JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2...

13
JSI - EN - 05 - 1B - 001 Date Feb 1st, 2005 Total Pages 2 Present Page 1 Written by IL KYU, AN Approved by IN JAE, HWANG Subject O/R operation with Hetronic radio-remote controller(M37, M40) ■ Proper procedure to operate O/R 1. Engage PTO according to the proper procedure. 2. Set the radio-remote transmitter to O/R mode, and release the safety lever of O/R. O/R safety lever locked O/R safety lever released 3. Refer to the operation decal above the control lever. (Pulling the lever O/R extension, Pushing the lever → O/R contraction) O/R control lever (Passenger side) Rear outrigger operation(swing) Front outrigger operation (vertical) Front outrigger operation Rear outrigger operation (vertical) JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea Tel : (+82)43 877-3023 Fax : (+82)43 882-3023 E-MAIL : [email protected] ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Transcript of JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2...

Page 1: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 001 Date Feb 1st, 2005Total Pages 2 P re s e n t P a g e 1Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with Hetronic radio-remote controller(M37, M40)

■ Proper procedure to operate O/R

1. Engage PTO according to the proper procedure.

2. Set the radio-remote transmitter to O/R mode, and release the safety lever of O/R.

O/R safety lever locked O/R safety lever released

3. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Passenger side)

Rear outrigger operation(swing) Front outrigger operation (vertical)

Front outrigger operation Rear outrigger operation (vertical)

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 2: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 001 Date Feb 1st, 2005Total Pages 2 P re s e n t P a g e 2Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with Hetronic radio-remote controller(M37, M40)

4. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Driver side)

Front outrigger operation (vertical) Rear outrigger operation (swing)

Rear outrigger operation (vertical) Front outrigger operation

■ Supporting the pump

1. Set the pump to be horizontal in all directions. If necessary, use timbers

to increase the support area. The timber must be laid under the support

plates so that the load is distributed uniformly over the all timbers.

2. The place where the pump will be set up has to be spacious enough to

extend and swing all outriggers fully.

3. There is a risk of injuries caused by persons becoming trapped as the

outrigger is extracted and retracted.

4. The maximum deviation from the horizontal permitted is 3゜. Otherwisethere is a danger of the truck tipping over.

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 3: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 002 Date Feb 1st, 2005Total Pages 2 P re s e n t P a g e 1Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with Hetronic radio-remote controller(M43, M50, M55)

■ Proper procedure to operate O/R

1. Engage PTO according to the proper procedure.

2. Set the radio-remote transmitter to O/R mode, and release the safety lever of O/R.

O/R safety lever locked O/R safety lever released

3. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Passenger side)

Rear outrigger operation (swing) Front outrigger operation (vertical)

Front outrigger operation (swing) Rear outrigger operation (vertical)

Front outrigger operation (telescopic)

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 4: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 002 Date Feb 1st, 2005Total Pages 2 P re s e n t P a g e 2Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with Hetronic radio-remote controller(M43, M50, M55)

4. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Driver side)

Front outrigger operation (vertical) Rear outrigger operation (swing)

Rear outrigger operation (vertical) Front outrigger operation (swing)

Front outrigger operation (telescopic)

■ Supporting the pump

1. Set the pump to be horizontal in all directions. If necessary, use timbers

to increase the support area. The timber must be laid under the support

plates so that the load is distributed uniformly over the all timbers.

2. The place where the pump will be set up has to be spacious enough to

extend and swing all outriggers fully.

3. There is a risk of injuries caused by persons becoming trapped as the

outrigger is extracted and retracted.

4. The maximum deviation from the horizontal permitted is 3. Otherwise

there is a danger of the truck tipping over.Caution ① : Do not extend the front telescopic O/R before swing the front O/R.

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 5: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 003 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 1Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M37, M40)

■ Proper procedure to operate O/R

1. Engage PTO according to the proper procedure, and turn the HBC

transmitter on.

The yellow light twinkles twice a

second when "ON"

Turn the HBC transm itter on w ith

this sw itch.

2. Set the O/R mode with this switch, pull and down the select switch.

Boom operation mode O/R operation mode

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 6: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 003 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 2Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M37, M40)

3. Release the O/R safety lever.

O/R safety lever locked O/R safety lever released

4. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R contro llever

(Passenger side)

Rear outrigger operation(swing) Front outrigger operation (vertical)

Front outrigger operation Rear outrigger operation (vertical)

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 7: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 003 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 3Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M37, M40)

5. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Driver side)

Front outrigger operation (vertical) Rear outrigger operation (swing)

Rear outrigger operation (vertical) Front outrigger operation

■ Supporting the pump

1. Set the pump to be horizontal in all directions. If necessary, use timbers

to increase the support area. The timber must be laid under the support

plates so that the load is distributed uniformly over the all timbers.

2. The place where the pump will be set up has to be spacious enough to

extend and swing all outriggers fully.

3. There is a risk of injuries caused by persons becoming trapped as the

outrigger is extracted and retracted.

4. The maximum deviation from the horizontal permitted is 3゜. Otherwisethere is a danger of the truck tipping over.

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 8: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 004 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 1Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M43, M50, M55)

■ Proper procedure to operate O/R

1. Engage PTO according to the proper procedure, and turn the HBC

transmitter on.

The yellow light twinkles twice a

second when "ON"

Turn the HBC transm itter on w ith

this sw itch.

2. Set the O/R mode with this switch, pull and down the select switch.

Boom operation mode O/R operation mode

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 9: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 004 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 2Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M43, M50, M55)

3. Release the O/R safety lever.

O/R safety lever locked O/R safety lever released

4. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Passenger side)

Rear outrigger operation (swing) Front outrigger operation (vertical)

Front outrigger operation (swing) Rear outrigger operation (vertical)

Front outrigger operation (telescopic)

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 10: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 004 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 3Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M43, M50, M55)

5. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Driver side)

Front outrigger operation (vertical) Rear outrigger operation (swing)

Rear outrigger operation (vertical) Front outrigger operation (swing)

Front outrigger operation (telescopic)

■ Supporting the pump

1. Set the pump to be horizontal in all directions. If necessary, use timbers

to increase the support area. The timber must be laid under the support

plates so that the load is distributed uniformly over the all timbers.

2. The place where the pump will be set up has to be spacious enough to

extend and swing all outriggers fully.

3. There is a risk of injuries caused by persons becoming trapped as the

outrigger is extracted and retracted.

4. The maximum deviation from the horizontal permitted is 3゜. Otherwisethere is a danger of the truck tipping over.

Caution ① : Do not extend the front telescopic O/R before swing the front O/R.

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 11: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 005 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 1Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M33)

■ Proper procedure to operate O/R

1. Engage PTO according to the proper procedure, and turn the HBC

transmitter on.

The yellow light twinkles twice a

second when "ON"

Turn the HBC transm itter on w ith

this sw itch.

2. Set the O/R mode with this switch, pull and down the select switch.

Boom operation mode O/R operation mode

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 12: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 005 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 2Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M33)

3. Release the O/R safety lever.

O/R safety lever locked O/R safety lever released

4. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Passenger side)

Rear outrigger operation(swing) Front outrigger operation (vertical)

Front outrigger operation Rear outrigger operation (vertical)

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED

Page 13: JSI-EN-05-1B-001=Hetronic OR(M37, M40) remarks... · JSI-EN-05-1B-001 Date Feb1st,2005 TotalPages 2 PresentPage 2 Writtenby ILKYU,AN Approvedby INJAE,HWANG Subject O/RoperationwithHetronicradio-remotecontroller(M37,M40)

JSI - EN - 05 - 1B - 005 Date Feb 1st, 2005Total Pages 3 P re s e n t P a g e 3Written by IL KYU, AN Approved by IN JAE, HWANG

Subject O/R operation with HBC radio-remote controller(M33)

5. Refer to the operation decal above the control lever.

(Pulling the lever O/R extension, Pushing the lever→ → O/R contraction)

O/R controllever

(Driver side)

Front outrigger operation (vertical) Rear outrigger operation (swing)

Rear outrigger operation (vertical) Front outrigger operation

■ Supporting the pump

1. Set the pump to be horizontal in all directions. If necessary, use timbers

to increase the support area. The timber must be laid under the support

plates so that the load is distributed uniformly over the all timbers.

2. The place where the pump will be set up has to be spacious enough to

extend and swing all outriggers fully.

3. There is a risk of injuries caused by persons becoming trapped as the

outrigger is extracted and retracted.

4. The maximum deviation from the horizontal permitted is 3゜. Otherwisethere is a danger of the truck tipping over.

JUNJIN HEAVY INDUSTRY SERVICE DEPARTMENT 428-1 Doosung-ri Maengdong-Myun Eumsung-Gun Chungbuk, Korea

Tel : (+82)43 877-3023   Fax : (+82)43 882-3023 E-MAIL : [email protected]

ⓒ COPYRIGHT 2005 JUNJIN HEAVY INDUSTRY CO., LTD. ALL RIGHTS RESERVED