,000

    Nm3/hr

    of gas

    utilized

    113 113 220

    Sl

    N

    o

    Title of Energy Saving

    project implemented

    Year of

    Implementa

    tion

    AnnualElectrical

    Savings

    achieved

    Annual thermal

    savings

  • 8/6/2019 JSW Steels Limited

    5/18

    5

    9Saving in Everything W e Do Sep-2010

    Energy Saving Projectsotal

    Annual

    Saving

    Invest. Made

    UnitsMillion

    Rs

    Million

    In terms of

    Quantity orGcal/ Tcs.

    Rs

    Million

    RsMillion

    RsMillion

    5Captive pow er generationhas increased from 86.87

    MWh to 93.35 MWh.

    2008-09 6.48 176.5

    Bystabilization

    of BF gaspressure

    with thehelp of BFgas holder

    - 176.5 Nil

    6

    Waste heat utilization andby product gas utilizationhas improved at Non

    recovery type coke ovenbased captive power plantresulting in increase ofpower generation from59.16 MWh to 72.38 MWh

    2008-09 13.22 360.2 - - 360.2 Nil

    7

    By effective control of o ffblast and increased plantavailability increase in theCDI rate by 18.39% overthe last year

    2008-09 - -

    Energy

    Consumption has

    increasedfrom 0.377

    to 0.464Gcal/tcs.

    262 262 Nil

    8

    LPG consumption has beenreduced from 12.61Tons/day to 10.9 Tons/day

    by replacing LPG by Corexgas in BF flare stack pilot,sand heating system in BOFand in BF boiler bymodifying th e Corex gasline

    2008-09 - -

    EnergyConsumptio

    n hasreduced

    from 0.015

    to 0.0125Gcal/ Tcs.

    24.59 24.59 25

    SlNo

    Title of Energy Savingproject implemented

    Year ofImplementat

    io n

    Annual Electrical

    Savings achieved

    Annual thermal

    savings

    10Saving in Everything W e Do Sep-2010

    Energy Saving Projectsotal

    Annua

    lSaving

    s

    Invest

    . Made

    Units

    Mill ion

    RsMillio

    n

    In terms ofQuantity or

    Gcal/Tcs.

    RsMillio

    n

    Rs

    Million

    Rs

    Million

    9

    Corex gas utilization has

    been improved from 93%

    to 94.18% by modifying

    the controls in flaring

    system

    2008-09 - -

    Energy

    Consumptio

    n has

    reduced

    from 1.455

    to 1.393

    Gcal/Tcs.

    1003 1003 0.40.14

    days

    10

    LD gas recovery increased

    by 45.47% over the last

    year. This has been

    achieved by taking LD gas

    holder capital repair and

    changed the delivery mesh

    and also additional booster

    has also been installed totake care of LD gas

    transport during booster

    shutdow

    2008-09 - -

    Energy

    Consumptio

    n has

    reduced

    from 0.190

    to 0.132Gcal/Tcs.

    234 234 1Within 2

    days

    11

    Replacement of h igh

    pressure high CV corex gas

    by low pressure low CV BF

    gas for Ore Drying Furnace

    2009 10

    Energy

    Consumptio

    n has

    reduced

    from 0.015

    to 0.012

    Gcal/Tcs

    73.58 73.58 305

    months

    12

    Interconnection of 4mTPA-

    7mTPA BF gas line networkfor ensuring BF gas to

    CO#3, even during shut

    down of BF#3 -7mTPA unit.

    2009-1060,000Nm3/

    Hr Flared

    gas is used.

    367 367 903

    months

    13

    Increasing BF #3 Gas

    holder pressure from

    1000mmWC to 1085mmWC

    2009-10

    This hasenabled to

    generate

    and use

    additional

    125,000Nm3

    /Hr Mixed

    gas

    735 735 0.25 1 day

    Payback

    months

    Sl

    No

    Title o f Energy Saving

    project implemented

    Year of

    Implementat

    io n

    Annual Electrical

    Savings achieved

    Annual thermal

    savings

  • 8/6/2019 JSW Steels Limited

    6/18

    6

    11Saving in Everything W e Do Sep-2010

    Team work in Encon 2009-10

    Sl No P roject Description FY Responsible Agencies P roject status

    1

    Interconne ction of 4mT-7mT PA BF gas line

    interconnection for ensuring BF gas for gas

    mixing station at coke o ven#3 even w ith

    BF#3 under down c ondition

    2009-10

    VP(EMD), Manager

    (Coke oven), Manager

    (EMD), Asst. Managers

    and technicians

    Project has

    been

    completed

    2

    Rep lacing HP a nd high CV corex gas by LP

    and low CV BF gas for ore drying furnace of

    pellet plant.

    2009-10

    VP(EMD),Sr.Manager

    (EMD),Manager(EMD),

    Asst.Managers(EMD),

    Technicians

    Project has

    been

    completed

    3

    Utilizing mixed g as in corex gas netw ork by

    regulating Corex gas pressure in case of

    one corex g as unit is under shutdow n.

    2009-10

    VP(EMD),Sr.Manager

    (EMD),Manager(EMD),

    Asst.Managers(EMD),

    Technicians

    Project has

    been

    completed

    4

    Increa sing the BF#3 Gas holder pressure

    from 1000mmWC to 1085mmWC for

    ensuring 100% opera tion of Gas mixing

    station.

    2009-10

    VP(EMD),Sr.Manager

    (EMD),Manager(EMD),

    Asst.Managers(EMD),

    Technicians

    Project has

    been

    completed

    Encon Team work

    12Saving in Everything W e Do Sep-2010

    Solid Waste Management 2009 - 10

    Replacing iron ore5869858698Base mix yardMill scale6

    -21212129744Pelle t plant & SPdust5

    This is 2% of totalenergy for making

    pellet103462199030Pellet plantsludge4

    This is 25% ofenergy for making

    sinter2544091372837

    BOF as coolant,IM, PP & SP as f lux

    Steelmaking slag

    3

    This is 80% of totalenergy for making

    cement19256381996666

    Cement making,ground granulated

    BF slag

    Iron makingslag

    2

    This is 31% of totalenergy for making

    crude steel15858011558926

    Power plant, BFs,Coke ovens & sold

    Coal & cokefines

    1

    Equivalent ofEnergy

    Quantityreused /

    recycled, t

    Generation, Tons

    Waste used atType ofmaterial

    Sl.No

    Solid waste 2009-10

  • 8/6/2019 JSW Steels Limited

    7/18

    7

    13Saving in Everything W e Do Sep-2010

    Specific Water Consumption

    2.182009-10

    2.932008-09

    3.132007-08

    ConsumptionYear

    Specific w ater consumption details (m3/ Tcs)

    This has been achieved due to the follow ing:

    1.Waste water utilization at ore Beneficiation plant#2

    2.Waste w ater also utilized for ore w ashing at BF#3

    14Saving in Everything W e Do Sep-2010

    Carbon Emission Reduction initiatives

    23%11 crores60 crores49 croresRs .

    Percentage

    Variance2009-102008-09

    Sales

    ofCarboncredits

    This pertains to carbon credit earned against following projects:1.By-product gas uses for power generation at captive powerplant#1

    2.Usage of Waste heat of non recovery coke plant for powergeneration at captive power plant#2

  • 8/6/2019 JSW Steels Limited

    8/18

    8

    15Saving in Everything W e Do Sep-2010

    Future CDM Projects for Green Environment

    Total CO2

    Reduction

    Total

    annualSaving Investment

    Tons of

    CO2/ YrRs. Rs.

    Payback

    months

    1Waste heat from B F

    Stoves2010 17975 78.8 200 31

    2

    Installation of Process

    boiler for utilizing

    60,000Nm3/H r of BF

    gas

    2011 290473 436.26 60 1.5

    3

    Utilization of BF Gas i.e.

    100000 Nm3/hr forgenerating steam for

    power generation

    2011 484122 727.08 100 1.65

    5CDQ for 1.2 mTPA Non

    Recovery Coke Ovens2011 89878 378 750 24

    SlNo

    Projects

    630 18Part oftotal

    package

    4 TRT for BF 4 2011 149796

    16Saving in Everything W e Do Sep-2010

    Renew able Energy at JSW

    Traffic signals and Street Lighting at steel plant andTownships has been provided with Solar Energy.

    All the Guest houses have been provided with solar hotwater facility.

    Jatropa cultivation has been initiated at Vidyanagartownship and w ill be extended to around 75acres.

    The total energy generated is about 390000 units and asaving of Rs. 1033500. by solar photo voltaic Cells.

  • 8/6/2019 JSW Steels Limited

    9/18

    9

    17Saving in Everything W e Do Sep-2010

    Environment projects-2009-10

    3 new de-dusting systems at RMHS#2 (crusher building,screening building & proportioning building) to control thefugitive emissions.

    Tyre washing facility near beneficiation plant #1 to arrest thecarry over of dust from the truck tyres on to the road.

    Installation of pneumatic conveying system at BF#1 de-dusting system. This has resulted in reducing the do wntime ofthe de-dusting system due to the problems encountered atthe dust conveying arrangement.

    5 de-dusting systems of Coke ovens Installed at the coalcrusher house, coke screening & coke cutter house.

    10 no. of stack monitors to monitor the dust level on acontinuous basis.

    3000 m3/ hr. Compressor to cater to the new de-dustingsystems & dry fog dust suppression systems

    18Saving in Everything W e Do Sep-2010

    AAQ at 3 stations to monitor PM 2.5, PM 10, TSP, SO2,Nox & CO on a continuous basis

    SGP at SMS1 to granulate the slag.

    DSS at RMHS junction houses & yards to control the

    fugitive emissions from yards & junction houses.

    Gas cooling at SP1 to control the temperature & hencereduce the damage to the electrodes.

    Pneumatic conveying at PP to utilize the bag filter dustsfrom various plant units.

    Environment projects-2009-10

  • 8/6/2019 JSW Steels Limited

    10/18

    10

    19Saving in Everything W e Do Sep-2010

    ISO - NCRs for 2009-10( OCT09- Mar10)

    To collect the dust generated during hot metal handling.Present Level: SPM 3763 microg/m3

    Target : SPM 1500microg/ m3.

    Objective :To collect the dust generated during blow ing.

    Present level: SPM 4063 m icrog/m 3 during blowing

    Target: SPM 1500 microg/m 3

    1. No action plan to implement the above evidenced.

    2. SPM le vel not monitored since January 2009 to till date.

    3. Since it is significant environment aspect auditee needsto take measures to control and bring it to the target level /norms as required by the applicable Environment act (EPAct 1986 amended in 1999).

    20Saving in Everything W e Do Sep-2010

    ISO Corrective action 2009-10

    Management to take the decision reg. Performance ofSecondary De-dusting Systems for Mixer and Converter 2.

    EMD being central authority for monitoring dust levelshelp from EMD required to monitor the dust levels in theseareas.

    Risk assessment of SP1- JB1C2 conveyor being reviewedand revised with immediate effect.

    Testing has been done but test report is aw aited. As soonas the test certificate is recd. same w ill be submitted forinspection

  • 8/6/2019 JSW Steels Limited

    11/18

    11

    21Saving in Everything W e Do Sep-2010

    ISO Preventive action 2009-10

    As per the MOM of MRM No.36 dt.23/ 07/ 09, a circular hasbeen issued to ensure usage of P PES in the w ork zone tillthe desired levels are a chieved. The copy of the circular isattached. 2. EMD has agreed to continue monitoring thedust levels in these areas as it was done earlier.

    Henceforth, corrective and preventive action shall betaken after any incident after reviewing the riskassessment of the concerned activity.

    Test Certificates will be avl. in time. Follow up will beinitiated with Safety Dept. so that test certificates arerecd. in time.

    22Saving in Everything W e Do Sep-2010

    Energy Based Innovative projects 2009-10

    Installation and commissioning of BF gas networkinterconnection of 4mTPA and 7mTPA operating at variedoperating pressure with control system:

    Net Saving: Rs 36.792Crores

    Replacement of high pressure and high CV corex gas by lowpressure and low CV BF gas for ore drying at Pellet plant:

    Net saving : Rs 91.98crores

    Up gradation of BF gas holder pressure from 1000mmW C to1075mmWC

    Net saving: Rs 168.192crores

    Utilizing 970mmWC mixed gas in 1000mmWC corex gas

    network during one Corex gas unit under Shutdowncondition by controlling pressure in Corex gas networ k

    Net saving: Rs 50crores

  • 8/6/2019 JSW Steels Limited

    12/18

    12

    23Saving in Everything W e Do Sep-2010

    Up gradation of BF gas ho lder pressure from1000mmWC to 1075mmWC (Innovative project)

    BF#3 gas holder was designed for a pressure of 1000mmWC

    Before commissioning of gas holder, BF gas network was operatedwith a pressure of 1150mmWC.

    It w as experienced that, there was fluctuation of BF gas pressure inthe upstream side of gas mixing station near Oxygen plant.

    Outlet of this mixing station was against Corex gas networkpressure of 950 to 980mmWC.

    Due to fluctuation of upstream pressure 970 to 10 00mmWC at Gasmixing station, mixed gas generation i.e BFG+COG was varying inbetween 30000Nm3/Hr to 40000Nm3/Hr.

    With 1000mmWC pressure of gasholder, there would be drop inpressure up to 10mmWC and it would not have been possible togenerate mixed gas.

    Therefore, a proposal was made that gasholder pressure to be1200mmWC.

    Accordingly a static load on piston was calculated and was foundthat, column found ation and structural cant take that much of load.

    Further, it w as found that, pressure of 1075mmW C w ill be suitableas around 200Tons of weight on gas holder piston w ill be safe withexisting foundation and columns.

    24Saving in Everything W e Do Sep-2010

    But it was found that, there is not much area on top of thepiston to accommodate concrete load of 200Tons.

    Therefore a decision was taken to use pig iron available atplant site. Hence pig iron w ere anchored by concrete.

    The pressure achieved w as 1075mmWC.

    This has enabled us to generate mix gas up to 160000Nm3/ Hr.Otherwise the gas was being flared.

    So there is gain of 125000Nm3/ Hr of mixed gas.

    This has helped us also in generating mixed gas for largestHSM reheating furnaces.

    Overall mixed gas generation was possible up to165000Nm3/Hr

    Cost of mixed gas Rs. 1.22/ Nm3

    Cost of modification Rs. 25Lakhs

    Benefit works out to be 168crores/ Anum

    This work is one of its kind in any steel plant. This hasmade the gas network viable and for generating desiredquantity of mixed gas fo r stable operation of plant.

    Up gradation of BF gas ho lder pressure from1000mmW C to 1075mmWC (Contd..)

  • 8/6/2019 JSW Steels Limited

    13/18

    13

    25Saving in Everything W e Do Sep-2010

    PistonDome

    Pig Iron added toincrease the weight

    of Piston

    Concrete Blocks

    Concrete

    Rubber Seal

    Shell

    Piston RestBlocks

    Gasholder Dome

    Designed Pressure -1000 mmWCPressure Increased by Adding Pig Iron -1075 mmWC

    BF-3 Gasholder (Innovative project)

    26Saving in Everything W e Do Sep-2010

    Energy Conservation projects 2010-2011

    0.2468Total

    0.1Rs 8 MillionBF gas to power plant for

    power generation5

    0.02Rs 8 MillionUp gradation of EMC SCADA4

    0.0128Rs. 8 Million

    Replacement of H P Corexgas by BF gas for 2ndOre drying furnace of

    pellet plant

    3

    0.05Rs 50 Million

    Interconnection O2 and N2header of all Oxygenplant for flexibility of

    operation so as tooperate all units

    2

    0.064Rs.600 MillionInstallation of 2 No.s of BF

    gas fired boilers forprocess Steam

    1

    Effect on Sp.Energyin Gcal/ Tcs

    InvestmentProject DescriptionSl No

    A

  • 8/6/2019 JSW Steels Limited

    14/18

    14

    27Saving in Everything W e Do Sep-2010

    Energy Conservation measures 2010-2011

    B

    Total Effect on Sp.Energy Consumption = A+B= 0.347Gcal/ Tcs

    0.1002Total

    0.02Increasing TRT power generation

    from 3MWh to 8MWh3

    0.012Increasing the utilization of

    Corex gas from 97.94 to98.94%

    2

    Reduction of BF coke rate from518 to 480kg/ THM

    0.0682

    Increasing BF Coal rate from66. 23 to 100kg/TH M

    1

    Effect onSp.Energy in

    Gcal/ TcsProject Description

    Sl

    No

    28Saving in Everything W e Do Sep-2010

    Best Practices Observed On Energy Front

    Preparing Energy budget with regard to by- product gasyield, Gas CV, Heat rate, Power rate, Utility utilization inshops. Budget as per experience and Energy improvementprojects

    Energy Managem ent through SCADA.

    Delay strategy followed by shops during short and longshutdowns.

    Low cost, No cost solutions for energy related problems.

    Planning and implementation of Energy conservationprojects under Capex.

    Continuous work for Energy security.

  • 8/6/2019 JSW Steels Limited

    15/18

    15

    29Saving in Everything W e Do Sep-2010

    Energy Security Efforts at JSW

    Optimizing the P CI ( Pulverized Coal Injection) to reducecostly coke in all Blast furnaces

    Utilizing more than 15% non coking coal in coke ovens

    Corex gas utilization is > 98.4%

    Efforts are on for BF gas utilization > 95% by 2012

    Has Instal led TRT @ BF#3 i.e. for High To p pressure blastfurnace

    About to install CDQ for recovery type coke ovens andproduce 50MWh pow er generation

    JSW Steel is set to get Natural gas, another importantmeasure for Energy Security

    30Saving in Everything W e Do Sep-2010

    Energy Report

    On Dat e T il l d at e Parameter Unit Target On Date Till dateCO 1&2 Gross Coke % 74 70.8 71.2No of pushing Nos 112 108 108Waste heat power Mwh 64 55.6 53.5Pow er Rate Kw h/ tp 12 16.42 16.51CO3 Gross Coke % 74 72.4 72.5Specific heat Gcal/ Tdc 0.65 0.61 0.61CO 3 gas yield Nm3/ tdc 310 332 315Tar yield % of tdc 3.2 2.85 2.91No of pushings Nos 224 221 216.5Pow er Rate Kw h/ tp 55 57 57Gaseous Hea t ra te Gca l/ T 0.007 0.007 0.007Coke Breeze Heat Gca l/ T 0 .388 0.402Pow er Rate KWh/ T 40 42 39Gaseous Heat rate Gca l/ T 0.007 0.006 0.006

    Coke Breeze Heat Gcal/ T 0.194 0.150Pow er Rate Kw h/ T 40 38 39G ase ous F ue l ra te Gcal / T 0.12 0.13 0.131Pow er Rate KWh/ T 70 65 67

    10600 293540

    Sinter Plant 1 6469 184574

    Pellet Plant

    Sinter Plant 2 7838 207757

    For June 28, 2010

    ProductionShops

    1165724265

    Coke oven 1&2

    Coke oven 3

    Energy Management Department

    673482409

    Daily Plant Energy MIS

  • 8/6/2019 JSW Steels Limited

    16/18

    16

    31Saving in Everything W e Do Sep-2010

    Energy Report

    On Da te T il l d at e Parameter Unit Target On Date Til l dateCoal Rate Crx 1 Kg/ Thm 815 900 867Coke Rate Crx 1 Kg/ Thm 170 185 199Oxygen Ra te Crx 1 Nm3/Thm 560 615 744Nitrogen Rate Crx-1 Nm3/Thm 125 144 288Gas yield Crx 1 Nm3/ Thm 1680 1,638 1,817Coal Rate Crx 2 Kg/ Thm 815 963 899Coke Rate Crx 2 Kg/ Thm 170 159 191Oxygen Ra te Crx 2 Nm3/Thm 560 630 615Nitrogen Rate Crx 2 Nm3/Thm 110 122 118Gas yield Crx 2 Nm3/ Thm 1680 1,812 1,798Corex gas C V Kcal/ Nm3 1855 1,870 1,898Pow er Rate KWh/ Thm 85 109 113Coke Rate BF 1 Kg/ Thm 520 452 466CDI Rate BF 1 Kg/ Thm 80 100 90Gas yield BF 1 Nm3/ Thm 1750 1,609 1,675Oxygen Rate BF 1 Nm3/ Thm 70/100 48 46N it rogen Rate BF 1 Nm3/Thm 50 48 46Heat rate (stoves) Gca l/Thm 0.63 0.45 0.44

    Coke Rate BF 2 Kg/ Thm 520 469 452CDI Rate BF 2 Kg/ Thm 120 100 77Gas yield BF 2 Nm3/ Thm 1885 1,793 1,930Oxygen Rate BF 2 Nm3/ Thm 55 55 45N it rogen Rate BF 2 Nm3/Thm 50 65 83Heat rate (stoves) Gca l/Thm 0.50 0.59 0.60Pow er Rate KWh/ Thm 50 48.8 53.55

    Blast Furnace 2 3609 86029

    Blast Furnace 1 2841 74352

    Corex 1 2207 55246

    Corex 2 2003 56535

    For June 28, 2010

    ProductionShops

    Energy Management Department

    Daily Plant Energy MIS

    32Saving in Everything W e Do Sep-2010

    Energy Report

    On Dat e T il l da te Parameter Unit Target On Date Till dateCoke Rate BF 3 Kg/ Thm 525 437 450CDI Rate BF 3 Kg/ Thm 150 105 87Gas yield BF 3 Nm3/ Thm 1800 1,601 1,782Oxygen Rate BF 3 Nm3/ Thm 50 90 84.87BF 3 Ni trogen Rate Nm3/Thm 50 36 58B F 3 Power rate KWh/Thm 160 147 160Heat r ate (st oves ) Gcal / Thm 0.50 0.49 0.53B F gas C V Kcal/ Nm3 750 750 750Heat rate Gcal/ Ton 0.75 0.75 0.79Power rate KWh/ Ton 34 37 35Oxygen rate Nm3/ Tls 54 57 59Nitrogen rate Nm3/ Tls 28 50 46Power Rate KWh/ Tls 45 42 43Hot Metal rate Ton / Ton 1.027 0.996 1.024LD Gas Recovery Nm3/ Tls 100 113 107Argon Rate Nm3/ TSla 2.00 1.20 1.39Power Rate KWh/ TSla 18 18 19

    Oxygen rate Nm3/ Tls 54 59 59Nitrogen rate Nm3/ Tls 28 45 39Power Rate KWh/ Tls 45 70 69Hot Metal rate Ton / Ton 1.027 1.216 1.235LD Gas Recovery Nm3/ Tls 100 0 0.00Argon Rate Nm3/ TSla 2.00 1.82 2.15Power Rate KWh/ TSla 18 30.6 30.0Heat rate Gcal/ Tp 0.27 0.279 0.368Power Rate KWh/ Tp 90 80 88

    SMS 2 7140 177882

    CCP 2 7049 174687

    HSM-1 227290

    LCP 1875 46786

    9903

    259675

    256235CCP 1

    SMS 1 10238

    10153

    192424B las t Fu rnac e 3 8 27 3

    For Jun e 28, 2010

    ProductionShops

    Energy Management DepartmentDaily Plant Energy MIS

  • 8/6/2019 JSW Steels Limited

    17/18

    17

    33Saving in Everything W e Do Sep-2010

    Energy Report

    On Dat e T ill d at e Parameter Unit Target On Date Ti l l dateHeat rate Gcal/ Tp 0.27 0.863 0.402Pow er Rate KW h/ Tp 90 419 190Heat rate Gcal/ Tp 0.35 0.31 0.372Pow er Rate KW h/ Tp 160 156 212Heat rate Gcal/ Tp 0.4 0.29 0.552Pow er Rate KW h/ Tp 110 109 175Heat rate Gcal/T p 0.298 0.90 0.165

    380 66113 Pow er Rate KW h/ Tp 95 613 129BF gas co nsum pti on Nm 3/h r 165000 10 3,90 8 94 ,6 69Corex Gas Cons Nm3/ Hr 85000 98,513 96,305To tal Generat ion M Wh 100 104 99Corex Gas Cons Nm3/ Hr 25000 19,410 21,454BF gas co nsum pti on Nm 3/H r 175000 1 36 ,3 33 1 20 ,1 11To tal Generat ion M Wh 120 111 107Plant load MWh 360 291 285Speci f ic power KWH/ Tcs 560 406 447

    r on 4 mT PA B F # 3 SMS #1 SMS # 2 HSM-1 CRM Total/ day3.90 0.05 3.80 3.90 0.52 0.39

    Losses (% ) Corex gas 1.65 CO Gas 0.11 BF 1 & 1 6.62 B F 3 Gas 15 .5 6

    Specific Energy Consumption 6.67 (w ith BP norm) On date 6.34 Ti l l Date 6.50

    Energy Management Department

    Electricity

    HSM-2 728 79444

    Daily Plant Energy MISShops

    LP G

    For June 28, 2010

    Remarks: 1)Good Hot metal rate in SMS -1 i.e 0.996 Thm/ Tls. 2) Good Coke rate in Blast Furnace -1,2 & 3. 3) Good CDI rate of Blast Furnace -1 i.e 100 Kg/ Thm.

    14.87W RM & Others JPOCL BOC # 1 & 20.20

    Production

    10 4

    CRM CPL

    CRM CCM

    2796

    W RM 1702

    1.91 0.20

    29025

    CPP-2 111 2976

    BRM 2094 29892

    CPP-1

    34Saving in Everything W e Do Sep-2010

    ENERGY A Major Thrust at JSW

    JSW Steel Since inception has taken care of Energy Efficienttechnologies

    JSW Steel Cares for Energy

    Daily Energy Review during ED(O) & HODs Meeting

    Energy is reviewed during w eekly cost meeting

    SEC is the Key Result Area for Senior and Top Management

    CEO Review s Energy during weekly production performancemeeting

    CEO Reviews Energy during monthly production meeting

    MD Reviews performance of Energy conservation activities,future plans and encourages team for achieving set goals.