JOZINI MUNICIPALITY IDP 2019/20 REVIEW
1
JOZINI LOCAL MUNICIPALITY (KZ272)
INTEGRATED DEVELOPMENT PLAN (IDP) 2019/20 REVIEW
4th GENERATION
ADOPTED: 29TH MAY 2019
Prepared by Local Jozini Municipality Circle Street, Bottom Town, Jozini 3969 Tel: 035 572 1292 Fax: 035 572 1266 Website: www.jozini.gov.za
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
2
TABLE OF CONTENTS LIST OF ACRONYMS ........................................................................................................... 7 INTRODUCTION AND BACKGROUND ................................................................................ 8 SECTION A: EXECUTIVE SUMMARY.................................................................................. 9 A.1. WHO ARE WE? ........................................................................................................... 10 A.2. HOW WAS THIS PLAN DEVELOPED? ....................................................................... 13 A.3. KEY CHALLENGES .................................................................................................... 15 A.4. LONG TERM VISION AND GOALS ............................................................................. 16 A.5. WHAT COULD BE EXPECTED FROM US IN THE NEXT 5 YEARS ........................... 17 A.6. HOW WILL OUR PERFORMANCE BE MEASURED?................................................. 19 SECTION B: PLANNING AND DEVELOPMENT PRINCIPLES .......................................... 20 B1. GOVERNMENT POLICIES AND IPERATIVES ............................................................ 21
SUSTAINABLE DEVELOPMENT GOALS (SDG’S) ................................................. 21 14 OUTCOME WITH SPECIAL EMPHASIS ON OUTCOME 9 ................................ 22 NATIONAL DEVELOPMENT PLAN ........................................................................ 24 KWAZULU-NATAL PROVINCIAL AND GROWTH DEVELOPMENT STRATEGY (PGDS) .................................................................................................................... 25 PROVINCIAL GROWTH AND DEVELOPMENT PLAN (PGDP) .............................. 26 DISTRICT GROWTH AND DEVELOPMENT PLAN (DGDP) ................................... 26 STATE OF THE NATION ADDRESS (SONA) ......................................................... 28 STATE OF THE PROVINCE ADDRESS (SOPA) .................................................... 28 BACK TO BASICS................................................................................................... 28
B2. GOVERNMENT PRIORITIES ....................................................................................... 34 THE NEW GROWTH PATH .................................................................................... 34
SECTION C: SITUATIONAL ANALYSIS ............................................................................. 35 C.1. DEMOGRAPHIC CHARACTERISTICS ....................................................................... 36
C.1.1. DEMOGRAPHIC INDICATORS .................................................................... 36 C.1.2. KEY FINDINGS (INCLUDING TRENDS) ...................................................... 38 DENSITY ................................................................................................................. 41
C.2. CROSS CUTTING ISSUES ......................................................................................... 44 C.2.1. REGIONAL CONTEXT ................................................................................. 44 ADMINISTRATIVE ENTITIES ................................................................................. 44 STRUCTURING ELEMENTS .................................................................................. 47 EXISTING NODES AND CORRIDORS ................................................................... 49 MOVEMENT PATTERNS AND ROUTES ................................................................ 54 LAND COVER AND BROAD LAND USES .............................................................. 57 LAND OWNERSHIP ................................................................................................ 60 LAND REFORM ...................................................................................................... 62 ENVIRONMENTAL ANALYSIS ............................................................................... 64 BIODIVERSITY (INCLUDING PROTECTED AREAS .............................................. 64 HYDROLOGY ......................................................................................................... 66 AIR QUALITY .......................................................................................................... 66 CLIMATE CHANGE ................................................................................................. 66 UMKHANYAKUDE DISTRICT-WIDE WASTE DISPOSAL SITE COMPLIANT CHECK .................................................................................................................... 68 RECYCLING, REUSE, RECOVERY AND WASTE MINIMIZATION INITIATIVES ... 70 ILLEGAL DUMPING ................................................................................................ 70 MUNICIPAL ENVIRONMENTAL CAPACITY ANALYSIS......................................... 73 BUILDING CONTROL ............................................................................................. 78 C.2.5. SPATIAL AND ENVIRONMENTAL SWOT ANALYSIS ................................. 79 C.2.6. DISASTER MANAGEMENT .......................................................................... 80 MUNICIPAL INSTITUTIONAL CAPACITY ............................................................... 80 DISASTER RISK ASSESSMENT ............................................................................ 81
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
3
RISK REDUCTION & PREVENTION ...................................................................... 85 RESPONSE & RECOVERY .................................................................................... 86 TRAINING & AWARENESS .................................................................................... 88 FUNDING ARRANGEMENTS ................................................................................. 89 C.2.7. DISASTER MANAGEMENT: SWOT ANALYSIS ........................................... 91
C.3. MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT ............... 92 C.3.1. HUMAN RESOURCE STRATEGY AND PLAN ............................................. 92 ORGANISATIONAL DEVELOPMENT ..................................................................... 93 INSTITUTIONAL ARRANGEMENTS ....................................................................... 93 POWERS AND FUNCTIONS .................................................................................. 95 C.3.2. ORGANISATIONAL STRUCTURE/ ORGANOGRAM ................................... 98 C.3.3. MUNICIPAL INSTITUTIONAL CAPACITY & STATUS OF CRITICAL POSTS .............................................................................................................................. 112 HUMAN RESOURCE DEVELOPMENT ................................................................ 115 C.3.4. EMPLOYMENT EQUITY ............................................................................. 118 AN EMPLOYMENT EQUITY COMMITTEE HAS BEEN ESTABLISHED AND IS RESPONSIBLE FOR THE FOLLOWING: ............................................................. 118 EMPLOYMENT OF DISABLED PEOPLE .............................................................. 118 LABOUR RELATIONS .......................................................................................... 118 C.3.6. ICT GOVERNANCE FRAMEWORK ........................................................... 118 C.3.7. MUNICIPAL TRANSFORMATION & ORGANISATIONAL DEVELOPMENT: SWOT ANALYSIS ................................................................................................. 120
C.4. SERVICE DELIVERY AND INFRASTRUCTURE ANALYSIS .................................... 121 C.4.1. WATER AND SANITATION ........................................................................ 121 UMKHANYAKUDE WATER & SANITATION PROJECT DEVELOPMENT FOR JOZINI ................................................................................................................... 131 C.4.2. SOLID WASTE MANAGEMENT ................................................................. 133 LANDFILL SITES .................................................................................................. 133 C.4.3. TRANSPORTATION INFRASTRUCTURE .................................................. 143 PUBLIC TRANSPORT .......................................................................................... 143 AIR TRANSPORTATION....................................................................................... 146 C.4.4. ENERGY ..................................................................................................... 148 C.4.4.1. .................................................................................................................. 150 ELECTRICITY BACKLOGS ................................................................................... 153 ELECTRICAL NETWORK REFURBISHMENT ...................................................... 154 C.4.5. ACCESS TO COMMUNITY FACILITIES ..................................................... 155 C.4.5.1. CEMETERIES .......................................................................................... 155 C.4.5.2. SPORTS AND RECREATION .................................................................. 155 THUSONG CENTRE ............................................................................................. 155 LIBRARIES ........................................................................................................... 155 C.4.6. HUMAN SETTLEMENTS ............................................................................ 157 C.4.6.2. HOUSING SECTOR PLAN ...................................................................... 157 C.4.6.5. EXISTING AND PLANNED HOUSING PROJECTS ................................. 159 C.7. TELECOMMUNICATIONS ....................................................................... 161 C.7. SERVICE DELIVERY & INFRASTRUCTURE: SWOT ANALYSIS ........... 162
C.5. LOCAL ECONOMIC & SOCIAL DEVELOPMENT ANALYSIS ................................... 163 C.5.1. LOCAL ECONOMIC DEVELOPMENT ANALYSIS ...................................... 163 C.5.1.1. LED STRATEGY ...................................................................................... 163 C.5.1.2. POLICY/ REGULATORY ENVIRONMENT .............................................. 163 C.5.1.3................................................................................................................... 164 C.5.1.4. INTERVENTIONS AND PROGRAMMES ................................................. 168 C.5.1.5. BENEFICIARIES ...................................................................................... 169 C.5.1.7. STRATEGIC PROGRAMMES RESPONSIVE TO COMPARATIVE AND COMPETITIVE ADVANTAGES ............................................................................. 203
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
4
C.5.1.8. JOB CREATION....................................................................................... 203 C.5.1.9. EPWP INDICATORS ............................................................................... 203 C.5.1.11. CAPACITY OF THE MUNICIPALITY ..................................................... 203 C.5.1.12. MOBILISATION OF PRIVATE SECTOR RESOURCES ......................... 203 LOCAL ECONOMIC DEVELOPMENT: SWOT ANALYSIS .................................... 203 C.5.2. SOCIAL DEVELOPMENT ANALYSIS ......................................................... 205 C.5.2.1. POVERTY ERADICATION MASTER PLAN (PEMP) ............................... 205 C.5.2.2. HEALTH ................................................................................................... 205 C.5.2.3. EDUCATION ............................................................................................ 208 C.5.2.4. COMMUNITY DEVELOPMENT (VULNERABLE GROUPS) .................... 212 C.5.2.5. SPECIAL PROGRAMMES AND PLANS .................................................. 215 C.5.2.6. DISABILITY SUMMITS ............................................................................ 215 C.5.2.7. SAFETY & SECURITY AND NATIONAL BUILDING & SOCIAL COHESION .............................................................................................................................. 215 C.5.2.8. MUNICIPAL SAFETY PLAN..................................................................... 215 C.5.2.9. SOCIAL DEVELOPMENT SWOT ANALYSIS ......................................... 215
C.6. MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT ....................................... 216 C.6.1. CAPITAL FUNDING & EXPENDITURE TO ADDRESS SERVICE DELIVERY .............................................................................................................................. 216 C.6.2. SOCIAL AND ECONOMIC REDRESS VIA INDIGENT MANAGEMENT ..... 219 FREE BASIC SERVICES ...................................................................................... 219 C.6.3. REVENUE RAISING STRATEGIES ............................................................ 220 C.6.4. DEBT MANAGEMENT ................................................................................ 221 C.6.5. FINANCIAL MANAGEMENT ....................................................................... 222 C.6.5.1. SCM ......................................................................................................... 222 TECHNICAL SERVICES ....................................................................................... 222 C.6.5.2. ASSETS AND INFRASTRUCTURE ......................................................... 223 C.6.5.3. REPAIRS AND MAINTENANCE .............................................................. 223
PLANNED REPAIRS & MAINTENANCE .......................................................................... 223 C.6.5.4. FINANCIAL RATIOS ................................................................................ 224 C.6.6. LOANS/ BORROWINGS AND GRANT DEPENDENCY ............................. 225 C.6.7. EXPENDITURE MANAGEMENT ................................................................ 225 C.6.8. AUDITOR GENERAL’S OPINION ............................................................... 227 AUDIT OPINIONS FOR THE 3 PREVIOUS YEARS .............................................. 260 C.6.9. MUNICIPAL FINANCIAL VIABILITY SWOT ANAYSIS ................................ 261
C.7. GOOD GOVERNANCE AND PUBLIC PARTICIPATION ANALYSIS ......................... 262 C.7.1. BATHO PELE ............................................................................................. 262 BATHO PELE POLICY AND PROCEDURE MANUAL .......................................... 262 SERVICE DELIVERY IMPROVEMENT PLAN (SDIP) ........................................... 263 C.7.2. OPERATION SUKUMA SAKHE (OSS) ....................................................... 263 C.7.3. IGR ............................................................................................................. 264 C.7.4. WARD COMMITTEES ................................................................................ 265 C.7.5. TRADITIONAL LEADERSHIP ..................................................................... 265 C.7.6. IDP/ BUDGET STEERING COMMITTEE .................................................... 266 C.7.7. MANAGEMENT STRUCTURES ................................................................. 266 C.7.8. COMMUNICATION PLAN/ STRATEGY ...................................................... 266 C.7.9. PERFORMANCE AND AUDIT COMMITTEE .............................................. 267 C.7.10. RISK MANAGEMENT ............................................................................... 268 C.7.10.1. RISK MANAGEMENT COMMITTEE ...................................................... 268 C.7.10.2. RISK REGISTER & ANTI-FRAUD AND ANTI-CORRUPTION STRATEGY .............................................................................................................................. 268 C.7.11. MUNICIPAL POLICIES ............................................................................. 268 C.7.12. MUNICIPAL BYLAWS IN TERMS OF SCHEDULE 4B AND 5B ................ 270 C.7.13. BID COMMITTEES ................................................................................... 270
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
5
C.7.14. MUNICIPAL PUBLIC ACCOUNTS COMMITTEE (MPAC) ........................ 271 C.7.15. PORTFOLIO COMITTEES ........................................................................ 272 PUBLIC PARTICIPATION ANALYSIS ................................................................... 277 C.7.16. GOOD GOVERNANCE & PUBLIC PARTICIPATION: SWOT ANALYSIS . 278 C.7.18. WARD BASED PLANS ............................................................................. 279 C.7.19. LAND USE MANAGEMENT ...................................................................... 279
C.8. KEY CHALLENGES .................................................................................................. 280 C.9. COMBINED SWOT ANALYSIS ................................................................................. 281 SECTION D: MUNICIPAL VISION, GOALS AND OBJECTIVES ....................................... 283 D.1. LONG TERM VISION ................................................................................................ 284
MUNICIPAL VISION .............................................................................................. 284 MUNICIPAL MISSION ........................................................................................... 284 VALUES ................................................................................................................ 284 4.1.3. STRATEGIES, GOALS AND OBJECTIVES ................................................ 285
D.2. GOALS, OBJECTIVES AND STRATEGIES .............................................................. 285 SECTION E: STRATEGIC MAPPING ............................................................................... 294
E.1.1. ENVIRONMENTALLY SENSITIVE AREAS ................................................. 295 E.1.2. DESIRED SPATIAL OUTCOMES ............................................................... 295 INTRODUCTION ................................................................................................... 295 PURPOSE OF THE SDF ....................................................................................... 295 REGIONAL CONTEXT .......................................................................................... 296 ADMINISTRATIVE ENTITIES ............................................................................... 296 EXISTING NODES AND CORRIDORS ................................................................. 300 BROAD LAND USES ............................................................................................ 301 EXISTING SPATIAL STRUCTURES OF JOZINI ................................................... 301 AREAS OF ENVIRONMENTAL INTEREST .......................................................... 303 OPPORTUNITY AREAS........................................................................................ 303 INTERVENTION AREAS ....................................................................................... 303 THE MAKHATHINI INTEGRATED MASTER DEVELOPMENT PLAN ................... 304 TOWN PLANNING SCHEME ................................................................................ 307 PRIVATE DEVELOPMENTS ................................................................................. 313
E.2. IMPLEMENTATION PLAN ......................................................................................... 314 PROJECTS ........................................................................................................... 363
SECTION F: FINANCIAL PLAN ........................................................................................ 389 F.1. PURPOSE ................................................................................................................. 390
BACKGROUND ..................................................................................................... 390 LINKING THE IDP AND THE BUDGET ................................................................. 391
F.2. 3 YEAR MUNICIPAL BUDGET ................................................................................. 392 OPERATIONS AND MAINTENANCE COSTS OF MUNICIPAL FIXED ASSETS .............. 393 PLANNED REPAIRS & MAINTENANCE .......................................................................... 393 F.3. SOUND FINANCIAL STRATEGIES (REVENUE ENHANCEMENT STRATEGIES & EXPENDITURE MANAGEMENT PLAN) ........................................................................... 394 F.4. PRIOR 3-YEAR OPEX ............................................................................................... 394 F.5. MTEF ALLOCATIONS ............................................................................................... 395 SECTION G: ANNUAL OPERATIONAL PLAN (SDBIP) .................................................... 399 7.1 ANNUAL OPERATIONAL PLAN (SDBIP) ................................................................... 400 SECTION H: ORGANISATIONAL & INDIVIDUAL PERFORMANCE MANAGEMENT SYSTEM ........................................................................................................................... 401 H.1. INTRODUCTION AND BACKGROUND .................................................................... 402
PERFOMANCE MANAGEMENT POLICY STATEMENT....................................... 402 ORGANISATIONAL PERFOMANCE MANAGEMENT SYSTEM ........................... 402
H.4. BACK TO BASICS ..................................................................................................... 404 8.1.4 ANNUAL PERFOMANCE REPORT ............................................................. 404
SECTION I: ANNEXURES ................................................................................................ 405
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
6
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
7
LIST OF ACRONYMS
B2B Back to Basics CBO Community Based Organisation CIF Capital Investment Framework CIP Comprehensive Infrastructure Plan COGTA Co-operative Governance and Traditional Affairs DMP Disaster Management Plan EAP Employee Assistance Programme EIA Environmental Impact Assessment EMF Environmental Management Framework EPWP Expanded Public Works Programme GDP Gross Domestic Product GIS Geographical Information Systems HDA Housing Development Agency HSP Housing Sector Plan HIV/AIDS Human Immunodeficiency Virus/Acquired Immunodeficiency Syndrome HR Human Resources ICT Information Communication Technology IGR Intergovernmental Relations IDP Integrated Development Plan IWMP Integrated Waste Management Plan JMPT Joint Municipal Planning Tribunal KPA Key Performance Area KPI Key Performance Indicator LED Local Economic Development LUMS Land Use Management System MFMA Municipal Finance Management Act MIG Municipal Infrastructure Grant MPAC Municipal Public Accounts Committee MSA Municipal Systems Act MTAS Municipal Turnaround Strategy MTREF Medium-Term Revenue and Expenditure Framework MTSF Medium-Term Strategic Framework NDP National Development Plan NGO Non-governmental organisation OSS Operation Sukuma Sakhe OPMS Organisational Performance Management System PMS Performance Management Systems RDP Reconstruction and Development Programme SCM Supply Chain Management SCOA Standard Chart of Accounts SDBIP Service Delivery Budget Implementation Plan SDF Spatial Development Framework SDIP Service Delivery Improvement Plan SEA Strategic Environmental Assessment SMME Small, Medium and Micro Enterprise SONA State of the Nation Address SOPA State of the Province Address SPLUMA Spatial Planning and Land Use Management Act WBP Ward Based Plans
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
8
INTRODUCTION AND BACKGROUND
This document presents the second review of the fourth generation Integrated Development Plan for Jozini Municipality i.e. 2019/20. It was prepared in fulfillment of the requirements of Chapter 5 of the Local Government Municipal Systems Act, 32 of 2000. In terms of section 34 of the aforementioned Act, all South African Municipalities must compile the IDP for five years and review it on an annual basis taking into account:
• New information; ▪ Comments from consultation process (Stakeholders); ▪ IDP/Budget alignment between Local and District Municipality; ▪ Alignment with provincial and national priorities and Plans; and ▪ Alignment of IDP and sector plans and that have been updated or
developed as part of the process.
This 2019/20 IDP Review is the outcome of a 9 months planning process and the plan is the key tool that will guide and inform all planning, budgeting, management and decision-making processes aimed at benefitting Jozini communities and stakeholders within the municipal area. In line with Section 152 and 153 of the South African Constitution, if the municipality is able to fulfill this local developmental role effectively, it would be able to do the following:
• Provision of equitable essential basic services;
• Creation of jobs;
• Promotion of economic development and growth
• Promoting democracy; and
• Accountability and Eradication of poverty Having undertaken all the necessary participatory processes with various and relevant stakeholders, we believe and regard this IDP as a credible plan and will enable the municipality to manage the process of fulfilling its developmental responsibilities better, faster and effectively. The executive summary outlines the background to the area, the process followed in preparing the IDP that is outlined in IDP/Budget Process Plan. Notwithstanding the improved understanding of the concept and the purposes of the IDP by a majority of stakeholders, there are still challenges in terms of aligning the plans and programmes of the three spheres of government and this remains a critical concern to Jozini Local Municipality. That as it may, in my capacity as the Mayor of Jozini Local Municipality I encourage all strategic partners and stakeholders to remain committed to the realization of our vision aimed at providing sustainable services to our people faster, better and at the lowest cost possible. We believe that the IDP alignment with the budget will assist the municipality achieve just that. I thank You!!!
HIS WORSHIP MAYOR, CLLR. DP MABIKA - JOZINI LOCAL MUNICIPALITY
His Worship the Mayor
Cllr. DP Mabika
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
9
SECTION A: EXECUTIVE SUMMARY
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
10
A.1. WHO ARE WE?
Jozini Local Municipality is one of the four municipalities within uMkhanyakude District Municipality. It is located in the northern region of KwaZulu–Natal, and is bordered by Mozambique to the north, Swaziland to the west, uMhlabuyalingana to the east, Big Five/ Hlabisa to the south and Nongoma and Uphongolo to the west. It consists of 6 semi formalized towns viz. Jozini, Mkhuze, Ingwavuma, UBombo, Bhambanana and Ndumo. The remaining parts of the municipality are characterized as being rural in nature. Jozini Municipality covers 32% (3057 Square Kilometres) of the total area of 13859 Square Kilometres of uMkhanyakude District Municipality. The primary investment points are Mkhuze and Jozini; secondary investment points have been identified at Ingwavuma, UBombo, Ndumo and Bhambanana and tertiary investment points have been identified at Ophansi, Manyiseni, Makwakwa, Emabhanoyini, Makhonyeni. These investment points are seen as the existing and future growth points in the municipal area and serve as the basis for the clustering of activities and services such as schools, shops, community halls, etc. The municipal area is well served by major movement routes, inter-alia national link (N2), R22 that links Jozini to Manguzi in the uMhlabuyalingana Municipality and the 522-1 which extends from uBombo in the south to Ingwavuma in the north. Jozini local municipality is divided into twenty wards. The large area of Jozini falls under the ownership of Ingonyama Trust and some areas are privately owned by individuals whilst a small portion is owned by the State. The current state of land ownership makes it difficult for the municipality to control development in areas under its jurisdiction.
Basic facts Basic figures
Stats SA 2001
Community Survey 2007
Stats SA 2011
Community Survey 2016
Growth
Total population 184 052 207 722 186 502 198 215 5.9%
Total number of households 33 534 38 530 38 849 44 584 12.9%
uMkhanyakude District Municipality
573 341 614 046 625 846 689 090 9.2%
Age profile 0-14 15-34 35-64 65+
76 945 68 190 33 939 7428
82 344 43 161 32 806 6824
Age profile 0-14 15-34 35-64 65+
76 945 68 190 33 939 7428
82 344 43 161 32 806 6824
% Household with no income 49% 47% 43%
Investment points
Primary nodes Secondary nodes Tertiary nodes
Mkhuze Jozini
Ingwavuma Ubombo Bhambanana Ndumo
Ophansi Manyiseni Makwakwa Emabhanoyini
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
11
Map showing all 20 wards
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
12
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
13
A.2. HOW WAS THIS PLAN DEVELOPED?
The IDP adopts an outcome based approach in line with the national government priorities and the associated 12 outcomes. The Government outcome 9 (nine) commits the local government to develop local government system which is efficient, effective, responsive and accountable. In line with Outcome 9, Jozini Municipality IDP responds directly to issues facing the area and its communities, and rendering local government services efficiently and effectively. However, the municipality will also contribute directly and indirectly to the attainment of other outcomes, particularly those dealing with economic development, infrastructure development, rural development and environmental management. Therefore, alignment with the relevant sector frameworks and programmes across the spheres of government is critical. In preparing this IDP, the following was considered:
The NDP Vision 2030 The IDP Framework Guide from COGTA Stats SA Community Survey results 2016 Municipal boundaries as per the Municipal Demarcation Board Refinement of the Municipality’s Strategic Framework; Back to Basics Programme Ward based plans Public Participation Comments; MEC Letter, Assessment comments on the Final IDP Review 2018/19; Self-Assessment; Different Stakeholder Comments and Requirements Legislative Compliance in terms of Chapter, 4, 5 and 6 of MSA Act No 32 of 2000 The 2019/2020 Strategic Planning Session Outcomes Report – January 2019 The State of the Nation and Province Address of 2019 Etc…
The IDP methodology phases
• The Preparation Phase- During this phase, the municipality prepared a Process Plan which illustrated how the IDP process would be managed.
• The Analysis Phase- Analysis of existing information was also done during this phase.
• The Strategies- During this phase, the municipality had a Strategic Planning session where the vision, mission and values of the municipality were done. The municipality also prepared strategic objectives.
• Projects Phase- This phase dealt with the identification and design of specific projects for implementation. All the critical problems that were identified in during the analysis phase were addressed by doing the prioritization.
• Integration Phase- This phase aligned the projects with municipal objectives and strategies.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
14
Below are the schedules for the public participation meetings held: 1st round of Public Participation Meetings
CLUSTER WARD VENUE DATE TIME
1 & 2 1, 2, 3, 4, 5, 6, 7, 8, 19 & 20
Biva Community Hall
05 November 2018 10:00am
3 & 4 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 & 19
Ezulwini Community Hall
06 November 2018 10:00am
2nd round of IDP and Budget Roadshows Meetings:
CLUSTER WARD VENUE DATE TIME
1 & 2 1, 2, 3, 4, 5, 6, 7, 8, 19 & 20
Mhlekazi Community Hall
16 April 2019 10:00am
3 & 4 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 & 19
Bhambanana Community Hall
17 April 2019 10:00am
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
15
A.3. KEY ORGANIZATIONAL CHALLENGES
KPA 01: INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION
Inadequate Implementation of the Staff Attraction & Retention Policy Prolonged Litigation Cases Lack of a Municipal-Wide Gender Equality Policy Framework Inadequate Implementation of Batho Pele
KPA 02: BASIC SERVICE DELIVERY AND INFRASTRUCTURAL DEVELOPMENT
Absence & Ageing Basic Infrastructure Lack of universal access to water and sanitation services Lack of universal access to Refuse removal Services Lack of Electrification License Backlog of housing development Lack of a Municipal-Wide Infrastructure Plan Lack of a Municipal-Wide Electrification Plan Lack of a Municipal-Wide Integrated Transport Plan (ITP) Lack of a Municipal-Disaster & Fire Rescue Services Centre
KPA 03: SOCIO – ECONOMIC DEVELOPMENT
Inability to attract investors to the area (mostly due to the infrastructure backlog) High level of unemployment Lack of a Municipal-Wide SMME Plan Inadequate implementation of LED Strategy
KPA 04 GOOD GOVERNANCE AND PUBLIC PARTICIPATION
Lack of support from sector departments in planning processes Delays in gazetting of various Bylaws Unresolved and unimplemented Forensic Reports Recommendations
KPA 05: FINANCIAL VIABLITY AND MANAGEMENT
Low equitable share High grant dependency ratio Number of Indigent beneficiaries too high Loss of assets. Inadequate Revenue Enhancement Focus
KPA 06: SPATIAL PLANNING AND ENVIRONMENTAL MANAGEMENT
Absence of a legal waste disposal site Land tenure- 65 Percent of land is registered under the Ingonyama Trust Board. The
remaining percentage of land is state and privately owned Illegal developments and mushrooming of shops and small businesses Challenge in terms of issuing title deeds on low cost housing Absence of a Single Wall to Wall Scheme Congestion in Jozini Town
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
16
A.4. LONG TERM VISION AND GOALS
The vision of the municipality is as follows:
A MUNICIPALITY WITH SUSTAINABLE SERVICES FOR ALL, THRIVING SOCIO- ECONOMIC DEVELOPMENT AND GOOD GOVERNANCE.
The mission of the municipality is as follows:
TO STRENGTHEN DEMOCRACY, PUBLIC PARTICIPATION AND STAKEHOLDER MANAGEMENT
TO MANAGE FINANCIAL RESOURCES OF THE MUNICIPALITY EFFICIENTLY,
EFFECTIVELY AND ECONOMICALLY
TO GROW THE ECONOMY OF THE BEDROCK OF AGRICULTURE AND TOURISM BY CREATING A CONDUCIVE ENVIRONMENT FOR INVESTMENT
Values:
INTEGRITY COMMITMENT
PROFESSIONALISM PATRIOTISM
The municipality’s goals are desired end results that Jozini municipality would like to see itself in short term and long-term period. There is synergy with the Goals as contained in the Spatial Development Framework, National Development Plan, Provincial Growth Development Plan/ Strategy as well as District Growth Development Plan. It must however be noted that the municipality is financially constrained to fully align with these long –term plans. The municipality will strive to realize the following priorities during the 2019/20 financial year and beyond:
1. Economic Growth
1.1. Prioritize agriculture production and transformation
1.2. Access to land
1.3. Sector department support
2. Social-Economic Development
2.1. Prioritize youth development and the fight against social ills
2.2. Job creation
2.3. Small business support in procurement
2.4. Skills development
3 Organizational Efficiency
3.1. Improve organizational Efficiency
3.2. Entrench a positive organizational culture
3.3. Improve skills of employees
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
17
A.5. WHAT COULD BE EXPECTED FROM US IN THE NEXT 5 YEARS
Our approach will balance the provision of basic services, with the need to create economic opportunities for Local Economic Development. This will be done through the following strategic priority areas:
No Key Performance Areas Priorities
1 Municipal Institutional Development and Transformation
1.1 Procedures and Controls
1.1.1. Introduce & strengthen procedures and controls 1.1.2. Policies introduced to strengthen fleet, travel & human resource management 1.2 Labour Relations 1.2.1. Ensure Labour Relations Forum functionality
1.2.2. Ensure LLF resolutions are implemented
1.2.3. Ensure LLF meetings sit regularly 1.2.4. Implement performance Management 1.3 Efficiency improvements
1.3.1. Introduce innovations to improve efficiency 1.3.2. Introduce paperless procedures
1.3.3. Introduce off-site document management
2 Basic Service Delivery and Infrastructure Development
2.1 Projects and Asset management 2.1.1. Manage existing projects and register new projects 2.1.2. Facilitate Asset Management 2.1.3. Facilitate regularization and expansion of EPWP
2.1.4. Ensure that grant funding is fully utilized
3 Socio and Economic Development
3.1 Disaster management 3.1.1. Introduce a framework for responding to disasters
3.1.2. Ensure equipment is available to respond to disasters
3.2 Waste management 3.2.1. Ensure Labour Relations Forum functionality
3.2.2. Register recycling projects
3.2.3. Implement waste Buy-Back Centers
3.3 Youth development 3.3.1. Implement youth development initiatives 3.3.2. Promote sport and small business initiatives involving the youth
3.4 Economic Development 3.4.1. Develop priority sectors
3.4.2. Promote external investment into Agriculture and Tourism
4 Municipal Financial Viability and Management
4.1 Credit Control 4.1.1. Ensure strong credit control 4.1.2. Target top businesses that owe the municipality
4.2 Internal controls
4.2.1. Ensure a functional audit committee and internal audit 4.2.2. Recruit skilled individuals
4.2.3. Councillors to collaborate with internal audit 4.2.4. Build internal capacity to reduce reliance of consultants
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
18
5 Good Governance and Public Participation
5.1 Intergovernmental relations
5.1.1. Direct IGR to unlock revenue collection
5.1.2. Use sector departments to reduce government debt 5.2 Traditional leadership buy-in
5.2.1. Prioritize youth development and the fight against social ills 5.2.2. Job creation 5.2.3. Small business support in procurement 5.2.4. Skills development 5.3 Organizational values
5.3.1. Improve organizational Efficiency
5.3.2. Entrench a positive organizational culture
5.3.3. Improve skills of employees
6 Spatial Planning and Environmental Management
5.1 Land-use management 5.1.1. Introduce wall2wall schemes
5.1.2. Ensure municipal GIS capability
5.1.3. Ensure tribunal functionality
5.1.4. Develop & enforce bylaws & building regulations
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
19
A.6. HOW WILL OUR PERFORMANCE BE MEASURED?
To measure and monitor our progress, a Performance Management Framework and Policy was developed and it is reviewed regularly (annually). Key performance indicators have been refined in support of the municipality’s development priorities and objectives aligned with the organizational structure in line with the Integrated Development Plan framework to ensure consistency in measuring and reporting on long terms strategies and projects. Measurable performance targets with regard to each of these development priorities and objectives were established and are reflected on the Organisational Performance Management Scorecard attached to the Integrated Development Plan and is reviewed annually together with the Integrated Development Plan review. A process to ensure regular reporting is in place and gets reported quarterly to the Council via the Performance Audit Committee. Individual performance agreements and performance plans for the Municipal Manager and Heads of Departments are prepared annually in line with provisions prescribed in the Performance Regulations (Notice 805, published on 1 August 2006 in the official gazette). These agreements are fully implemented and aligned with the Service Delivery and Budget Implementation Plan as required in terms of the Municipal Finance Management Act 56 of 2003. Performance Evaluation Panels have been established for the assessment of performance of the Municipal Manager as well as Managers directly accountable to the Municipal Manager and performance assessment is taking place on a quarterly basis to ensure that annual departmental targets will be achieved. Jozini municipality has also introduced performance management for Managers reporting to HOD’s/ Section 56 Managers.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
20
SECTION B: PLANNING AND DEVELOPMENT
PRINCIPLES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
21
B1. GOVERNMENT POLICIES AND IPERATIVES
SUSTAINABLE DEVELOPMENT GOALS (SDG’s)
The Sustainable Development Goals (SDGs), otherwise known as the Global Goals, are a universal call to action to end poverty, protect the planet and ensure that all people enjoy peace and prosperity. These 17 Goals build on the successes of the Millennium Development Goals, while including new areas such as climate change, economic inequality, innovation, sustainable consumption, peace and justice, among other priorities. The goals are interconnected – often the key to success on one will involve tackling issues more commonly associated with another. The SDGs work in the spirit of partnership and pragmatism to make the right choices now to improve life, in a sustainable way, for future generations. They provide clear guidelines and targets for all countries to adopt in accordance with their own priorities and the environmental challenges of the world at large. The SDGs are an inclusive agenda. They tackle the root causes of poverty and unite us together to make a positive change for both people and planet. “Supporting the 2030 Agenda is a top priority for UNDP,” said UNDP Administrator Helen Clark. “The SDGs provide us with a common plan and agenda to tackle some of the pressing challenges facing our world such as poverty, climate change and conflict. UNDP has the experience and expertise to drive progress and help support countries on the path to sustainable development. Table: Alignment with SDG’s
SDG Goal Municipal Response
No poverty The municipality has a poverty reduction programme where each ward has R1000000.00 to address this
Zero hunger The municipality has a poverty reduction programme where each ward has R1000000.00 to address this
Good health and well-being
Quality education
Gender equality The is an Employment Equity plan which is reviewed and implemented annually
Clean water and Sanitation
Affordable and clean energy
Work and economic growth Job creation through EPWP and LED projects
Industry, innovation and Infrastructure
Reduced inequalities
Sustainable cities and communities SDF review and introduction of wall to wall schemes.
Responsible consumption and production
Climate Action
Life below water
Life on Land
Peace, justice and strong institutions Good governance
Partnerships for the goals
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
22
14 OUTCOME WITH SPECIAL EMPHASIS ON OUTCOME 9
Government has agreed on 12 outcomes as a key focus of work. Each outcome has a limited number of measurable outputs with targets. Each output is linked to a set of activities that will help achieve the targets and contribute to the outcome. Each of the 12 outcomes has a delivery agreement which in most cases involves all spheres of government and a range of partners outside government. Combined, these agreements reflect government’s delivery and implementation plans for its foremost priorities. Each outcome has been broken into various outputs that stipulate activities to be undertaken towards the achievement of a particular outcome. The 12 National Outcome Delivery Agreements are as follows: Outcome 1: Improved quality of basic education; Outcome 2: A long and healthy life for all South Africans Outcome 3: All South Africans should be and feel safe; there should be decent employment through inclusive growth Outcome 4: Decent Employment through Inclusive Economic Growth; Outcome 5: An efficient, competitive and responsive economic infrastructure network; Outcome 6: There should be vibrant, equitable, sustainable rural communities with food security for all; Outcome 7: Vibrant, equitable and sustainable rural communities with food security for all. Outcome 8: Sustainable Human Settlements and Improved Quality of Household Life Outcome 9: A responsive, accountable, effective and efficient Local Government System. Outcome 10: environmental assets and natural resources that are valued, protected and continually enhanced Outcome 11: Create a better South Africa and contribute to a better and safer Africa and World; and Outcome 12: An efficient, effective and development oriented Public Service and An empowered, fair and inclusive citizenship. The outcome as the Department of Co-operative Governance and Traditional Affairs (National and Provincial departments) and all municipalities is Outcome 9: A responsive, accountable, effective and efficient local government system. Notwithstanding; all National Outcome Delivery Agreements talk to local government, due to an understanding that local government is where the tyre hits the road on service delivery. It is therefore crucial that there should be thorough coordination and alignment between local municipalities and sector departments towards the realization and attainment of the targeted results. Outcome 9 has been broken down into seven (7) outputs: Output 1: Implement a differentiated approach to municipal financing, planning and support Output 2: Improving access to basic services. Output 3: Implementation of the Community Work Programme Output 4: Actions supportive of the human settlement outcome Output 5: Deepen democracy through a refined Ward Committee model Output 6: Administrative and financial capability Output 7: Single window of coordination The effective implementation of the service delivery agreement will assist in achieving the following imperatives:
Creating a radical paradigm shift in the management of the public service by aligning service delivery with the values and needs of the public;
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
23
Ensuring a focus on customer value proposition which should entail evaluation of service delivery through the eyes of the customer;
Providing strong feedback mechanisms on quality and timeliness of service delivery. Creating of strong public/private partnerships through involvement of the private sector
and civil society in the broad process of policy determination and implementation, Unprecedented improvement of the image of government in the eyes of the public by
enthusiastically embracing and supporting the process and culture of performance.
Through the service delivery agreement; COGTA and municipalities committed to the following:
The extension of basic services which include water, sanitation, electricity and waste Management;
Creation of job opportunities through the Community Works Programme; Transformation of administrative and financial systems in the municipalities which
includes Supply Chain Management and the integration and streamlining all of our internal software systems to ensure uniformity, linkages and value for money;
The filling of six critical senior municipal posts in various municipalities namely Municipal Manager, Chief Financial Officer, Town Engineer, Town Planner, Human Resources Manager and Communications manager as the basic minimum for every Municipality;
That all municipalities in the province will achieve clean audits by 2014; Building municipal capacity to enable municipalities to collect 90% of their revenues; Strengthening the organizational performance management systems for improved
service delivery and accountability to the communities; Improving our interaction with the institutions of traditional leaders and integrating the
ward-based system of planning and governance with the programme of traditional councils, where they exist.
These talks to the five (5) National Key Performance Areas (KPAs) and should form basis for every Municipality’s strategic objectives. Through the service delivery agreement; the Honourable Mayors of all municipalities committed themselves to the following:
That they will play their role as outlined in the Municipal Finance Management Act by monitoring the prudent management and utilization of their municipal finances;
That they will monitor the execution of their municipal Service Delivery and Budget Implementation Plans (SDBIPs) for improved and accelerated service delivery;
That they will take personal responsibility and accountability for non-delivery to communities;
That they will ensure every rand spent in their municipalities does what it is earmarked for;
That they will advocate and actively work towards corrupt-free municipalities; That they will lead by example in their various communities by adhering to ethical
standards and professional conduct in their public and private lives; That they will render unwavering support to the effective functionality of their newly
established Municipal Public Accounts Committees and Audit Committees to ensure that corruption, fraud and mismanagement is uprooted;
That, working with esteemed traditional leaders; they will work tirelessly in restoring the confidence of the people in the system of local government.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
24
NATIONAL DEVELOPMENT PLAN
The National Development Plan is a plan for the country to eliminate poverty and reduce inequality by 2030 through uniting South Africans, unleashing the energies of its citizens, growing an inclusive economy, building capabilities, enhancing the capability of the state and leaders working together to solve complex problems. The high level on the National Development Plan focuses on issues of eliminating poverty and reducing inequality and further unpacks milestones as follows:
Increase employment from 13 million in 2010 to 24 million in 2030. Raise per capita income from R50 000 in 2010 to R120 000 by 2030. Increase the share of national income of the bottom 40 percent from 6 percent to 10
percent. Establish a competitive base of infrastructure, human resources and regulatory
frameworks. Ensure that skilled, technical, professional and managerial posts better reflect the
country's racial, gender and disability makeup. Broaden ownership of assets to historically disadvantaged groups.
Further to the National Development Plan the KwaZulu – Natal Provincial and Growth Development Strategy make emphasis on the issue at a Provincial Level. The sustainable development is a development which takes cognizance of issues at a National level, down to a Provincial and It taken further in municipality through IDPs. Issues on the National Development Plan are addressed on all KPAs in the IDP. Table: Alignment with the NDP
NDP Focus Municipal Response
Increase employment from 13 million in 2010 to 24 million in 2030.
• Job creation through EPWP and LED projects
Raise per capita income from R50 000 in 2010 to R120 000 by 2030.
• Job creation through EPWP and LED projects
Increase the share of national income of the bottom 40 percent from 6 percent to 10 percent.
• National
Establish a competitive base of infrastructure, human resources and regulatory frameworks.
•
Ensure that skilled, technical, professional and managerial posts better reflect the country's racial, gender and disability makeup.
• There is an Employment Equity plan which is reviewed and implemented annually
Broaden ownership of assets to historically disadvantaged groups
•
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
25
KWAZULU-NATAL PROVINCIAL AND GROWTH DEVELOPMENT STRATEGY (PGDS)
In an effort to align with the PGDS goals, Jozini seeks to undertake the following actions: Table: Alignment with PGDS
PGDS Goal Municipal Response
Inclusive Economic growth
• Implementing EPWP through Capital Projects
• Developing the Agricultural Sector
• Promoting SMME’s
• Infrastructure investment and development
• Poverty alleviation projects
Human Resources Development
• Review and implementation of the WSP
• Skills Development
Human and Community Development
• Constructing and maintaining access roads
• Continuously supporting the Sukuma Sakhe Programme (War against poverty)
• Participating in the local Community Policing Forum
• Budgeting for/ implementing the poverty alleviation projects
Environmental Sustainability
• Promoting solar powered electricity
• Installing solar geysers in households
• Helping the households in planting trees
Governance and Policy
• Annual Policy reviews
• Reviewing the Anti-Fraud and Corruption Strategy
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
26
• MPAC
• Implementing the WSP
Spatial Equity • Reviewing the SDF
• Developing the Land Use Management Schemes
PROVINCIAL GROWTH AND DEVELOPMENT PLAN (PGDP)
The PGDS identifies seven strategic goals and thirty strategic objectives that will drive the Province towards its 2030 vision. The cabinet then identified a need to further prepare an implementation in the form of PGDP.
DISTRICT GROWTH AND DEVELOPMENT PLAN (DGDP)
The District Growth and Development Plan is meant to play a key role in the integration and alignment of the intentions of the NDP at national level and PGDP at provincial level on the one hand, with the activities of local government operating at the coalface of implementation and interaction with constituent communities on the other. The aim of the DGDP is therefore to translate the Provincial Growth and Development Plan into a detailed implementation plan at a district level, inclusive of clearly defined targets and responsibilities thus enabling the province to measure its progress in achieving the accepted growth and development goals. In addition to the more detailed focus on the interventions identified by the PGDS-PGDP, the DGDP is expected to propose specific milestones that will have to be achieved per priority sectors. This will be refined in a collaborative approach with all the relevant stakeholders to ensure ownership of targets that will be set for specific time horizons. The KwaZulu-Natal Provincial Planning Commission facilitates and supports the lead departments to develop detailed trajectories to ensure that the roadmap is clear on what is required to achieve the 2030 Vision for KwaZulu-Natal. The current DGDP is due for a review as it was developed in 2014. UMkhanyakude District Municipality developed a DGDP through the assistance by KZN COGTA and the DGDP is zooming in into the strategic direction up to year 2035 which focusses on linking the IDP with the National and Provincial planning imperatives; The Alignment of the PGDS and UMkhanyakude DGDP can best be summarized as follows:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
27
PGDS Strategic Goals
DGDP Strategic Goals IDP KPAs
Inst. Trans. and Dev.
Basic Service Delivery
LED Financial Viability
Good Governance
Cross Cutting
1. Inclusive Econ Growth
Expanded District Economic output and increased quantity and quality of employment opportunities
X X
2. Human Resource Development
2. Enhanced quality of district human resources
X
3.Human and Community Development
3. Improved quality of life and life expectancy
X X X X
4. Strategic Infrastructure
4. High quality infrastructure network to support improved quality of life and economic growth
X X
5. Environmental Sustainability
5. District characterised by integrity and quality of its physical environment and underpinned by a coherent spatial development
X
6. Governance and Policy
6. Excellence in governance and leadership
X X
7. Spatial Equity 7. District characterised by integrity and quality of its physical environment and underpinned by a coherent spatial development
X
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
28
STATE OF THE NATION ADDRESS (SONA)
President Cyril Ramaphosa presented the State of the Nation Address (SoNA) to a joint sitting of the two Houses of Parliament (National Assembly and National Council of Provinces) on 07 February 2019 at 19H00. The theme for this year was: “Following Up on Our Commitments to the People: Making Your Future Work Better.” The following are some of the keys points that the President touched on during the SONA:
Eskom will be split in three Government plans to "immediately embark" on a process of establishing three separate entities – Generation, Transmission and Distribution – under Eskom Holdings.
'Investment books' will be compiled for each province A new target to improve South Africa’s ease-of-doing-business ranking A requirement for work experience will be dropped in the public sector Release of state-owned land for human settlements Introduction of eVisa regime New gas and oil legislation after the Brulpadda boon New infrastructure implementation model Eradicate unsafe school toilets within 3 years Compulsory early development for all children Access to a tablet for every pupil by 2025 New technology subjects, and technical high schools A new bank for housing No taverns, shebeens and liquor outlets near schools Scorpions 2.0 Election day date A war room for public health
STATE OF THE PROVINCE ADDRESS (SOPA)
Kwa-Zulu Natal Premier Willies Mchunu delivered the State of the Province Address at the KZN Legislature; Pietermaritzburg on Wednesday 27 February 2018. The theme of the state of the province address for this year was “We are ready to hand over, towards even better and faster growth and development of our Province and it’s people”
BACK TO BASICS
In line with the renewed mandate of the Presidential Priority, the back to basics programme is to be focused and driven towards giving differentiated support to municipalities. The back to basics programme was launched with the theme of serving communities better. The plan of action is to ensure a focused and strengthened local government by getting the basics right and together with other spheres of government, providing basic services efficiently and effectively and in a caring manner. The back to basics transformational agenda recognizes that there are widely divergent levels of performance between different categories of municipalities in terms of services, public engagement, good governance, financial management and technical capacity. The aim is to encourage all municipalities to become positively functional centres of good governance.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
29
There is also a need to set the proper standards for municipal performance. Jozini Municipality committed itself to implementing the Back to Basics Programme, as means to revitalize basic service delivery. The programme has five pillars, namely:
Provision of basic services Good Governance Public Participation Financial Management Institutional Capacity
With regards to its implementation within the municipality, departments report on progress made on the set indicators and programmes that are implemented. Both on a monthly and quarterly basis Jozini municipality consolidates reports which are in return sent to Provincial and National COGTA Departments. The reports indicate performance of the municipality in different aspects of the key performance areas (providing services to its communities, whether these are carried out on time and on a regular basis. An indication from quarterly assessments by COGTA shows that Jozini municipality’s performance is improving. The municipality was rated as functional on the 1st and 2nd quarters of 2018/19. JOZINI MUNICIPALITY B2B SUPPORT PLAN Challenge Source of
challenge Municipal Quarterly Activity to address Challenge
Due date Sector Quarterly Activity to address Challenge
1. High vacancy rate – Vacant S56 posts (CFO & ED-STRATEGIC)
(MM – suspended- Corporate Services Manager Acting as MM) 2/5 vacant
SDBIP
Q1: Advertisement for posts
15 September 2018
Q2: Interviews, Screening and Competency assessments
30 October 2018
Q3: Submission to MEC
16 November 2018
Q4: Filling of posts 01 December 2018
2. Ageing infrastructure
IDP/SDBIP Q1: O & M Plan to be approved by Council
30 September 2018
Skills audit by MISA
Q2: Monitor implementation of O&M as per SDBIP
31 December 2018
Q3: Monitor implementation of O&M as per SDBIP
31 March 2019
Q4: Monitor implementation of O&M as per SDBIP
30 June 2019
3. Asset Management Plan
IDP Q1: Submission to MISA for development of asset management
30 September 2018
DBSA/MISA Q2- RESPONSE FROM MISA
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
30
Challenge Source of challenge
Municipal Quarterly Activity to address Challenge
Due date Sector Quarterly Activity to address Challenge
plan
Q2: Development of plan dependant on funding from MISA
31 December 2018
Q3: Development of plan dependant on funding from MISA
31 March 2019
Q4: Development of plan dependant on funding from MISA
30 June 2019
4. Reporting iro MIG is lacking
COGTA Infrastructure
Q1: Monthly & Quarterly submissions of financial and non-financial reporting implementation plan on Payment schedule submitted
30 September 2018
COGTA MI monitoring in all 4 quarters MISA - Support LM in submission of PMU application - (Undertake assessment of capacity)
Q2: Monthly & Quarterly submissions of financial and non-financial reporting implementation plan on
31 December 2018
Q2: Payment schedule
31 December 2018
Training of councillors on MIG – Request support from COGTA Municipal Infrastructure Unit
31 December 2018
Q3: Monthly & Quarterly submissions of financial and non-financial reporting on implementation plan
31 March 2019
Payment schedule 31 March 2019
Q4 Monthly, Quarterly & Annual submissions of financial and non-financial reporting on implementation plan
30 June 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
31
Challenge Source of challenge
Municipal Quarterly Activity to address Challenge
Due date Sector Quarterly Activity to address Challenge
Payment schedule 30 June 2019
5. Master plan iro roads & stormwater maintenance
LM Session Q1: Seek support from UMkhanyakude District Municipality (ITP)
30 September 2018
UKDM
6. Backlog in housing: Incomplete and poorly constructed houses – (Dept of Housing – Houses built for Amakhosi)- (Mathenjwa, Mngomezulu, Nyawo, Nsinde and Ngwenya Traditional Authorities)
IDP & LM Session
Q1-Follow up DOHS in writing
30 September 2018
DOHS – was supposed to rectify the matter
7.Backlog in housing - The municipality appointed 10 service providers to undertake feasibility studies for all 20 wards with the area jurisdiction.
IDP/support plan Q1- Prioritisation of projects submitted to Portfolio
30 September 2018
DOHS -
Q2-Submission to DOHS
30 October 2018
Q3- Report on Implementation of plan
31 March 2019
Q4- Report on Implementation of plan
30 June 2019
8.Challenge in terms of issuing title deeds on low cost housing
IDP/support plan Challenge has been addressed. Title deeds are in place and will be issued. Issuing of Title Deeds in conjunction with DOHS
31 December 2018
DOHS
9.Electricity backlogs
IDP/LM Q2-Finalisation of electrification master plan-
31 December 2018
ESKOM
Q3 Submission to Council
31 March 2019
10.Challenge with SPLUMA implementation
C/F SUPPORT PLAN
Q1: DJMPT – submit names of members to district (shared service)
31 September 2018
UKDM
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
32
Challenge Source of challenge
Municipal Quarterly Activity to address Challenge
Due date Sector Quarterly Activity to address Challenge
11. Poor debt management and revenue collection strategies
IDP Q1: 1. Hold meetings on an individual basis with government departments. (KZN Public Works National Dept of Public Works, Rural Development and Land Affairs (R58million) 2. Hold meetings with ITB.
30 September 2018 30 September 2018
COGTA MF
Q2: Act on the cleansed data and recommend write offs.
31 December 2018
Q3: Extract top 10 debtors and arrange meetings. Support by COGTA required
31 January 2019
12. LED Strategy SDBIP The Municipality is planning to workshop and review the LED Strategy to Councillors before it can be adopted
30 September 2018
Adoption of strategy 31 December 2018
13.Bylaws not in place – Building control by-laws & Building Conducting plans
SDBIP Q2 Public consultation
31 December 2018
COGTA MG- Translation of by-laws Review by-laws 31 March 2019
By-laws to be adopted
30 June 2019
14. Development of IWMP (Including waste disposal site)
Q1 Awaiting approval grant funding from EDTEA
30 September 2018
EDTEA
Q3: Development of IWMP
31 March 2019
Q4: Submission of Council & adoption by Council
30 June 2019
15.Outdated SDF IDP/SDBIP Q1: Incorporate comments from COGTA into the draft SDF.
30 September 2018
COGTA SPATIAL PLANNING
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
33
Challenge Source of challenge
Municipal Quarterly Activity to address Challenge
Due date Sector Quarterly Activity to address Challenge
Q2: Invite members of public to comment on the Draft SDF
30 October 2018
Q2: Facilitate the approval of the draft SDF by Municipal Council
31 December 2018
Q3: Prioritise the projects proposed from the SDF and incorporate them in the IDP
30 March 2019
Q4: Request funding for implementation of the SDF projects.
30 April 2019
16. AG action plan – unresolved issues
25/36 resolved. MANCO / Audit Readiness meetings to be conducted weekly
30 December 2018
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
34
B2. GOVERNMENT PRIORITIES
Jozini Local Municipality is affected by various challenges faced by communities not only in its area of jurisdiction but also in the country as a whole. The Municipality is therefore aware of the national strategies and Programme of Action to meet them. The national government’s targets for 2014, which were key components in preparing this IDP, are as follows:
The reduction of unemployment by half; The reduction of poverty by half; The provision of skills required by the economy; Ensuring that all South Africans are able to fully exercise their constitutional rights and
enjoy the full dignity of freedom; The provision of a caring government service to the people; Reducing the number of serious and priority crimes and cases awaiting trial, Improving services to achieve a better national health profile and reduction of
preventable causes of death; and Positioning South Africa strategically as an effective force in global relations.
THE NEW GROWTH PATH
The main thrust of The New Growth Path is identification of strategic areas where employment is possible, then it analyses the policies and institutional developments required to take advantage of employment opportunities. The Municipality through EPWP is ensuring that it aligns itself with the proposals for the New Growth Path.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
35
SECTION C: SITUATIONAL
ANALYSIS
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
36
C.1. DEMOGRAPHIC CHARACTERISTICS
C.1.1. DEMOGRAPHIC INDICATORS
DEMOGRAPHIC INDICATORS CENSUS 2011 CS 2016 Source
Population size
Total population 186 502 198 215 StatsSA
Growth rates 0.9% 5.9% StatsSA
Population distribution
Population density 52 persons/ km² StatsSA
Urban 4.9% 8,492 StatsSA
Farms 0.2% 990 StatsSA
Traditional 94.9% 188,733 StatsSA
Population composition
Young (0-14) 41% 82 344 StatsSA
Working age (15-64) 55% 75 967 StatsSA
Elderly (65+) 4% 6 824 StatsSA
Sex ratio (women/100 men) 85.8% StatsSA
Dependency ratio 82.4% StatsSA
Disabled (%)
Fertility rates*
Total fertility rate* StatsSA
Adolescent fertility rate* StatsSA
Crude birth rate* StatsSA
Mortality rates*
Total mortality rate* 1008 StatsSA
Under 5 mortality rate* StatsSA
Infant mortality rate* StatsSA
Leading cause of death* StatsSA
HIV prevalence rate Health
Life expectancy*
Males* StatsSA
Females* StatsSA
Human Development Index Derived
Population groups
Black African 99.2% 197,489 StatsSA
Coloured 0.1% 134 StatsSA
White 0.3% 478 StatsSA
Indian/Asian 0.1% 114 StatsSA
* need to follow-up if these variables will be available at municipal level for Census 2011. If not provincial figures to be used as a proxy
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
37
SOCIO-ECONOMIC INDICATORS CENSUS 2011 CS 2016 Source
Households and services
Average household size 4.7 4.4 StatsSA
Female headed households 53.7% StatsSA
Child headed household 1.8%
Access to piped water 10.9% 20 793 StatsSA
Access to electricity 29.1% 18 560 StatsSA
Access to sanitation 13 596 StatsSA
Tenure status (% owned) 38.9% StatsSA
Educational status
Literacy rate 27% StatsSA
Attending educational institution StatsSA
No schooling 27.4% StatsSA
Primary enrolment rate Education
Teacher: learner ratio Education
Secondary enrolment rate StatsSA
% Completed matric 25.2% StatsSA
Matric pass rates Education
% Completed higher education 5.1% StatsSA
Employment status
Labour absorption rate StatsSA
Unemployment rate (official) 44.6% StatsSA
Unemployment rate (by sex) StatsSA
Unemployment rate (youth) 53% StatsSA
Labour participation rate StatsSA
Main occupation sector StatsSA
Income status
Average household income StatsSA
Indigent households (below R800) StatsSA
Social grant recipients
Deprivation index StatsSA
Gini coefficient Derived
Safety and security
?? SAPS
Travel and transport
??
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
38
C.1.2. KEY FINDINGS (INCLUDING TRENDS)
Jozini Local Municipality is under UMkhanyakude District Municipality, located in the north-eastern part of KwaZulu Natal. The municipality shares a border with Swaziland to the west and Mozambique to the north. It covers 3057 km² of the total area of UMkhanyakude District Municipality. Jozini was predominantly a rural municipality with 89% of the population residing in rural areas under the jurisdiction of traditional authorities. 80 % of the municipality’s population falls in the age groups 0 to 34 years. This is a very young population that have serious implications for service delivery and the provision of (especially social) facilities in the municipal area. The implications of a young population in an area is high requirements for social services; educational and employment opportunities.
0
5000
10000
15000
20000
25000
30000
POPULATION BY AGE GROUP
00-04 05-09 10-14 15-19 20-24 25-29 30-34 35-39 40-44
45-49 50-54 55-59 60-64 65-69 70-74 75-79 80-85 85+
AGE GROUP MALE FEMALE TOTAL
00-14 41 608 40 736 82 344
15-34 36 787 39 454 76 241
35-64 12 790 20 016 32 806
65+ 2 098 4 726 6 824
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
39
Main dwelling that household currently lives in
Formal dwelling/house or brick/concrete block structure on a 20,563
Formal dwelling/house/flat/room in backyard 4,343
Traditional dwelling/hut/structure made of traditional mater 13,111
Flat or apartment in a block of flats 3,655
Cluster house in complex 21
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
40
Townhouse (semi-detached house in a complex) 30
Semi-detached house 274
Informal dwelling/shack in backyard 1,100
Informal dwelling/shack not in backyard (e.g. in an informal 568
Room/flatlet on a property or larger dwelling/servant’s quart 311
Caravan/tent 13
Other 596
Unspecified 0
* Refuse removal
Removed by local authority/private company/community members at least once a week
2,224
Removed by local authority/private company/community members less often than once a week
669
Communal refuse dump 692
Communal container/central collection point 91
Own refuse dump 33,081
Dump or leave rubbish anywhere (no rubbish disposal) 5,535
Other 2,292
Total 44,584
MAIN SOURCE OF ENERGY FOR COOKING
Electricity from mains 17,804
Other source of electricity (e.g. generator; etc.) 45
Gas 1,927
Paraffin 27
Wood 23,059
Coal 0
Animal dung 10
Solar 964
Other 296
None 453
Unspecified 0
MAIN SOURCE OF ENERGY FOR LIGHTING
Electricity from mains 18,767
Other source of electricity (e.g. generator; etc.) 27
Gas 116
Paraffin 78
Candles 23,372
Solar 1,783
Other 58
None 340
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
41
Unspecified 44
Total 44,584
MAIN SOURCE OF ENERGY FOR HEATING
Electricity from mains 16,580
Other source of electricity (e.g. generator; etc.) 27
Gas 1,471
Paraffin 59
Wood 20,814
Coal 79
Animal dung 15
Solar 1,287
Other 640
None 3,590
Unspecified 23
Total 44,584
ELECTRICITY
Yes 18,305
No 23,478
Unspecified 2,801
Total 44,584
RACE POPULATION
Black African 197,489
Coloured 134
Indian/Asian 114
White 478
Total 198,215
Urban 8,492
Farms 990
Traditional 188,733
Total 198,215
DENSITY The municipality has a fairly low average population density with the expected high density areas of the primary node and the traditional authority areas. This pattern has a positive effect on service delivery as the higher the density the more economical can service delivery be done.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
42
Population growth
Gender Population 2011 Population 2016
Male 86,116 93,282
Female 100,386 104,933
Total 186,502 198,215
Source: Stats SA Community Survey 2016 The information from STATSSA Census 2011 and Community Survey 2016 indicates an annual population growth rate of 1,226% per annum for the period 2011 to 2016.
WARD POPULATION WARD POPULATION
1 7173 11 8094
2 8144 12 10401
3 9422 13 10775
4 8292 14 11634
5 13677 15 8465
6 6939 16 9494
7 9574 17 10425
8 8504 18 7939
9 9506 19 8813
10 11085 20 8148
Source: Stats SA Census 2011
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
43
The above map indicating the population density clearly shows that the population are concentrated at the nodes of Jozini, Mkuze and Ingwavuma. The road between the nodes of Bhambanana and Ndumo also reflects high population densities.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
44
C.2. CROSS CUTTING ISSUES
C.2.1. REGIONAL CONTEXT
Jozini Municipality is located in Northern KwaZulu Natal and borders Swaziland and Mozambique. Jozini Municipality falls within the UMkhanyakude District Municipality and covers an area of 3073.08 km². This equates to approximately 32% of the area of the district. The Lebombo Mountains and Makhatini Flats provide some diverse and beautiful terrain rich in local resources including water features and even fossil sites. The name Jozini means place of spears and is attributes to the many spears found in the caves in the area that were used during ancient wars. Jozini Municipality borders the following municipal areas:
• Umhlabuyalingana Local Municipality to the East
• Hlabisa and the Big 5 False Bay Local Municipalities to the South
• Portions of the Greater St Lucia Wetland Park to the South
• The Uphongolo Local Municipality (Zululand District) to the West
• Mozambique to the North
• Swaziland to the West
ADMINISTRATIVE ENTITIES
The Jozini Municipality has 20 municipal wards and 7 Traditional Authority Areas. The following is a list of Traditional Councils in the Jozini Municipality:
Mathenjwa Mngomezulu Nyawo Myeni-Ntsinde Jobe Myeni- Ngwenya Siqakatha (Gumede)
The Jozini Municipality also has a portion of State-owned land within its area of jurisdiction. Apart from the Administrative entities that appear in the above map, the Jozini Municipal area also boasts a number of environmentally sensitive areas, i.e.:
Game Farms Protected Environmentally Sensitive Areas Non-Protected Environmentally Sensitive Areas Ezemvelo Wildlife Protected Areas Areas of High Intrinsic Biodiversity Value
The location of the above are shown on the Environmental Considerations and the Environmental and Tourism Asset maps on the following pages.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
45
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
46
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
47
STRUCTURING ELEMENTS
• Pongola River
• 2 nature reserves (Ndumo which borders Jozini and Mhlabuyalingana; Mkhuze which borders Jozini and Big Five)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
48
• Terrain (borders Ingwavuma and Swaziland)
• Jozini dam
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
49
EXISTING NODES AND CORRIDORS
Investment points (Nodes) are the existing and future growth points and centers of population concentration within the municipality. They form the bases for the allocation of funding and resources as well as the rollout of service delivery. It is crucial to build upon such investment points we also find a clustering of certain activities such as shops, schools, churches, community halls and clinics. The table below contains the hierarchy of investment points for Jozini:
Primary nodes Secondary nodes Tertiary nodes
Mkhuze Jozini
Ingwavuma Ubombo Bhambanana Ndumo
Ophansi Manyiseni Makwakwa Emabhanoyini
Mkhuze: is the economic hub of the municipal area and will remain the focus for future development. Mkuze town is centrally located and it served by major road such as the N2 which links it with Hluhluwe, Mtubatuba, Richards Bay towns. There is an influx of major services such as offices, residential development and commercial uses has led to Mkuze being the major investment node within the area of Jozini Municipality. Jozini: is the second economic hub within the area of jurisdiction of the Jozini municipality, however the topographical constraints and land tenure issues has led to flee of potential investors to other areas. Rural Areas: rural areas are characterized by extensive commercial and subsistence farming, mainly crop production and cattle farming.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
50
The following initiatives should be supported in the Jozini node:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
51
Public Capital Investment Plan to ensure that investment will lead to sustainable long term development of the node and efficient public and private service delivery for the residents of Jozini Local Municipality
Detailed local plan to update and review the 2010 Urban Design Framework Shortened land use management procedures Adoption of a Town Planning Scheme Industrial development based on the agro-economy Commercial development Decentralization point for local administration of provincial and local government services Higher order social and commercial services Housing development
As the primary node in the municipal area the table depicts the status of Jozini Town.
EXISTING FACILITIES NO.
PLANNED FACILITIES PROPOSED FACILITIES
NO.
Pre-School 3 Municipal Buildings Upgrade
Secondary School 1
Primary School 1
Tertiary Education (FET) 1
Secondary School 1
Fire Station 1
Education Centre 1
Emergency Service Facility
1
Clinic 1 ABET/Training Centre 1
Police Station 1 Post Office 1
Civic Centre ? Post Boxes 1
Pension Pay Point 1
Hospital 1
Sport Field 2
Civic Centre 1
Bus Service on Regular basis
1
Old Age Home 1
Taxi rank and/or Bus Depot 2
Sport Complex 1
Library 1
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
52
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
53
Ingwavuma has a registered General Plan and town layout but due to continuing difficulty of transfer of the land from the KZN Department of Human Settlements to the Municipality no transfer of individual properties can take place.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
54
MOVEMENT PATTERNS AND ROUTES
The major structuring element for determining the existing and future concentration of development, activity and investment in the Jozini Municipality consists of an access and movement hierarchy that has been established through the major internal and external national and provincial linkages. In rural, provincial and national contexts, corridors range in scale depending on function and categorisation of the transportation route that forms the basis of the corridor. Corridors carry the flows of people and trade into and around the nodes connected through the corridor. These flows of people and trade make a corridor function, and should form an integral part of the corridor planning and development processes. The key advantage of a corridor as a spatial structuring element, and tool for economic growth, is that is has the potential to link areas of higher thresholds (levels of support) and economic potential, with those that have insufficient thresholds. This allows areas that are poorly serviced to be linked to areas of opportunity and benefit with higher thresholds.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
55
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
56
The Primary Transport Corridor for Jozini is the provincial road R22 (P522) that links the N2 with Jozini and onwards to Manguzi in the Umhlabuyalingana Municipality and the Mozambique Border. This corridor forms the spine of access for goods and services in Jozini Municipality and is the major link to the rest of the district, province and country. The Secondary Development Corridors The primary focus of these corridors is to link places of economic opportunity with places of residence. Development can be encouraged at appropriate locations along these corridors. Secondary Corridors in the Municipal area are as follows: 1. D850 This route links Jozini to Ingwavuma and provides access through the central part of the municipal area. The route runs parallel to the primary corridor but due to the topography of the area provides an important link to the western part of the municipality. 2. P449 – P444 – P447 This corridor links Jozini with the N22 and Mbazwane/Sodwana Bay. There is already development taking place due to the access provided by this corridor and the topography of Jozini town that make development expensive and difficult in the limited space available. A prime example is the Jozini Shopping Centre and new developments in it’s vicinity that leads to process where the commercial heart of the municipality is moving steadily towards this locality. This is an area where shortened processes as indicated in Section 21 (l)(ii) of SPLUMA must seriously be considered by the municipality. 1. P435 This corridor is of significance due to the linkage between the primary P522 corridor linking Jozini town with Ndumo. Ndumo is an area of vast capital investment and concomitant development where the P435 provide the primary access to Ndumo. Interventions envisaged in this area relate to:
Tarring of roads which will provide transport services access to the remote regions, and open up additional economic opportunity in opening the areas. Accessibility is of key importance.
Developing a localised Corridor Development Strategies which will focus on spatial structure, infrastructure provision and attracting both public and private sector investment.
Ensure multimodal transport integration occurs along these roads at key points. Tertiary corridors link areas and lower order settlements within the municipality to the secondary and tertiary nodes. These are generally slower moving corridors in terms of social interaction and economic activities. The following routes in Jozini fulfil the role of Tertiary Corridors: 1. P2-8 This is a link road parallel to the N2, linking Mkhuze to D463 in the southern part of the municipality. 2. P236 Linking the P2-9 with uBombo and eventually Jozini and the Primary and Secondary corridors at Jozini town. 3. D1836 This corridor is primarily an access corridor for the area situated between the Regional Corridor and the Pongola floodplain. I provide a link between Jozini town and the P522.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
57
4. D1840 This corridor links the P522 to Ndumo and provides access to the north central and north western parts of the municipality right up to both the Mozambique and Swaziland borders.
LAND COVER AND BROAD LAND USES
The current land uses evident in the municipal area relate to the places people live, the manner in which they live as well as the manner in which they use the land. As such, the following broad, and related, land uses are evident in the Jozini municipal area.
Wetlands and waterbodies associated with the Pongola River and its course in a northerly direction towards Mozambique as well as the Mkuze River along the southern boundary of the municipality.
Some, although rather limited, unimproved grassland and barren rock. Forests and Woodlands are located along the ridge of the Lebombo Mountains as well as
along the Mkuze River. The distribution of cultivated land in the municipality is limited. Some areas of the municipality are degraded land.
LAND COVER HACTARES PERCENTAGE
Airfields 6.5 0.0
Bare rock and sand 506.2 0.1
Bushland and woodland 191521.8 55.6
Forest 7397.9 2.1
Grasslands 62511.5 18.2
Natural water bodies 2112.0 0.6
Plantations 25.3 0.0
Wetlands 5858.3 1.7
Mines and Quarries 31.9 0.0
Dams 1066.7 0.3
Commercial-orchards 19.2 0.0
Commercial- Pineapples 78.2 0.0
Commercial- Sugarcane 7441.8 2.2
Commercial- Agriculture 972.9 0.3
Dense settlements 1191.0 0.3
Low density settlements 12079.8 3.5
Scattered low density settlements 47658.2 13.8
Railways 87.8 0.0
Roads 3612.0 1.0
TOTAL 344179.2 100
The above table illustrates in detail the extent of the various land uses. From the table, it is evident that bushland and woodland occupy the majority (55.6%) of the land in Jozini LM and settlements occupy approximately 17.6%. The accompanying map indicates at first glance that Veld, cultivated land and trees the majority of land uses in the municipality contain. There are also some build up areas in the north eastern section of the area. This Land Use Pattern together with the environmental and slope
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
58
information needs to dictate the spatial development form of the municipality as the basis of the eventual SDF.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
59
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
60
LAND OWNERSHIP
The Jozini LM covers approximately 32% (2 138 km2) of the total area of uMkhanyakude District Municipality. About 60% of Jozini falls under Ingonyama Trust ownership with four tribal courts which are recognized as being custodians of the land. There also exists a significant area of State land which surrounds the Pongola River. Conservation areas within Jozini LM include, iSimangaliso Wetland Park the Mkuze Game Reserve, the UBombo Mountain Reserve, the Hlatikhulu Nature Reserve, the Manguzi Forest Reserve and Ndumo Game Reserve. Discussions for the establishment of formal town areas for Jozini, Bhambanana, etc are still ongoing.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
61
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
62
LAND REFORM
Source: Land Claims Office, 2014
Map. Land Restitution Claims
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
63
Table 1. Current Status of Land Claims
Map. Land Reform
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
64
Status of Claim Description Type of Claim Reference No. No of Claims
Negotiations Rural Community KRN6/2/2/E/15/0/0/14 & 17 2
Valuations Rural Community KRN6/2/2/E/28/0/0/18 1
Research Rural Community KRN6/2/2/E/12/0/0/13, 12/0/0/1 2
Research Rural Community KRN6/2/2/E/12/0/0/3 1
Gazetted Rural Community KRN6/2/2/E/15/0/0/18, 15/0/0… 1
Draft S42D Rural Community KRN6/2/2/E/43/0/0… 1 Source: Department of Rural Development and Land Reform, 2014
The first map above presents the locality of all land restitution claims within Jozini LM. It is seen that the majority of settled claims are located towards the southern portion (Mkuze Town) of Jozini LM while a few unsettled are located towards the north in the Ndumo area. The above table indicates the state of land claims within the Jozini Municipality. 8 land restitution claims were lodged and only 1 has been gazetted.
ENVIRONMENTAL ANALYSIS
BIODIVERSITY (INCLUDING PROTECTED AREAS The factors responsible for high levels of biodiversity present in the area are also responsible for the high levels of biodiversity present in the vegetation. The uMkhanyakude District is part of the Indian Ocean phytogeography region and is a regional transition zone and a regional mosaic. Flora comprises a mixture of several floristic elements and communities and differs substantially from that of surrounding regions. Vegetation is exceptionally diverse and ranges from forest, thickets and woodlands to grassland and swamps depending on topography and edaphic conditions. These can be classified into 15 discrete vegetation types. Of at least 2180 vascular plant species, 225 species are endemic or near endemic to the Jozini area. Biodiversity in the municipality is under pressure because of land conversion, climate change, unsustainable harvesting of natural resources and the wide spread of alien species. Natural resources provide opportunities for economic empowerment through sustained agriculture, ecotourism, indigenous plant use etc. The primary areas of conservation are indicated on Map below and can be described as follows: 1. The ESA Species areas in the southern part of the Municipality 2. The CBA Irreplaceable areas along the N2, next to Hlathikulu Forest Reserve and west of Ndumo Game Reserve 3. The Landscape corridor of the Lebombo mountains on the western boundary of the municipality 4. The floodplain and wetland complex of the Phongolo River from Jozini Dam to Ndumo Nature Reserve,
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
65
Biodiversity Map
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
66
HYDROLOGY Jozini has an abundance of natural water resources. Major rivers include the Pongola River, the Ingwavuma River, the Mkuze River, and the Usuthu River, of these only the Usuthu and Pongola Rivers are perennial. The Pongola is the most important river in Jozini as it traverses the full length of the area. The flooding of the Ingwavuma and the Usuthu dam up the waters of the Pongola, resulting in an area of deep flooding during peak floods and the infilling of plains. Local Mountain drainage comprises a number of seasonal streams that drain the dip-slope and scarp-slope faces. Some of these streams have perennial pools. In spite of this apparent abundance of water, there is some concern about the provision of potable water to rural areas. The town of Mkuze obtains its water from the Mkuze River and a small dam. The River originates in Northern KwaZulu-Natal and flows through the Lebombo Mountains, across the coastal plain into Lake St Lucia. It is approximately 290km long and has a drainage basin of 4820 km² but is not a reliable water source. The dam referred to is privately owned and arrangements for abstraction are of a temporary nature and it is considered to be an unstable water source. The town UBombo also gets its water from the Mkuze River and a number of boreholes that are not reliable. As such, the towns of Mkuze and UBombo do not have sufficient potable water to sustain their respective populations. This has resulted in restrictions and the occasional total cessation of their water supply (uPhongolo Sub-Regional Plan, 1999).
According to the Department of Water Affairs and Forestry, water from the Pongolapoort Dam is of excellent quality, but its total dissolved solid is low which means that it is very aggressive on steel. Floods are simulated twice a year and, if possible, synchronised with the high flows of the Usutu River to obtain the maximum flood effect. The Pongolapoort Dam supplies water for the Tshongwe-Malobeni water scheme as well as scheme villages. The Pongola River Flood Plain has a series of pans that flood seasonally. The Pongola River is a major water source supplying the whole Shemula Scheme. The town of Jozini obtains water from the Jozini Water Treatment plant, which is presently operating at full capacity (uPhongolo Sub-Regional Plan, 1999).
AIR QUALITY Due to the rural nature of the municipality; air quality issues in the Jozini are less prevalent. The presence of sugar cane farming suggests that there is a need of a seasonal check-up and regulatory mechanisms on the burning of sugarcane farms.
CLIMATE CHANGE Jozini area is characterized by seasonal dry winters and wet summers with periodic flooding. The summer temperature ranges from 23° to 40°, while winter temps range from 16° to 26°. Mean annual rainfall is 600mm and 800mm along the Lebombo Mountains which fall within a moist belt. The annual average evaporation is approximately 1660mm with evaporation highest during the winter and early spring months. WASTE MANAGEMENT ANALYSIS LANDFILL SITES Following the closure of iSibandlane and Ingwavuma waste disposal sites, Jozini municipality has one waste disposal site, i.e. Mkhuze Waste Disposal site. While the said 2 sites have been closed; there is still element of illegal dumping taking place on the sites.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
67
LANDFILL SITES LOCATION MAP WITHIN JOZINI LM The status of the 3 sites is indicated in the table below:
Name of Facility Status Licence NR Capacity of site
Available airspace
Mkhuze Waste Disposal
Operational Not Licensed 6300 3.55yrs
Sibandlane Waste Disposal
Closed Licensed for closure
1500 2.27yrs
iNgwavuma Waste Disposal
Closed Licensed for closure
1350 5.77yrs
MKHUZE LANDFILL Mkhuze landfill site is situated approximately 3 km outside the town of Mkhuze. The site is 70m x 30m and has a life expectancy of approximately 3.5 years. The Jozini municipality is the owner and operator of the site. There are no permanent staff on site and irregular burning occurs. The public is not charged to dispose and no records are kept of traffic. The Mkuze landfill site has no signage to the site and is not fenced off. The waste requires daily coverage and a TLB.
ISIBANDLANA LANDFILL The Jozini landfill site is owned and operated by the Jozini municipality. The site is 80m x 75m and has a life expectancy of 2 years. There are no permanent staff on site and irregular burning occurs. The site is situated in a quarry on a steep cliff. The quarry has been in operation since 1970. This is not an ideal location in terms of:
Visual amenity (proximity to the road),
Site expansion, and also the,
There is a possibility that the storm water could run downwards into the quarry mouth,
There is no cover material.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
68
The landfill site was once fenced however the fence and the gate was stolen. The site has since been closed subsequent to the DEA waste disposal site licensing process, wherein it was licensed for closure. However, there is still element of illegal dumping on the site.
INGWAVUMA LANDFILL Ingwavuma Landfill site is situated approximately 15km to the North East of the town of Ingwavuma. The dimensions are approximately 60m x 45m. The site is partly fenced with steel wire. There is an access gate at the entrance which is not monitored. The Municipality is the owner and operator of the site. There are two appointed persons on site from 0700 – 1600 Monday to Friday. Domestic waste is then disposed of on site and burned when necessary. The waste is not covered as in accordance with DWAF requirements. The approximate life-span of the existing site is 5 years, but expansion in all directions is possible. Burning also minimizes the volume of the waste. Due to the distance to the site, the public does not make much use of it.
UMKHANYAKUDE DISTRICT-WIDE WASTE DISPOSAL SITE COMPLIANT CHECK On a quarterly basis the uMkhanyakude Environmental Management Unit conduct a waste disposal site compliant check exercise on all waste disposal sites within the District. This to determine the level of improvement within which municipalities manage their waste disposal sites. Since almost all waste disposal sites are illegal, there is poor compliant with most of the checklist indicators. The waste disposal compliant check for Jozini Waste Disposal sites is further highlighted in the table below. It should however be indicated that 2 sites (iSibandlane and iNgwavuma) has since been closed subsequent to the DEA licensing of illegal waste disposal sites project. As such, currently the Jozini municipality utilizes the Mkhuze waste disposal which is itself illegal and unlicensed.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
69
UMKHANYAKUDE DISTRICT-WIDE WASTE DISPOSAL SITES COMPLIANT CHECK
Indicators>>>>>
Lic
en
se
Op
era
tin
g
Pla
n
Ac
ce
ss
Re
gis
ter
Ac
ce
ss
co
ntr
ol
Lin
er
Co
ntr
olle
d
dis
po
sal
Co
ve
r
Eq
uip
me
nt
Pe
rso
nn
el
Leach
ate
ma
nag
em
en
t
Sto
rmw
ate
r
ma
na
ge
me
nt
Gro
un
dw
ate
r
mo
nit
ori
ng
Au
dit
s
Nu
isa
nc
e
Mo
nzit
ori
ng
co
mm
itte
e
Wa
ste
Info
rma
tio
n
Re
cy
cli
ng
acti
vit
y o
n s
ite
Name of the Site
Mkhuze Waste Disposal Site X
✓ ✓ X
✓ X
✓ ✓ ✓ ❖ X X X X X X X
❖
iSibandlane Waste Disposal Site •
X X X X X X X X X X X X X X X X X
iNgwavuma Waste Disposal Site •
X X X X X X X X X X X X X X X X X
LEGEND:
❖ Fully-compliant
✓ Partially compliant, but not a significant detrimental impact
X Not compliant and/or significant detrimental impact
• Licensed for closure
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
70
RECYCLING, REUSE, RECOVERY AND WASTE MINIMIZATION INITIATIVES The municipality does not have any recycling policy for either its municipal staff nor for the municipality as a whole. Domestic waste at all the landfill sites was observed to contain large amounts of recyclable material despite the recycling activities. This included plastics and paper grades. General waste at households was observed to contain a large amount of recyclable material. This included plastic and paper grades. There are no accurate records of the quantities of waste generated in different areas of the municipality. It is therefore not possible to set recycling, reuse, recovery and minimization targets. The Jozini Recycling Centre was established with Assistance from the Belgium Government to recycle paper and plastic waste from the Jozini area, unfortunately the site is underutilized. Due to poor management by the municipality the recycling centre has not been utilized for it intended function. New S.A Waste Management and Recycling Service” was once among other recyclers who operated the recycling centre, where cardboard boxes, and plastics were recycled. They had however had a number of problems associated with high transportation costs associated with the distance to the main depot in Durban. The municipality should resuscitate and refurbish the Jozini recycling centre and it should also encourage green waste/compost treatment at the Recycling Centre. Facilities to deal with green waste are available but underutilized at the recycling centre. The municipality needs to consider the implementation of a policy to govern recycling, waste minimization, and reuse activities. Recovery operations for plastic and paper at the landfill site / recycle center need to be improved to increase the amounts of recyclable materials recovered from the landfill site. Recovery of recyclable materials needs to be encouraged at homes and business focal sources. This will reduce the amounts of recyclable waste to landfill site. Public education campaigns required to promote and educate on benefits of recycling. Municipality needs to consider additional public private initiatives to encourage waste recycling and reuse. This could include promoting recycling of waste in outlying settlement areas and having these removed initially by the municipality. Eventually this activity could be contracted out or ‘sold’ to a private recycler. The municipality needs to conduct a detailed study to understand the percentages of recyclable materials that form a part of the general waste stream from residential and business areas. This study should also consider what system to employ for removal of these wastes from residential areas to central areas in the municipality, and hence sale to other areas. An accurate method of recording waste dropped off at the landfill sites needs to be established (weighbridge at the landfill). the existing Mkhuze site and the proposed Regional landfill site must also prioritize this.
ILLEGAL DUMPING Jozini has been identified as one the dirtiest municipality in the District. Illegal dumping and litter is rife in the municipality, impacting negatively of the Tourism Sector, which is one of the 2 main economic drivers in the municipality. The perpetrators of illegal dumping are Individuals, households, waste transporters, businesses/industries, builders and demolishers. Contributors to illegal dumping includes:
Lack of community pride and lack of respect for law, people and land they live in Avoiding of cost to transport and pay at disposal/landfill sites Lack of proper waste collection services
The following General Provisions should apply to areas where illegal dumping takes place:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
71
Measures to counter act illegal dumping to be considered (instituting waste collection service in affected area, developing bylaws, law enforcement activities, education and awareness).
Providing a waste collection service in areas previously not serviced. Public Awareness (Reduce Reuse Recycle) via schools, shopping centres, pay points. Public private initiatives - Clean up campaigns including those organized with religious
organizations, recycling forums. Sign posting areas where frequent dumping occurs. Identifying known hot spots. Policing / managing known dumping hot spots.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
72
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
73
MUNICIPAL ENVIRONMENTAL CAPACITY ANALYSIS
ENVIRONMENTAL GOVERNANCE The prioritization and consideration of environmental management issues in a municipality depend on a functional environmental governance structure. In the absence of a functional structure the likelihood is that environmental management issues would not be taken into consideration, and in some cases the end result would be absence of environmental management policies/plans. In cases where there are some environmental management policies/plans; the absence of a functional environmental management unit and a dedicated environmental management official would most likely result in lack of integration of such a plan into municipal planning processes (the IDP) which in turn leads to poor or non-implementation of the plan.
HUMAN RESOURCE CAPACITY Thu Jozini municipality has a functional Environmental Management Unit, with an Environmental Management Post filled. Although there are still capacity gaps in the sector, however the municipality is the 2019/2020 financial year has prioritized filling at least 30 permanent positions for General Workers to be responsible for Waste Management in various parts of the municipality especially in and around major nodal areas of Jozini, Mkhuze, Ubombo, Ingwavuma, Bhambanana and Ndumo respectively. There are 4 drivers (who are considered full time workers). There are 65 general workers who assist with waste collection, street sweeping etc who are paid a daily rate. Eighty percent of time is dedicated to waste litter picking, street sweeping, verge cutting and storm water drain cleaning. Twenty percent of the time is used for other non-waste functions such as moving furniture, cleaning grass and organizing and placing of drums. There is a need to appoint a Waste Officer, to coordinate all activities related to waste management in terms of the Waste Act.
ENVIRONMENTAL PLANNING TOOLS: INTEGRATED WASTE MANAGEMENT PLAN While the municipality developed its Integrated Waste Management Plan (IWMP) in 2011; the IWMP was never adopted by the Council, and as such the municipality does not have an updated IWMP in compliance with Chapter 3, Sect 12 (d) of NEMWA. Municipality does not have waste by-laws to manage waste management activities. It is however very encouraging to note that at the time of the adoption of the 2019/2020 IDP, the processes were at very advanced stage towards the compilation of the Municipal-Wide Integrated Waste Management Plan (IWMP) which will be aligned to the municipal IDP for implementation. The municipality needs to gazette Bylaws with the following waste management focus areas:
Consideration for the establishment of a waste information system as per the Waste Act. Information from landfills or generators of waste to be fed on to National Database.
Providing access to municipal waste services in areas previously un-serviced and consider Free Basic Refuse Removal (FBRR) policy. The municipality will need to determine in a phased and prioritized manner how to include other areas on this service (see also Waste Act S9 (2) c).
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
74
Describe the various waste types and requirements for the general management for business, residential, industrial, garden, building rubble, and health care risk in the municipality (to promote separation at source, recycling etc and to develop municipal standards). Include a description of general waste for collection by the municipality, and an indication of those for which a private company will need to be engaged.
Waste generator obligations (i.e. storage of waste do’s and don’ts etc) as above.
Liability to pay for waste services rendered to householders.
Bylaw requirements for the transportation and transfer of waste in line with national norms.
Provision to control illegal dumping and abandoned articles in Bylaws.
Designation and appointment of Waste Officers in terms of the Waste Act.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
75
Table 2: Waste Management Challenges within Jozini municipality
PROBLEM INTERVENTION RESPONSIBILITY (DEA ROLE?)
1. Disposal sites
1.1 Unlicensed landfill sites. All Landfill sites should be licensed in terms of the National Environmental Management: Waste Act (Act No. 59 of 2008). Municipalities need to apply for the permit with the provincial environmental departments which are the regulatory authorities for general waste facilities.
The Ingwavuma and Isibandlana waste disposal sites have been licensed through the DEA Licensing of Illegal Waste Disposal site initiative.
1.2 Need for new landfill sites. In 2012 the municipality embarked on a land identification process for the proposed new landfill site. The last activity to have taken place on that process was the Public Participating Process (PPP) undertaken by Buk'Indalo Consultants & Stemele Bosch at KwaQondile (22 June 2012). That process had since stalled. Most recently the municipality embarked on the process of legalising the Mkhuze waste disposal site. That initiative also stalled.
The municipality should address the ownership issue with the oPhongolo municipality in respect of the Mkhuze Waste Disposal site. Through its process: licensing of landfill site; DEA should also assist the municipality in licensing the Mkhuze waste disposal site.
1.3 Lack of equipment. The equipment currently utilized by the municipality is not enough, and cannot handle the ever increasing pressures associated with the amount of waste generated within the municipal area. There are only 2 trucks which are expected to collect waste throughout the municipality. This as a result translates to non-collection of waste, thereby resulting in the emergence of illegal dumping spots through the settlements’ streets and open spaces
Adoption and proper implementation of the IWMP would address the lack of equipment.
2. Integrated Waste Management Plans (IWMPs).
2.1 IWMP never adopted and never implemented
The municipality had developed its IWMP in 2012. However, it has never been adopted by the Council. As such it has never been integrated into the IDP for implementation purpose. The municipality should adopt its IWMP and implement it accordingly.
Adoption and proper implementation of the IWMP would address the lack of equipment.
3. Funding
3.1 Insufficient Funds allocated to waste management.
The municipality should use the budget allocations made for the items they are allocated for.
DEA engaged Treasury during the development of the National Policy on the provision of Basic Refuse Removal for Indigent Households, and the allocations for waste were increased.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
76
PROBLEM INTERVENTION RESPONSIBILITY (DEA ROLE?)
3.2 No cost recovery in tariffs. The municipality should use the tools provided by sector departments and Treasury in order to set cost reflective tariffs. Further implementation of other policies such as the National Policy on the provision of Basic Refuse Removal for Indigent Households will ensure a balanced approach in setting the cost reflective tariffs.
DEA should conduct training on waste tariff strategy and model that would assist the municipality to determine appropriate tariffs for the waste services it provides based on cost accounting principles. NB: The use of this tool and the implementation of the Policy referred to in 3.1 above will ensure that no one is disadvantaged form getting the service on account of cost.
3.3 Poor revenue collection mechanisms.
4. Waste Collection Service
4.1 Insufficient equipment/tools (e.g. receptacles)
Proper and efficient planning through the IWMP process. The municipality have to take an active role in the development of IWMP even if consultants have been appointed to do the work. Knowledge of what an IWMP is and what kind of information should be contained in such a report will assist municipality to know when a consultant produces a sub-standard report.
4.2 Insufficient/inappropriate vehicles
4.3 Servicing and maintenance problems
4.4 Households sparsely dispersed (rural)
4.5 Inaccessible households
5. Governance and institutional
5.1 Political support and buy-in Political leadership should be engaged in issues pertaining to waste management to ensure political buy-in.
The DEA engages leadership from all levels of government through different avenues: ✓ Waste Khoro is an annual event where all
waste management officials (national, provincial, municipal) come together to discuss waste management issues and recommend action items. The political leadership including portfolio committee members, mayors and councillors are invited as well as the leadership from other sector departments.
✓ Training is offered on an on-going basis to municipal officials including councillors. The recently-held training being “Councillor Induction Programme (CIP) on Environment, Waste & Climate Change” held on the 05 –
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
77
PROBLEM INTERVENTION RESPONSIBILITY (DEA ROLE?)
07 June 2017 in Richards Bay.
6. Compliance
6.1 Do not have Waste By-laws The municipality must customise the model waste by-laws into its own by laws
The DEA has developed a model by-law which municipalities can use to custom make their own by-laws.
7. Human Resources/Personnel
7.1 Lack of capacity: Knowledge Municipalities should appoint suitably qualified and people with relevant experience.
The DEA gives training and support to municipalities on an on-going basis on different aspects of waste management. ✓ Official training on technical aspects e.g.
landfill operator training. ✓ Councillor training on the legal obligations of
municipalities on waste management issues. ✓ Workshops on a wide range of new
developments (tools, legislation).
7.2 Lack of capacity: Personnel Municipalities should ensure an on-going development of people through attendance of short courses, conferences etc.
All government spheres can contribute towards this. DEA is always looking at ways to enhance the personnel capacity in municipality. The recently-concluded Youth Jobs in waste is testimony to the department’s endeavours.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
78
ENVIRONMENTAL SECTOR INTERVENTION IN THE MUNICIPALITY Currently DEA has deployed its Local Government Support official (based at a District) to assist municipalities with environmental management issues. DEA is always looking at ways to enhance the personnel capacity in municipality. The recently-concluded Youth Jobs in waste is testimony to the department’s endeavours. Training programme are offered on an on-going basis to municipal officials including councillors. In the current financial year the Department of Environmental Affairs has further deployed Youth Environmental Coordinator in all municipalities including Jozini Local Municipality as part of the bigger plan for the department to enhance environmental capacity in municipalities
BUILDING CONTROL
As with any other rural municipalities, Jozini municipality is characterized by poor building control systems which is compounded by the reality that the municipality does not own the land, as it is total owned by the Ingonyama Trust. Therefore, the inability of the municipality to inform and make suggestions around land allocation results in inability to effectively manage and control building structure as a result. Poor Building control is reflected through poorly-organized, poorly-built towns. The municipality has however invested in Building Control Directorate Unit by ensuring that it is functional. The Directorate has a Manager, and an Officer. Building Control By-laws have also been developed and are prioritized to have been gazetted during the course of 2019/2020 financial year Despite these challenges; a handful of building applications are submitted and subjected through the municipal building control application processes. There is however an internal challenge regarding storage and preserving of such application documentations. Jozini Local municipality have numerous copies of building plans at its disposal and management of these plans has become a challenge. Old building plans are fading and in a poor physical state. The National Building Regulation Act states that the plan once submitted needs to be commented on, approved or refused within a 30-day period. The effective implementation of a building plan management software solution will facilitate these regulations whilst also maintaining proper archives of past plans such that in the event of plan applications being misplaced, the filing application can be completely recreated in a physical form. The need for electronic filing and management system is further strengthened by introduction of the MPRA Act where land properties and structures built thereon within Local Municipalities are required to be rated by municipalities as another source of municipal revenue. With electronic filing and management system, the Municipality will be able to scan and associate electronic building plans to land properties in a database environment. Through this process, storage and access to building plans will be effectively controlled.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
79
C.2.5. SPATIAL AND ENVIRONMENTAL SWOT ANALYSIS
STRENGTHS WEAKNESSES
• SDF currently under review
• Implementation of SPLUMA
• IWMP
• Land ownership
• 65 Percent of land is registered under the Ingonyama Trust Board. The remaining percentage of land is state and privately owned
• Illegal dumpsites
• Illegal developments
OPPORTUNITIES THREATS
• Legalising of the Mkhuze Landfill site • Mushrooming developments
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
80
C.2.6. DISASTER MANAGEMENT
MUNICIPAL INSTITUTIONAL CAPACITY
Municipal Disaster Management Centre Jozini Local Municipality Disaster Management unit was established in 2011. The Municipality currently does not have a Disaster Management Centre (building). However, a park home is used as a Disaster Centre where Firefighters are based. The Manager: Disaster Management & Fire Rescue Services and Disaster Management & Fire Rescue Officer are situated in one of the Municipal Offices not far from the Fire Station/Disaster Centre. The Municipality is in the process of drafting a business plan for the establishment of the state of the art Municipal Disaster Management & Fire Rescue Centre. The vision behind such a centre is that it must incorporate the provision for such services not just in the major nodes but also include satellite Disaster and Fire rescue centres in Ingwavuma precinct in order to bring services closer to the people.The business plan process should have be completed by end of first quarter of the 2019/2020 financial year. Staffing In accordance with the approved organizational structure, the Section which is now a fully fledge Section has the following positions: 1 x Manager: Disaster Management & Fire Recues Services – Filled 2 x Disaster Management Officers – With only one (1) Filled 2 x Chief Fire Officers – Both are vacant 2 x Leading Fire Fighters – Filled 16 x Fire Fighters – With only 8 that are filled and balance are vacant 2 x Disaster Management Coordinators – Vacant 1 x Disaster Management & Fire Rescue Clerk – Vacant Vehicles & Equipment The Unit currently does not have a vehicle allocated for Disaster Management activities; however, the Unit currently utilizes the Fire & Rescue vehicles and other Municipal vehicles to attend to Disaster issues. The Municipality is planning to budget for 1 Disaster Management vehicle in the 2020/2021 financial year. It is however encouraging to note that the Municipality has as at May 2019 acquired the new jaws of life equipment which is essential for the function. Office Space Jozini Municipality does not have a Centre however it has a Fire Station situated in town in a park home where Firefighters are based. The Manager; Disaster Management & Fire Rescue Services as well as the Disaster Management Officer has their offices in the Municipal building in Jozini town at Circle Street. The Municipality is planning to build a fully functional Disaster Management Centre, still battling with funding currently. A process for the compilation of the business plan to source funding for the centre is in advanced stage. Municipal Disaster Management Policy Framework Section 42 of the Disaster Management Act (Act 57 of 2002) states that each metropolitan and each district municipality must establish and implement a framework for disaster management in the municipality aimed at ensuring an integrated and uniform approach to disaster management in its area. With the New Amendment Act the scope has been cascaded to Local Municipality as well.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
81
It is however encouraging to note the Jozini Local Municipality has complied with the legislation and has compiled and adopted the Disaster Management Framework as part of the 2019/2020 IDP & Budget process. Municipal Disaster Management Plan In terms of the Disaster Risk Management Act 2002, (Act No.57 of 2002), Section 53, each municipality must prepare a disaster risk management plan for its area according the circumstances prevailing in the area. In this regard it encouraging to note that the Municipality has an up to date and Council adopted 2019/2020 Disaster Management Plan which is annexed in this document to serve as a strategic planning tool to guide the delivery of these services to the people of Jozini and beyond. Municipal Disaster Management Inter-Departmental Committee Jozini Local Municipality has no municipal Inter-Departmental committee, however it makes use of the Management (Manco), Community Services Departmental and Disaster Management & Fire & Rescue Sectional meetings to address all Disaster Management related issues. Moving forward we plan to establish the committee which will comprise of Community Services Portfolio Chairperson, Director Community Services, Municipal Manager, Manager Public Safety, Manager: Disaster Management and Fire & Rescue Personnel. Municipal Disaster Management Advisory Forum Section 51 of the Disaster Management Act (Act 57 of 2002) states that municipalities may establish a municipal disaster management advisory Forum. Jozini Municipality Disaster Risk Management Advisory Forum was established and launched on the 24 October 2018 and is fully functional with its regular meetings being held on a quarterly basis. According to subsection (1) a forum is a body in which the municipality and other key stakeholders consult one another and co-ordinate their actions on matters relating to disaster management in areas under their jurisdiction. Terms of Reference have been developed for all members of the forum.
DISASTER RISK ASSESSMENT
List of Priority Risks (Hazards) Based on the combined results of the Ward investigations, the following matrix which reflects the Hazards threatening Jozini Municipality, as compared to UMkhanyakude District Municipality was developed:
Table 1: List of Priority Risks (Hazards) for Jozini Local Municipality
No. Prevalent Hazards and Threats
Jozini
01 Road Accidents High Risk
02 Rail Accidents Medium
03 Drought Very High
04 Disease: Animal (Amatele) Very High
05 Disease: Human (HIV/AIDS) Very High
06 Disease: Human (Malaria) Medium
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
82
07 Disease: Human (Cholera) Medium
08 Veld/Forest Fires Very High
09 House Fires Very High
10 Severe Storms (Heavy Rainfall) High
11 Severe Storms (Floods) High
12 Severe Storms (Wind) Medium
13 Severe Storms (Lightning) Very High
14 Severe Storms (Hail) Medium
15 Extremely High Temperatures High
16 Lack of (Adequate) Sanitation Low
17 Lack of (Adequate) Water High
18 Lack of Proper Road Infrastructure High
19 Civil Unrest – Crime High
20 Water Contamination/Pollution Medium
Hazard Maps and Vulnerability Maps Veld Fires Fire has a fundamental role of sustaining biodiversity, but if it is not managed properly it may result in ecosystem degradation. Veld fires can have severe impacts on the environment like loss of biodiversity and ecologically sensitive areas, and air pollution from smoke. There are also environmental factors or processes that increase the susceptibility of the environment to impacts of veld fires. These factors like environmental degradation, topography and weather play an important role in increasing vulnerability to veld fires. Veld fires have been a persistent problem in Jozini Municipality area and this situation has worsened over the past several years due to global warming coupled with the drought situation the municipality is currently faced with. The Municipality is experiencing devastating veld and structural fires across all wards especially during the winter/dry season.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
83
Structural Fires Strong Wind
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
84
Floods
Lightning
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
85
Drought
RISK REDUCTION & PREVENTION In this section the focus is on disaster risk reduction strategies required for the identified common risks and hazards in KPA 2. Prevention and mitigation strategies are looked at. Structural and non-structural measures need to be undertaken to limit the severity of the adverse impact of natural and technological hazards on vulnerable areas, communities and households. Prevention where possible, is undertaken to provide outright avoidance of the adverse impact of hazards and related environmental technological and biological disasters. The importance of Risk Reduction and Prevention cannot be underestimated; currently the municipality is involved in awareness campaigns at local schools and in the community on disaster management. The table below indicates hazards which normally turn into disaster risks due to the vulnerability of the community and environment because of the lack of capacity and alertness. Disaster Risk Reduction (DRR) programmes have been developed to deal with identified disaster risks. These are some of the DRR strategies for example, integrated development & service delivery, awareness campaigns, capacity building, dissemination of early warning, land use management and other methods.
Hazard Mitigation Strategies /Risk Reduction Programmes
Structural Fires • Awareness Campaigns
• Fire Drills
• Fire alarms
• Smoke detectors
• Fire brakes
Lightning • Awareness Campaigns
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
86
RESPONSE & RECOVERY Municipal Capacity in terms of Response and Recovery Section 53 of the Disaster Management Act (Act 57 of 2002) deals with disaster management plans for municipal areas. Section 53 (1) (k) of the Act prescribes that a
• Installation of lightning conductors
• Indigenous knowledge
Drought • Awareness Campaigns
• Water Harvesting
• Drilling of boreholes
• Desalination
• Erecting shades over dams
• Water restrictions
Strong Winds • Awareness Campaigns
• Plantation of trees
• Early Warning Systems
• Building to standards
Heavy rain • Early Warning Systems
• Awareness Campaigns
• Building to standards
Civil Unrest • Law Enforcement
• Quality Basic Service Delivery
• Public Participation/Consultation
Epidemics • Consistency in Awareness Campaigns
• Vaccinations
Motor Vehicle Accident • Upgrading and road maintenance
• Visibility of Road Traffic Officers
• Awareness Campaigns
• Visibility of road signs
Veld Fires • Procurement of fire beaters
• Conduction of awareness’s
• Burning of fire brakes
• Improving firefighting equipment
• Recruiting volunteers
Floods • Construction of dams
• Construction according to building standards
• Awareness Campaigns
• Consistency in Early Warning Systems
• Building Bridges
• Proper maintenance of drainage system
Extremely High Temperatures • Early Warning Systems
• Awareness Campaigns
Hazmat Incidents • Implementation of Municipal By Laws
• Upgrading and road maintenance
• Visibility of Road Traffic Officers
• Awareness Campaigns
• Upgrading of Hazmat equipment
Water Contamination/Pollution • Implementation of Municipal By Laws
• Awareness Campaigns
• Regular inspections and sampling
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
87
disaster management plan must contain contingency plans and emergency procedures in the event of a disaster, providing for prompt disaster response and relief and the procurement of essential goods and services. The Municipality set aside Disaster management budget annually for the purchase of relief materials in the form of tents, blankets, food parcels and plastic sheeting. This material is provided to victims of disaster incidents when necessary. List of relevant stakeholders in Response and Recovery
DEPARTMENT
DR
OU
GH
T
FIR
E
FL
OO
D
EP
IDE
MI
C
ST
OR
M
RA
ILW
A
Y
JOZINI MUNICIPALITY
MANAGER: DISASTER MANAGEMENT & FIRE RESCUE SERVICES
X X X X X X
MANAGER PUBLIC SAFETY X X X X X X
DIS. MAM. OFFICER X X X X X X
MUNICIPAL MANAGER X X X X X X
HIS WORSHIP MAYOR X X X X X X
EXECUTIVE DIRECTOR: COMMUNITY SERVICES
X X X X X X
EXECUTIVE DIRECTOR: PLANNING & ECONOMIC DEVELOPMENT SERVICES
X X X X X X
EXECUTIVE DIRECTOR: CORPORATE SERVICES
X X X X X X
CHIEF FINANCIAL OFFICER X X X X X X
EXECUTIVE DIRECTOR: TECHNICAL
X X
X
HOUSING X X X
UMKHANYAKUDE DISTRICT MUNICIPALITY
DIS. MAN. CENTRE X X X X X X
TECHNICAL DEPARTMENT X X
NATIONAL
N.D.M.C. X X X X X X
S.A.P.S. X X X X X
SANDF X X X X X X
PROVINCIAL
P.D.M.C. X X X X X X
HEALTH
X X X X X
SOCIAL DEVELOPMENT X X X
X
TRANSPORT
X X
SANDF X X X X X X
SAPS X X X X X X
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
88
R.T.I. X X X X X
AGRICULTURE& E/AFF X X X X X
EDUCATION
X X X X
HOME AFFAIRS X X X
HOUSING X X X
KZN WILDLIFE X X X X X
N.G.O.
S.A. RED CROSS
X X X X
ORG. AGRICULTURE X X X X X
F.P.A. X
ORGANIZED BUSINESS X X X X X X
S.A. WEATHER X X X X X X
TRAINING & AWARENESS Sections 15 and 20(2) of the Disaster Risk Management Act (Act 57 of 2002) specifies the promotion of capacity building, training and education throughout the Republic, including in schools, and, to the extent that it may be appropriate.
This key performance area addresses the development of education and training for disaster risk management and associated professions as well as the inclusion of disaster risk management and risk-avoidance programmes in school curricula. It also outlines that awareness needs to be created within the community. For example community and school awareness campaigns etc. Disaster Management Sections annually puts aside a budget to conduct awareness campaigns in schools, war-rooms, communities, traditional leaders, councillors and other stakeholders. During these awareness campaigns, disaster awareness pamphlets are given to the participants. The Municipality is in the process of deploying volunteers in all 20 Wards, these volunteers will also be capacitated on disaster management including disaster awareness campaigns. These campaigns will assist in prevention or mitigation of disaster incidents.
Planned Public Awareness Campaigns The Municipality annually plans to conduct 8 disaster awareness campaigns. These awareness campaigns are targeted for schools, communities, traditional leaders, and now will be cascaded to the volunteers once they have been appointed. The awareness campaigns are planned as follows:
Target group Deadline Responsible Section
40 Councillors and 7 Traditional Leaders and 1 school
By end September 2019 Disaster, Fire & Rescue Services
1 school and 1 War-room By end of December 2019
Disaster, Fire & Rescue Services
1 school and 1 War-room By end of March 2020 Disaster, Fire & Rescue Services
1 school and 1 War-room By end of June 2020 Disaster, Fire & Rescue Services
Research
The Municipality has never commissioned scientific studies relating to disaster
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
89
FUNDING ARRANGEMENTS
Activity Funding source Funding mechanism
Disaster risk reduction
• Relevant spheres of government
• Jozini Local Municipality
• Own budgets
• Own budgets but can be augmented by application for funding to the NDMC for special national priority risk reduction projects
Response, recovery and rehabilitation and reconstruction efforts
• Relevant spheres of government
• Own budget, particularly for those departments frequently affected by disasters.
• Access to central contingency fund once threshold is exceeded on a matching basis.
• Reprioritise within capital budget for infrastructure reconstruction.
• Access to central contingency fund once threshold is exceeded.
• Conditional infrastructure grant, i.e. Municipal Infrastructure Grant (MIG)
Education, training and capacity-building programmes (Enabler 2)
• SETA
• PDMC
• UKDM
• Jozini Municipality
• Own budgets and reimbursement through SETAs
• Public awareness programmes and research activities can also be funded through the private sector, research foundations, NGOs and donor funding
Risk Assessments • Relevant Government Departments.
• Private Sector
• Jozini Municipality
• Own Departmental Budget
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
90
NAME OF THE PROJECT BUDGET TARGETED AREAS
DATE
Disaster Management Policy Framework
R200 000 All Wards 01 July 2019
Disaster Management Plan
NIL All Wards 31 December 2019
Disaster Advisory Forum
NIL All Wards Quarterly
Disaster Management Sector Plan
NIL All Wards 01 July 2019
Disaster Management Relief Material (including Lightning Conductors)
R3 000 000 All affected Wards 01 July 2019
Disaster Bakkie & Branding R300 000 Disaster Management Section
01 July 2019
Disaster Workshops R50 000 40 Councillors & 7 Amakhosi
01 July 2019
Disaster, Fire & Rescue Services Awareness Campaign
R20 000 All 20 Wards 01 July 2019
Disaster Management Pamphlets
R30 000 All 20 Wards 01 July 2019
Disaster Management Advisory Forum meetings
R10 000 All members of the Disaster Advisory Forum
01 July 2019
Office Furniture R100 000 Disaster Centre 01 July 2019
Disaster Centre MIG allocation Jozini Town 01 July 2019
Fire Truck R1 000 000 Jozini Disaster, Fire & Rescue Centre
01 July 2019
Personal Protective Clothing (Fire Gears)
R100 000 Fire & Rescue Services personnel
01 July 2019
Fire Equipment R500 000 Fire & Rescue Services
01 July 2019
Fire By-laws R200 000 Fire & Rescue Services
01 July 2019
Fire Fighters Check-ups R50 000 Fire & Rescue Services
01 July 2019
Training Equipment R100 000 Fire & Rescue Services
01 July 2019
1 Jaws of Life Fire & Rescue Services
01 July 2019
Room Furniture (beds, stove, etc)
R50 000 Fire & Rescue Services
01 July 2019
Office Furniture R100 000 Fire & Rescue Services
01 July 2019
Training of staff R100 000 Disaster, Fire & Rescue Services staf
01 July 2019
PRDP Renewals and Updates R20 000 Fire & Rescue Services
01 July 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
91
Uniform Disaster, Fire & Rescue Services staff
01 July 2019
C.2.7. DISASTER MANAGEMENT: SWOT ANALYSIS
STRENGTHS WEAKNESSES
• Good management
• Good monitoring and evaluation system
• Existence of required or relevant expertise.
• Availability of budget (though limited).
• Developed comprehensive programmes.
• Good institutional arrangement.
• Political buy-in.
• Availability of personnel (though limited)
• Disaster Management Plan is in place with all identified risks.
• Disaster Management Advisory Forum is in place
• Insufficient funding
• Insufficient Disaster Management Personnel & Equipment
• Insufficient human resource (Staff)
• Vehicle shortage
• Absence of a Fire Truck
• Absence of Disaster Management & Fire Rescue Centre
OPPORTUNITIES THREATS
• Employment of more staff.
• Sharing of best practices and capacity building obtained from other municipalities, PDMC, NDMC and other institutions.
• External sources of funding
• Reduction of disaster management funding
• Lack of cooperation
• Climate change impact (Severe weather events).
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
92
C.3. MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT
Municipal Transformation plays an integral role in the maximizing of sustainable service delivery. Jozini Municipality operates within a sphere of continuous progressive transformation. This is made possible through the implementation of transformative strategies which will ultimately feed into building a strong municipal administrative system and processes. The municipality is geared towards the transformation through the development and implementation of the Human Resource Strategy and Plan.
C.3.1. HUMAN RESOURCE STRATEGY AND PLAN
Jozini Municipality has a Human Resource Strategy which was approved in May 2019. The HR strategy focuses on promoting comprehensive administration which is proficient and operative that will enable the municipality to meet its development needs. The Municipality must ensure that financial and capacity resources are provided to meet the needs of the communities as indicated in the IDP Review, and that would also enable the adherence to the vision, objective and strategies. The foundation of the Human Resources function is a Human Resources Strategy which supports the Integrated Development Plan of the municipality. Jozini Municipality has an adopted Human Resources Strategy which addresses the following:
Training and development Labour Relations Personnel Administration Organisational Development Employee Assistance
The vision of Training and Development is to ensure that Council has a skilled and capable workforce to support inclusive growth and development of skills within the municipality. This is achieved through co-ordinating and providing quality assured skills development and training to Council employees to ensure that they function at an optimal level thus contributing to effective and efficient service delivery. Implementation of the HR Strategy:
The municipality holds weekly TOP MANCO meetings and monthly Extended MANCO meetings to ensure that the organizational culture is maintained. Human Resources is a standing item in MANCO meetings where HR issues such as the Organogram, recruitment, trainings, attendances etc.
Critical skills are retained in terms of the skills retention policy, whereby staff is constantly trained thereby ensuring capabilities for suitable for promotions. All budgeted vacant positions are advertised in terms of the employment equity plan and the selection process is determined by the EEP
All senior managers (S54/56) undergo a competency testing through SALGA prior to their appointment. The gaps in training for those managers are identified during this process which informs the Personal Development Plan. Employees and Councillors are provided with CPMD and MFMP trainings.
The HR Policies are continuously reviewed and workshopped to the relevant stakeholders
Annual skills audits are undertaken and this informs the workplace skills plan as a means for identifying opportunities for further growth and development.
Continuous induction programs are undertaken to introduce new employees to the organisation culture.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
93
Jozini Municipality’s Human Resource Plan was approved in May 2019. The following areas are being implemented in terms of the HR Plan and relevant policies:
Recruitment and Selection The Recruitment and Selection process is primarily aimed at procuring staff with the necessary competencies, thus enabling the organisation to deliver on its strategic and operational priorities. A transparent and objective approach to appointments is currently being followed where both trade unions are invited to short-listing sessions and interviews as observers. In this regard, the municipality will ensure that assessments are fair, equitable, objective, consistent, transparent and non-discriminatory.
Retention To achieve its strategic objectives, it is just as crucial for the municipality to retain its competent staff. A major source of discontent amongst staff is the drawn-out process of TASK Job Evaluations, which was targeted at
- “a consistent basis for pay and remuneration in which the relationships between jobs are systematic and transparent both within and between municipalities;
- “clearer and consistent job descriptions and job titles/designation;” - “a better understanding by employer and employees of the skills content of posts and
therefore their education and training needs; and - “a basis for understanding employment cost factors from one municipality to
another.”
ORGANISATIONAL DEVELOPMENT The Council strives to maintain and enforce a strict workflow to ensure: -
Uniformity Security Accessibility Transparency
during the reporting procedure, from report preparation to the finalization or implementation of recommendations and resolutions. There are 5 Portfolio Committees which are scheduled to meet every month that feed into the 1 EXCO per month. All reports are approved by the Municipal Manager before they are placed in an agenda.
INSTITUTIONAL ARRANGEMENTS The purpose of conducting an institutional analysis is to ensure that the municipal development strategies take existing institutional capacities into consideration and that institutional shortcomings are addressed. Jozini local municipality was established in 2000 in terms of the Municipal Structures Act, 1998 (Act No. 117 of 1998). The municipal offices are at Jozini Town. The municipality also hosts the uMkhanyakude District offices situated in Mkhuze town. There is also a satellite office in Ingwavuma town as well as the Testing Station situated in Mkhuze,
MUNICIPAL COUNCIL The Council of Jozini Municipality comprises of 20 ward Councillors and 40 Councillors in total, with eight (8) EXCO members. The EXCO is chaired by the Mayor, Honourable Cllr DP Mabika and the Council is chaired by the Speaker, Honourable Cllr LE Gumbi.
The Municipality has all the powers assigned to it in terms of the Constitution as well as relevant national and provincial legislation. The executive and legislative authority is vested
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
94
in the Council. The Council therefore, takes all the major decisions of the Municipality including delegation of powers to political office bearers, Council committees and officials. COUNCIL
Political Party Number of seats
IFP 19
ANC 18
EFF 1
DA 1
INDEPENDENT CANDIDATE 1
TOTAL 40
EXCO
Political Party Number of seats
IFP 4
ANC 3
INDEPENDENT CANDIDATE 1
TOTAL 8
There are 5 portfolio Committees established for political oversight over departmental activities and making recommendations to Council. It is in these committees where policy issues are debated thoroughly prior to their submission to the Council for adoption.
Through Portfolio Committees, Councillors are able to give political direction to the administrative programmes of Council. The table below highlights the Portfolio Committees that have been established to contribute to effective decision-making in processes of governance and ensure effective implementation of service delivery projects and monitoring thereof.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
95
Name of the Committee
Powers and Functions Chairperson
Council • Executive and Legislative authority
• Approves: IDP, Budget, Bylaws, Staff Establishment, appointment of MM and s56; raising of loans; SCM deviations; Long term contracts etc
Cllr L.E. Gumbi
(Speaker)
EXCO • Executive and Legislative Authority
• Budgeting preparation and implementation
• Recommends to Council
Cllr. D.P. Mabika (Mayor)
MPAC • Oversight Cllr. N. Ngubane
Infrastructure • Municipal Roads, Municipal Airports and Airstrips, Housing Technical), Water, Electricity, Public Works, Project Planning, Project Management Unit, Contract Management’; Parks & Garden & Cemeteries (Reservations), Roads & Storm Water Management
Cllr. T.D. Khuzwayo
Planning & Economic Development Services
• Development Planning, Geographical information Systems (GIS) Building Control& enforcement, Land Use Management, Environmental Planning & Management, Housing (provision) and Land affairs, Tourism Development & Marketing, Local Economic Development, Poverty Alleviation, Expanded Public Works Programme
Cllr. N.R. Zulu
Community Services
• Waste Management, Protection Services, Disaster Management, Emergency services, Safety and Security, Sports Culture, Sports and Recreation, Special programmes i.e. Gender, Disabled; OSS
• Functions under the Office of the Municipal Manager, i.e. Communications, IGR, Batho Pele, Youth Development & Support, IDP & PMS, Internal Audit & Risk Management, Office of the Mayor, Office of the Speaker /Public Participation services are also accountable to this Portfolio Committee
Cllr. D.P. Mabika (Mayor)
Corporate Services
• Administration, Secretariat, Legal Services, ICT, Council Support, Fleet Management Policies and Procedures, Customer Care, Records Management (Registry), Facilities Management, Skills Development Facilitation (SDF, and Human Resources.
Cllr. N.S. Myeni
(Deputy Mayor)
Finance • Budget preparation and implementation, revenue and expenditure management, mid-year budget and performance assessment, revenue generation, capital expenditure control, investments, assets and liability management, internal audit and audit committees, financial report and auditing, debt collection credit control and loans, supply chain management – procurement of goods and services.
Cllr. D.P. Mabika (Mayor)
Table: List of Standing Committees of Council
COMMUNITY DEVELOPMENT WORKER (CDW) PROGRAMME Currently, Jozini has a total of 15 community development workers (CDW’s). CDWs are functional, but not to a full extent as there is a challenge of resource shortages.
POWERS AND FUNCTIONS The powers and functions of the Municipality are described in the table below. Table: Powers and Functions
FUNCTION AUTHORIZATIONS DEFINITION
Schedule 4 Air pollution Yes Any change in the quality of the air that adversely affects human health
or well-being or the ecosystems useful to mankind, now or in the future.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
96
Building regulations
Yes The regulation, through by-laws, of any temporary or permanent structure attached to, or to be attached to, the soil within the area of jurisdiction of a municipality, which must at least provide for: Approval of building plans; Building inspections, and Control of operations and enforcement of contraventions of building regulations. If not already provided for in the national and provincial legislation.
Child care facilities
Yes Facilities for early childhood care and development which fall outside the competence of national and provincial government pertaining to child care facilities.
Electricity reticulation
Yes Bulk supply of electricity, which include for the purposes of such supply, the transmission, distribution and, where applicable, the generation of electricity, and also the regulation, control and maintenance of the electricity reticulation network, tariff policies, monitoring of the operation of the facilities for adherence to standards and registration requirements, and any other matter pertaining to the provision of electricity in the municipal areas.
Fire Fighting Yes In relation to District Municipality “Firefighting” means: Planning, co-ordination and regulation of fire services; specialized firefighting services such as mountain, veld and chemical fire services; co-ordination of the standardization of infrastructure.
Local tourism Yes The promotion, marketing and if applicable, the development, of any tourists attraction within the area of the municipality with a view to attract tourists, to ensure access, and municipal services to such attractions, and to regulate, structure and control the tourism industry in the municipal area subject to any provincial and national legislation, and without affecting the competencies of national and provincial government pertaining to nature conservation, museums, libraries and provincial cultural matters.
Municipal airport No A demarcated area of land or water or a building which is used or intended to be used, either wholly or in part, for the arrival or departure of aircraft which includes the establishment and maintenance of such facility including all infrastructure and services associated within an airport, and the regulation and control of the facility, but excludes airport falling within the competence of national and provincial government.
Municipal Planning
Yes The compilation and implementation of and integrated development plan in terms of the Systems Act.
Municipal Health Services
No Subject to an arrangement with MECs to do the necessary authorizations, or alternatively, subject to amendments to the Structures Act, Municipal Health Service means environmental health services performed by a district municipality and includes: • Air pollution, Noise pollution; Solid Waste Removal; Water and Sanitation; Licensing and control of undertakings that sell food to the public; Control of public nuisance; and Facilities for the accommodation, care and burial of animals.
Municipal public transport
Yes The regulation and control, and where applicable, the provision of: • Services for the carriage of passengers, whether scheduled or unscheduled, operated on demand along a specific route or routes or, where applicable, within a particular area• Schedule services for the carriage of passengers, owned and operated by the municipality, on specific routes.
Pontoons and ferries
Yes Pontoons, ferries, jetties, piers and harbors, excluding the regulation of international and national shipping and matter related thereto, and matters falling within the competence of national and provincial governments
Storm water Yes The management of systems to deal with storm water in built-up areas
Trading regulations
Yes The regulation of any area facility and/or activity related to the trading of goods and services within the municipal area not already being regulated by national and provincial legislation
Water (Potable) No The establishment, operation, management and regulation of a potable water supply system, including the services and infrastructure required for the regulation of water conservation, purification, reticulation and distribution, bulk supply points, metering, tariffs setting and debt collection so as ensure reliable supply of a sufficient quality and quality of
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
97
water to households, including informal households, to support life and personal hygiene.
Sanitation No The establishment, provision, operation, management, maintenance and regulation of a system, including infrastructure, for the collection, removal, disposal and/or purification of human excreta and domestic waste-water to ensure minimum standard of service necessary for safe and hygienic households.
Schedule 5 Amusement facilities /Beaches
Yes A public place for entertainment. The area for recreational opportunities and facilities along the sea shore available for public use and any other aspect in this regard which falls outside the competence of the national and provincial government.
Billboards and the display of advertisements in public places
Yes The display of written or visual descriptive material, any sign or symbol or light that is not intended solely for illumination or as a warning against danger which promotes the sale and/or encourages the use of goods and services found in: Streets; Roads; Thoroughfares; Sanitary passages; Squares or open spaces; and/or Private property.
Cemeteries, funeral parlors and crematoria
Yes The establishment, conduct and control of facilities for the purpose of disposing of human and animal remains.
Cleansing Yes The cleaning of public streets, roads and other public spaces either manually or mechanically
Control of public nuisance
Yes The regulation, control and monitoring of any activity, condition or thing that may adversely affect a person or a community
Control of undertakings that sell liquor to the public
Yes The control of undertakings that sell liquor to the public that is permitted to do so in terms of provincial legislation, regulation and licenses, and includes an inspection service to monitor liquor outlet for compliance to license requirements in as far as such control and regulation are not covered by provincial legislation.
Facilities for the accommodation, care and burial of animals
Yes The provision of and/or the regulation, control and monitoring of facilities which provide accommodation and care for well or sick animals and the burial or cremation of animals, including monitoring of adherence to any standards and registration requirements outlined in legislation.
Fencing and fences
Yes The provision and maintenance and/or regulation of any boundary or deterrents to animals and pedestrians along streets or roads.
Licensing of dogs
Yes The control over the number and health status of dogs through a licensing mechanism.
Licensing and control of undertakings that sell food to the public
Yes Ensuring the quality and the maintenance of environmental health standards through regulation, a licensing mechanism and monitoring of any place that renders in the course of any commercial transaction, the supply of refreshments or meals for consumption.
Local amenities Yes The provision, manage, preserve and maintenance of any municipal place, and building reserved for the protection of places or objects of scenic, natural, historical and cultural value or interest and the provision and control of any such or other facility for public use but excludes such places, land or buildings falling within competencies of national and provincial governments.
Local sport facilities
Yes The provision, management and/or control of any sport facility within the municipal area.
Markets Yes The establishment, operation, management, conduct, regulation and/or control of markets other than fresh produce markets including market permits, location, times, conduct etc.
Municipal abattoirs
Yes The establishment conduct and/or control of facilities for the slaughtering of livestock.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
98
C.3.2. ORGANISATIONAL STRUCTURE/ ORGANOGRAM
The municipality has developed an organogram based on the mandate, powers and functions and need for effective administration. The new organogram was approved on May 2019. The organizational structure makes provision for the following departments and strategic programmes:
The office of the Municipal Manager Corporate Services Planning and Economic Development Services Infrastructure & Technical Services Community Services Finance
The implementation of the organogram is a priority for the municipality given a need to create sufficient capacity to implement the IDP and render services effectively. The organogram is revised continuously to cater for the changing needs of the municipality. However, the key challenge is to attract and retain qualified and experienced personnel on Senior management positions. This could be due to the remote location of the area in relation to major urban centres and the limited resources available to the municipality for staff remuneration. There are 6 section 56/57 managers (2 vacant)). The municipality has 5 financial management intern positions which are funded by treasury and they are all filled.
Municipal parks and recreation
Yes The provision, management, control and maintenance of any land, gardens or facility set aside for recreation, sightseeing and/or tourism and includes playgrounds but excludes sport facilities.
Municipal roads Yes The construction, maintenance, and control of a road which the public has the right to and includes, in addition to the roadway the land of which the road consists or over which the road extends and anything on that land forming part of, connected with, , or belonging to the road.
Noise pollution Yes The control and monitoring of any noise that adversely affects human health or well-being or the ecosystems useful to mankind, now or in the future.
Pounds Yes The provision, management, maintenance and control of any area or facility set aside by the municipality for the securing of any animal or object confiscated by the municipality in terms of its bylaws.
Public places Yes The management, maintenance and control of any land or facility owned by the municipality for public use.
Refuse removal, refuse dumps and solid waste disposal
Yes The removal of any household or other waste and the disposal of such waste in an area, space or facility established for such purpose, and includes the provision, maintenance and control of any infrastructure or facility to ensure a clean and healthy environment for the inhabitants of a municipality.
Street trading Yes The control, regulation and monitoring of the selling of goods and services along a public pavement, road reserve and other public places.
Street lighting Yes The provision and maintenance of lighting for the illuminating of streets.
Traffic and parking
Yes The management and regulation of traffic and parking within the area of the municipality including but not limited to, the control over operating speed of vehicles on municipal roads.
Municipal public works
Any supporting infrastructure or services to empower a municipality to perform its functions
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
99
2019/2020 ORGANIZATIONAL STRUCTURE (ORGANOGRAM)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
100
DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
101
DEPARTMENT: CORPORATE SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
102
DEPARTMENT: CORPORATE SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
103
DEPARTMENT: BUDGET AND TREASURY OFFICE (BTO)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
104
DEPARTMENT: BUDGET AND TREAUSRY OFFICE (BTO)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
105
DEPARTMENT: PLANNING AND ECONOMIC DEVELOPMENT SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
106
DEPARTMENT: PLANNING AND ECONOMIC DEVELOPMENT SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
107
DEPARTMENT: TECHNICAL SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
108
DEPARTMENT: COMMUNITY SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
109
DEPARTMENT: COMMUNITY SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
110
DEPARTMENT: COMMUNITY SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
111
DEPARTMENT: COMMUNITY SERVICES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
112
C.3.3. MUNICIPAL INSTITUTIONAL CAPACITY & STATUS OF CRITICAL POSTS
The organogram shows an overview of the municipal administrative structure which has been approved by Council. The Municipality consists of six main departments i.e. Corporate Services, Finance, Community Services, Technical Services, Planning and Economic Development as well as the Office of the Municipal Manager. The following positions have since been filled respectively:
Chief Financial Officer: Mr. MT Nkosi Executive Director Community Services: Mr. LB Mpontshane Executive Director Planning and Economic Development: Ms. NP Ndaba Executive Director Technical Services: Mr. LMV Cele (Acting Municipal Manager)
The Municipality is in the recruitment process for the Municipal Manager and Director: Corporate Services positions. These positions will be filled by July 2019. All Senior Management posts are considered as critical posts. The key challenge that the Municipality is faced with is the attraction and retention of skilled senior management staff (S54/56). The filling of vacancies has been prioritised to enhance the vacancy rate while the staff cost effect on the overall OPEX (Operating Expenditure) is being monitored to ensure that it does not exceed the recommended tresh-hold of 40% of the Operational budget of the Municipality. From the approved 2019/2020 organizational structure as well as in line with the approved 2019/2020 Budget the following key positions have already been advertised and are in various stages of the recruitment process with the target date of 31st July 2019 to have finalized the entire process:
POSITION DEPARTMENT TARGET COMPLETION DATE
1. Municipal Manager Office of the Municipal Manager 30th June 2019
2. Manager: Office of the Mayor Office of the Municipal Manager 31 July 2019
3. Manager: Youth Development & Support
Office of the Municipal Manager 31st July 2019
4. Manager: Communications, IGR & Batho Pele
Office of the Municipal Manager 30th June 2019
5. Risk Management Officer Office of the Municipal Manager 30th June 2019
6. IDP & PMS Officer Office of the Municipal Manager 30th June 2019
7. Manager: ICT Corporate Services 30th June 2019
8. Assistant Manager: Council Support Services
Corporate Services 31st July 2019
9. Assistant Manager: ICT Corporate Services 31st July 2019
10. Occupational Health & Safety Officer
Corporate Services 31st July 2019
11. Personnel Officer Corporate Services 31 July 2019
12. Labour Relations Officer Corporate Services 31st July 2019
13. Council Support Clerk x 2 Corporate Services 31st July 2019
14. Customer Care Clerk x 2 Corporate Services 31st July 2019
15. General Assistant x 11 Corporate Services 31st July 2019
16. Manager: Supply Chain Management (SCM)
Budget & Treasury Office (BTO) 30th June 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
113
POSITION DEPARTMENT TARGET COMPLETION DATE
17. Secretary To the Executive Director: Planning & Economic Developments Services
Planning & Economic Developments Services
31st July 2019
18. GIS Officer Planning & Economic Developments Services
31st July 2019
19. Development Practitioner Planning & Economic Developments Services
31st July 2019
20. Librarian: Jozini Municipal Library
Community Services 31st July 2019
21. Superintendant: DLTC Community Services 31st July 2019
22. Truck Driver: Waste Management (Ingwavuma Office)
Community Services 31st July 2019
23. Social Development Officer Community Services 30th June 2019
24. Special Programmes Officer (Arts & Culture)
Community Services 31st July 2019
25. Foreman: Waste Management x 4
Community Services 31st July 2019
26. Pound Management Officer Community Services 31st July 2019
27. General Assistant (Waste Management) x 30
Community Services 31st July 2019
28. Admin Officer: KwaNgwenya Rural Service Centre
Community Services 31st July 2019
29. Customer Care Clerk: KwaNgwenya Rural Service Centre
Community Services 31st July 2019
30. Technician: Roads & Storm-Water
Technical Services 31st July 2019
Jozini Municipality has six departments which are aligned to five National Key Performance Areas. Below, an overview is given in terms of each department’s units:
MUNICIPAL DEPARTMENTS; FUNCTIONS & CONTACT DETAILS
MUNICIPAL DEPARTMENT
CORE FUNCTIONS / SECTIONS/UNITS
RESPONSIBLE OFFICIAL
1. OFFICE OF THE MUNICIPAL MANAGER
1.1 Overall Strategic Management of the Municipality
1.2 Office of the Municipal Manager
1.3 IDP & PMS & Back to Basics (B2B) Services
1.4 Internal Audit & Risk Management Services
1.5 Communications; Batho Pele & Intergovernmental Relations
Vacant: Municipal Manager (But Mr LVM Cele is Acting) Vacant: Senior Manager: Office of the Municipal Manager Ms. Samke Mkhize: Manager: IDP & PMS Ms. Lungi Mvundla: Manager: Internal Audit & Risk Management Vacant: Manager: Communications, Batho Pele & IGR Mr. Nhlonipho Ndlovu:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
114
MUNICIPAL DEPARTMENT
CORE FUNCTIONS / SECTIONS/UNITS
RESPONSIBLE OFFICIAL
1.6 Youth Development & Support
Services
1.7 Office of the Mayor 1.8 Office of the Speaker/ Public
Participation Services
Assistant Manager: Communications Vacant: Manager: Youth Development & Support Services Vacant: Manager: Office of the Mayor Mr. Zweli Mpontshane: Manager: Office of the Speaker/Public Part. Mr. Xolani Nkosi: Assistant Manager: Public Participation
2. BUDGET & TREASURY OFFICE (BTO)
2.1 Overall Strategic Management of the Department
2.2 Revenue & Expenditure Management Services
2.3 Budget Planning & Reporting &
Asset Management Services 2.4 Supply Chain Management
(SCM) Services
Mr MT Nkosi: CFO: Budget & Treasury Office (BTO) Mr. Vusi Gumede: Manager: Revenue & Expenditure Ms. Ncediwe Ntini: Assistant Manager: Expenditure Management Mrs. Ntombi Dube: Assistant Manager: Revenue Management Mr. Xulu: Manager: Budget Planning & reporting Services Ms Kholeka Cele: Assistant Manager: Budget Planning & Reporting Ms. Nxumalo: Assistant Manager: Asset Management Services Vacant: But Mr Nkambule is Acting Manager: Supply Chain Management (SCM)
3. CORPORATE SERVICES
3.1 Overall Strategic Management of the Department
3.2 Human Resources
3.3 General Administration Services 3.4 Legal Services 3.5 Information Communications &
Technology
Vacant: But Mrs. LA Mncwango is Acting ED: Corporate Services Mrs. Mpume Gumede: Manager: HRD Mr. Zenzele Ngema: Assistant Manager: HRD Mr. Siyabonga Myeni: Assistant Manager: HRM Mr. Banzi Buthelezi: Manager: General Administration Mr. Mthembu: Assistant Manager: Ingwavuma satellite Office Mr. M Dlamini: Assistant Manager: Mkhuze Satellite Office Vacant: Assistant Manager: Council Support Services Ms. Siphelele Mpontshane: Manager: Legal Services Vacant: Manager: Information Communications & Technology
4. PLANNING & ECONOMIC
4.1 Overall Strategic Management of the Department
s. N. Ndaba: ED: Planning & Economic Development
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
115
MUNICIPAL DEPARTMENT
CORE FUNCTIONS / SECTIONS/UNITS
RESPONSIBLE OFFICIAL
DEVELOPMENT SERVICES
4.2 Spatial Planning & Land Use
Management & GIS 4.3 Building Control & Enforcement 4.4 Housing Implementation &
Coordination 4.5 Local Economic Development
(LED) & Tourism Services
Services Mr. Siboniso Myeni: Manager: Development Planning Services Mrs. Thuli Ndaba: Manager”: Building Control & Enforcement Mr. Thabani Dludlu: Manager: Housing Implementation Mr. Sabelo Mabaso: Manager: LED & Tourism Services
5. COMMUNITY SERVICES
5.1 Overall Strategic Management of the Department
5.2 Public Safety Services 5.3 Environmental e Management
Services 5.4 Municipal Library Services
5.5 Disaster Management & Fire Rescue Services
5.6 Special Programmes & Municipal Enterprises
5.7 Social Development Services
Mr. LB Mpontshane: ED: Community Services Mrs Zama Khumalo: Manager: Public Safety Mrs Nozipho Khumalo: Manager: Environmental Services Vacant: Manager: Municipal Library Services Mr. Bhekie Mdletshe: Assistant Manager: Municipal Library Ser. Mrs. Ayanda Gumede: Manager: Disaster Management & Fire Mr Sifiso Nsele: Manager: Special Programmes & Municipal Enterprises Mrs. Busi Mngomezulu: Manager: Social Development Services
6. INFRASTRUCTURE & TECHNICAL SERVICES
6.1 Overall Strategic Management of the Department
6.2 Project Management Unit (PMU) 6.3 Operations & Maintenance (O &
M) Services 6.4 Roads & Storm-Water Services 6.5 Parks & Gardens & Cemeteries
Services
Mr. LVM Cele: ED: Technical Services Mr Nkala: Manager: PMU & Building Services Vacant: Assistant Manager: PMU & Building Services Mr. Simphiwe Bhengu: Manager: O & M Services Mr Xolani Kunene: Assistant Manager: Roads & Storm-Water Vacant: Assistant Manager: Parks & Gardens & Cemeteries
HUMAN RESOURCE DEVELOPMENT The Workplace Skills Plan (WSP) serves as the strategic document that gives direction on training and development within the Municipality. The WSP is aligned to the National Skills Development Strategy, the Skills Development Act 97 of 1998 as well as the Skills Levies Act 09 of 1999. The WSP and Annual Training Reports are submitted annually to the LGSETA. Submission of these reports ensures that the Municipality receives its mandatory grant. The municipality trains staff as per the WSP. Employees representative of all Departments have been sent to different workshops which address the skills gaps identified by their respective departments. Jozini municipality WSP was approved in May 2019. The Training and Development component has positioned itself strategically to improve current training and development practises within Council as well as to form strategic partnerships with accredited Training and Development Institutions, Corporates as well as other entities within the Local Government Sector to establish a standard of best practice.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
116
Council also has a Bursary Policy which caters for employees and members of the Community (Community Achievement Bursaries).
TRAINING & DEVELOPMENT POLICY To improve the quality of life of workers, their prospects of work and labour mobility To improve productivity in the workplace To increase the levels of investment in education and training in the labour market and to
improve the return on that investment To encourage Jozini Municipality to provide Councillors, Employees and the Community
with the opportunities to acquire new skills To ensure equality of access to all development opportunities and provide career
development for all Jozini residents
BURSARY POLICY Assist the employee of the Municipality to improve their academic qualification and to
improve their work performance and their career pathing Create a lifelong learning culture in pursuit of the principle of the “learning organization” Assist in developing the professional capacity of employees’ thus promoting service
delivery.
RECRUITMENT & SELECTION POLICY Recruitment and Selection must be seen as the first step in the process of filling a vacant
post i.e. “sourcing a pool of possible and suitable candidate”. Recruiting, Selecting and Retaining the right people is paramount to the success of Jozini Municipality.
To match the human resources to the strategic and operational needs of the Municipality through IDP and SDBIP and ensuring the full utilization and continued development of employees
Provide a sound framework for the attraction, development and retention of the high calibre employees.
Align the Recruitment and Selection practices with all legal requirements. Introduce fair and objective principles and procedures for the staffing of the Municipality Provide guidelines for the appointment of candidates to the Municipality The Recruitment and Selection Policy and its implementation will be fundamentally
aimed at matching the human resources to the strategic and operational needs of the Municipality and ensuring the full utilization and continued development of employees
Recruitment and Selection is an area of decision making that requires thorough attention, accompanied by best practice guidelines to ensure that risks of corruption and unfair practices are minimized
RETENTION POLICY To attract and retain competent staff that can have an adverse effect on service delivery. To retain key staff members whose services are regarded as critical to achieve the vision
and mission of the Municipality. To identify individual’s potential for assuming a higher degree of responsibility. To help develop a skills base for succession planning. To create and sustain a pleasant humane working environment where employees are
given the opportunity to thrive. Staff retention is a process of ensuring that employees with valued or needed skills or
experience in a scarce/critical field where recruitment is difficult are kept within the service of the Municipality by using various techniques
The Municipality recognizes that its most valuable asset is its human resources. A great deal of time and money is invested in the recruitment, training and development of
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
117
employees and, as such, every effort should be made to retain those employees who have scarce or critical skills
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
118
C.3.4. EMPLOYMENT EQUITY
Jozini Municipality is an equitable employer within targeted group represented in various layers of the municipal structure. However, there are still a number of areas where improvement is required. All HODs are African males. Women occupy 12 positions out of the 29 filled middle management positions.
AN EMPLOYMENT EQUITY COMMITTEE HAS BEEN ESTABLISHED AND IS RESPONSIBLE FOR THE FOLLOWING:
Annual review of the Employment Equity Plan To enforce compliance and implementation of the Employment Equity Act.
EMPLOYMENT OF DISABLED PEOPLE As per the requirement from the Department of Labour, employers are required to employ a total of 2% people with disability. The municipality must employ people with disability, positions which are suitable for the people with disabilities must be identified and will be stated as such on the job advertisement. Currently there are two employees living with disability.
LABOUR RELATIONS The main focus of labour relations is to manage and strengthen the relationship between organized labour and management. South African Local Government Bargaining Council (SALGBC) represents the municipalities in relations to labour related issues. All the disciplinary and grievance processes are dealt with in terms of the collective agreement agreed upon by the Bargaining Council and the Organized Labour. Appeals are also dealt with in terms of the same collective agreement until cases are referred to Bargaining Council. Labour Relations under the Human Resources section is also responsible for the following:
Facilitation of grievance procedures Facilitation & preparation of Local Labour Forum Facilitation and arranging workshops on disciplinary processes and procedures with
employees Assist and advise line management and employees with Labour Relations and Human
Resources related matters
C.3.5. ICT GOVERNANCE FRAMEWORK
In line with the National Corporate Governance of ICT Policy Framework, Jozini Municipality has an approved ICT Governance Policy. The purpose of ICT Governance Policy is to provide a strategic direction for the ICT Services supported by the ICT Strategy, to ensure that ICT goals are aligned with the IDP objectives, the risks are managed appropriately, and the ICT resources are used responsibly. In providing strategic direction, ICT Governance Policy enables the ICT team members to focus and contribute effectively towards the attainment of departmental goals which talks to the entire Municipality. The purpose of ICT Governance as per COBIT Framework is to ensure the following:
IT is aligned with the business IT enables the business and maximises benefits IT resources are used responsibly IT risks are managed appropriately
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
119
In implementing ICT Governance Policy, an ICT Steering Committee has been established and is fully functional, constituted by senior management representatives and chaired by the Executive Director: Corporate Services.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
120
C.3.6. MUNICIPAL TRANSFORMATION & ORGANISATIONAL DEVELOPMENT: SWOT ANALYSIS
STRENGTHS WEAKNESSES
• Section 79, 80 and other Council Committees established and are operational.
• A reliable ICT system for effective functioning and efficient service delivery.
• Human Resource Policies in Place
• Opportunity of job creation
• Employment Equity Plan is also in place
• Low staff turnover
• WSP is submitted annually and the mandatory grant is received every year
• Fair Representation of Women Professionals at Senior & Middle Management levels
• Inadequate Gender equality mainstreaming
• Absence of a Gender Equality Policy Framework
•
OPPORTUNITIES THREATS
• Grading of municipality from grade 1 to grade 2
• Job evaluation committee has been formed & functional
• Receiving of discretionary grants
• Implementation of the electronic document management system (EDMS)
• Bursary Policy for councillors, employees and members of the public.
• Loss of critical skills
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
121
C.4. SERVICE DELIVERY AND INFRASTRUCTURE ANALYSIS
The success of local economic development is tied to the provision of basic and other types of infrastructure to the people. All services under analysis in this section are located in a specific locality, as per the Spatial Development Framework (SDF) of the municipality and have potential to enhance socio-economic development. Infrastructure analysis focuses on the status quo regarding water supply, sanitation facilities, energy and housing provision, roads and public transport, waste management and telecommunications – all of which underpins socio-economic development and determines people’s quality of life. The provision of adequate municipal infrastructure remains a challenge throughout the municipality.
C.4.1. WATER AND SANITATION
There is stiff competition amongst different water users. While water remains a stumbling block for economic development through agricultural activities, water for domestic purpose i.e. portable water, becomes crucial, hence a priority. Based on the municipal wards-based IDP participation meetings; water remains the main priority at Jozini Municipality. In terms of the latest Umkhanyakude District Municipality’s Water Service Development Plan (WSDP); Jozini comprises of 17 water schemes. But most of these schemes are not properly maintained therefore dysfunctional. In areas not covered by the scheme or/and in cases whereby the schemes are dysfunctional, there are boreholes. Unfortunately, most of these boreholes are non-functional due to poor maintenance. It should be noted that Jozini municipality is not a Water Service Authority. Water and sanitation are the responsibilities of the District municipality. The table below illustrates the main supply of water to households. There has been an increase in the number of households that have access to piped water; the majority of households still rely on natural resources for their water supply. Only 10.9% of households have access to piped water inside their dwellings. Source of Water
Water source HHs %
Regional/local water scheme (operated by municipality or other water services provider)
17162 44
Borehole 3682 9
Spring 1147 3
Rain water tank 783 2
Dam/pool/stagnant water 2486 6
River/stream 10098 26
Water vendor 476 1
Water tanker 1472 4
Other 1543 4
Total 38849 100
Source: Stats SA (Census 2011)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
122
Water Infrastructure
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
123
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
124
WATER DEMAND MODEL In order to have the flexibility to determine water demands for different spatial groupings, such as scheme or supply footprints, a zero-base demand model based on Census demographics (with an applied growth rate to get current figures) and levels of service (at smallest grouping) was adopted for the demand modelling. Although the demand model is based on the official Census data and agreed unit demands it is not a stochastic model, involving random demographic and unit demand sampling and probability behavior. It also does not allow for level of confidence or degree of accuracy calculations of the Census data, growth rates, nor of the unit demand values adopted. The low and high results represent the extremes of what the predicted water demands could be. These are calculated in the model by using the extremes of the range of each data item in determining the results. No statistical probability or reliability measure can be attributed to these figures, except to say that all actual results should fall somewhere within this predicted range. Water Demand Summaries
Row Labels
Sum of Cur AADD (Rest
LOS) Ave
Sum of Future
AADD LOS 2020 Ave
Sum of Future
AADD LOS 2025 Ave
Sum of Future LOS AADD 2030
Ave
Sum of Future
AADD LOS 2040 Ave
Sum of Future
AADD LOS 2035 Ave
Sum of Future HHI 2045 Ave
JOZINI 8 702 15 932 16 989 19 105 28 135 24 523 35 360
Row Labels
Sum of CurL OSSPD Ave
rage
Sum of Future SPF LOS 2020
Ave
Sum of Future SPF LOS 2025
Ave
Sum of 2030LOS SPD Ave
Sum of Future SPF LOS 2035
Ave
Sum of Future SPF LOS 2040
Ave
Sum of 2045HHI SPD Av
JOZINI 11 883 20 847 22 476 25 733 34 008 42 283 50 55 Source: Draft DC27 WSDP 2016
Deciding what footprint base to use to determine the demand; discuss or review the existing infrastructure or scheme capacities was found to be quite a challenge. Anomalies were found between the DWS Water Reconciliation Strategy footprints and the current distribution infrastructure. In addition, the level of detail in various infrastructure reports/GIS obtained from previous PSPs differed and subsequently was difficult to compare with one another. The solution was to develop “Water Master Plan supply areas”, which are comprised of a larger supply area that simulate the seven (7) regional schemes aspired to by UKDM, bounded in instances by rivers, distance from source, topography; with smaller sub-schemes within those regional boundaries that are aligned with the existing infrastructure supply footprints and operational small schemes areas. The six (6) water master plan supply areas are areas are Shemula, Jozini, Hluhluwe, Mpukonyoni, Mtubatuba, and Hlabisa. Water demands have been determined on sub-scheme level and the infrastructure evaluated at the same or sub-zone level. Sub-zones were defined for the specific purpose of reviewing bulk distribution main capacities, where the existing diameters were known and could be assessed. The Shemula WMP Supply Area is divided into Shemula Eastern Sub-Supply Area and Shemula West and Central Sub-Supply Area. Shemula Eastern Sub-Supply Area is divided into four (4) Sub-Schemes:
Mshudu Thengani (Kwangwanase) Manguzi Enkanyezini
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
125
The Combined demographics and water demand for Mshudu, Thengane, Manguzi and Enkanyezini are:
Total backlog of 9076 stands (ito Census 2011) that need to receive access to RDP supply
Household growth of the combined eastern Shemula sub-schemes is from 11015 to 15069 households and a movement/migration of LOS as indicated achieving 25,8% YC supply by 2030
The capacity of the treatment works of 6,8Mℓ/day is sufficient for the current demand of 3,5Mℓ/day for 2015, or 4,52Mℓ/day with 50% losses
The 20 year (2035) GSPD (Gross Summer Peak Demand) is 11 Ml/day. The infrastructure capacity and upgrade requirements can be summarized as follows:
The current WTW capacity is 6.8Mℓ/day. This is sufficient for the current demand of 3.5Mℓ/day. The demand will surpass the capacity by 2025 and will increase to 11Mℓ/day by 2035.
The demand shortage can be addressed by equireme the Shemula Western and Central Water Sub-Supply Area source.
The demand from Shemula Western and Central Sub-Supply Area water source can be either 4Mℓ/day where the current Shemula Eastern region water sources are retained or 11Mℓ/day where the Shemula Eastern region water sources are discontinued.
This will require an assessment of the bulk distribution from the Shemula Western and Central Sub-Supply Area.
The Shemula West and Central Sub-Supply Area is divided into six (6) Sub-Schemes:
Manyiseni Ingwavuma Ndumo Embonisweni Phelandaba North Phelandaba South
The combined demographics and water demand for Manyiseni, Ndumo, Ingwavuma, Embonisweni, Phelandaba North and South are:
Total of 14325 stands (ito Census 2111) that need to receive access to RDP supply Household growth of the sub-schemes combined is from 27057 to 31882 households
and a movement/migration of LOS as indicated achieving 42% YC supply by 2030. The 20-year (2035) GSPD (Gross Summer Peak Demand) is 29 Ml/day.
The infrastructure capacity and upgrade requirements for Western and Central Shemula (Ingwavuma to Phelandaba) is summarized as follows:
The current demand for the supply area is 11Mℓ/day The water treatment works has currently been upgraded and has a combined capacity to
produce 27.5Mℓ/day and will therefore address the current demand shortfall. There is a shortfall of 1Mℓ/day for the projected 2035 demand The water treatment works will also supply the demand from Shemula Eastern Region.
This will increase the demand of 28Mℓ/day to 32.7Mℓ/day if the Eastern Region current supply sources are retained or 39.5Mℓ if the sources are discontinued.
The Jozini WMP Supply Area is divided into Jozini Eastern Sub-Supply Area and Jozini West and Central Sub-Supply Area. Jozini Eastern Sub-Supply Area is divided into seven (7) Sub-Schemes:
Tshongwe Malobeni Othobothini
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
126
Nondabuya Mjindi Jozini Mkuze Mhlekazi
The combined demographics and water demand for Jozini, Malobeni, Mjindi, Nondabuya, Mkuze and Othobothini are:
Total of 12 611 stands (ito Census 2011) that need to receive access to RDP supply Household growth of the sub-schemes combined is from 28 167 to 32 173 households
and a movement/migration of LOS as indicated achieving 48% YC supply by 2030. The 20-year (2035) GSPD (Gross Summer Peak Demand) is 27 Ml/day.
Sanitation varies from water-borne to Ventilated Improved Pit Latrines (VIPs) sanitation. The difference between the two sanitation provision methods must however be kept in mind. Water borne sanitation is provided through the connection to a sewer network, while VIPs are the localized provision of sanitation structures. The table below illustrates the type of sanitation facility utilized by households. There are very few households which have access to the flush toilet sewer (including flush septic tank). A positive trend has been the decrease in the number of individuals who do not have access to any form of sanitation facility. Sanitation Facilities (Population Group) (Stats SA, 2011)
Type HHs %
None 8985 23
Flush toilet (connected to sewerage system) 3734 10
Flush toilet (with septic tank) 987 3
Chemical toilet 7850 20
Pit toilet with ventilation (VIP) 6971 18
Pit toilet without ventilation 8115 21
Bucket toilet 542 1
Other 1665 4
Total 38849 100
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
127
The table below presents the status quo of access to water and sanitation services in Jozini LM. From the table, it is evident that there are very few settlements/ wards that absolutely do not have access to water and sanitation facilities. Access to water in many wards is irregular and a few areas still use boreholes, water tankers or rivers as a source of water. There are only two wards that do not have access to sanitation (wards 15 and 17). There are a few sanitation programs that are still underway and therefore more wards will be provided with these services. Table. Settlements with access to Water and Sanitation
WARD NO.
SETTLEMENTS WITH ACCESS TO WATER
SETTLEMENTS WITH ACCESS TO SANITATION
1 There is completely no provision of water. There are irregular functioning boreholes.
Sanitation was provided as a package to about 80 households who had access to RDP houses.
2 None Sanitation was provided as a package to households who had access to RDP houses.
3 None Ezineshe, Komkhulu, Nhlangano and few households at Mozi.
4 None, except water tankers or rivers.
None, except self-built toilets.
5 Sinethezekile (50%) and Gedleza (10%) areas
Hlalanathi, Sibongile and Sinethezekile areas. They are old and households built after the programme had passed, do not have toilets.
6 Nyawushani and Biva areas (but irregular)
Sanitation was provided to all households, except in households built after the sanitation provision was completed.
7 Maphaya, MaMlambo and Emlotheni area.
There are only self-built toilets.
8 Msiyane and Othobothini. In other areas, installation of water pipes
Msiyane and Othobothini areas. However, it’s not all households that were provided.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
128
WARD NO.
SETTLEMENTS WITH ACCESS TO WATER
SETTLEMENTS WITH ACCESS TO SANITATION
is underway.
9 None Ophondweni, Emhlumeni, Ogwaluweni, Lumbe areas. But there are households built after sanitation program was completed that do not have toilets.
10 Kwashukela area. However, supply is irregular.
Mzinyeni, Kwambuzi, Mangqwashu, Kwashukela and Empumelelweni. However, there are households that were built after sanitation provision program which do not currentl have access to sanitation.
11 Mphoweni, Brijini and Ntabayengwe. But it is irregular.
Nonjinjikazi, Enkomeni, Ntabayengwe, Mphoweni, Brijini, e”J”, Mlambongwenya, Nyamane, Kwa-Jimmy, Kwa-John, Empakeni and Majwayiza.
12 Shumela, Zulwini, parts of Bhambanana and Esiweni areas. Although, water is only available on Wednesdays and Saturdays
Shemula, Mathayini, part of Bhambanana, Onaleni, KwaMlawu, Thekwane, Bhamu and Ezibayeni
13 Makhanisi, Siwongane, Embodla areas. At Embodla, supply of water is not regular.
Makwakwa, Makhanisi and Siwongane areas do have access to toilets and there are a few sanitation projects that are currently underway in the ward.
14 Ingwavuma town and parts of surrounding areas of the town.
Kumanhlali, Elangeni and surrounding areas of Ingwavuma town.
15 1 functioning borehole near Manyiseni TC and 1 wind mill. All other boreholes are sporadic in providing water.
None
16 Mthanti, Mwayi and Magwangu areas. Although it’s irregular.
Few previous RDP houses have toilets. Mthanti and Mwayi areas do have toilets.
17 Mziki, Mahlabeni and part of Munywana areas
None
18 Water pump engines at: Dinabanye, Zanhleni and Nkungwini areas.
Previous RDP houses have toilets, Nyathini, Oshabeni, Dinabanye and parts of Nkungwini areas.
19 None Phaweni, Magobhoyi, Mfingose and certain sections of Ohlalwini areas have toilets.
20 Mkuze Tshaneni Area- Very few households have their sanitation facilities maintained. Most are vandalised.
Source: uMkhanyakude Water and Sanitation Table, Jozini Water Scheme
Source: Water and Sanitation Department
WATER SCHEME NAME CHALLENGES
Mkuze plant Inadequate capacity to supply the population
Mkuze River Plant Water source (Mkuze River) dries out
Jozini Old Inadequate capacity and illegal connections
Jozini New Inadequate capacity to supply the population
Makhonyeni Plant Inadequate capacity to supply the population
Block Six Water source depends on permission from commercial farmers.
Mjindi Central Inadequate capacity to supply the population
Emachobeni Inadequate capacity to supply the population
Shemula water scheme Inadequate capacity to supply the population
Nondabuya water scheme Illegal connections and inadequate capacity to supply population
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
129
The second table shows water schemes in Jozini LM. It is evident that the majority of the water plants do not have the capacity to supply the population. Predictions to this situation presented is that with the increasing population certainly some settlements will be left without access to water due to the inability of water plants to supply to the growing number of people. Interventions in this regard should be considered when bulk services are provided The Umkhanyakude District municipality has an Operations and maintenance Plan which is being implemented.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
130
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
131
UMKHANYAKUDE WATER & SANITATION PROJECT DEVELOPMENT FOR JOZINI All projects have been prioritised using a combination of weighting criteria – Strategic Importance; Extent of Cost Ratio; Per Capita Consumption (l/capita/day); Non-Revenue Water; Functional Criticality of Scheme; Institutional Capacity; Available Co-funding; and Implementation Readiness. Furthermore, the location of the project was evaluated by identifying 1) the associated per capita cost, 2) the percentage of people who are currently unserved within that project footprint, and finally the per capita daily demand (ℓ/c/d). A high per capita daily demand would signal a large number of households who currently have a reasonably high level of service and are therefore less of a priority than areas which are completely unserved.
JOZINI WATER Upgrading the Shemula Water Treatment plant to benefit 62 700 households in Jozini
and uMhlabuyalingana Implementing the Jozini Bulk Regional Scheme (40 Ml/day) to benefit 50 200 households
in Jozini, uMhlabuyalingana and Big Five Implementing KwaJobe Community Water Scheme to benefit 3062 households Upgrading of Mkuze Treatment Works to 5Ml/day to benefit 1362 households. Refurbishment of Machibini water scheme 5 Water Tankers were provided to Jozini local municipality
BOREHOLE PROGRAMMES 5 boreholes were equipped under drought relief at Kwa Dinabanye Kumkhamu,
Nhlabende, Kings Palace, Madinyana and Khume 17 boreholes drilled at Mambuzikazi, Lindizwe Okholweni (Sandile), Ezimambeni Ward
15, Ezimambeni Ward 15, Pangani Khume, Khume Sola, Manganini A, Manganini C, Manganini B, Kwagiba, Mangayini D, Mambuzikazi, Lindizwe Okholweni,
SANITATION 6254 households have benefitted under the Ingwavuma Sanitation Project (Wards
9,10,11,12,13,14,15,17,18,19) 2009 households have benefitted under the Jozini Rural Household Project (Wards 3,4,
20) Jozini Capital Projects PROJECT NAME PROJECT
VALUE EXPENDITURE TO DATE
BALANCE BUDGET FOR 2018/19
ADJUSTMENT MIG BUDGET FOR 2018/19
PROPOSED DRAFT ALLOCATION FOR 2019/2020
Ingwavuma via Sanitation
R142 588 855,43
R110 555 736,79
R32 033 118,64
R10 000 000,00
R22 606 888,70
Jozini Regional CWSS
R255 877 297,80
R222 915 511,79
R32 961 786,01
R 10 000 000,00
R17 760 753,73
Kwajobe Community Water Scheme (Ntshongwe Malobeni)
R160 194 178,00
R55 372 148,56 R104 822 029,44
R 20 000 000,00
R21 983 196,51
R10 000 000,00
Mkuze water Treatment upgrade & Refurbishment
R50 562 816,44
R49 054 369,61 R1 508 446,83
R 1 508 446,83
R1 508 446,83 R10 000 000,00
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
132
Rehabilitation of uBombo Water Scheme
R8 561 400,00
R372 017,40 R8 189 382,60
R 6 000 000,00
R5 000 000,00 R5 000 000,00
Shemula water upgrade (Phase 2B)
R207 052 290,00
R187 351 475,85
R19 700 814,15
R 15 991 553,17
R12 000 000,00
R1 500 000,00
Thembalethu Sanitation (WWTW)
R100 918 806,75
R36 247 625,03 R64 671 181,72
R 5 000 000,00
R5 000 000,00 R7 000 000,00
Jozini Low Cost Housing Sewer Upgrade
R55 799 182,90
R7 660 936,47 R48 138 246,43
R 15 000 000,00
R8 000 000,00 R20 000 000,00
Ingwavuma Boreholes (Drought)
R5 497 135,00
R5 497 135,00
R5 497 135,00
R800 000,00 R5 000 000,00
Jozini, Umhlabuyalingana VIP Sanitation Project
R150 633 000,00
R150 633 000,00
R10 000 000,00
R15 000 000,00
Greater Ingwavuma Water Supply Scheme
R5 000 000,00
R 2 000 000,00
R15 000 000,00
Nondabuya CWSS Upgrade
R5 000 000,00
R 2 000 000,00
R10 000 000,00
Siweni/Ingwavuma Emergency Pipeline
R15 000 000,00
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
133
C.4.2. SOLID WASTE MANAGEMENT
The municipality provides waste collection services in its main towns, which means that outskirt areas (the villages) are not covered in terms of waste collection. These households rely mostly on backyard dumping and burning. Extending waste collection services to all areas of the municipality is one of the municipality’s strategic objective. The municipality has 1 dumping site which is at Mkhuze and it will be licensed by June 2019 with the assistance of EDTEA. An Integrated Waste Management Plan (IWMP) is in the process of being developed in order to address issues relating to waste management, such as refuse removal. The following table depicts percentage distribution of households by type of refuse disposal. The final IWMP is anticipated to have been concluded by 30th September 2019 should everything goes according plan. Refuse Disposal
* Refuse removal
Removed by local authority/private company/community members at least once a week 2,224
Removed by local authority/private company/community members less often than once a week
669
Communal refuse dump 692
Communal container/central collection point 91
Own refuse dump 33,081
Dump or leave rubbish anywhere (no rubbish disposal) 5,535
Other 2,292
Total 44,584 Source: Statistics South Africa (CS 2016)
LANDFILL SITES
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
134
Following the closure of iSibandlana and iNgwavuma waste disposal sites, Jozini municipality has one waste disposal site, i.e. Mkhuze Waste Disposal site. While the said 2 sites have been closed; there is still element of illegal dumping taking place on the sites.
LANDFILL SITES LOCATION MAP WITHIN JOZINI LM The status of the 3 sites is indicated in the table below:
Name of Facility Status Licence NR Capacity of site
Available airspace
Mkhuze Waste Disposal
Operational Not Licensed 6300 3.55yrs
Sibandlane Waste Disposal
Closed Licensed for closure
1500 2.27yrs
iNgwavuma Waste Disposal
Closed Licensed for closure
1350 5.77yrs
MKHUZE LANDFILL Mkhuze landfill site is situated approximately 3 km outside the town of Mkhuze. The site is 70m x 30m and has a life expectancy of approximately 3.5 years. The Jozini municipality is the owner and operator of the site. There are no permanent staff on site and irregular burning occurs. The public is not charged to dispose and no records are kept of traffic. The Mkuze landfill site has no signage to the site and is not fenced off. The waste requires daily coverage and a TLB.
UMKHANYAKUDE DISTRICT-WIDE WASTE DISPOSAL SITE COMPLIANT CHECK On a quarterly basis, the uMkhanyakude Environmental Management Unit conduct a waste disposal site compliant check exercise on all waste disposal sites within the District. This to determine the level of improvement within which municipalities manage their waste disposal sites. Since almost all waste disposal sites are illegal, there is poor compliant with most of the checklist indicators.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
135
The waste disposal compliant check for Jozini Waste Disposal sites is further highlighted in the table below. It should however be indicated that 2 sites (iSibandlane and iNgwavuma) has since been closed subsequent to the DEA licensing of illegal waste disposal sites project. As such, currently the Jozini municipality utilizes the Mkhuze waste disposal which is itself illegal and unlicensed.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
136
UMKHANYAKUDE DISTRICT-WIDE WASTE DISPOSAL SITES COMPLIANT CHECK
Indicators>>>>>
Lic
en
se
Op
era
tin
g
Pla
n
Ac
ce
ss
Re
gis
ter
Ac
ce
ss
co
ntr
ol
Lin
er
Co
ntr
olle
d
dis
po
sal
Co
ver
Eq
uip
me
nt
Pe
rso
nn
el
Lea
ch
ate
ma
nag
em
en
t
Sto
rmw
ate
r
ma
nag
em
en
t
Gro
un
dw
ate
r
mo
nit
ori
ng
Au
dit
s
Nu
isa
nc
e
Mo
nit
ori
ng
co
mm
itte
e
Wa
ste
Info
rma
tio
n
Re
cy
cli
ng
ac
tivit
y o
n s
ite
Name of the Site
Mkhuze Waste Disposal Site X
✓ ✓ X
✓ X
✓ ✓ ✓ ❖ X X X X X X X
❖
iSibandlane Waste Disposal Site •
X X X X X X X X X X X X X X X X X
iNgwavuma Waste Disposal Site •
X X X X X X X X X X X X X X X X X
LEGEND:
❖ Fully-compliant
✓ Partially compliant, but not a significant detrimental impact
X Not compliant and/or significant detrimental impact
• Licensed for closure
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
137
Recycling, Reuse, Recovery and Waste Minimization Initiatives The municipality does not have any recycling policy for either its municipal staff nor for the municipality as a whole. Domestic waste at all the landfill sites was observed to contain large amounts of recyclable material despite the recycling activities. This included plastics and paper grades. General waste at households was observed to contain a large amount of recyclable material. This included plastic and paper grades. There are no accurate records of the quantities of waste generated in different areas of the municipality. It is therefore not possible to set recycling, reuse, recovery and minimization targets. The Jozini Recycling Centre was established with Assistance from the Belgium Government to recycle paper and plastic waste from the Jozini area, unfortunately the site is underutilized. Due to poor management by the municipality the recycling centre has not been utilized for it intended function. New S.A Waste Management and Recycling Service” was once among other recyclers who operated the recycling centre, where cardboard boxes, and plastics were recycled. They had however had a number of problems associated with high transportation costs associated with the distance to the main depot in Durban. The municipality should resuscitate and refurbish the Jozini recycling centre and it should also encourage green waste/compost treatment at the Recycling Centre. Facilities to deal with green waste are available but underutilized at the recycling centre. The municipality needs to consider the implementation of a policy to govern recycling, waste minimization, and reuse activities. Recovery operations for plastic and paper at the landfill site / recycle center need to be improved to increase the amounts of recyclable materials recovered from the landfill site. Recovery of recyclable materials needs to be encouraged at homes and business focal sources. This will reduce the amounts of recyclable waste to landfill site. Public education campaigns required to promote and educate on benefits of recycling. Municipality needs to consider additional public private initiatives to encourage waste recycling and reuse. This could include promoting recycling of waste in outlying settlement areas and having these removed initially by the municipality. Eventually this activity could be contracted out or ‘sold’ to a private recycler. The municipality needs to conduct a detailed study to understand the percentages of recyclable materials that form a part of the general waste stream from residential and business areas. This study should also consider what system to employ for removal of these wastes from residential areas to central areas in the municipality, and hence sale to other areas. An accurate method of recording waste dropped off at the landfill sites needs to be established (weighbridge at the landfill). The existing Mkhuze site and the proposed Regional landfill site must also prioritize this. ILLEGAL DUMPING Jozini has been identified as one the dirtiest municipality in the District. Illegal dumping and litter is rife in the municipality, impacting negatively of the Tourism Sector, which is one of the 2 main economic drivers in the municipality. The perpetrators of illegal dumping are Individuals, households, waste transporters, businesses/industries, builders and demolishers. Contributors to illegal dumping includes:
Lack of community pride and lack of respect for law, people and land they live in Avoiding of cost to transport and pay at disposal/ landfill sites Lack of proper waste collection services
The following General Provisions should apply to areas where illegal dumping takes place:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
138
Measures to counter act illegal dumping to be considered (instituting waste collection service in affected area, developing bylaws, law enforcement activities, education and awareness).
Providing a waste collection service in areas previously not serviced. Public Awareness (Reduce Reuse Recycle) via schools, shopping centres, pay points. Public private initiatives – Clean up campaigns including those organized with religious
organizations, recycling forums. Sign posting areas where frequent dumping occurs. Identifying known hot spots. Policing / managing known dumping hot spots.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
139
INTEGRATED WASTE MANAGEMENT PLAN The municipality has resuscitated the development of its IWMP, and must adopt and implement the broad findings of the IWMP and incorporate such findings in to the municipal IDP for implementation. The municipality needs to gazette Bylaws with the following waste management focus areas:
Consideration for the establishment of a waste information system as per the Waste Act. Information from landfills or generators of waste to be fed on to National Database.
Providing access to municipal waste services in areas previously unserviced and consider Free Basic Refuse Removal (FBRR) policy. The municipality will need to determine in a phased and prioritized manner how to include other areas on this service (see also Waste Act S9 (2) c).
Describe the various waste types and requirements for the general management for business, residential, industrial, garden, building rubble, and health care risk in the municipality (to promote separation at source, recycling etc. and to develop municipal standards). Include a description of general waste for collection by the municipality, and an indication of those for which a private company will need to be engaged.
Waste generator obligations (i.e. storage of waste do’s and don’ts etc.) as above. Liability to pay for waste services rendered to householders. Bylaw requirements for the transportation and transfer of waste in line with national norms. Provision to control illegal dumping and abandoned articles in Bylaws. Designation and appointment of Waste Officers in terms of the Waste Act.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
140
Waste Management Challenges within Jozini municipality
PROBLEM INTERVENTION RESPONSIBILITY (DEA ROLE?)
1. Disposal sites
1.1. Unlicensed landfill sites. All Landfill sites should be licensed in terms of the National Environmental Management: Waste Act (Act No. 59 of 2008). Municipalities need to apply for the permit with the provincial environmental departments which are the regulatory authorities for general waste facilities.
The Ingwavuma and Isibandlana waste disposal sites have been licensed through the DEA Licensing of Illegal Waste Disposal site initiative.
1.2. Need for new landfill sites.
In 2012 the municipality embarked on a land identification process for the proposed new landfill site. The last activity to have taken place on that process was the Public Participating Process (PPP) undertaken by Buk’Indalo Consultants & Stemele Bosch at KwaQondile (22 June 2012). That process had since stalled. Most recently the municipality embarked on the process of legalising the Mkhuze waste disposal site. That initiative also stalled.
The municipality should address the ownership issue with the oPhongolo municipality in respect of the Mkhuze Waste Disposal site. Through its process: licensing of landfill site; DEA should also assist the municipality in licensing the Mkhuze waste disposal site.
1.3. Lack of equipment. The equipment currently utilized by the municipality is not enough, and cannot handle the ever-increasing pressures associated with the amount of waste generated within the municipal area. There are only 2 trucks which are expected to collect waste throughout the municipality. This as a result translates to non-collection of waste, thereby resulting in the emergence of illegal dumping spots through the settlements’ streets and open spaces
Adoption and proper implementation of the IWMP would address the lack of equipment. DEA should assist the municipality to review/edit the never-adopted IWMP, for the municipality to adopt and implement it.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
141
PROBLEM INTERVENTION RESPONSIBILITY (DEA ROLE?)
2. Integrated Waste Management Plans (IWMPs).
3. Funding
3.1. Insufficient Funds allocated to waste management.
The municipality should use the budget allocations made for the items they are allocated for.
DEA engaged Treasury during the development of the National Policy on the provision of Basic Refuse Removal for Indigent Households, and the allocations for waste were increased.
3.2. No cost recovery in tariffs.
3.3. Poor revenue collection mechanisms.
The municipality should use the tools provided by sector departments and Treasury in order to set cost reflective tariffs. Further implementation of other policies such as the National Policy on the provision of Basic Refuse Removal for Indigent Households will ensure a balanced approach in setting the cost reflective tariffs.
DEA should conduct training on waste tariff strategy and model that would assist the municipality to determine appropriate tariffs for the waste services it provides based on cost accounting principles. NB: The use of this tool and the implementation of the Policy referred to in 3.1 above will ensure that no one is disadvantaged form getting the service on account of cost.
4. Waste Collection Service
4.1. Insufficient equipment/tools (e.g. receptacles)
Proper and efficient planning through the IWMP process. The municipality have to take an active role in the development of IWMP even if consultants have been appointed to do the work. Knowledge of what an IWMP is and what kind of information should be contained in such a report will assist municipality to know when a consultant produces a sub-standard report.
4.2. Insufficient/inappropriate vehicles
4.3. Servicing and maintenance problems
4.4. Households sparsely dispersed (rural)
4.5. Inaccessible households
5. Governance and institutional
5.1. Political support and buy-in
Political leadership should be engaged in issues pertaining to waste management to ensure political buy-in.
The DEA engages leadership from all levels of government through different avenues: ✓ Waste Khoro is an annual event where all
waste management officials (national,
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
142
PROBLEM INTERVENTION RESPONSIBILITY (DEA ROLE?)
provincial, municipal) come together to discuss waste management issues and recommend action items. The political leadership including portfolio committee members, mayors and councillors are invited as well as the leadership from other sector departments.
✓ Training is offered on an on-going basis to municipal officials including councillors. The recently-held training being “Councillor Induction Programme (CIP) on Environment, Waste & Climate Change” held on the 05 – 07 June 2017 in Richards Bay.
6. Compliance
6.1. Do not have Waste By-laws
The municipality must customise the model waste by-laws into its own by laws
The DEA has developed a model by-law which municipalities can use to custom make their own by-laws.
7. Human Resources/Personnel
7.1. Lack of capacity: Knowledge
Municipalities should appoint suitably qualified and people with relevant experience.
The DEA gives training and support to municipalities on an on-going basis on different aspects of waste management. ✓ Official training on technical aspects e.g. landfill
operator training. ✓ Councillor training on the legal obligations of
municipalities on waste management issues. ✓ Workshops on a wide range of new
developments (tools, legislation).
7.2. Lack of capacity: Personnel
Municipalities should ensure an on-going development of people through attendance of short courses, conferences etc.
All government spheres can contribute towards this. DEA is always looking at ways to enhance the personnel capacity in municipality. The recently-concluded Youth Jobs in waste is testimony to the department’s endeavours.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
143
C.4.3. TRANSPORTATION INFRASTRUCTURE
Transport and road networks vary a great deal across the municipality. The majority of citizens rely on foot for daily transport needs. The road network is made up of primarily provincial, district and access roads, the majority of which are in poor condition. The road network in Jozini consists of the following:
There is one national road (N2); Provincial Roads. These road networks serve as the main connectors of the 20 wards,
they also help in connecting to the surrounding municipalities. They also connect the primary nodes in the municipality. Most of the tarred roads are in a bad condition especially P522-1 between Jozini town and Mbazwana and the P443 between Bhambanana and Ingwavuma. These roads are characterized by potholes and livestock roaming the roads;
The district roads serve as a major connection between major centres, towns and their respective rural settlement areas, and among the settlement areas. These roads are characterized by poor maintenance and most of them are gravel roads; making it difficult to use during rainy seasons; and
There is a number of Artery Roads within Jozini Municipality which despite being gravelled are in a poor state.
One of Jozini municipality challenges is that most of the roads are in a state of disrepair and requires substantial upgrading. This renders some settlements almost inaccessible by a normal car and accounts for a poor public transport system in these areas.
PUBLIC TRANSPORT Public transport is relatively underdeveloped because the number of people travelling from the outer parts of the Municipality is so low. The municipality is characterized by poor transportation linkages and therefore poor mobility. Movement on the Jozini roads is perceived to be dangerous, due to:
the bad state of the roads, free-roaming animals and the weak state of roadworthiness of many of the vehicles in the area.
Public transport is poor and dangerous. As many of the roads are inaccessible for buses and taxis, “bakkies” are illegally used for public transport. The poor conditions of the road network in the municipality determine the access to transportation by the communities. Due to the conditions, taxi and bus transportation is not accessible to the neediest of the communities. Such communities are spatially placed in the outskirts of the major centres or towns and are connected to these centres/towns by either district or artery roads whose conditions are not conducive for taxis and buses to drive through. An efficient transport system can significantly increase the economic conditions of an area. This is due to the reduced cost in the time spent travelling raising productivity, the actual cost of travelling reduces as more efficient means of travel be used and it allows for faster delivery of goods and services. Road access allows more people the opportunity to access markets for both supply and consumption thus stimulating the local economy. Access and accessibility represent one of the major factors enabling both human and economic development. The major existing road linkages consist of the following:
N2 in the south-west providing regional and national access to the area
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
144
P 522 linking the N2 to Jozini and Bhambanana
P522 linking Bhambanana to Ingwavuma and the Swaziland border P444 linking Jozini to Mseleni
Jozini municipality is responsible for provision of access roads and there are plans in place to do the new access roads. The municipality has budgeted for a grader which will assist in delivering this service.
DEPARTMENT OF TRANSPORT PROJECTS
Project name Activities Ward Tribal Authority Area Start Km
End Km
Manqayini School Access Road – New Gravel Road
New Gravel Road 7 Nsinde 0.0 1.0
Sambane School Access Road – New Gravel Road
New Gravel Road 12 Nyawo 0.5 1.5
Mpondwana – New Gravel Road
New Gravel Road 8 Nyawo 0.0 4.0
D2210 – Betterment & Regravel
Betterment & Regravelling
19 Nyawo 0.0 3.0
D1839 – Betterment & Regravel
Betterment & Regravelling
14 Mngomezulu & Nyawo
0.0 6.0
D1840 – Betterment & Regravel
Betterment & Regravelling
11 Mngomezulu 1.0 5.5
D1911 – Betterment & Regravel
Betterment & Regravelling
18 Mngomezulu 12.0 19.0
D1912 – Betterment & Regravel
Betterment & Regravelling
15 Mathenjwa 0.0 1.2
D1912 – Betterment & Regravel
Betterment & Regravelling
15 Mathenjwa 1.2 2.4
D1823 – Betterment & Regravel
Betterment & Regravelling
2 Nsinde 6.0 10.8
D2374 – Betterment & Regravel
Betterment & Regravelling
1 Ngwenya 0.0 4.5
L1191 – Betterment & Regravel
Betterment & Regravelling
1 Ngwenya 0.0 5.0
D464 – Betterment & Regravel
Betterment & Regravelling
1 Ngwenya 3.0 4.6
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
145
Transport network
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
146
AIR TRANSPORTATION Accessibility by air is important from both economic and tourism development, existing airfields are as indicated, Mkuze houses the Mkuze air strip. Currently there are plans to upgrade the runway and facilities to regional airport status with adequate facilities to handle commercial flights. The upgrade would boost the activity in the area by providing more direct, quicker access to tourism areas. The airport would create a limited number of direct jobs but provide a significant boost to the economy. There is also a small grass strips at Ingwavuma, Ndumo and Ubombo that appear to be dysfunctional.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
147
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
148
C.4.4. ENERGY
Energy distribution has important economic developmental implications with a potential to make considerable impact. This impact relates to improved living conditions, increased productivity and greater sustainability of the environment. In the municipality electricity is largely generated by Eskom. The provision of electricity to houses has been identified as the priority in the municipality through the ward participation meetings. Jozini Municipality is characterized by a huge backlog in electricity provision. While such a backlog could be attributed to limited power of the available substations in relation to demand; sparsely nature of households plays a determining factor in electricity provision. Source of energy for heating
Energy Source HHs %
None 6792 17
Electricity 9006 23
Gas 1472 4
Paraffin 304 1
Wood 20517 53
Coal 505 1
Animal dung 89 0
Solar 155 0
Other 9 0
Total 38849 100 Source: Stats SA (Census 2011)
It is quite evident from the above figure that the majority of household in Jozini are heavily reliant on wood as a source of energy for heating and cooking Source of Energy for Cooking
Type HHs %
None 155 0
Electricity 9952 26
Gas 3482 9
Paraffin 220 1
Wood 24768 64
Coal 150 0
Animal dung 30 0
Solar 33 0
Other 59 0
Total 38849 100 Source: Stats SA (Census 2011)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
149
The use of electricity within Jozini LM is minimal and this could be because of the rural nature of the municipality. Access to electricity between 2001 and 2011 has improved Source of Energy for Lighting
Energy Source HHs %
None 585 2
Electricity 11301 29
Gas 307 1
Paraffin 218 1
Candles 25072 65
Solar 1365 4
Total 38849 100 Source: Stats SA (Census 2011)
20.1% of the population use electricity for lighting purposes, while the use of electricity for cooking is estimated at 16.2% and for heating at 14.4%. The use of candles for lighting has decreased drastically between 2001 and 2011, while the use of electricity for lighting increased
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
150
The above tables paint a depressing picture as far as access to electricity in Jozini Municipality is concerned. The use of wood as for cooking and candles for lighting remain high among households in Jozini Municipality. About 64% of households still utilize wood for cooking, while around 65% still rely on candles for lighting. This implies that the use of electricity remains a luxury for households. The use of woods impacts negatively on the environment, because it intensifies deforestation. ESKOM is trying to address the electricity backlog through upgrading the Service stations and building a new one.
C.4.4.1.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
151
Jozini Local Municipality does not have electricity distribution license, even for the towns. Eskom is the only Electricity Distributor for towns and rural villages. The whole electricity network under Jozini LM belongs to Eskom. The electricity infrastructure has serious challenges. The network is very old and some of it has even passed its lifespan.
THE ELECTRICITY INFRASTRUCTURE The whole electricity network belongs to Eskom. There are a number of HV and MV cables that originate from the five substations which distribute electricity within different parts of the municipal area. This is further supported by the MV substations that are there.
Despite the fact that a number of houses still do not have access to electricity, the capacity of the existing sub-stations is nearing its maximum supply, however Eskom has made plans to address this situation. This included the development of another sub-stations, a 20 MVA 132/22Kv substation in Ndumo. Whilst the capacity of some of the electricity infrastructure within the area appears to be weak and below acceptable standards, the community does not yet experience black-outs as there are not many people with electricity.
The implementation of the Rural Electrification programme entails the detailed design of the distribution electricity connector infrastructure as per the Eskom and NERSA guidelines and specifications of a 20 AMP connection. Construction activities will include overhead distribution lines, individual household connections, installation of pre-paid electricity meters and in-house distribution boards.
The Jozini Local Municipality will take overall responsibility for the implementation of the programme. Eskom will continue to electrify those areas that they are busy with, which falls under the Municipality. The Technical and Planning Department together with the Director oversee all the electrification projects, while the Consultants manage the contractors.
Once the projects are completed, the infrastructure in those areas falling under Eskom supply will be handed over by the Municipality to Eskom for operation and Maintenance.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
152
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
153
ELECTRICITY BACKLOGS The licensed distributors in the area under the Jozini Local Municipality (JLM) is Eskom. Eskom has five substations within the Jozini Local Municipality. The five substations are:
Mkhuze substation; Makhonyeni substation; Nondabuya substation, and Ndumo substation.
The Jozini Local Municipality is characterized by serious backlogs. Currently, it is claimed that out of 38,849 households, only 10,203 have access to electricity. This figure translates to 26.3% of houses electrified, which is far much lower than the national figure. The huge electricity backlog is partly attributed to the sparsely nature of the households, in addition to lack of sufficient capacity from Eskom substations. To confirm the seriousness of lack of access to electricity in the Municipality, around 59% of households still utilize wood for cooking, while 57% relies on candles for lighting. To the majority of households in the area, the use of electricity still remains a luxury. ESKOM ON-GOING PROJECTS
PROJECT WARD FUNDER STATUS MARCH 2019
Ophansi Electrification (647) 20 ESKOM 30%
Bhekindoda Electrification (296) 9 ESKOM 45%
Shukela Electrification (256) 10 ESKOM 20%
Madeya Electrification (261) 17 ESKOM 20%
Nyamana/ Ntabayengwe/ Siweni/ Bhekindoda Electrification (553)
11 ESKOM 5%
Ekuhlehleni Electrification (522) 15 ESKOM 20%
Makhonyeni/ Bhanjana electrification (252)
05 ESKOM 20%
Mzinyeni/ KwaMbuzi Electrification (401)
10 ESKOM 60%
Ndumo #2 electrification (494) 16 ESKOM Construction started
Esihlangwini electrification (276) 14 ESKOM 20%
Enkungwini electrification (502) 18 ESKOM 50%
PROJECT WARD SOURCE OF
FUNDING 2019/20 2020/21
Nhlangano 3
KwaQondile 7
Mkhuze waManzi/Mshophi 1 & 20
Manqonjwana Electrification
2
Shemula/ Khonya (722) 12 ESKOM
Nyamana/ Ntabayengwe/ Siweni/ Bhekindoda Electrification (397)
11 ESKOM
Emngceleni Electrification (494)
10 ESKOM
Embadleni (352) ESKOM
Gwaliweni Phase 2 (269) 9 ESKOM
Jozini Bulk extensions (900)
Various ward ESKOM
Oshabeni/ Nonjinjikazi (505)
11 ESKOM
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
154
Khonya #2 (718) 5 ESKOM
Amandlethu (236) 8 ESKOM
Enkungwini #2 (869) 18 ESKOM
Esihlangwini #2 (500) 14 ESKOM
Mkhonjeni Biva Island (204)
6 ESKOM
Mzinyeni & KwaMbuzi Phase 2 (471)
10 ESKOM
Embadleni #2 (721) 17 ESKOM
Ndumo Phase 3 (Thelamama) (573)
16 ESKOM
Extensions 10 (345) Various wards ESKOM
Extensions 24 Various wards ESKOM
ELECTRICAL NETWORK REFURBISHMENT The Municipality plans to carry out refurbishment of the electrical network as their infrastructure is very old. They plan to do this in phases. The initial stage is to upgrade the two incomers which are the Munic 1 and Munic 2. They have estimated a budget of R140.8 million to complete this work. The Municipality has requested a grant funding of R60 million from the Department of Energy to cover part of the R140.8 million to fund the upgrade of the two electrical networks. They plan to cover the balance of the budget from own balance sheet.
According to the information obtained from the business plan, the Municipality has a backlog of 28,646 houses without electricity. The estimated funding required for the current backlog, based on the estimated household cost per connection of R19,000 will translate to a total of R5443 million to be raised to deal with the total backlog, without considering new housing developments.
What is however very encouraging to note is the Municipality has commenced with the process of compiling a DBSA funded Municipal-Wide Electrification Master Plan which will serve as strategic tool tp guide decision making towards the provision of electricity to the people of Jozini. It is anticipated that the master plan would have been concluded and adopted by Council not later than 31st December 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
155
C.4.5. ACCESS TO COMMUNITY FACILITIES
C.4.5.1. CEMETERIES There are 2 cemeteries that are under Jozini municipality i.e. Umkhuze and Ingwavuma. There are also 7 other cemeteries which are in the villages but are not owned by the municipality. Those villages are Makhonyeni A, Makhonyeni B, Sibongile, Hlalanathi, Biva, Mkhonjeni and Bhanjana. The municipality is clearing and fencing the ones in the villages. It is also worth mentioning that the municipality is currently undertaking the feasibility studies for the formalization and development of new cemeteries in Bhambanana, Ndumo, and Jozini Nodal areas.
C.4.5.2. MUNICIPAL HALLS & SPORTS AND RECREATION The municipality has built a number of community halls and constructed a number of sports fields/ grounds with the assistance of the Department of Sports and Recreation in some. In total Jozini municipality has 21 sportsfields and 43 halls. It has been noted that most of these facilities were in the past not well maintained, the municipality has tried to renovate most of these facilities. In this regard is worth noting that the municipality has strengthened its organizational capacity inclusive of policies for the management of the facilities
THUSONG CENTRE Jozini Municipality has 1 Thusong Centre which is located within Jozini town and another Service Centre located at KwaNgwenya (ward 1). This centre is operating well. There are government departments that occupy offices within this centre. The Jozini Thusong Service Centre is set within the development communication change which reflects a democratic approach to a public communication and information system. As it aims to put the information needs of citizens first in the communication process, this system is to empower the poor and disadvantaged. Jozini Thusong Service Centre is viewed as a means to operationalize the development communication approach as well as address information and service imbalances at local level by bringing government closer to the people.
MUNICIPAL LIBRARIES The municipality has 05 libraries (Jozini, Manyiseni, Ndumo, Qondile and KwaJobe). There is one library which is still under construction (Ingwavuma) The libraries currently accommodate from preschool up to tertiary students. The libraries are currently engaged to the following programmes:
Internet cafes; computer for blind people; Advocacy on Educational programmes; Computer literacy; reading activity; Outreach programmes; career guidance and mobile library.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
156
Social Facilities
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
157
C.4.6. HUMAN SETTLEMENTS
There has been a more than significant increase between 1996 and 2001 and between 2001 and 2011 in the number of households residing in formal dwellings. As can be expected, there has also been a significant decrease, over the same time periods, in the number of households residing in traditional dwellings. The Jozini LM plays a role in housing delivery at the local level, since housing delivery is identified as being one of the municipalities mandates. The core role of local municipalities as outlined in the Constitution, 1996 is to take all reasonable and necessary steps, within the framework of national and provincial legislation and policy, to ensure that the inhabitants within its area of jurisdiction have access to adequate housing.
C.4.6.2. HOUSING SECTOR PLAN The formulation of the Jozini Housing Sector Plan (HSP) Review is in accordance with statutory requirement of section 9(1) of the National Housing Act (No. 107 of 1997) which informs the compilation of Housing Sector Plans. Part 4 of the Act specifically requires municipalities to compile strategies and targets, as part of their Integrated Development Plans. As such the Jozini Municipality has developed a comprehensive strategic plan of which the main objective is to create sustainable human settlement within the municipal area. Sustainable human settlements in this instance, refers to the creation of human settlements that cater for the infrastructural and socio-economic needs of the people. The objective is to sustain livelihoods rather than catering only for housing (BNG). This new Jozini LM HSDP envisages a more demand driven housing delivery process that will enable the municipality to assume overall responsibility for housing programmes within their areas of jurisdiction. As such, all municipalities have to be accredited and demonstrate their capacity to plan, implement and maintain projects and programs that are integrated with their IDPs. Since the introduction of the Housing Act, (Act No. 107 of 1997), the National government has introduced a comprehensive programme to address a range of housing needs in South Africa. The programme is outlined in the National Housing Code and the recently introduced Comprehensive Plan for the Creation of Sustainable Human Settlements (commonly known
Area Percentage
Urban 4,9%
Tribal/Traditional 94,9%
Farm 0,2%
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
158
as Breaking New Ground). The National Housing Code (March 2000) sets out clearly the National Housing Policy of South Africa. It identifies the primary role of the municipality as taking all reasonable and necessary steps, within the framework of national and provincial legislation and policy, to ensure that the inhabitants within its area of jurisdiction have access to adequate housing on a progressive basis. This entails the following:
Initiating, planning, facilitating and coordinating housing development. This can be undertaken by the municipality itself or by the appointment of implementing agents.
Preparing a housing delivery strategy and setting up housing development goals. Setting aside, planning and managing land for housing. Creating a financially and socially viable environment for housing delivery. Facilitating the resolution of conflicts arising from housing delivery initiatives. Facilitating the provision of bulk services. Administering national housing programmes. Expropriating land for housing development.
The main aim of this plan is not only to assist the municipality in fulfilling the above-mentioned role assigned to it in terms of the National Housing Code, but it is also to fulfill development goals and objectives outlined in the IDP and SDF. The Housing Plan is aligned with strategies and development goals in the IDP and SDF. The Jozini Local Municipality has committed itself to support the acceleration of sustainable human settlements at appropriate locations and to ensuring that social development is catered for within the municipality. The following are some of the key development trends/ patterns and their implication for the delivery of housing in Jozini Local Municipality:
Population densities in Jozini are highest in the northern parts of the municipality (ward 14, 5 and 10). The delivery of housing should be focussed in areas where there are higher population densities as well as identified investment areas.
Jozini LM has a very youthful population as the majority are aged between 15 and 64 (54. 8%). This has implications in terms of the type of services that might be required. Although the relative youthful population is decreasing, it is still dominating and adds pressure on the provision of educational facilities and employment opportunities to retain them within the municipal area. Youth unemployment rate is 52.7%. This implies that because this group is the most dominant group within Jozini, there may be a need to expand on housing instruments and explore various other ways in which unemployed people can access housing delivery processes.
Majority of the Jozini LM population belong to the very low-income groups (earn less than R3200 p/m). Low levels of income indicate high levels of poverty and high levels of dependency. The area has a strong rural character with the low-income population who can qualify for housing subsidies.
There is a huge percentage of economically inactive people (31%), this may be an indication of the level of grant dependency within the municipality. This has detrimental implications for the sustainability of housing projects in the future and the ability of household heads to maintain houses, pay municipal rates and services.
There are more females than males in Jozini this suggests the need for future housing projects to be gender sensitive and prioritize housing issues confronted by females.
Jozini LM has undulating terrains. This has detrimental implications for service delivery which should be considered at the planning phases of development processes.
The population settlement trend is that people are generally settled in rural settlements where there is a lack of infrastructure development and services. Therefore, housing projects should be in areas close to existing economic opportunities, services and facilities.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
159
C.4.6.5. EXISTING AND PLANNED HOUSING PROJECTS Table. Planned and Current Housing Projects
PROJECT NAME WARD PROJECT TYPE
NO. OF UNITS
PROJECT MILESTONE
Ndumo 16 Rural 1000 Planning
Jozini Ward 5 5 Rural 1000 Planning
KwaJobe Phase 2 3 Rural 800 Construction
KwaNsinde Rural 600 Construction Almost Complete
KwaNgwenya 1 Rural 600 Construction Almost Complete
KwaMngomezulu 16 Rural 800 Construction Almost Complete
KwaMathenjwa Rural 1000 Construction Almost Complete
Siqakatha 6 Rural 1000 Feasibility
Mhlekazi & Mkuze 1 & 20 Rural 800 Feasibility
Zineshe & Gujini 3 & 4 Rural 800 Feasibility
Hlalanathi & Mamfene 5 & 6 Rural 800 Feasibility
Maphaya & Madinyane 2 & 7 Rural 800 Feasibility
Msiyane & Nondabuya 8 & 19 Rural 800 Feasibility
Ophondweni & Emziyeni 9 & 10 Rural 800 Feasibility
Nyamane & Machobeni 11 & 14 Rural 800 Feasibility
Shemula & Makhanisi 12 & 13 Rural 800 Feasibility
Mbadleni & Ndumu 16 & 17 Rural 800 Feasibility
Manyiseni & Nkungwini 15 & 18 Rural 800 Feasibility
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
160
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
161
C.4.6.6 TELECOMMUNICATIONS
Item Yes No
Cellphone 85,7% 14,3%
Computer 4,1% 95,9%
Television 39,8% 60,2%
Satellite Television 5% 95%
Radio 69,4% 30,6%
Landline / Telephone 2,2% 97,8%
Motor Car 13,9% 86,1%
Refrigerator 35,3% 64,7%
Electric / Gas-Stove 36,1% 63,9%
Between 2001 and 2011, there has been a dramatic increase in the number of households who had access to televisions, cell phones and the internet. This is important to note, since it could, in the future, become a means to directly communicate with households.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
162
C.4.6.7 SERVICE DELIVERY & INFRASTRUCTURE: SWOT ANALYSIS
STRENGTHS WEAKNESSES
• Community halls in all but one ward
• Community facilities: sport fields,
• Financial resources
• Quarterly site visit by portfolio committee.
• Existence of Municipal Libraries
• Electricity licence
• Inconsistency on goal implementation
• Limited office space
• Incomplete project due to inadequate project management.
• Lack of infrastructure plan.
• Lack of a municipal-Wide Integrated Transport Plan (ITP)
• No legal landfill site
OPPORTUNITIES THREATS
• Rural development as identified in national development plan
• Funding sources such as DBSA and donor funds.
• Land available for development
• Lack of proper water and sanitation service
• Rapid urbanisation without services
• Drought
• Poor maintenance of provincial road.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
163
C.5. LOCAL ECONOMIC & SOCIAL DEVELOPMENT ANALYSIS
C.5.1. LOCAL ECONOMIC DEVELOPMENT ANALYSIS
According to guidelines prepared by World Bank “Local Economic Development (LED) is the process by which public, business and non-governmental sector partners work collectively to create better conditions for economic growth and employment generation. The aim is to improve the quality of life for all.
C.5.1.1. LED STRATEGY Jozini municipality has an LED Strategy which was approved in May 2019. The funding to review the strategy was received from COGTA and Officials from COGTA were part of the project steering committee during the review of the strategy. It is attached in the IDP document.
C.5.1.2. POLICY/ REGULATORY ENVIRONMENT
INFORMAL ECONOMY POLICY The municipality has an adopted Informal Economy Policy which regulates permits for street vendors. The informal economy provides a form of livelihood to the poor and makes an important contribution to the economic and social life of residents in Jozini Municipality. The informal economy in Jozini is diverse, ranging from street traders and shebeen owners to child careers and domestic workers. It is often characterized by its flexibility, creativity, resilience to absorb shocks, and its ability to adapt to changing external environments. This activity is quite widespread and accounts for a significant proportion of the employment and income of the municipality. The development of the Ithala Mall and adjoining retail facilities in Jozini CBD plays a significant role in promoting small business development and prevention of leakage of buying power to neighboring towns. The services of the informal economy in Jozini not only address selling of food and beverages but also extend to tertiary services such as plumbing and catering. The issue of lack of finance and appropriate business skills hinder entrepreneurs from developing their businesses into fully-fledged formal operations. The major challenges that the informal sector experiences are summarized as:
Competition from big supermarkets makes it difficult for the informal traders (the informal traders compete with the supermarkets who sell the goods at a very cheap rate because they buy the stock in bulk and this reduces their potential income and growth of their business);
There is a lack of facilities such as street vendor shelter, safe packaging and storage facilities for sellers;
Lack of access to capital for expansion of business and for improvement; Lack of awareness of incentives available to them which could benefit them; Lack of awareness of support structures available to the; and the Lack of management and business skills.
INVESTMENT/ RETENTION POLICY Investment Promotion in Jozini Municipality is uncoordinated due to the lack of an Investment Promotion Strategy for the Municipality. Consequently, there is a lack of investment promotion projects and programmes for the local municipality. Efforts have been
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
164
made, through the LED Forum, to hear presentations by potential investors and investment projects; however, very little visible result has been seen from these endeavors. IMPLICATIONS FOR REVISED LED STRATEGY
Need for Investment Promotion Strategy to Guide Investment and Promotion in the LM Training for LED Officials in Investment Promotion Strengthening relationships with TIKZN in order to build on investment promotion
opportunities Strengthening relationships with Umhlosinga Development Agency in order to grow
investment promotion in Jozini Need for requirements of LED Forum
The municipality has been involved in a number of efforts to assist small scale businesses and cooperatives in their development. This has involved the development of business plans, linking SMMEs and co-operatives to funding sources and assistance in terms of registration. Challenges that have been felt in this regard include the limited funding for such projects. There is also no guiding documentation (no investment promotion strategy or SMME Development Strategy) that assists the LED Unit in developing, supporting and retaining businesses in the Municipality. Due to this, there is also little business retention and support programmes for large-scale investors into the local municipality. He municipality is in the process of appointing the service provider to do an Investment/Retention Policy.
EPWP POLICY The EPWP policy is aligned with EPWP phase 3 but still need to be adopted by the Council.
SMME’S AND CO-OPERATIVES DATABASE There is a database for all active/registered SMMEs and Cooperatives in the municipality.
C.5.1.3 This PGDS and PGDP provides KwaZulu-Natal with a reasoned strategic framework for accelerated and shared economic growth through catalytic and developmental interventions, within a coherent equitable spatial development architecture, putting people first, particularly the poor and vulnerable, and building sustainable communities, livelihoods and living environments. Attention is given to the provision of infrastructure and services, restoring the natural resources, public sector leadership, delivery and accountability, ensuring that these changes are responded to with resilience, innovation and adaptability. This will lay the foundations for attracting and instilling confidence from potential investors and developing social compacts that seek to address the interconnectedness of the Provincial challenges in a holistic, sustainable manner, whilst nurturing a populous that is productive, healthy and socially cohesive. The PGDS aligns itself to the Millennium Development Goals (MDGs), the New Growth Path (NGP), the National Development Plan (NDP), as well as various other national policies and strategies. It identifies seven strategic goals, all of which have a direct bearing on economic development. They are:
Goal 1: Job Creation; Goal 2: Human Resource Development; Goal 3: Human & Community Development; Goal 4: Strategic Infrastructure;
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
165
Goal 5: Environmental Sustainability; Goal 6: Governance and Policy; and Goal 7: Spatial Equity.
Strategic Goal 1, Job Creation, deals directly with local economic development, and is of particular importance to the purposes of the current analysis. The key strategic objectives within this goal are:
Unleashing the agricultural sector; Enhancing sectoral development through trade and investment; Improvising the efficiency of government-led job creation programmes; Promoting SMME and entrepreneurial development; and Developing the knowledge base to enhance the knowledge economy.
In addition, other cross cutting goals and objectives relate to the development of strategic infrastructure such as roads and rail, ensuring demand-driven skills development and training, ensuring efficient coordination between all developmental stakeholders, and promoting spatial equity through spatial concentration. Implications for Jozini LED: To this end, the Jozini LED needs to ensure:
A focus on development of key economic sectors (agriculture, manufacturing, tourism, SMME & informal sector and services);
Advancement of investment promotion and facilitation as a means to stimulate economic development;
Development of SMMEs and promotion of entrepreneurship; Industry-driven skills development and training; Development of spatial concentration through use of nodal and corridor development; Enhanced coordination between all stakeholders.
The District Municipality has developed a DGDP. This was done in order to compile a comprehensive and strategic vision and direction for growth in the District until the year 2030. The long-term vision for uMkhanyakude District as outlined in the DGDP is simply and clearly “uMkhanyakude Metro by 2030”. The vision is said to be about two things; 1. the resolve by the family of Municipalities to bridge the urban/rural divide insofar as the
development of the District needs to ensure that all the people of the District needs to have access to and enjoy the conveniences of a metropolitan city; and
2. to rally the people of the District around one large, long term planning idea. This DGDP was designed to link the IDP with the National and Provincial planning imperatives. The District DGDP identified the following Strategic Goals for Long Term development within uMkhanyakude: 1. Expanded District Economic Output and increased quality and quantity of employment
opportunities 2. Enhanced quality of District Human Resources 3. Improved quality of life and life expectancy within the District 4. High quality infrastructure network to support quality of life and economic growth 5. District development to be characterised by integrity and quality of physical environment
and underpinned by a coherent spatial development 6. Excellence in governance and leadership Furthermore, there are six Key Performance Areas (KPAs) that were identified within the DGDP. These are the following: 1. Municipal Transformation and Institutional Development 2. Service Delivery and Infrastructure Development
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
166
3. Local Economic Development 4. Municipal Financial Viability and Management 5. Good Governance and Public Participation 6. Spatial Planning and Environmental Management Implications for Jozini LED:
Importance of IGR structures and communication between local and district municipalities
Local Economic Development as a KPA for the DGDP Integrated urban and rural development Improved municipal leadership, training and capacity LED for the promotion of employment opportunities and economic growth
MAIN ECONOMIC CONTRIBUTERS Agriculture Tourism Business: Formal and Informal
AGRICULTURE
Agriculture, although it has shown a positive growth rate within the past 10 years, has declined in contribution to the Gross Value Added of the Local Municipality. In 2013, the sector only contributed 7% to the overall GVA of Jozini Local Municipality. The climate of Jozini Local Municipality can, for the most part, be described as subtropical and varies from moist subtropical along the coast to moderately dry subtropical in the west. The climate, together with the soils of the area has the greatest influence on agricultural production in the area. Value-adding remains a challenge for Jozini Municipality’s agricultural production. Value-adding approaches should focus on processing, packaging, marketing and the distribution of local produce. Workers are more likely to transfer their skills to value-added enterprises than to non-agricultural manufacturing and service industries. Jozini Municipality needs to harness the potential of proposed strategies and plans for agriculture in order to:
Promote the development of economic infrastructure, such as market stalls at accessible locations;
Provide agricultural extension services (fertilizers, seeds, irrigations etc.) and training programmes with the Department of Agriculture as a key partner;
Identify international donor agencies for investment programmes; Promote agricultural beneficiation; and Identify suitable areas for the development of market gardens.
In addition to traditional livestock the following activities are present in Jozini:
Sheep farming; Goat farming; Dairy ranching; Poultry production; Wildlife ranching; Aquaculture; Vermiculture; Apiculture; and Alternative animal production systems
Crops produced in the area include:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
167
Cotton; Sugarcane; Fruit and vegetables; Fruit trees (avocado, papaya, banana, citrus, and mango); Cassava; and Forestry.
TOURISM
Tourism is regarded as a cross-sectoral industry in that it has linkages with other sectors such as retail, manufacturing, transport, catering, hospitality, etc. As a result, it is difficult to measure the contribution of tourism to the local economy as GVA from the tourism industry is spread across a number of other sectors. The provincial catering and accommodation sector employed close to 42,000 people, and generated a GVA of more than R6.7 billion in 2011. The sector experienced 5.7% real average annual GVA growth since 2001, while employment within the sector declined at 1.9% per annum. This indicates that while the sector is growing, the employment in the sector is not growing at the same pace as the output and there is a need to boost employment in the sector. In order for tourism development to be effective within the context of the LED, it needs to be aligned to the tourism strategy for Jozini Municipality and the newly developed Draft Tourism Strategy for Ndumo. The vision for tourism in Jozini Municipality is the following:
To increase the tourism product offerings in order to attract tourists that have traditionally bypassed the area and in the long term to turn Jozini into a fully-fledged destination in its
own right by focusing on the area’s natural asset base, the diverse cultural representations and the unspoilt natural beauty of the area.
It is necessary to institutionalize the tourism industry by promoting partnership investments. The Jozini Dam is an under-exploited resource in the area. The local municipality has identified the need for park and recreational zones at Jozini to boost the local economy through tourism. The Muzi Lake, boat and canoeing projects have been specified as a priority project represents a potential entry point to unlock potential. The main attractions in the Jozini region listed in the IDP review are: Lebombo Mountains; Pongolapoort Dam (commonly known as Jozini Dam); Pongolapoort Game Reserve; Mkhuze Game Reserve; Ndumo Game Reserve; Hlathikulu Forest; Jozini Dam Development; Border Cave; fishing in the Pongolo River; King Dingaan’s Grave; Usuthu Gorge. MANUFACTURING
The manufacturing sector is the joint third (with general government) largest contributor to the Local Municipality’s GVA (contributing 13% in 2013). The provincial manufacturing sector employed close to 287,000 people, and generated a GVA of more than R76 billion in 2011. The sector experienced 2.4% real average annual GVA growth since 2001, while employment within the sector declined at 2.0% per annum. Some of the key constraints highlighted by manufactures in the context of LED, which have had an impact on employment and output of the sector are:
Increasing input costs (electricity, water, labour and capital goods); Collapse of the rail network and unreliability of the current rail service; Underinvestment into electricity and water supply infrastructure; Lack of available, zoned industrial land;
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
168
Too much red-tape creating an administrative burden for industry; Lack of maintenance and provision of roads and other bulk services; Restrictive labour legislation; Declining competitiveness due to a lack of new investment (and technology); Vulnerability to international market prices; Lack of coordination between public and private sector; Lack of support for industry by local government (in terms of lobbying with provincial and
national government and SOEs); and Impact of HIV/AIDs on the working age population.
Manufacturing contributes 13% to Jozini’s overall Gross Value Added and employs 5.43% of the total employed persons within the formal economy. Jozini’s industrial activity is limited due to lack of supporting infrastructure. However, it should be noted that despite this, there are numerous SMME and informal activities in evidence in the area. For these smaller operators as well as large scale industrialists, water and power access remain constraints, there are opportunities that can be explored in this sector. Expanding established industry has a range of exciting possibilities and municipal support functions will play an increasingly important role in supporting continued inward investment in to the local area. There is also a number of untapped opportunities in the manufacturing sector, especially timber processing which is currently dominated by larger established sawmills. RETAIL, COMMERCE AND THE INFORMAL ECONOMY
Informal trading has become a feature of the urban and rural environment in Jozini Local Municipality, and requirement its changing nature in both spatial and economic terms. The municipality has developed an Informal Trading policy. The uncontrolled and unplanned growth of this sector will have a negative impact on the developmental agenda of the municipality. It can result in conflicts between stakeholders due to the uncertainty of each other’s rights and limitations, e.g. informal traders and big businesses and officials. The advantages of having an informal trader’s policy are:
It defines a holistic and integrated approach to informal trading; It will clarify the municipality’s position on informal trading; It will form the basis for the implementation of By-Laws that regulate informal trading in
the municipality; and It provides basis for resource allocation decisions.
C.5.1.4. INTERVENTIONS AND PROGRAMMES The following co-operatives will be supported by the Department of Small Business Development:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
169
C.5.1.5. BENEFICIARIES
CO-OP CONTACT PERSON
Makhathini Youth farming Simelane N Mazwi
Vezithanga Agriculture Lindiwe T Ntshakala
Umpheme Poultry Broilers Mazibuko Sindisiwe
Ingenzeka Nyawo Samkelisiwe
WARD 1 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Mpungamlilo poultry (eggs) Presented at Mlingo hall by ward committee member: Thembinkosi Bhekinkosi Mbhamali
0825362872
KwaNtaba tent, chairs, pots, etc
Ngudeni tent, chairs, pots, etc
Mpileni mobile cold room
Mhlekazi tent, chairs, pots, etc
Mkhuze wamanzi park, Shisanyama, meat cutting machines
S Mponza, M Mathe 0611725988/ 0761558913
Nhlonglela Ehlanzeni tent, chairs, pots, etc Mrs Myeni, Mrs Manukuza 0824795414/ 0762526217
The Holly Mountain of Ukukhanya (Tent, 100 chairs, 3 tables (Esitobhini area)
Mrs Ntshangase (Sihlalo), Musa Shongwe (Nobhala), Xolile Mthiyane
076265217 0646657317 0794142218
Izenzo 7( Inhlangano yabeFundisi): fencing of 4 hectares garden, goats,
NJ Myeni, T Nyawo, Mr Zakwe 0823590324/ 0724382412/ 0711451330
Ngudeni Garden (2 tanks and hoes) Gugu Hlatshwayo, Sthenjwa Ndwandwe 0769126014/ 07230551050
Ngudeni Dam OB Mawela/mGuva Thabede 0828429547
Shelter, 4 laptops, photocopier, Fax machine, Stationery
Nokulunga Hlatshwayo, Skhumbuzo Shoba 0793049945/ 0655220274
Mhlekazi tent with 200 chairs and mobile coldroom
Dumisile Myeni Ntombi Gabela 0824365219
Mhlekazi pig farming Mboneni Myeni, Zibuse Dladla 0728806075
Mhlekazi stove with pots Mabhuti Fakude, Xolani Dladla 0713842617/ 0727172931
Mbabazane Garden (Fencing) Nokuthula Gabela, Sizakele Dladla 0764506619/ 0798154751
Mpungamlilo Market Bonisiwe Thwala, Nomthandazo Masuku 0766613838/ 0727485904
Mpungamlilo tent with 200 chairs Thembeni Donda, Celiwe Fakude 0799046269/ 0724052465
Mpungamlilo goat farming Nhlanhla Thabede, Bonginkosi Mziyakho 0796799703/ 0714173311
Empileni coldroom Siyabonga Ndlovu, SB Manyanga 0824868257
Sinothando bakery (stove/ oven) Smangele Myeni, Maleli Thwala,
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
170
P Manukuza 0792358756/ 0795364430
Mkhuze wamanzi creche Jabulani Ntombela, R Gumede 0824891395
Tshaneni poultry Nokwethemba, Gugu Ngema 0822569209/ 0797299951
Siyaqhubeka youth project:Salon (Nhlonhlela) Nokubonga Fakude, Mpilo Gumbi 0712651467/ 0727043031
Fezeka Youth project (chips machine) Snethemba Mathe, Mpume Myeni 0791847865/ 0723584824
Ntulindawo coldroom Lahliwe B Thabethe, FG Mzileni 0761558913
Ngoqongweni sewing project Siphiwe Buthelezi, Khaya Fakude 0798044497
Sound system and traditional attire Abafana bakaSgugu0767525928/ 006083008299
Ngoqongweni tent and chairs and generator Sboniso Mazolo, Sipho Fakude 0728015011
Mshophi Youth project (coldroom, tent and 200 chairs)
Mathalente Myeni, Mimi Fakude 0722164545/ 0663764904
Home blocks project Mbongeni Mathenjwa, Abraham Mzileni 0765971216/ 0798628648
KwNtaba tent, 200 chairs and pots 0729736439/ 0762378375
KwaNtaba coldroom, tent and chairs Dumisani Nyawo Jabulile Shongwe 0763469794
KwaNtaba sound system James Nkambule, Qiniso Myeni 0795788930/ 0826378412
Mange tent, 200 chairs and coldroom Xolile Zungu, Ziningi Myeni 0724845124/ 0714431713
Mange cutting machines Jabulani Siyaya 0728124599
Mange sound system Nkinsimane Myeni, Mzamo Zungu 0646027007/ 0712224284
Mange dam PF Fakude 0723321140
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
171
WARD 2 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Sun-rise crèche Peter Mafeni 10
Siqalo esihle block making Bongani Ngema 2
Ukuhlobangemvunulo Hlalile Ntimane 1
Majozini car wash B Thabethe 6
Madinyane Ziphilise goat farming W Mbatha 3
Ezinkunini car wash D Mlambo 5
Majozini poultry T Makhunga 9
Market stalls C Ntombela 7
Majozini sound system SJ Dlamini 8
Majozini catering (izitsha) M Mbhamali 4
Makhehlekehle welding E Mngadi 11
Esikhaleni catering PN Mdletshe 13
Gidamuva (ubuhlalu- Majozini) J Khanyile 15
Siza uzalo sewing machine B Gumbi 14
Grass project (Nkangala) B Mtshali 16
Sisonke pig farming (Esikhaleni) MW Myeni 12
Siyathuthuka catering (Nkangala) E Myeni 18
Sinamuva catering (Ezinkunini)) T Mabaso 19
Magcwalinsila plumbing S Dlamini 17
Events and sound system (Majozini) S Dlamini 20
Siyababusisa M Gumbi 21
Ophande
Bekezela Mama (tent, chairs, coldroom & uniform)
Siyaphumelela project (sewing)
Zenzele block making
Umnotho wethu project (abalimi)
Eyethu club (mobile fridge, tent & chairs)
Zinkunini
Siyabonga internet café (computers, printer, photocopier, papers, etc)
Gogobane Bhumeni garden (fencing material)
Makhabaluthuli sound system
Zizamele catering project
Qophumlamdo (2 video cameras & 2 cameras)
Nkangala
Nkangala Mothers (tent, chairs, generator & 3 tables)
Hlanganani (300 chairs)
Thuthukani boys (6 grass cutting machines)
Struggle woman (catering set)
Sphethamakhaya project (toilet paper machine, accessories and stretch tent)
Majozini
Siyabajabulisa project (meat cutting)
Sizabantu container (container to sell vegetables)
ST. Alexis
St Alexis internet café (computers, printers, photocopier)
Sukuma project (catering equipment)
Qhubekela phambili (amacansi)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
172
Obaleni catering (stretch tent, sound system, gas stove, pates)
Lindani project (chainsaw, brush cutter)
Siyaqhubeka catering project (catering equipment)
Obaleni car wash
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
173
WARD 3 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Ubumbano project
4 grass cutting machines (ezinyokeni Youth group)
Uthandolwethu Club (Ezinyokeni) tent & 500 chairs
Sizisizwe Creche (Ezinyokeni)
Emseni crèche- Ezinyokeni (chairs and toilets, fencing & 5000 ltrs tank))
Endalini tree cutting 0768704673 0763472379 0727788716
Qalakancane garden (eNhlangano)
Zamokuhle Agricultural project
Mbadleni coldroom and generator
Mbadleni block making
Mbadleni poultry
Komkhulu poultry
Komkhulu market
Komkhulu salon
Mthambalala crèche
Mthambalala bakery
Mozi fencing
Mozi tent with 400 chairs and sound system
Mozi crèche
Ndalini sewing projectNdalini nursery
Sivukile 3 pole tent and sound system
Nhlangano tractor
Nhlangano crèche
Nhlangano tent with 400 chairs
Zineshe tent
Zineshe craft work
Zineshe poultry
Ezinyokeni tent, coldroom and sound system
Ezinyokeni market stalls
Ezinyokeni youth poultry
Ezinyokeni youth (1000 bags of cement)
Ndalini market
Sinamuva nursery
Masibambane poultry
Vukani poultry
Kwadonsa poultry
Bonelani garden fencing and engine
Sekusile garden engine and 2gates
Mtholwane garden fencing, engine and pipes
Qalakancane garden
Vulamehlo craft work
Ezinyokeni poultry
Amacansi (omama baseZinyokeni)
Ezinyokeni blocks project (500 bags of cement)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
174
Ekudilikeni creche
Mobile tent (Ekudilikeni)
Financial assistance (student registration fees)
Ward tent with 2000 chairs
3 coldrooms
Workshop building
Market stalls
Mthambalala shelter
Kusakusa garden garden Ezinyokeni (fencing, engine, tank)
Church of Christ Ezinyokeni (3 pole tent, 400 chairs & sound system)
Qalakusa sewing project Ezinyokeni (tables, chairs & structure)
Siyazama project Ezinyokeni (photocopying machine)
Siyahluma poultry project
Ezinyokeni goat farming
Injongo yezemvelo eNhlangano
Ezinyokeni community shelter
Mandlanzi dam
Ezikhoveni church eMthambalala (church house, chairs & tables)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
175
WARD 4 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Beauty contest for youth 1
Drivers’ licences for youth 2
GG mobile fridge 3
Computers for youth 4
Sibonokuhle Block making project
Sibonokuhle Sewing machines
Sibonokuhle vegetable market
Sibonokuhle poultry
Mthidlwe Poultry project
Isishebo Poultry project (Mthidlwe)
Mthidlwe dam
Mthidlwe creche
Cezwane Tent, chairs, tables and covers/ cloths
Cezwane Isiqalosethu crèche (chairs, tables and swings)
Cezwane Sound system, tent and chairs
Cezwane Agriculture material for elders
GG Tent, chairs and generator
GG Vegetable market
GG Asimbonge co-op (poultry)
Zagogwana Crèche
Zagogwana Gardens
Ekuveleni Poultry project
Ekuveleni goat farming
Mangwenya Poultry Project
Cezwane poultry
Mangwenya block making
Mangwenya tent
Mandonya tent, pots, stove, tables, etc.
Nomabhengu goat farming
Sibonokuhle goat farming
Mthidlwe Dlamiyana project
Cezwane Mthala market fencing
Mandonya poultry
Career EXPO
Mandela Day
Sizanani coldroom
Sizakancane project (goats, tent, chairs, sound system)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
176
WARD 5 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Mthelu crèche LS Myeni 1
GG 3 pole tent with 200 chairs J Zwane 2
Hlalanathi tent, chairs and table T Mabaso 3
Emagroundini pig farming NT Radebe 4
Banjana Block making M Buthelezi 5
Sibongile tent and chairs 6
Imakancane tent & chairs 7
Makhonyeni primary (creche) 8
Mkhayane tent, chairs and tables 9
Gedleza coldroom 10
Sinethezekile sports kits 11
September Zulu dance 12
June Youth celebration 13
Zion celebration 14
Disability day 15
Sibongile traditional attire hire (beads and amacansi)
J Mathabela
Makhonyeni primary sewing machines Z Mchunu
Gedleza coldroom ZI Simelane
Banjana crèche
Banjana Coldroom, tent, chairs and 2 tables
Umshini wezingubo (Banjana)
Banjana poultry
Banjana Jumping castle hire
Banjana pig farming
Banjana catering and decoration project
GG Poultry (1000 chicks)
GG sewing project (10 machines)
GG youth block making
GG youth goat farming project
GG youth sheep farming project
Hlalanathi crèche
Hlalanathi sound system
Hlalanathi catering
Hlalanathi poultry
Hlalanathi grass cutting machine
Gedleza tent, chairs and tables
Gedleza poultry (eggs) for Abafelokazi
Makhonyeni primary crèche
Makhonyeni primary coldroom
Makhonyeni primary tent and chairs
Makhonyeni primary catering and decoration
Makhonyeni primary jumping castle
Makhonyeni primary block making
Mthelu coldroom
Mthelu tent
Mthelu sewing machine
Mthelu catering and decoration
Mthelu Jumping castle
Sinethezekile coldroom (emagroundini)
Sinethezekile arts/ craft project
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
177
Emagroundini crèche
Sinethezekile sewing club
Sinethezekile poultry
Sibongile coldroom
Sinethezekile shelter for market stalls
Sibongile poultry
Sinethezekile bakery
Makhonyeni tent, tables and chairs
Mkhayane cold room
Hlalanathi tent, tables and chairs
Mthelu creche
Mthelu tent and chairs
Gedleza crèche
Sibongile tent, tables and chairs
Mkhayane poultry
Banjana tent
Fencing of gardens and grass cutting machines
Sewing machines
Umbhoshongo wesevumelwano sabafelokazi (Makhonyeni)
Gedleza toilets
Gedleza chips machine
Gedleza women’s Christmas and sewing machines
Mkhayane tent, chairs and tables
Mkhayane catering
Mkhayane sewing machine
Mkhayane chips machine
Sibongile women’s Christmas
GG coldroom
GG women’s Christmas
Hlalanathi women’s Christmas
Hlalanathi women’s Christmas
Hlalanathi sports jersey
Sinethezekile sewing machine
Emathangeni sound system
Sinethezekile youth in agriculture
Sinethezekile VIP toilet
Social awareness
Jojo tanks
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
178
WARD 6 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Biva mealie processing machine
Fencing of dams at Biva
Sishanyama (Butchery and car wash)
Sewing project
Cleaning chemicals machines
Creche (ukhethe)
Mamfene market
Ukhethe market
Ukhethe community tent
Mamfene poultry
Mamfene craft (amacansi)
Our future creche (Biva)
Siyamukela creche (Mkhonjeni)
Mayenzeke bakery
Biva warehouse
Nyawoshane poultry project
Ntenga creche
Nyawushane creche
Biva poultry
Market stalls (Mabaso & Mgababa)
Market stall (Mlambo store)
Mlobane poultry
Biva craft
Pig farming (Mamfene)
Ikusasa lomkhonjeni creche
Chemical mix machine (Biva)
Nyawushane poultry
Sound system
Soccer tournament
VIP Toilet
Mamfene
Indali yezinkomo
Drop in centre
Block making
Poultry (eggs)
Nusery
Ntenga
Poultry (X2)
Zenzele project (coldroom)
Siyabonga tent and chairs
Sound system
Nguni cattle and goats farming
Queen Mrtha Cultural village
Sewing project
Biva
Kwazenzele project
Biva co-op: Senzakahle sound system
Shayamoya coldroom
Shayamoya co-op: pig farming
Old age home
Siyanqoba project (tent and chairs)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
179
Ukuphila project (goat farming)
Biva Mlobane coldroom
Warehouse (Biva Mlobane)
Spilanakho project (Biva Mlobane)
Ukuhlehla Kwenqama project
Stokvel mom coldroom
Senzani project (fencing of 5 hectares and water pump)
Mkhonjeni
Creche
Malwande Club (Nguni cattle farming)
Siqi club (Drop in centre)
Okuhlekodwa coldroom
Sizanani coldroom
Youth goat farming
B.W. poultry project
Vukuzenzele co-op
Mbubeni
Full sound
Vezulwazi project (sand and blocks)
Ukuzama poultry (eggs)
Mamfene
Tent and chairs
Khanyisani creche
Ncengimpilo coldroom
Zamokuhle coldroom and catering equipment
Sound system
Gardens (fencing, 6 tanks, 3 water pumps)
Siyathuthuka siqawe co-op
Lelo hair salon
Nyawushane
Agricultural scheme
Mgababa and Mabaso market
Poultry project
Inqanawe sewing project (machines)
Isongeso coldroom
Isibonelo tent and chairs
Amawele video machine
Imbiza sound system
Mayenzeke bakery
Shisanyama
Creche
Car wash
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
180
WARD 7 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Qondile pension point 2
Equipment to support the existing crèches 3
Renovations of Maphaya crèche All creches 8
Mlotheni crèche 7
Mpompoza community tent with chairs Gugulethu Myeni 4
Manqayini community tent with chairs Shadrack Mzileni 4
Jozini tourism draw card event 5
Community tents (Qondile, Maphaya, Delunina, Mlotheni, 16 Area, 17 Area and Machibini)
Ward committee member to all members B.J. Mkhwanazi
6
Thembalethu garden co-op and Senzokuhle (water tanks, pipes, electric pumps, seeds)
9
Yonayethu fashion design (sewing machine, wool)
Opencent Xaba
Lightning conductors All ward 1
Siyazenzela block making machine (16 Area) Nokwazi Mkhize 10
Cement, sand, machine, car wash 11
Qalakancane bead material (mpompoza) Buhle Myeni 12
Sports event 15
Poultry projects (house, chicks, food, etc.) Sicelosethu- 17), Ukuthula (Qondile) Sizakancane (Maphaya) Isiqalo (Manqayini)
Dombi Ndlazi Alice Nhleko Rose Kwesaba Bonisiwe Mtshali
14
17 AREA
Msushwana catering (cooking equipment)
Zamimpilo (goat farming, workshop on farming, material for yard)
Isicelo sethu (Home base care training)
Siyazama project (farming material and seeds)
16 AREA
Koze kulunge project
Khulakahle project (sheep farming and maintenance tools)
Koze kuse project (3 pole tent, 3 tables, 200 chairs and 5000L water tank)
MPOMPOZA
Zenzele comm project (block making material, storeroom house)
Zabalaza project (goat farming and maintenance tools)
LOCATION
Khethakahle project (3 pole tent, 200 chairs and 2 tables)
Senzokwethu catering (5 pole tent, 50 spoons, 300 plates, 300 glasses, forks, knives 50 numbers)
Siyazama projects (ploughing material and vegetable seeds)
Siyaphambili ward 7 project (container with cooking material: 5 size 25 pots esintu, 10
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
181
izingqoko with different sizes)
Umfutho wamandla poultry project (eggs)
Inhlaba project (2 coldrooms)
MANQAYINI
Isixaxa samadoda project (goat farming)
Qalisa project (10 Sewing machines, storeroom container)
MAPHAYA
Sukumani project (fence making machine)
Zizamele knitter machine (Stove and baking equipment)
Khayelisha project (Stove and baking equipment)
Sizakancane poultry project (building/ structure and…..)
Ikusasalethu project (structure and baking equipment)
Mr Jabulani Buthelezi
Jozini Archives (Inqolobane yomlando): Structure for traditional maretial, etc)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
182
WARD 8 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Othobothini Tractor & implement 1
Endabeni Goat farming 2
Othobothini Brush cutters (X8) FROM STIL 3
Endabeni Coldroom 4
Poles for garden fencing (whole ward) 5
Nazareth drums (X4) 6
Amandlethu garden
Amandlethu sound system
Msiyane sound system
Msiyane coldroom
Emgabadeli tent
Emgabadeli coldroom
Endabeni garden
Endabeni coldroom
Othobothini goat farming
Othobothini sewing machines
Othobothini catering
AMANDLETHU
Catering
Ice machine
Photo and posts printers
Mobile fridge
Goats
2 pole stretch tent and chairs
Grass cutters
Mobile kitchen
Fencing of gardens
Netball poles and balls and jersey
Beads
Orphans and vulnerable children support
Nguni cattle farming
OTHOBOTHINI
Sound system
Coldroom
Tents
Bakery
Phumelela & Phathigeja farming Othobothini farmers
Salon
Gym programme
Market
ENDABENI
Pigs
Sound system
Creche
Grass cutters
Exercising project
MSIYANE
Grass cutting machines
Photocopying machines and printers
Sewing machines
Tents
Beads
Goats
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
183
Catering
Bakery
Pastors forum event
Blocks, bricks and lentils
Coldrooms
Bakery
Netball poles and balls
EMGABADELI
Catering
Pig farming
Bricklaying
Grass cutters
Amacansi
Women’s conference
Youth conference
Men’s conference
Disability conference
Drugs campaign
Teenage pregnancy awareness
Indigenous games material
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
184
WARD 9 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Boreholes (with electric pumps) Elumbe and Ezulwini 01
Sports attires for different codes (Netball, Soccer & boxing)
02
Chips making machines Mombeni, OPH, Bhekindoda 03
Building material (cement, sand, corr. Iron, etc.)
04
Drivers licenses Ward 9 Youth (14) 05
Financial assistance e.g. registration fee for students
06
Food parcels to the poorest families 07
60 meters X20 fence to fence for goats 08
Tree cutting machines (warmlight) Mhlumeni, Mombeni 09
Luncheon Mombeni 10
Goats 11
Blocks making equipment 12
Arts and culture attire and activities (Indlamu, modelling, etc.)
13
2 internet cafes 14
Vegetables gardens 15
Catering 16
Grass cutters
Driller (Jeckermer) and generator
Gymnasium
Child protection week, Commemoration of international day for older persons, 16 days of activism
Drugs and substance abuse programme
Food security
Early childhood development
Mobile fridges
Tents with chairs, tables and generator
Dams
Creches (building, renovations, fencing
Fencing of grazing fields
Dipping tanks
Catering equipment
Sewing machines
Cattle
Tractor
Pigs
Chicken (meat & eggs)
Decoration equipment
Workshops for project beneficiaries
Workshops for sectors/ forums
Skills training to youth
Sound systems
Salons (buildings, fencing, equipment)
Bakeries (buildings and equipment)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
185
WARD 10 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Mzinyeni water pump EM Mpontshane 0729802398
Mangqwashu grass cutting and wood cutting machines (X10)
Jobe Sipho 0768481045
Ezimbengeni Water pump Ngwenya Thulani 0720893473
Mzondi pipeline extension TS Dlamini 0765655882
KwaShukela Embundwini creche Skhaliso 0793654458
Empumelelweni creche Maria Mkhwamubi 0721203492
Ethangeni creche B Mpontshane 0826870715
Ezinhlabeni imijikelo Dumisani Gumede 07277059987
Mabheshwini creche Ngwenya Johnson 0714795247
Sports kits (25)
Mpumelelweni dam
Mpumelelweni garden
Mpumelelweni bakery
eZakheni 2 pole tents with 400 chairs (2)
Ezakheni Block making project
Mzinyeni creche
Mzinyeni livestock
Mzinyeni poultry (eggs)
Mzinyeni welding machines
Mzinyeni bakery
Mzinyeni gymnasium material
Mzinyeni pig farming
Mzinyeni tent
Mzinyeni fish farming
Mzinyeni butchery
Mzinyeni funeral club (catering material)
Mzinyeni grass and wood cutting
Thembeka goat farming
Mzinyeni sound system
Danishini crèche
Danishini tent
Danishini spares
Danishini gymnasium
Kwashukela community tent and chairs
Kwashukela container (Salon)
Ezimbengeni goat farming
Ezimbengeni pig farming
Completion of Kwashukela block making project
Inala sewing
Kwashukela poultry
Mphokoshane poultry
Mangqwashu poultry
Mangqwashu 2 tents with 200 chairs
Mangqwashu block making
Mangqwashu sewing machines
Ubambiswano funeral club (tent with 3 poles, 300 chairs 7 tables, coldroom, pots)
Mangqwashu sound system
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
186
Thakani goat farming
Savela goat farming
Mangqwashu dam
Thangeni goat farming
Thandokuhle crèche
Vuka uzenzele fence
Mangqwashu catering
Vusezakhe poultry
Sqalokuhle project (tank shelter, fence)
Vumbuka project (amacansi)
Khwambusi sound system
Khwambuzi (photocopier, printer and generator)
Khwambusi sewing machines
Kwambuzi tent
Khwambusi goat farming
Khwambuzi (amacansi)
Mzondi crèche renovations
Mzondi poultry
Mzondi youth (Isaselihle catering) stove, pots, decoration material
Hlakaniphani creche
Ethangeni goat farming 0826870715
Ethangeni Dam
Ethangeni Vukuzenzele fencing
Phumuzamabheshu Nasisizwe project (amacansi) Siyazama project Sinothando funeral club Qaphelani goat project Siyavuna Garden Creche
0714795247
Mpumelelweni Goat farming Bakery
Kwashukela Water pumps, NPO: NikaUsizo building and computer Siyathwalisana funeral club Thuthuka salon and catering Sebenza goat farming Kwashukela sound system Ourgarden project Imbokodo co-op
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
187
WARD 11 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Round tables and stretch tent (Nkondosini) Presented by T.O. Mpungose at Maphindela hall
0797784273
Fixed park home (for cooking) (Magugu area)
Hair salon facilities (Nkunini area)
Carpentry equipment (Mkhontweni)
Catering equipment (Dwaleni)
Cold room (Mpakeni)
Tent and chairs (kwaJimu)
Nyamane decoration material
Mnoyini tent and chairs
Mlambongwenya plastic tables (10)
Ntabayengwe catering (izitsha)
Nkomeni traditional attire for boys and girls
Mphoweni cattle farming
6 cold rooms
Ntabayengwe/ nkomeni boreholes
Ntbayengwe/ Enkomeni block making
Ntabayengwe/ Nkomeni tent with chairs
Poultry farming
Ntabayengwe/ Nkomeni creche
HIV awareness
Mphoweni coldroom and Poultry Sebenzile Gina, Philisiwe Gina, Mancane Mgudlula, Doris Ntimbane
Thuthuka/ Dwaleni (Mphoweni) goat farming Silomo Gina, Samson Tembe, Jabulani Tembe, Enoch Nyawo, Jonathan Gumede 0713960313, 0762463514, 0711483311
Vulindlela tractor Galaza J mpontshane, Zakhele Mafuleka, Zulu Ntimbane, Joseph Gina, Mgqibelo Mabuyakhulu 0726061284, 0827923084, 0715713813
Ikusaselihle care centre (Outdoor play: jungle gym, swings, balls, sand play) (indoor play: toys, playdoor, tables & chairs)
0768898301
Masibambisane sewing machines Thembekile Mafuleka, Nozipho Myeni, Lindiwe gumede, Nelisiwe Gumede, Samkelisiwe Gumede, Zodwa Tembe 0761921999
Mantenga farming Khumbulani Mphontshaba, Sakhile Mphontshana, Mxolisi gumede, Velaphi Mpontshana,, Themba Gina, Xolani Gina 0606403301 0799991109
Phumzame grasscutters Thulani Tembe, Lungisani Mthombeni, Simon Ndlazi, Fano Tembe, Gwaqa Gina 0792278499
Sinenhlanhla Clean Mandla Gumede, Nozipho Myeni, Nonsikelelo Dlamini, Thandazile Gumede, Buzakuthini Duma
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
188
0822582330
Sizumphakathi catering and baking (Baking machine, etc)
Tholakele Myeni, Makhosi GUMEDE, Yakhiwe Zikhali, Khethiwe Ndlovu, Khumbuzile Mngomezulu, Nkosingphile Dludla, Thandazile Tembe 0791587006
Mobile freezers (10) Submitted by ward committee members
10 tents
10 catering projects
Goat farming
Cattle farming
3 creches
4 boreholes
Ikhwane
VIP mobile toilet
10 sound systems
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
189
WARD 12 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Siyaphambili Mobile fridge MT Ndlovu
Bhamzity mobile toilets TP Ndlazi
FM Msweli mobile fridge
Zinoju Milling (2 pumps)
Youth in Action (grass cutters) Andile Qwabe
Zongamavila (tree cutting) Sipho Msweli
Magebhukeni project (pumps & pipes) Khumalo Makhweta
Esifomothini mobile fridge DK Gumede
Alliance 6 poultry (500 chicks Mthembeni Mconyan
Sobancane project (bakery and decoration) Scelo Nene 0728046414
Mageza Project (water pump & pipes) Khanyisile Ndlovu 0827360019
Shemula Market stalls (Siyazama) Siyazama project 0765645871
Bhamu mobile toilets Mthembeni Ndlazi
Youth support (sports)
Dezile trading coldroom and catering
EMGANWINI
Iphakade coldroom Nombuso Ngobe 0726474846
Mnqobi (sewing) Luzile Mtshali
Sinamuva goat farming Dumisani Shabalala 0823627079
ESIWENI
Bhambanana co-op (car wash & shisanyama)
Thabo Lukhele 0768790646
Banumzane group (goats) Nelisiwe Gumede 0714257308
Malibongwe catering Sne Mafuleka 0725359707
EMATHAYINI
Siyaphambili mobile fridge Nompumelelo Manganyela 0723298468
ESIGODINI
Blue morning stars (sports kits) Princess Ngwenya 0796617409
Bholo goat farming Amos Khumalo 0790228392
SHEMULA
Expert aluminum fabrication (Equipment) Sandile Gumede 0761752226
Ezimabheni (inkonjane yokudweba imisele/ tractor)
Mahlathini Mthombeni 0728783351
Hlaleleni creche (100 chairs) Thembinkosi Thusi 0760361955
Z.A. project (sound system) Albert Gumede 0764783111
MLAWU
Sisonke group (traditional attire) Thenjiwe Khumalo 0790522851
Simunye group (sewing machines) Thulisiwe Khumalo 0791619389
Sound system Nkanyiso Mtshali 00797268077
Coldroom Sindisiwe 0760454331
Livestock Nothando Vilakazi 0768885846
Block making Skhumbuzo Msweli 0797268077
Garden Thangithini Nene 0767293837
THEKWANE
Siyanqoba goat farming Lawrence Khumalo 0765044158
Vukanibafazi (amacansi) Nokufa Ndlovu 0724690042
Asakhane block making Mandla Mpontshane 0764050545
Zamimpilo poultry Amos Ndlovu 0791844732
Sizanobuhle sewing machines Tholakele Tembe 0715147349
Masibambisane panel beaters (equipment) Sifiso Mathenjwa 0727657388
Siyaphambili sewing machines (overlock, flat, sideslim)
Thembisile Mthombeni 0767537215
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
190
Zizamele sewing machines (overlock, flat, sideslim)
Thabile Mpontshane 0793158898
Ngwenyane pig farming (fencing) Thokozane Ngomane 0766926763
ESIGODINI
Ikusasalethu (engine) Thobile Tembe 0715349253
Power of Annointing Choir (sound system) MC Gumede 0764956078
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
191
WARD 13 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Siyajabula farming
Khuthala poultry (meat)
Ziphilise women project (home based care)
Siyaphambili poultry (ubuhlalu)
Amandla multi-media trading (internet café) 0796239799
Mlawu poultry project (eggs)
Zama Disability
Siyakhula sewing project
Vukuzenzele sewing project
Dancers launch
MMM Salon
Sinenhlanhla co-operative poultry
Lethithemba
Zuzanawe primary co-operative limited
Sinethemba farming
Top 4 goat farming 0820644108
Isindu co-operative 0729543912
Umgweli crèche (house, fence) 0822966560
Siyakhona project
Magagane project 0820777065
Madalasini project
Smiling business project (house, izinkukhu) 0767553677
Gadlaz a project (salon)
Bathopele project
Gwasogu project
Ikhona beadwork
Siyazizamela project
Gymnasium project (container & equipment)
Makwakwa bakery 0791288821
Ithubalethu farming 0793660591
Izazi zama true project 0793007729
Amaphinifa project 022670677
Elegant tenor brothers (Gospel group) 0767515332
Yoda dancers 0728399628
Sukumani Bafazi nihlaleleni project 0760144553
Inhloso yentuthuko 0764893881
Sibahle beauty salon 0728399628
Shemula lodge group 0828146814
The red-carpet project 061111578
Phaphama gogo for storage 0818099341
Sifisokuhle group 0797859214
Mbodla bakery 0790486970
Asisukumeni sifundeni (sewing) 0720363320
Vulamehlo acting 0820930865
Prosperity group 0728210930
African home boys (isicathamiya)
Decoration project (tables and cloths) 0767553677
AA.FM. Project
Amadleku factory (amahewu)
Asakheni bafazi
Isibonakaliso toilet paper factory
Siyakhona project 0781274072
Diphini pig farming 0791703088
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
192
Khethokuhle gospel group 0720772831
Omama bamacansi
Makhane outlets (block making)
Alibongwe project
Mbodla youth development and training 0793853230
Qiniselani farming
Sizakancane 0828427245
Ibukelani project
Mawakho project (fence, goats) 0826329781
Zamukuphila project
Vulamehlo project (machines, cement, office)
Sebenzani farming project
Siqalulwazi creche (fence, house) 0769473728
Mantombazane hlanganani group (mobile fridge)
0799492333
Simunye poultry project (structure, chicks, fence)
0818897814
Celakuhulumeni project (goats, fence) 0762700469
Nqaba poultry farming (chicks, fence) 0761953942
447 creche (fence, house) 0826816033
Fundanathi creche (house, fence) 0728051493
Vukebuthongweni project
Kufeziwe project (3 mobile, 3 generators) 0826329781
Sibonisweni project (fence) 0822966560
Asiyeni project
Go getters’ internet café
Gugudaphansi (water pump, pipe, fence) 0828427243
Nkosenhle
Ayibongwe group singers’ (Tent and sound system project)
072053231
Siyakha block making 0797585978
Sizwangaye project
Empire fashion designs
Fezokuhle project (chicks, fence) 0761092656
Mashaba youth farm (water pump, fence, pipe)
0824731567
Siphimfundo skills development (house, computer, fence)
0828359121
Khula project (car wash, compressor) 0846440022
Makhana football association 0825389780
Mthura’s studio (video camera, photo camera, sound system)
0725142904
Zakheni project (2 pole tent, 200 chairs, 20 tables)
0794011864
Abafana bendoda ehloniphayo
Makhana youth club
Sizani project (grass cutters) 0762024313
Talangobani project (aluminum doors and windows fitting)
0727004032
Sphiwe fashion design (decoration, tent, sound system)
0720635167
Makhana art centre (house, video camera, camera)
0825936227
Imizamo emihle pig farming 0607576004
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
193
WARD 14 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Omama bemvunulo (Mthonjeni)
Sizolwethu (izitsha) Mthonjeni
Mthonjeni garden (fencing)
Goat farming project (Mthonjeni)
Mthonjeni decorators (cloths and 10 tables)
Ward 14 drivers’ licenses assistance
Farmers assistance
Sports kits and equipment
Sewing project
Mthonjeni catering (omama)
Mthonjeni poultry
Resources for Mambuzikazi crèche
Okhalweni crèche
Lundini crèche
Grass cutting machines
Fencing of grazing land (Mathamhlophe and Mambuzikazi)
Volcano group sound system
T-shirts printing machine (Mthonjeni)
Emachobeni poultry
Ngungunyane creche
Carpentry project at Ingwavuma (emasitini
Mfithi crèche
Ngungunyane Creche
Mfithi cattle dam
Inqabayethu funeral club
Fencing of Vukaphansi garden (Okhalweni)
Qedumona Day Care centre
Fencing of gardens at Sihlangwini
Mahlabashana crèche
Redigging of Manhlali dam
Bheka dam
Machobeni dam
Langeni crèche
Sgodini dam
2 pole tents (10)
Fencing of gardens at Langeni, Qedumona, Kwabheka, Phopho Sgodini, Longoma
Jojo tanks for gardens
Sihlangwini goat farming
Longoma dam
Longoma borehole
Thanduxolo (pots, plates and other catering equipment)
Sizanani funeral club- amadlelo aluhlaza, umshini wokungcwaba
Kwamvungande (isigayo samanzi)
Esovane (dam, isigayo samanzi)
Inkambu yezinkomo (Esovane, Emachibini, KwaHlathi, Esigqulubeni, Mambuzikazi, Esihlangwini)
Mthonjeni nursery
Mthonjeni (indawo yezimbuzi)
Mthonjeni pig farming
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
194
Ward 14 centre for the disabled
Isakhiwo sokweluka (Mambuzikazi, Esheshi, Mthonjeni)
Inkonzo yomjikelezo
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
195
WARD 15 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
12 grass cutting machines Presented by Mduduzi Mathenjwa at Maphindela hall
0786844794
12 sewing machines
4 sound systems
Pig farming
Poultry project
Block yard
Hand craft (ubuhlalu namacansi)
Sheep farming
Khume crèche
Endabeni creche
Sandanezwe project
4 Market stalls
Project for disabled people
Sesifikile goat farming
Vukani poultry
Phezukomkhono garden
Eyethu cattle farming
Zizamele sewing project
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
196
WARD 16 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Eziphosheni goat farming Duma Tembe 1
Eziphosheni Saved by Grace (sound system)
Sbongile Gumede 2
Magwanga goat farming P.E. Nkomonde 3
Edanishini block making project Thuleleni tembe 4
Siqalo poultry project Bongumenzi Gumede 5
Zamakancane poultry Khululiwe Tembe 6
Zweli Duze car wash Zweli Duze 7
Eziphosheni hair salon Thulisiwe Gumede 8
Freedom Eziphosheni (tent and decoration)
MaNzuza 9
Mobile freezer S.G. Mahamba 10
Thokozani Ntombela (20 pigs) Thokozani Ntombela 11
Maphindela tent and chairs Phathisiwe Gina 12
Shayakwasani project (amacansi) Gibhithe Ndlovu 13
Upgrading of sound system Bafanyana 14
3 pole tent and 100 chairs Jabulani Khumalo 15
Mattew project (goat farming) Matthew 16
Pig project Nokwazi Tembe 17
Magwanga sound system Sphamandla Thela 18
Magwanga sewing machine Vusi Gumede 19
Sizakancane project (amacansi)
Ndumo clothing factory (sewing machines)
Sizanani project (ice maker)
Fezokuhle video production (video camera and printer)
Zaphowani project (engine and pipes)
Gadavu project (engine and pipes)
Mazibovu project (engine and pipes)
Thuli and Cebi’s hair salon
Siyazama project (poultry)
Siyathuthuka poultry project
Gwinyazonke project (recording studio)
Nomusa project (sewing machines)
Qalakancane project (4 pole tent and 100 chairs)
Masizwane project (Tupperware)
Edanishini car wash
Landiwe poultry project
Mandla Mhlongo tent and 100 chairs
Lungelo Mthembu grass cutting machines
Hlengiwe Gumede Poultry
Vukuthwale (3 pole tent and generator)
Magwanga mobile fridge and toilets
Catering equipment Z.G. Myeni
Allivanah Maphendula (3 sewing machines)
Masibumbane project (5 sewing machines)
Mbadada crèche
Tankipile Engineer N Mthombeni
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
197
Zithembe Project
Catering equipment
Vukuzenzele hair salon
Car wash & shisanyama
Nomusa computer project
Siyazama project
Zizamele poultry project Hloniphile Mlambo
Esibongile project
Valamlomo
Danishini creche
Snenhlanhla project
Sizakancane poultry
Manasibuke project
Mandola project
Nonto & Fiki’s Salon
Khambule project
Magwanga boreholes
Magwanga block making Manuntu Nkomonde
Magwanga repairing Tyre project Bheki Gumede
Maphindela goat farming
Magwanga cattle farming Mmema, Phiwe, Ntombendala, Antony, Phiwa
Pastors’ tent Mashi Ndlazi
Mobile fridge Mshuki Mbhamali
Zimeledelanithi Themba Mabika
Isibaya project Bongumusa Tembe
Ifalethu project Nathi Mbuyisa
Aphilisiwe 47 PTY (LTD) Sduduzo Mdluli
Gobinsimbi project France Ndabeni
Sukuzimele project Lindiwe Ntimbane
Khalasipoki project Bhekinkosi Khumalo
Motor service Nkosivumile
Valumlomo project MaZulu
Ward 16 Sports tournament (all codes)
Purchasing of tractors
Water pumps for community gardens
KwaMbadada creche
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
198
WARD 17 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Vulamehlo project (fence)
Mahlabeni pig farming 0799340801
Zethembe Sewing project
John Dri crafters
Cattle dams (Munywana, Mziki, Mbadleni, Mahlabeni)
Mziki creche Musa Tembe
Asakhe project (Catering equipment)
Munywana cattle farming
Impala fast food
Siyabonga poultry project
Mobile fridges (Mziki, Munywana, Madeya, Mbadleni, Impala, Mahlabeni)
Zethembe goat farming
Mbadleni poultry
Mkhayeni 3 pole tent with chairs
Masisizane funeral club
Mkhayeni poultry
Masikhanye funeral club tent with chairs and pots
0723113990/ 0726169352
Madeya creche
Tents (Madeya, Mahlabeni, Mziki, Munywana)
Block Making (Madeya, Impala)
Log cutting machine (Madeya, Impala, Mziki, Mbadleni, Munywana, Mahlabeni)
Sound system (Madeya, Mbadleni, Zenzele, Munywana, Impala, Mahlabeni)
Ngwane blocks
Kholongo Block making
Kholongo tent
Kholongo goat farming
Kholongo salon
Fence (Kholongo, Madeya, Mbadleni, Munywana)
Mlube pigs project
Siyazama sewing project
Siyaphumelela sewing project
Goat farming (Mahlabeni, Munywana, Madeya, Mbadleni, Mziki)
Siyethemba crafters (indlu yamacansi nobuhlalu)
Masakhane video camera (Mbadleni)
Imbewu nomanyolo
Boreholes
Mbadleni creche
Mgedula creche
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
199
WARD 18 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Dinabanye coldroom
Oshabeni boreholes (2)
Magugwane disability house
Bomvini creche
Ngonyameni block making
Bomvini poultry
Bomvini sound system
Gubhani poultry project and block making
Mthonjeni Xoshindlala (6 grass cutters)
Khulisani creche (Nkungwini)
20 Jojo tanks
Vulindlela crèche
Masibambane crèche
Sibuyile crèche
Zikhethele crèche
Simunye crèche
Engonyameni crèche
Green crèche
Pentecostal crèche
Sheshi crèche
Ekujabuleni crèche
Zilungiselele crèche
Mthonjeni women’s club
Oshabeni youth co-operative
Masiqhubeke cooking project (Mthonjeni)
Bomvini poultry
Mthonjeni garden
Mthonjeni dam
Mthonjeni sewing machines
Dwaleni crèche Presented by Mduduzi Vilane at Maphindela hall
Ngonyameni sound system
Jojo tanks (Oshabeni, Dedefane and Ngonyameni
Dams (Oshabeni, Nkungwini, Bomvini)
Soccer and netball
Bomvini poultry
Nyathini goat farming
Oshabeni goat farming
2 boreholes (Ngonyameni)
Waterpump (Bomvini)
Coldroom (Dinabanye)
2 boreholes (Oshabeni)
Block making project (Dinabanye)
Coldroom (Oshabeni)
Borehole (Ngonyameni)
Coldroom (Nyahini)
Borehole (Nyathini)
Masimbane creche (Odwaleni)
Tree cutting machine (Nkungwini)
Thables and chairs (Nkungwini)
Sewing project (Nkungwini)
Boreholes (Mthonjeni)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
200
Tree cutting machine (Bomvini)
Sound system (Bomvini)
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
201
WARD 19 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Toilet paper making Buyani Madlala 0827594919 1
Candle making machine Philisiwe Gcwensa 0715106654 2
Soap making machine Zazi Nyawo 0820795871 3
Sports kits for under 12 boys 4
Mobile fridge, 800-seater tent 5
Nguni cattle farming Bhungu Ngubane 6
Sewing project (Kwaphaweni Bonisiwe Gumede 0797276025 7
Sewing project (Ntshoqweni) 8
Tractor (Kwaphaweni and Magobhoyi) Dumisile Gina 0716475997 9
Tent and chairs (Kwaphaweni) Smangele Ndlazi 0766960580 10
Siyazama funeral project (tents and chairs)
Thobile Hlabisa 0820795879 11
Sethembe women’s club (Mobile fridge) 12
Amasimu (Mfingose) 13
Sewing machines (Phaweni and Magobhoyi)
14
Masihlangane goat farming Siyabonga Mpontshane 0820522245 15
Thandanani Youth (catering) 16
Decoration project Khumbulani Menyuka 17
Sound systems 18
Poultry farming (ezesizulu) Neli Ndimande 19
Poultry (Mabhanoyini) 20
Poultry (Ohlalwini) 21
Pig farming Yani Nyawo 22
Amacansi Gugu Ntimbane 23
Internet café (with ID photos camera & photocopying machine)
Bonisani Nyawo 24
Seeds and manure Whole ward 25
Talent search competition 26
Soccer and netball jersey 27
Magobhoyi tent 28
Old age home 29
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
202
WARD 20 POVERTY REDUCTION PROJECTS
PROJECT BENEFICIARIES PRIORITY NO.
Mobile fridges (X2) 01
Tshaneni goat farming 02
Community tent 03
Building material (for block making) 04
Fencing of community gardens 05
Mkhuze goat farming 06
Tshaneni Youth event 07
Old Age Fun Walk 08
Ward 20 youth activity 09
Ophansi creche 10
Mkhuze tent and sound system 11
Mshophi tourist market 12
Ophansi market stalls 13
Ophansi tent and chairs 14
Maskandi competition 15
Sewing machine 16
Mkhuze park 17
Ophansi Youth event 18
Mkhuze Youth project (Disposable nappies)
19
Best of Best camera, lights, sound system, laptop
20
Ward 20 Women event 21
Agriculture project 22
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
203
KEY NATURAL ASSETS/ RESOURCES
C.5.1.7. STRATEGIC PROGRAMMES RESPONSIVE TO COMPARATIVE AND COMPETITIVE ADVANTAGES
SPECIFIC PROGRAMME THAT SEEKS TO TRANSFORM THE LOCAL TOURISM PLAYERS:
Existence of the Community Tourism Organisation (CTO) which drives tourism programmes.
Identification of Woman Organisations doing craft work Sourcing of funding of tourism projects run by historically disadvantaged communities
(Mozi Pan and Ngodini Border Cave)
PROGRAMME THAT TARGETS THE INFORMAL ECONOMY The municipality is assisting informal traders in various ways. One of the things that are done is construction of market stalls in towns.
C.5.1.8. JOB CREATION Job creation is done through EPWP and LED projects.
C.5.1.9. EPWP INDICATORS The EPWP is implemented in all 20 wards The number of Jobs created through the programme is 1345 The reference group as a coordinating body is in place and it sits once a month Capacity building initiatives to participants are done as to meet some of the objectives for
the programme
C.5.1.10. CAPACITY OF THE MUNICIPALITY The figure below presents the location of Jozini LED within the Strategic and Development Planning Department of Jozini Municipality.
C.5.1.11. MOBILISATION OF PRIVATE SECTOR RESOURCES The municipality has developed an investment and promotion strategy which is at a draft stage. This strategy will assist the municipality with initiatives that will attract private investors, etc.
LOCAL ECONOMIC DEVELOPMENT: SWOT ANALYSIS
STRENGTHS WEAKNESSES
• Subtropical
• Plenty of land under irrigation and without irrigation
• Enough water
• Known as fruit basket
• Existing LED strategy
• Existing Tourism strategy
• Fully functional Unit
• Limited resources to support Cooperatives, SMME’S and big projects
• Shortage of Staff (capacity) within the Section
• Shortage of infrastructure (informal traders)
OPPORTUNITIES THREATS
• Heritage sites, Monuments (Idlinza Lenkosi • No revenue base
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
204
Udingane), Caves etc.
• Natural Resources (Pans, Animals Birds, Gorges, Mountains etc)
• Location (Swaziland Mozambique, N2)
• Other attractions (Jozini Dam, Game Reserves)
• Red tape
• Political Instability
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
205
C.5.2. SOCIAL DEVELOPMENT ANALYSIS
C.5.2.1. POVERTY ERADICATION MASTER PLAN (PEMP) It is government’s mission to ensure that communities living under conditions of poverty are helped to rise above their current condition. “Poverty is a human rights issue and government has a mandate to do everything possible to ensure that communities that are faced with poverty are given a chance to better their lives. The municipality has developed a Poverty Eradication (Reduction) Master Plan and it is implemented. Each ward has been budgeted for an amount of R700 000.00 to implement this plan for 2019/20.
C.5.2.2. HEALTH Jozini is served by two (2) hospitals namely; Mosvold hospital which is located in Ingwavuma and Bethesda hospital located at Ubombo. Jozini also has 1 Community Health Centre which is located at Msiyane in Ward 8 affectionately known as Othobothini Community Health Centre. Jozini has eighteen (18) clinics which are located in areas of great densities. There are also two gateway clinics and 6 mobile clinics (with 91 mobile points, but 23 of these have no shelter), but the communities are not satisfied with this service. Access to health services is still unreasonable since many people are forced to travel more than 10km to make use of the facilities. This service is one of the priority needs. There is an application of some form of planning standards which suggests that a population of 50 000 people needs to be provided with a hospital while 6000 people needs to be provided with a clinic. This therefore suggests that the area is supposed to be serviced by 3 /4 hospitals and 31 clinics which suggest a backlog of 2 hospitals and 14 clinics. It must be noted that these standards tend to be difficult to comprehend in a rural context especially in an area such as Jozini which is characterized by the sparsely populated settlement. The minimal/lack of access to portable water and electricity limits the level and quality of health care in the area. Additional constraints affecting quality healthcare is the shortage of doctors in the region, specialists in particular. In addition, out of all the districts in KwaZulu-Natal the rate of HIV/AIDS is estimated to be the highest in Umkhanyakude District Municipality (which includes Jozini Municipality). A cause of concern is that no exact figures could be provided on a local or district level. Associated with HIV/AIDs is the high number of tuberculosis patients. The high prevalence rate not only decreases life expectancy, it has significant impacts on the productivity of the population. The impact of HIV/AIDS in Jozini Municipality is aggravated by the high level of poverty in the area, making it difficult for people to escape the poverty trap.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
206
Map. Hospital Catchments
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
207
Map. Clinic Catchments
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
208
C.5.2.3. EDUCATION In terms of the Department of Education stats, there are 168 schools under Jozini municipality. According to the public participation meetings that have been conducted, many schools need additional classrooms and the upgrading of facilities. Due to their location, some schools do not even have access to basic infrastructure services including access roads. Accommodation for teachers in all areas is also a big problem. Educators are forced to travel far and during the rainy season, many of the schools are inaccessible. Lack of schooling or low levels of education will affect the level of income received in the community and is also a reflection of the standard of living. According to the Business Trust (2207), low education also affects the ability of local residents to actively participate in development programmes. Research indicates that the economic benefits of educating girls are similar to that of educating boys, but the social benefits favor female education over male education. Education of females increases the level of health and nutrition thus increasing overall health and productivity. Income earned by females increase their bargaining power in households and a greater proportion of women’s income on child goods compared to that of men. Economic theory suggests that education improves the level and quality of human capital, in turn increasing the productivity of individuals, but increasing the output generated per worker. Education facilitates long term growth and is often described as a tool to escape the poverty trap. Female education also raises the labour force participation, which significantly raises the productivity and output of the economy. It is also encouraging to mention as well that, unlike in the recent past Jozini is now home to a fully fledged TVET College located in Bhambanana in Ward 12 and another Satalite TVET College located in Jozini Ward 7 which is step in the right direction towards bring these tertiary institutions closer the people. KEY ISSUES
A need for additional classrooms; A need for cottages/ accommodation for teachers; A need for the upgrading of school facilities; A need for basic infrastructure for schools, including fencing; Feeding schemes and A shortage of pre-school facilities.
Facility Number
Crèche (Formal and Informal) 26
Primary School 104
Secondary School 44
Combined School 6
Based purely on the distance factor it is clear that the area is well provided for with regards to both primary and secondary facilities. There are three areas however where concentrations of households are further than 5km from a primary and six areas where concentration of households are further than 5km from a secondary school.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
209
Source: Stats SA Community Survey 2016
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
210
Map. Primary School Catchment
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
211
Map. Secondary School Catchments
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
212
C.5.2.4. COMMUNITY DEVELOPMENT (VULNERABLE GROUPS) The Special Programmes Unit is responsible for the co-ordination of the mainstreaming of issues of Historically Designated Individuals to the agenda of the municipality in general. This includes ensuring service delivery impacts in a manner that enhances the capacity of these groups to be part of the society as opposed to being a subject that is at the periphery. As a way of mainstreaming the designated groups, SPU has the responsibility of establishing structures that are meant to be the voice of these groups in influencing the municipalities to ensure that these groups participate at all levels of setting the agenda for service delivery.
5.2.4.1. YOUTH DEVELOPMENT & SUPPORT The youth development & support one of the Strategic objectives of the Municipality. Although currently the Municipality does not have an adopted Youth Development & Support Strategy and does not have a functional Municipal-Wide Youth Forum the municipality has successfully institutionalized issues of youth development & support by including a dedicated Youth Development & Support Section/Unit within its organizational structure. To demonstrate seriousness such a section is housed within the Department of the Municipal Manager. In this regard the position of Manager: Youth Development & Support was in the process of being filled at the time of adoption of this final IDP. It is anticipated that such a position would have been filled not later than 31st July 2019. It is believed that, such a strategic move will indeed enhance issues of youth development & support
5.2.4.2. DEVELOPMENT OF DISABLED PERSONS Jozini Local Municipality takes the development and support of disabled people very seriously. Disability sector is one of the key sectors under the Special Programmes Unit. There are number of activities that the municipality undertakes to realize the objectives. The municipality has placed it as one of the priorities in its recruitment policies to appoint disabled persons as part of their human capital. In addition the municipality continuously facilitates collaboration between Government and the Disability Sector to enhance service delivery. The municipality annual stages the Municipal-Wide Disability Day which is coupled with various games for the sector. The municipality has established Municipal-Wide Disability Forum which is functional. The municipality is also represented at the District Disability Forum. Although there is a lot that the municipality is doing in this regard, however mores till need to be done to further enhance the development and support of the sector of disabled persons within Jozini Local Municipality and beyond.
5.2.4.3. DEVELOPMENT OF THE ELDERLY The Municipality has a relatively high population of Older Persons. The poorest people live in rural areas where there are no resources. The municipality and Department of Social Development are working hard in eradicating poverty within our communities by coming up with projects through the poverty alleviation programme that people could do in their areas. There is a Senior Citizens Forum which deals with developing the elderly sector
5.2.4.4. DEVELOPMENT OF WOMEN In the South African context participation of women and the consideration of their needs is a cardinal principle embedded in all local initiatives. Jozini municipality has a Women’s Forum which deals with capacitating women and issues affecting women these days. The Women’s Forum is the most functional forum in Jozini municipality; the forum received an award from the Mayor at the closing function.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
213
The municipality also has a Men’s Forum, where men discuss issues affecting women and how to deal with men who abuse women.
5.2.4.5. PEOPLE AFFECTED BY CRIME, HIV/AIDS, DRUGS, ETC HIV/AIDS has had a major impact on both the quality of life of communities and families and on the economy. A number of initiatives have been implemented through the National Department of Health to combat the current epidemic however major challenges still remain. Within Jozini, 15.62% of the population was diagnosed with HIV in 2013, which is marginally higher than the District with 15.48% of the population infected with HIV. The number of HIV and Aids related deaths has increased in both the DM and the LM. In 2013, 64% of the deaths in the Jozini LM were Aids-related and 62% of the deaths in the uMkhanyakude DM were Aids related. The municipality has the HIV/AIDS Programme which deals mainly with HIV/Aids pandemic that adversely affect socio-economic conditions of people residing in our municipality and outside the jurisdiction of the municipality. It deals with the ways and means in which to deal with the pandemic such that different structures have been established in the municipality to deal with it. This is done under the auspices of the National, Provincial and municipalities policies dealing with HIV/Aids. A variety of structures exist such as Ward Aids Councils and Local Aids Council and these structures report on a monthly basis to inform District (District Aids Council) and Provincial reports (Provincial Aids Council). The municipality has in consultation with other stakeholders done different activities to advocate and promote awareness in order to combat the spread of the disease. Such activities include Heroes Walk, Prayer Day, and World Aids day. HIV rate at Jozini Municipality are estimated to 17% of the total population.
Source: Umkhanyakude Municipality IDP
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
214
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
215
C.5.2.5. SPECIAL PROGRAMMES AND PLANS
BUDGET
Disability Day R50 000.00
Disability Forum R180 000.00
Disability programme R90 000.00
Early childhood development programme R170 000.00
HIV & Aids Related Programmes R100 000.00
Indigenous Games R300 000.00
Operation Sukuma Sakhe Interventions R2 000 000.00
Senior Citizens R127 000.00
Women’s day R370 000.00
Youth day R390 000.00
C.5.2.6. DISABILITY SUMMITS Jozini municipality celebrates disability day by holding a disability Summit each year.
C.5.2.7. SAFETY & SECURITY AND NATIONAL BUILDING & SOCIAL COHESION Jozini Municipality launched it’s Safety and Security Forum during 2018/19.
C.5.2.8. MUNICIPAL SAFETY & SECURITY PLAN Jozini Municipality together with Department of Community Safety and Liaison and other stakeholders have developed and adopted a Municipal-Wide Safety and Security Plan. This plan is part of the IDP Annexures.
C.5.2.9. SOCIAL DEVELOPMENT SWOT ANALYSIS
STRENGTHS WEAKNESSES
• Provision for Special programmes budget
• Have functional Forums focusing on vulnerable groups
• Poor access to social development services
• The spread of HIV/AIDS is neglected and is not taken serious by the municipality.
• Absence of the Youth Development Strategy and Forum
• Lack of a Gender Equality Policy Framework
• Inadequate coordination and integration of special programmes
OPPORTUNITIES THREATS
• Available Government support on Special Programmes
• Skills Development & Training Opportunities for Vulnerable Groups
• Crime
• Dependency syndrome caused by Grant-Driven Support
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
216
C.6. MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT
Jozini Municipality from a financial perspective is a municipality that remains dependant on grants and shall remain so for the foreseeable future as such until alternative revenue sources are created to enhance the current constrained own revenue sources. Approximately 90% of Council revenue comes from National Transfers there is little scope for cross subsidisation given the limited business sector and therefore increases in tariffs impacts directly upon domestic consumers and hence almost immediately burdens the municipality’s cash flow. Increased taxation will invariably mean increased non-payment hence the tariffs have only been increased by the proposed NT 5, 6%
C.6.1. CAPITAL FUNDING & EXPENDITURE TO ADDRESS SERVICE DELIVERY
The municipality did not receive INEP funding in 2018/19 and it will not receive it in 2019/20. Fortunately, ESKOM has come up with a plan to address the backlog challenge that the municipality has in terms of access to electricity. A bit increase on MIG allocation of R37 million as compared to 2018/19 which was R36 million. Part of own capital expenditure not funded by the allocations mentioned above is accordingly considered to be funded by Equitable share and other own revenue anticipated to be collected as mentioned above. Summary of funds received and their source of funding
Account Description Budget year 2018/19
Transfers recognised – Capital – MIG R37 394 000.00
TOTAL R37 394 000.00
Projects (Ongoing and New)
PROJECT WARD SOURCE OF FUNDING
2019/20 2020/21
Onaleni Community Hall 12 MIG
Cezwana Youth Centre 4 MIG
Nhlonhlela Community Hall
1 MIG
Sinethezekile Sportsfield 5 MIG
Sidakeni Sports Field 9 MIG
Ndumane Access Road 6 MIG
Munywana Sportsfield 17 MIG
Machobeni Community Hall
14 MIG
Ngonyameni Community Hall
18 MIG
Emthonjeni Sports Field 14 MIG
Upgrading of Roads Ii Mkhuze CBD
20 MIG
Empileni Community Hall 1 MIG
Makwakwa Skills Centre 13 MIG
Kwaphaweni Community Hall
19 MIG
Ndumo Community Hall 16 MIG
Manyiseni Youth Centre 15 MIG
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
217
Ubombo Sportsfield 2 MIG
Nhlangano Community Hall
3 MIG
Sibonokuhle Sportsfield 4 MIG
Ophansi Sportsfield 20 MIG
Ngwavuma Multi-Purpose Centre
14 MIG
Combo-Court- Makhane 13 MIG
Madeya Community Hall 17 MIG
Kwambuzi Community Hall
10 MIG
Nyathini Sportsfield 18 MIG
Madeya community hall 17 MIG
Ezinhlalavini access road 8 MIG
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
218
Investment Register
Month Interest rate Number of days Opening Balance Deposits Interest Earned Withdrawals Closing Balance
Jun-19 30 days 54,511,209.58 233,525.00 - 54,744,734.58
Jul-19 30 days 54,744,734.58 25,000,000.00 382,292.12 80,127,026.70
Aug-19 30 days 80,127,026.70 130,273.97 80,257,300.68
Sep-19 30 days 80,257,300.68 130,273.97 - 30,130,273.97 50,257,300.68
Oct-19 30 days 50,257,300.68 25,000,000.00 130,273.97 - 75,387,574.65
Nov-19 30 days 75,387,574.65 - 130,273.97 - 75,517,848.62
Dec-19 30 days 75,517,848.62 130,273.97 - 26,062,118.49 49,586,004.10
Jan-20 30 days 49,586,004.10 25,000,000.00 130,273.97 74,716,278.07
Feb-20 30 days 74,716,278.07 130,273.97 74,846,552.05
Mar-20 30 days 74,846,552.05 130,273.97 - 25,651,369.86 49,325,456.16
Apr-20 30 days 49,325,456.16 25,000,000.00 130,273.97 74,455,730.13
May-20 30 days 74,455,730.13 130,273.97 74,586,004.10
Jun-20 30 days 74,586,004.10 130,273.97 - 25,743,835.62 48,972,442.46
2,048,830.82
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
219
C.6.2. SOCIAL AND ECONOMIC REDRESS VIA INDIGENT MANAGEMENT
FREE BASIC SERVICES The priorities reflected within this budget are aligned with the strategy and priorities of the Municipality. Whilst changes in policy and direction cannot simply happen overnight there have been significant shifts in Council thinking whilst maintaining at all times synergy with the Constitutional requirements of Local Government in respect of basic services and within the general dictates of the National treasury guidelines. Poverty reduction projects: part of other expenditure is the service delivery base projects which the municipality in its IDP planned to hand over to the community as per their suggestions during public participation meetings that took place as per Budget and process plan. As we know that Jozini Municipality is categorized in terms of 20 wards each ward has been allocated R700 000.00 which makes R14 million in total. The indigent policy: The Municipality has an indigent policy in place and is currently reviewing the Indigent register which will inform the provision of free basic services. The Indigent Policy was approved in May 2019. Jozini Municipality was characterized by high levels of unemployment and poverty Unemployment was recorded at 44% in 2011, and youth unemployment stood at 53%. Jozini had a total of 692 (1,8%) households headed by children and 54% of households headed by women. The average household income was 47 018, with almost 80 000 households earning R1 600 or less. The municipality has allocated budget for free basic services which is made up of community bursaries, indigent register, indigent support, burial assistance and free basic energy (FBE). The FBS budget for 2019/20 is R600 000.00. Income forgone: R286 481.13 (Property rates) The amount for indigent support increases each year as Jozini is faced with a challenge of unemployment. The municipality has also allocated budget for people with disabilities. There are programmes/ plans to utilise this budget and monitoring for this is done through quarterly reports/ assessments.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
220
C.6.3. REVENUE RAISING STRATEGIES
There is a real challenge when it comes to Revenue collection since most of our communities are indigent and the municipality mostly relies on grants. The other factor which contributes to this is that the municipality does not own the land and that makes it difficult to collect property rates. The following has been planned:
Collection of 40% of monthly billing by 30th of the following month Implementation of debt collection and credit control policy. Monitoring and management of deliverables of the appointed debt collector each month. Development of the revenue enhancement strategy. Reduction of long outstanding debt Implementation of credit control policy to allow proactive approach to dealing with
defaulting debtors Implementation of credit control policy to provide for arrangements and concessions’ Monitoring and management of deliverables of the appointed debt collector each month. Data cleansing exercise Monitoring and management of deliverables of the appointed debt collector each month.
The municipality holds meetings with government debtors and top 10 debtors. This has helped a lot as the departments are now paying.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
221
C.6.4. DEBT MANAGEMENT
The Municipality is facing a challenge of Aging Debtors with a huge amount of R189 million. Some of the debtors are non-traceable which makes it difficult to follow up and issue out demand letters. Approximately 93.45% of the total debtors are over 90 days, budget has been accordingly adjusted to cater for such provision for doubtful debts. Majority of the long outstanding debtors for Households relates to indigent customers, and they will be written off upon completion of the indigent register. Organs of State balance is made up of National Public Works properties, which are still being verified by agents appointed by Works. Commercial category balance is mostly made up of Tiger Lodge property, Senekal, Crystal Lagoon and Thanda Royal properties.
2015/16 2016/17 2017/18
Consumer Debtors R55 924 000 R39 430 000 R51 657 000
Other Debtors R5 141 000 R0 R1 693 000
Debtors Aged Analysis
Year
End
Month
End Mun Item Detail
0 -
30 Days
31 -
60 Days
61 -
90 Days
91 -
120 Days
121 -
150 Days
151 -
180 Days
181 Days -
1 Year
Over 1
Year
Total
-
2019 M09 KZN272 1100 Debtors Age Analysis By Income Source
1200 Trade and Other Receivables from Exchange Transactions - Water 0 0 0 0 0 0 0 0 0
1300 Trade and Other Receivables from Exchange Transactions - Electricity 0 0 0 0 0 0 0 0 0
1400 Receivables from Non-exchange Transactions - Property Rates 1,067,705 1,350,703 619,198 -164 616,698 0 15,259,201 63,283,107 82,196,448
1500 Receivables from Exchange Transactions - Waste Water Management 0 0 0 0 0 0 0 0 0
1600 Receivables from Exchange Transactions - Waste Management 348,532 510,101 251,224 -59 249,923 -145 1,873,461 19,262,003 22,495,040
1700 Receivables from Exchange Transactions - Property Rental Debtors 49,436 51,200 3,279 -19,186 0 -11,498 105,786 92,247 271,264
1810 Interest on Arrear Debtor Accounts 0 0 0 0 0 0 -12,236 3,063,751 3,051,515
1820 Recoverable unauthorised, irregular or fruitless and wasteful Expenditure 0 0 0 0 0 0 0 0 0
1900 Other 1,750,720 4,333,999 2,061,550 0 2,051,204 2,043,553 11,632,991 57,767,186 81,641,203
2000 Total By Income Source 3,216,393 6,246,003 2,935,251 -19,409 2,917,825 2,031,910 28,859,203 143,468,294 189,655,470
2100 Debtors Age Analysis By Customer Group
2200 Organs of State 972,945 2,767,386 1,235,611 -19,186 1,229,419 977,600 17,664,011 78,425,440 103,253,226
2300 Commercial 1,316,804 1,651,001 793,604 0 786,908 401,497 5,311,392 23,764,615 34,025,821
2400 Households 926,646 1,827,615 906,037 -223 901,498 652,814 5,545,403 41,274,287 52,034,077
2500 Other 0
2600 Total By Customer Group 3,216,395 6,246,002 2,935,252 -19,409 2,917,825 2,031,910 28,520,806 143,464,342 189,313,123
The municipality has a Credit Control and Debt Collection Policy in place.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
222
C.6.5. FINANCIAL MANAGEMENT
C.6.5.1. SCM The municipality has procurement plans that were prepared by departments and are in-line with the Budget and SDBIP. The municipality uses these procurements plans when implementing the SDBIP. The challenges faced with SCM are as follows:
Inefficiency of the advanced procurement system we end up doing manual orders SCM regulations sometimes serve as a stumbling block in fast tracking procurement
SCM management practices and principles are designed around issues of the Batho Pele Principles and the main Core objectives of providing service delivery. The municipality has deviation forms. On emergency and urgency cases the municipality does deviate and a well-informed reason is required to be filled in the deviation forms.
TECHNICAL SERVICES The most critical positions in the Technical Services department have been filled. The HOD for technical services has been appointed. The budget continues to fight the malaise and constrained economic conditions that Council continues to find itself in. indeed it is unlikely that the economic conditions and position will change much in the next two to three budget cycles at least in as far as the municipality’s ability to generate its own revenue sources as it is currently heavily reliant on National Transfers. The budget therefore follows a conservative approach to rates and tariffs but also slowly begins to plan in anticipation of improved economic conditions from 2018/2019. STRENGTH
Community halls in all but one ward Community facilities: sport fields, Relevant documents: IDP, SDBIP, PMS, budget Financial resources Quarterly site visit by portfolio committee.
WEAKNESSES
Electricity licence High vacancy rate Development of employees Inconsistency on goal implementation Limited office space Infrastructure projects not supporting (led) Lack of infrastructure plan. Potholes in towns. Failure to attract skilled officials
The Technical Services Department has a Project Accountant position and it is filled. This is a person who makes the communique between the Finance and Technical Departments easier.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
223
C.6.5.2. ASSETS AND INFRASTRUCTURE The municipality in its capital budget has made provision for repairs and maintenance during the 2019/20 financial year. Various initiatives to address the maintenance of assets were explored in the previous years; and will still be explored during the 2018/19 financial year these will include implementation of the asset management plan that is in place. The municipality also has a dedicated asset management officer whose responsibility is to oversee the entire asset management function and ensuring that this function is not left to chance. National Treasury has indicated that a minimum of 40% of the capital budget should be for renewal as opposed to new infrastructure. It is important to however note that in the case of Jozini Municipality there exists enormous infrastructure backlogs where the municipality is having to almost start from scratch in the provision of the infrastructure requirements, with the development of a comprehensive asset management plan it is anticipated that it will provide a clear directive in terms of identification of assets due for renewal ensuring that the renewal of assets is not a by chance initiative but one that is deliberate one informed by a long term strategic view.
C.6.5.3. REPAIRS AND MAINTENANCE
PLANNED REPAIRS & MAINTENANCE
Project Name 2019/20 2020/21 2021/22
Cezwana Youth Centre
R500,000.00 R527,000.00 R555,458.00
Jozini High Masts 500,000.00 R527,000.00 R555,458.00
Main Office Backup Generator
R500,000.00 R527,000.00 R555,458.00
Maintenance of 121 Res
R250,000.00 R263,500.00 R277,729.00
Maintenance of Community Halls
R500,000.00 R527,000.00 R555,458.00
Maintenance of Office Buildings
R1,000,000.00 R1,054,000.00 R1,110,916.00
Maintenance of Office Toilet
R500,000.00 R527,000.00 R555,458.00
Maintenance of Sportsfields
R800,000.00 R843,200.00 R888,732.80
Maintenance of youth centre
R300,000.00
New Tractor & slasher
R50,000.00
Repairs and Maintenance of Municipal Access Roads
R4,000,000.00 R4,216,000.00 4,443,664.00
Repairs and Maintenance of Streetlights and high mast lights
R600,000.00 R632,400.00 R666,549.60
Repairs of Mkhuze testing ground steep
R200,000.00
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
224
hill
Road Maintenance Tools and Protective Clothing
R150,000.00 R158,100.00 R166,637.40
C.6.5.4. FINANCIAL RATIOS Financial Ratios
Cost Coverage ratio
Total Assets: Total Liabilities
Budgeted Total Assets 395,096,666.96
Budgeted Total Liabilities 36,145,263.79
Ratio 10.93:1
Current Ratio
Current Assets: Current Liability
Current Assets 77,162,650.96
Current Liability 19,455,982.00
3.97:1
Capital Expenditure to Total Expenditure
Capital Expenditure 48,899,777.00
Total Expenditure 283,911,252.04
17.22
Debt to Revenue
Debt And Provision 189,823,833.00
Revenue 283,425,775.93
0.67
Collection Rate
Cash Collection -
Rates 17,786,296.00
Refuse 1,809,183.00
Rental 862,812.00
20,458,291.00
Billing
Rates 31,522,557.98
Refuse 3,146,904.00
Rental 862,812.00
35,532,273.98
Rate 57.58
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
225
Remuneration to Total Expenditure
Employee related Cost 87,773,686.79
Remuneration for Cllrs 14,832,072.98
Total Expenditure 235,011,475.04
43.66
C.6.6. LOANS/ BORROWINGS AND GRANT DEPENDENCY
Jozini municipality has over the recent years remained relatively financially stable. Continuous efforts are made to comply fully with the MFMA and other legislations directly affecting financial management. Jozini municipality cannot afford salaries that are prerequisite to GRAP due to the inability to attract the suitably qualified accountants at the skill required by GRAP as well as given the current limitation as it relates to the geographical location of our municipality. It is therefore highly unlikely that qualified accountants are going to respond given the current salaries that we offer, however we remain committed to muddling through these deep waters the best way we know how in order to respond to the concerns raised by the AG regarding the skills levels of the BTO. The municipality’s grant dependency is at 91%. The municipality does not have any borrowings at the moment.
C.6.7. EXPENDITURE MANAGEMENT
JOZINI MUNICIPALITY2019-20 BUDGET
Funding 2019-20 2020/21 2021/22
Equitable share R181,990,000.00 R191,817,460.00 R202,175,602.84
EPWP R3,217,000.00 - -
FMG R2,435,000.00 R2,566,490.00 R2,705,080.46
Provincialisation R6,186,000.00 R6,520,044.00 R6,872,126.38
Cecil Marks Boarder Development
R1,300,000.00 R1,370,200.00 R1,444,190.80
Rental of Facilities R862,812.00 R909,403.85 R958,511.66
Property rates R31,500,000.00 R33,201,000.00 R34,993,854.00
Refuse R1,600,000.00 R1,686,400.00 R1,777,465.60
Interest on investments R3,500,000.00 R3,689,000.00 R3,888,206.00
Interest on Outstanding Debt
R10,000,000.00 R10,540,000.00 R11,109,160.00
Licences R263,882.09 R278,131.72 R293,150.84
Other R1,000,000.00 R1,054,000.00 R1,110,916.00
Total R243,854,694.09 R253,632,129.57 R267,328,264.57
MIG R37,394,000.00 R39,413,276.00 R41,541,592.90
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
226
TOTAL R281,248,694.09
EXPENDITURE R173,315,774.40 R182,674,826.22 R192,539,266.83
ERC & CLLRS ALLOWANCE
R100,710,491.56 R70,957,303.35 R74,788,997.73
NEW POSTS R7,222,428.13
R281,248,694.09 R253,632,129.57 R267,328,264.57
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
227
C.6.8. AUDITOR GENERAL’S OPINION
The financial statements were audited by the Auditor-General in terms of section Public Audit Act of South Africa, 2004 (Act No. 25 of 2004) (PAA). The results are therefore included below. Jozini Municipality received an unqualified audit opinion in the 2017/18 financial year. Below is an action plan to address all Auditor General findings as per the management report. Annexure A Criteria AGSA Finding Internal
Control Deficiency
Management response
Remedial action required
Specific Action Plan Responsibility Due date
Material Findings in the Annual Financial Statements
In terms of Section 122 of the MFMA, every municipality and every municipal entity must for each financial year prepare annual financial statements which fairly presents the state of affairs of the municipality of entity. Its performance against the budget, its management of revenue, expenditure, assets and liabilities, its business, its financial results, and if the financial year, and disclose the information required in terms of sections 123,124 and 125.
Upon the audit of the AFS it was discovered that there were material misstatements on the financial statements submitted for audit and adjustments were effected to correct these misstatements relating to property, plant and equipment, payables, receivables, employee costs, expenditure, commitments, contingent liabilities and the cashflow statement.
The municipality is heavily reliant on consultants and does not have adequate review mechanisms to ensure accurate and complete financial statements are prepared
Management acknowledges and agrees with the finding, going forward interim financial statements will be prepared to ensure enhanced quality set of Financial Statements at the end of the financial year is produced
Prepare monthly recons and reviewed by the Managers and CFO Interim financial statements will be prepared to ensure enhanced quality set of Financial Statements at the end of the financial year is produced. This will be done timeously to ensure adequate reviews. The set will be submitted to Internal Audit on the 30 April 2019
PPE- To update depreciation on monthly basis Appointment of the Asset Management Consultants Payables -Review of the lead schedules supporting balances and adjust accordingly Receivables- Review of the lead schedules supporting balances and adjust accordingly Contingent Liabilities- Send confirmations to Attorneys till the submission date to AG Employee Costs-Review of the lead schedules supporting account totals and adjust accordingly
Financial Reporting Manager/Assistant Manager CFO CFO/IA Manager CFO/IA Manager CFO CFO
monthly
01 May 2019
31 July 2019
31 July 2019
31 August 2019
31 July
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
228
The new service provider will be appointed to provide Asset Management services The municipality need to conduct quality assurance on the interim and annual financial statements to minimize material misstatements and errors on the financial statements.
Expenditure-Review of the lead schedules supporting account totals and adjust accordingly Commitments-Adequately update the contract register monthly Cashflow statements-Review of the lead schedules supporting balances and adjust accordingly
CFO CFO
2019 Monthly
31 July 2019 30/04/ 2019
Deviation disclosed does not meet the definition of section 36 regulations deviations
In terms of Municipal Supply Chain Management regulation 36(1)(a) If competitive bidding was not followed, this was done only under the following circumstances:- i) In an emergency – where immediate action is necessary ii) If goods or services are produced or available from a sole provider; iii) For acquisition of special works of art or historical objects iv) Acquisition of animals for zoos; vi) It was an unsolicited bids;
During the audit of deviations disclosed by management, we have identified the following deviation that does not meet section 36(1)(a) regulations
Financial and performance management Management did not ensure that the proper SCM processes were followed prior to awarding the suppliers. Management doesn’t manage their contracts properly to ensure that they are completed on time and within the budget. Management did not review
Management acknowledges finding of auditors, and would like to state that investigation is already under way, and management was waiting for the outcome of this investigation to decide whether to treat this as irregular expenditure, or what. Management accepts auditor’s suggestions and has recorded this
All deviations within the provisions of the legislation will be approved by CFO and MM prior implementation Further to the above adequate details of the deviation will be written on the deviation form. The SCM Reports on WIUF will be reported to the AC, MPAC on a quarterly basis and council
CFO.SCM Manager and MM
Immediately Quarterly immediately
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
229
vii) The auditee participated in a contract arranged by another organ of state; or v) In any other exceptional case where it is impractical or impossible to follow the official procurement process.
and monitor compliance with applicable SCM regulations.
expenditure as irregular expenditure, and taken it out of deviations
Implementation of sec32 of the MFMA will be enforced where necessary.
Deviation does not meet the section 36 – Air-conditioning Servicing
In terms of Municipal Supply Chain Management regulation 36(1)(a) If competitive bidding was not followed, this was done only under the following circumstances: - i) In an emergency – where immediate action is necessary ii) If goods or services are produced or available from a sole provider; iii) For acquisition of special works of art or historical objects iv) Acquisition of animals for zoos; vi) It was an unsolicited bids; vii) The auditee participated in a contract arranged by another organ of state; or v) In any other exceptional case where it is impractical or
The following procurement is listed on the deviation register and it does not meet the regulation 36(1)(a) for deviation. Reasons given by management for deviation: Impractical to follow SCM process scrip and quote provision utilized for the service. The reason for deviation did not justify the impracticality.
Financial and performance management Management did not ensure that the proper SCM processes were followed prior to awarding the suppliers. Management does not manage their contracts properly to ensure that they are completed on time and within the budget. Management did not review and monitor compliance with applicable SCM regulations.
Management acknowledges and agrees with auditors’ findings, and this transaction has been correctly disclosed as irregular expenditure
The strip and quote principle was applied. An internal memo will be written and approved by the CFO and the MM for such transactions Further to the above adequate details of the deviation will be written on the deviation form.
CFO and SCM Manager
immediately
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
230
impossible to follow the official procurement process.
Contracts procured without following the competitive bidding process (Turnkey process)
In terms of the Municipal Supply Chain Management Regulations GNR 868 30 May 2005 Section 12 – A supply chain management policy must subject to section (2), provide the procurement of goods and services by way of – (d) a competitive bidding process for – (i) procurement above a transaction value of R200 000 (VAT included); and (ii) the procurement of long term contracts As per the approved SCM Policy (15) Competitive bidding (1) – Goods or services above a transaction value of R200, 000.00 (VAT included) and/or long term contracts may only be procured through a competitive bidding process, subject to paragraph 34 of this Policy
During the audit of the supply chain management we have determined that the following contracts were procured without following the competitive bidding process. The management followed a turnkey process (extended the scope of current service providers without following new procurement processes) in appointing the service providers under the contracts
Financial and performance management Management did not ensure that the proper SCM processes were followed prior to awarding the suppliers. Management did not review and monitor compliance with applicable SCM regulations.
Management notes the finding however this has been disclosed as irregular expenditure and they are currently under investigation.
Municipal Manager/CFO
30-Jun-19
Contracts procured without properly following s32
Municipal SCM Regulation 32(1) states that a SCM policy may allow the accounting officer to
During the audit of the supply chain management we have determined that the following contracts were procured using section 32 of the SCM
Financial and performance management Management did not ensure
Management notes the finding and has been disclosed accordingly in
Consultation with Provincial Treasury will be enforced prior to s32
CFO and SCM Manager
30 June 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
231
regulations procure goods or services for the municipality under a contract secured by another organ of the state (government department or municipality), but only if – (a) the contract has been secured by that other organ of state by means of a competitive bidding process applicable to that organ of state; (b) the municipality has no reason to believe that such contract was not validly procured; (c) there are demonstrable discounts or benefits for the municipality to do so; and (d) that other organ of state and the provider have consented to such procurement in writing.
regulations. See below the contracts procured and issues resulting in non-compliance
that the proper SCM processes were followed prior to awarding the suppliers. Management did not review and monitor compliance with applicable SCM regulations.
the set of financials under irregular expenditure.
appointments Develop the checklist for section 32 Awards
Immediately
Minimum threshold for local content production was not specified on the quotation issued to
Preferential Procurement Regulation 9(1), Prescribes that in the case of designated sectors, where in the award of bids local
During the audit of procurement and contract management, we have noted that the procurement of clothing goods as shown on the table below did not specify the minimum threshold for local content production in the request for
Financial and performance management Management did not ensure that the proper SCM processes
Management notes the finding and agrees with auditors, this was omission on management’s
This will be enforced in all quotations issued to the public,.
SCM Manager SCM Manager/CFO/MM
immediately
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
232
procure local goods
production and content is of critical importance, such bids must be advertised with specific bidding condition that only locally produced goods, services or works or locally manufactured goods, with a stipulated minimum threshold for local production and content will be consideredD6D7
quotation document in order for the bid to be considered:
were followed prior to awarding the suppliers. Management did not review and monitor compliance with applicable SCM regulations.
part as it can be seen that the request for quotations included this, but forms submitted to bidders omitted this form, MBD 6.2. This expenditure has been recognised as irregular, and going forward, the municipality will ensure that it includes these forms.
The SCM Manager, CFO and the Acting MM will review prior signing any adverts
Contracts are not being monitored on a monthly basis
In terms of MFMA sec 116(2) (2) The accounting officer of a municipality or municipal entity must— a) take all reasonable steps to ensure that a contract or agreement procured through the supply chain management policy of the municipality or municipal entity is properly enforced; b) Monitor on a monthly basis the performance of the contractor under the contract or agreement; c) establish capacity in the administration of the municipality
During the audit of procurement and contract management, we have identified that management do not monitor contracts on a monthly basis as required by MFMA. The contract performance measures and the methods whereby it is monitored are not sufficient to ensure effective contract management. Management failed to identify or detect under-performing projects timeously since contractor’s/ service providers are not monitored on a monthly basis
Financial and performance management Management did not review and monitor compliance with applicable SCM regulations. The performance of the contractor/ service provider is not monitored on a monthly basis No project manager allocated the contracts management function
Management does not agree with the auditor’s finding, since every time payments are made, inspection must be conducted to confirm quantities and progress being claimed for, but further to this, reports have been given to auditors to confirm monitoring that would normally take place.
Fast track appointment of the designated official for contract management Every time payments are made, inspection is to be conducted to confirm quantities and progress being to date of claims. Attendance Registers and minutes will be kept for all site visits for all projects. The Senior Managers and the Technical
SCM Manager, PMU Manager and Operations Maintainance Manger MM and HOD’s
30 June 2019 Immediately 30 January 2019 30 June 2019 Immediately
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
233
to assist the accounting officer in carrying out the duties set out in paragraphs (a) and (b); and to oversee the day-to-day management of the contract or agreement; In terms of GRAP 17 paragraph 87, an entity shall disclose the following in the notes to the financial statements in relation to property, plant and equipment which is in the process of being constructed or developed: b) The carrying value of property, plant and equipment that is taking a significantly longer period of time to complete than expected, including reasons for any delays.
Services Portfolio committee will conduct site visits bi-annually Penalties and termination procedures will be imposed where necessary Service Provider evaluation
Unauthorised, irregular and fruitless and wasteful expenditure not prevented
Audit Finding In terms of the MFMA section 62. General financial management functions. — (1) The accounting officer of a municipality is responsible for managing the financial administration of the
The municipality has incurred unauthorized and irregular expenditure in the current financial year. It has been noted that: 1. As disclosed in the statement of comparison of budget and actual amounts, the municipality has spent money not in accordance with the budget. 2. The non-compliance
Management did not review and monitor compliance with applicable laws and regulations
Management acknowledges and agrees with auditors’ finding, these will be treated according to National Treasury circular 68 and section 32 of the MFMA, and
To implement budget control procedures by locking the system not to allow equirements expenditure on projects. To develop and follow the
ALL HOD’s CFO MM SCM/ CFO
30 June 2019 30 June 2019 31 March 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
234
municipality, and must for this purpose take all reasonable steps to ensure— (d) that equirements, irregular or fruitless and wasteful expenditure and other losses are prevented.
(transgression) that caused the irregular expenditure in the previous year re-occurred in the current year relating to no three quotations (SCM regulation 17). 3. The non-compliance could have been prevented if reasonable steps (implementation of adequate controls and processes) had been taken to prevent the re-occurrence.
consequence management will be enforced
Standard Operating Procedures for procurement Properly constituted BID Committees Report UIF&W to council quarterly
30 April 2019
Investment in an institution not registered in terms of the Banks Act 1990
In terms of the MFMA Sec 7(3)(b) and the municipal investment regulation 6, a municipality may not open a bank account with an institution not registered as a bank in terms of the Banks Act, 1990 (Act No. 94 of 1990)
During the audit of cash and cash equivalents, it was noted that the municipality had invested funds with Ithala Bank. Ithala Bank is not registered in terms of the Banks Act and the municipality has not provided evidence of approval to invest in Ithala Bank from Treasury. This results in material non-compliance with the requirements of the MFMA and related regulation.
Management did not review and monitor compliance with applicable MFMA regulations.
Management notes the finding; however, Ithala Bank is registered in terms of Act no 94 of 1990 please see attached correspondence in this regard.
The investment with Ithala has been withdrawn and the account has been closed
MM/CFO immediately
Inconsistencies in the performance information (AOPO)
As per Municipal System Act 32 of 2001 para 41: Core components. — (1) A municipality must in terms of its performance management system and in accordance with any regulations and guidelines that may be prescribed— a. set appropriate key performance indicators as a yardstick for measuring performance, including outcomes and impact, with
During the audit of performance of predetermined objectives, we inspecting the annual performance report (APR) and service delivery and budget implementation plan (SDBIP), the following inconsistencies were identified between the performance indictors and the targets.
Management did not ensure that regular reviews of performance reporting are done in terms of best practice and as required by the MSA
Findings noted. The inconsistencies were the result of printing/ typing errors. The APR has been adjusted to address the issue of inconsistencies
Conduct Monthly departmental performance presentation to the HOD The municipality will also ensure alignment at the end of the financial year during preparation of the 2018/19APR through Internal Audit and AC Reviews.
MM/MANAGER IDP/PMS
28-Feb-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
235
regard to the municipality’s development priorities and objectives set out in its integrated development plan; b. set measurable performance targets with regard to each of those development priorities and objectives; c. with regard to each of those development priorities and objectives and against the key performance indicators and targets set in terms of paragraphs (a) and (b)— i. monitor performance; and ii. Measure and review performance at least once per year; d. take steps to improve performance with regard to those development priorities and objectives where performance targets are not met; and e. establish a process of regular reporting to— i. the council, other political structures, political office bearers and staff of
Perform adjustment on SDBIP during the budget adjustment process
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
236
the municipality; and ii. The public and appropriate organs of state
ANNEXURE B FINDINGS
No. Annexure B Criteria AGSA Finding Internal Control Deficiency
Management response
Remedial action required
Responsibility Due date
1 Limitation of scope
In terms of section 62(1) (b) of the MFMA, the accounting officer of a municipality must take all reasonable steps to ensure that full and proper records of the financial affairs of the municipality are kept in accordance with any prescribed norms and standards
During the audit of Jozini Local municipality, the following information was not made available to auditors. The Request for information submitted has been long overdue Assets: Additions Outstanding information Please provide us the following information for the sample on the annexure; - Payment vouchers including (Invoices, purchase orders, goods received note etc) - Evidence that the purchase of assets was authorized e.g (Purchase requisition, approved memorandum) General expenditure Outstanding information - Payment vouchers including (Invoices, purchase orders, goods received note etc) - Evidence that the expenditure was authorized (e.g Purchase requisition, approved memorandum etc) - Quotations where applicable Contracted services Outstanding information - Payment vouchers including (Invoices, purchase orders, goods received note etc) - Evidence that the expenditure was authorized (e.g Purchase requisition, approved
Poor record management and safeguarding of information
Management acknowledges the finding and information have been submitted to AG
The backup storeroom will be procured for all municipal files to ensure files are stored safely and the registry department will be the custodians of the storeroom and registry rules will apply. Further all voucher submitted to Forensic Investigators will be scanned and stored accordingly as a back-up. Conduct monthly expenditure audit or review to ensure completeness, accuracy and validity of the expenditure voucher supporting documentation.
MM/CFO Immediately 2019/06/30
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
237
memorandum etc) - Quotations where applicable Trade and other payables Outstanding information - Payment vouchers including (Invoices, purchase orders, goods received note etc.) - Service level agreement - Suppliers statement Travel and subsistence Outstanding information - Payment vouchers including (Invoices, purchase orders, goods received note etc.) - Evidence that the expenditure was authorized (e.g. Purchase requisition, approved memorandum etc.) Quotations where applicable
2 Road infrastructure – Backlogs – incomplete FAR
Section 63 of the Municipal Finance Management Act, Act 56 of 2007 states the following duties in respect of asset management: (1) The accounting officer of a municipality is responsible for the management of— (a) the assets of the municipality, including the safeguarding and the maintenance of those assets; and (b) the liabilities of the municipality. (2) The accounting officer must for the purposes of subsection (1) take all reasonable steps to ensure— (a) that the municipality has and maintains a management, accounting and information system
A scrutiny of the information requested in respect of roads, revealed that roads to the value of R308 million was indicated as backlogs. Management carried out their own conditional assessment on these roads and evaluated the conditions as poor or of a very poor quality. No co-ordinates were allocated to these roads. It was further observed that these roads were not reflected in the assets register resulting in possible material misstatement of the infrastructure assets. From a discussion with the PMU, the municipality, received a conditional assessment during September 2018, which was prepared by the uMkhanyakude District Municipality. This assessment covers all roads in the municipality and should have been considered in updating the assets register
Record keeping was not always done in a timely manner to ensure that complete, relevant and accurate information is accessible and available
All backlogs submitted to AG were done internally by the infrastructure department, taken from the communities’ wish list, and this has been incorporated into RAMS system, where there are access roads, or pathways, these would have been constructed by communities and private sector to access their desired destinations. RAMS has identified the roads that do not belong to the municipality but
The system has been developed that will assist to budget for roads construction, rehabilitation, directing and controlling maintenance resources. The operations and maintain ace plan need to be developed and implemented and linked to the procurement plan.
MM/Manager Operations and Maintenance
30-Jun-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
238
that accounts for the assets and liabilities of the municipality; (b) that the municipality’s assets and liabilities are valued in accordance with standards of generally recognised accounting practice; and (c) that the municipality has and maintains a system of internal control of assets and liabilities, including an asset and liabilities register, as may be prescribed.
are within the jurisdiction of Jozini Municipality. The District has finalized RAMS, the first PSC meeting was held on the 14 September 2018 for the introduction of the system in all local municipalities. Each municipality was issued with password to access the system. The system will assist to budget for roads construction, rehabilitation, directing and controlling maintenance resources.
3 Issues identified during physical verification
Section 122 (1)(a) of the Municipal Finance Management Act (MFMA) states that every municipality must for each financial year prepare annual financial statements which- fairly present activities, the state of affairs of the municipality, its performance against its budget, its management of revenue, expenditure, assets and liabilities, its business activities, its financial results, and its financial position as at the end of the financial year
During the physical verification conducted in the current financial year we have identified the following issues on the fixed assets register (FAR). Assets that cannot be verified
Financial and performance management Management did not sufficiently review the supporting schedules and financial statements prior to submission for audit. Management did not verify the assets disclosed on the fixed assets register to confirm that they actually exist and that they
Management acknowledges the finding on depreciation and agrees with the auditors, hence depreciation has been recalculated and correctly adjusted accordingly.
Community services Department to prepare a monthly report on conditions of all municipal facilities report to MANCO Asset Management Unit to conduct asset verification bi-annually IA will include Asset management project on the internal audit plan to examine that internal controls are strengthened to fairly present the fixed assets.
CFO/director community services/ IA Manager
30-Jun-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
239
its financial results, and its financial position as at the end of the financial year. Section 63 (2) of the MFMA further indicates that the accounting officer must for the purposes of subsection (1) take all reasonable steps to ensure: d) that the municipality has and maintains a management, accounting and information system that accounts for the assets and liabilities of the municipality; e) that the municipality’s assets and liabilities are valued in accordance with standards of generally recognised accounting practice; and f) that the municipality has and maintains a system of internal control of assets and liabilities, including an asset and liabilities register, as may be prescribed
are in good condition
4 Conditional grants: Unauthorized expenditure
s15(a) of the MFMA states that A municipality may, except where otherwise provided in this Act, incur expenditure only—(a) in terms of an approved budget; In terms of s1 of the MFMA it defines unauthorized expenditure as, in relation to a municipality, means any expenditure incurred by a municipality otherwise than in accordance with
During the audit of conditional grants, it was noted that there were expenses that were incurred in the prior year which was paid for using the current year grant
Financial and performance management Management did not perform proper review of grant expenditure.
Management acknowledges the finding and recommendation will be implemented
The Accounting Officer will enforce adequate procedures on budget expenditure. Develop Budget procedures aligned to the Budget Policy and DoRA. Enhance budget internal controls to prevent equirements expenditure. Technical Services should spend as per the approved procurement
MM/CFO Immediately
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
240
section 15 or 11 (3), and includes (f) a grant by the municipality otherwise than in accordance with this Act
plan. Improve cash flow management to ensure that the municipality is financially stable to meet its obligations
5 Subsistence and travel: Excessive kilometers claimed
s65(1) of the MFMA states that the accounting officer of a municipality is responsible for the management of the expenditure of the municipality. S65(2)(a) states that the accounting officer must for the purpose of subsection (1) take all reasonable steps to ensure that the municipality has and maintains an effective system of expenditure control, including procedures for the approval, authorization, withdrawal and payment of funds. Paragraph 12.8(k) of the municipality’s subsistence and travel policy states that the mileage shall be calculated in a cost effective manner; by looking at the distance from home to destination or distance from office to destination
During the audit of travel and subsistence, we have identified that excessive kilometers were claimed when submitting claim forms. The kilometers on the claim does not reasonably agree to the kilometers as per google maps when measuring the same distance traveled for the event. Excess amount of R4 453 was paid to officials. This amount should be disclosed as fruitless and wasteful expenditure.
Financial and performance management Management did not ensure that the subsistence and travel policy were followed when claiming for S&T. Management did not assess the reasonableness of the kilometers claimed by officials/councilors.
Management acknowledges auditors’ finding, and this will be investigated further in the current financial year, and corrective measures taken where necessary, but going forward, extra precaution will be taken when approving travelling claims.
The standard guideline with kilometers for travelling normal routes will be developed and signed by the Accounting Officer and applied prior processing of all travelling claims. Exceptions will be processed upon submission of an internal memo approved by the immediate supervisor and the MM. Existing guidelines will be populated to councillors and will be tabled to council
MM/HR Manager/CFO
2019/06/30 28 February 2019
6 Employee of the municipality doing business with the municipality and submitted a false declaration
In terms of the SCM regulation 13 I – A supply chain management policy must state that the municipality or municipal entity may not consider a written quotation or bid unless the provider who submitted the quotation or bid has indicated: i) whether he or she is in
During the audit of the procurement and contract management, the following award was made to the supplier (Mpomponyane Trading entity) that submitted a false declaration form (MBD4). Through the analysis performed, we have identified that Jozini local municipality employee has an interest in the supplier who
Financial and performance management Management did not ensure that the proper SCM processes were followed prior to awarding the suppliers. Management did
The false declaration identified by auditors, and any other that might be picked up by management, will be dealt with following relevant disciplinary actions. This
False declaration identified by auditors, and any other that might be picked up by management, will be dealt with following relevant disciplinary actions. The Municipality will source services of
CFO/ Director Corporate Services/MM
2018/02/28 30 June 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
241
the service of the state, or has been in the service of the state in the previous 12 months; ii) if the provider is not a natural person, whether any of its directors , managers, principal shareholders or stakeholder is in the service of the state in the previous twelve months. As required by SCM reg. 46(2)I and in terms of MSA schedule 2: Code of conduct for municipal staff members’ sec 5(1) – A staff member of’ a municipality/ municipal entity who, or whose spouse, partner, business associate or close family member, acquired or stands to acquire any direct benefit from a contract concluded with the municipality/ municipal entity, must disclose in writing the full particulars of the benefit to the council/ board. In terms of the MFMA 112(1) The supply chain management policy of a municipality or municipal entity must be fair, equitable, transparent, competitive and cost-effective and comply with a prescribed regulatory framework for municipal supply chain management, which must cover at least the following:
won the award. No declaration of such interest was mentioned on the declaration submitted by Mpomponyane Trading Entity. We have also inspected the employee’s declaration submitted to the Municipality, we noted that the employee did not declare such interest
not review and monitor compliance with applicable SCM regulations.
transaction will be accounted for as irregular expenditure, and due processes as per section 32 of MFMA will be followed. Going forward, the Municipality will source services of external service provider to perform the vetting of all suppliers in the Municipal data base, and any other potential service providers the Municipality might go into business with in the near future.
external service provider to perform the vetting of all suppliers in the Municipal data base, and any other potential service providers the Municipality might go into business with in the near future. Declaration of interest will be done upon the date of appointment for all new employees and Further to that employee awareness will be made in a form of meeting yearly beginning of each financial year. A comprehensive report to be prepared by HR and submit to Manco
Director Corporate Services
28 February 2019.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
242
(j) compulsory disclosure of any conflicts of interest’s prospective contractors may have in specific tenders and the exclusion of such prospective contractors from those tenders or bids. In terms of SCM reg. 44 (a), A supply chain management policy of a municipality or municipal entity must, irrespective of the procurement process followed, state that the municipality or municipal entity may not make any award to a person who is in service of the state.
7 Suppliers in service of the state who submitted false declarations
In terms of the Municipal Supply Chain Management Regulations 13 I, a supply chain management policy must state that the municipality or municipal entity may not consider a written quotation or bid unless the provider who submitted the quotation or bid has indicated- i) whether he or she is in the service of the state, or has been in the service of the state in the previous 12 months; ii) if the provider is not a natural person, whether any of its directors, managers, principal shareholders or stakeholder is in the service of the state in the previous twelve months.
During the audit of the procurement and contract management, we have identified suppliers in which persons in service of other state institutions have an interest. No declaration of such interest was mentioned on the declarations (MBD4 forms) submitted by suppliers
Financial and performance management Management did not ensure that the proper SCM processes were followed prior to awarding the suppliers. Management did not review and monitor compliance with applicable SCM regulations
The Municipality’s data base will be updated to remove service providers identified under both tables, 1 and 2, and those identified under table 2 will be disclosed as irregular expenditure, and due processes as per S32 of MFMA will be followed. External service provider will be sourced to assist the Municipality with the vetting of all service providers in the municipal data base.
The Municipality’s data base will be updated and the service providers identified as being in the service of the state will be put on hold. Those identified under table 2 will be disclosed as irregular expenditure, and due processes as per S32 of MFMA will be followed. External service provider will be sourced to assist the Municipality with the vetting of all service providers in the municipal data base.
CFO/MM Immediately MM deferred to the 2019/2020 FY
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
243
In terms of SCM regulation 44(a) and in terms of Supply Chain Management (SCM) policy (section 43) of Jozini municipality: Prohibition on awards to persons in the service of the state- Irrespective of the procurement process followed, no award may be made to a person - a) who is in the service of the state; b) if that person is not a natural person, of which any director, manager, principal shareholder or stakeholder is a person in the service of the state; or c) who is an advisor or consultant contracted with the municipality or municipal entity.
8 Employees who have interest through partnership with suppliers
In terms of the Municipal Supply Chain Management Regulations 13 I, a supply chain management policy must state that the municipality or municipal entity may not consider a written quotation or bid unless the provider who submitted the quotation or bid has indicated- (i) whether he or she is in the service of the state, or has been in the service of the state in the previous twelve months (ii) ii) if the provider is not a natural person, whether any of its directors, managers, principal shareholders or stakeholder is in the
During the audit of the procurement and contract management, the following awards were made to suppliers that submitted a false declaration form (MBD4). Through the analysis performed, suppliers were identified to be partners or associates of the employees of the municipality: Note that the suppliers and employees did not declare their interest.
Financial and performance management Management did not ensure that the proper SCM processes were followed prior to awarding the suppliers. Management did not review and monitor compliance with applicable SCM regulations
The false declaration identified by auditors, and any other that might be picked up by management, will be dealt with following relevant disciplinary actions. This transaction will be accounted for as irregular expenditure, and due processes as per section 32 of MFMA will be followed. Going forward, the Municipality will source services of external service
the Municipality will source services of external service provider to perform the vetting of all suppliers in the Municipal data base, and any other potential service providers the Municipality might go into business with in the near future Currently the MBD4 Forms are utilized as a control tool.
CFO Deferred to 2019/2020
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
244
service of the state in the previous twelve months. As required by SCM reg. 46(2)I and in terms of MSA schedule 2: Code of conduct for municipal staff members’ sec 5(1) – A staff member of’ a municipality/ municipal entity who, or whose spouse, partner, business associate or close family member, acquired or stands to acquire any direct benefit from a contract concluded with the municipality/ municipal entity, must disclose in writing the full particulars of the benefit to the council/ board.
provider to perform the vetting of all suppliers in the Municipal data base, and any other potential service providers the Municipality might go into business with in the near future
9 No permit to operate the municipal dump site
Section 24F of the National Environmental Management Act (NEMA), No. 107 of 1998 stipulates: Offences relating to commencement or continuation of listed activity. (1) Notwithstanding any other Act, no person may — (a) commence an activity listed or specified in terms of section 24 (2) (a) or (b) unless the competent authority or the Minister of Minerals and Energy, as the case may be, has granted an environmental equirements for the activity; or (b) commence and continue an activity listed
During the audit of dump site, it was identified that municipality doesn’t have the permit to operate the municipal dump site. The required permit / license had not been issued by the Department of Environmental Affairs (DEA) as required by NEMA. The municipality has been engaging on the matter and it has been identified that the land is on Pongola jurisdiction and thus there have been delays experienced
Management did not exercise care and adequate control over monitoring compliance with laws and regulations.
Management Acknowledges the finding, the processes are underway and currently at the final stage with the department of environmental affairs the licence will be obtained by the 30 January 2019
The processes are underway and currently at the final stage with the department of environmental affairs the licence will be obtained by the 30 January 2019
Director Community Services
30-Jun-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
245
in terms of section 24 (2) (d) unless it is done in terms of an applicable norm or standard. (2) It is an offence for any person to fail to comply with or to contravene— a) subsection (1) (a); b) subsection (1) (b); c) the conditions applicable to any environmental equirements granted for a listed activity or specified activity; d) any condition applicable to an exemption granted in terms of section 24M; or (3) It is a defense to a charge in terms of subsection (2) to show that the activity was commenced or continued in response to an emergency so as to protect human life, property or the environment. (4) A person convicted of an offence in terms of subsection (2) is liable to a fine not exceeding R5 million or to imprisonment for a period not exceeding ten years, or to both such fine and such imprisonment.
10 Relevant indicators and targets not reported on
As per Municipal System Act para 26. Core components of integrated development plans. An integrated development plan must reflect c) the council’s development priorities
Upon review of the planning and reporting documents for local economic development, it was identified that relevant indicators and targets are not included. The indicators and targets include development of strategies and policies which are of an
Management did not ensure that regular reviews of performance reporting are done in terms of best practice and as required by the
The municipality reported on Targets that were in the SDBIP. Other information is reported in the Annual Report. In future, the
In future, the municipality will ensure that all service delivery projects are in the SDBIP and APR. The SDBIP 2018/2019 will the adjusted accordingly during IDP adjustment
MM/IDP-PMS Manager/ LED Manager
30 Jan 2018.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
246
and objectives for its elected term, including its local economic development aims and its internal transformation needs
operational nature and excludes indicators and targets that indicate service delivery. An example is that the municipality has spent R16million on poverty alleviation projects (subsidies and donations to the public) in the current financial year yet there is no disclosure of this service delivery in the performance information. This results in the public not being informed of relevant information relating to service delivery and municipal officials not being measured on items that impact actual service delivery.
MSA.
municipality will ensure that all service delivery projects are in the SDBIP and APR
in January 2019. Kindly address the issue of public participation (ensuring that the public is aware of progress on the service delivery projects)
11 Construction of access roads
Your attention is drawn to paragraph 3.2.1 of the “Guide for Accounting Officers of Municipalities and Municipal Entities” which states that the need forms part of the strategic plan and Integrated Development Plan (IDP) of the municipality / municipal entity.
A scrutiny of the IDP and the budget revealed that Majalantini access road was not discussed or listed as a priority when the documents were prepared. Furthermore, no needs assessment or feasibility study could be forwarded for audit scrutiny
There were inadequate controls/ processes at the municipality to prevent overspending and adhere to legislation.
Management notes the finding, however according to the final budget 2017-18 that was submitted to Treasury and for audit purposes we have budgeted R53 million under roads
The IDP Process is considered on identification of projects.
MM/Manager PMU 31-May-19
12 Inaccurate Contract register submitted for audit
In terms of the Municipal Supply Chain Management Regulations GNR 868 30 May 2005 Section 18I. 18. Procedures for procuring goods or services through written or verbal quotations and formal written price quotations - A supply chain management policy must determine the procedure for the procurement of goods or services through written or verbal quotations or formal
During the audit of the supply chain management we have determined that the contract register submitted by the management was inaccurate and doesn’t contain all the necessary fields required. The following issues have been identified on the contract register submitted. (Refer to Table 1) Through testing of the completeness of the contract register, we have determined that the entity has entered into new contracts which could not be traced to the contract register.
Financial and performance management Management did not review and monitor compliance with applicable SCM regulations
The Municipality acknowledges and agrees with auditor’s findings, the Municipality does not have an effective Contract Management unit because of an employee occupying this position and yet still doing his old job as SCM Officer Demand & Acquisition, hence doing two jobs at an expense of
The vacant post of the SCM Officer Demand & Acquisition will be advertised and filled in the current financial year, by end February 2019, and thereafter the Municipality will be in a better position to deal with contract management unit issues. Once the SCM Officer Demand & Acquisition post is filled the official will strictly concentrate on the contract management duties on the daily basis
CFO/Director Corporate Services
Immediately 30 June 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
247
written price quotations, and must stipulate – I Requirements for proper record keeping. As per the approved SCM Policy (5) The Supply Chain Management Unit shall, in accordance with the provisions of these Rules, be responsible, inter-alia, for:- (vii) Maintaining records relating to quotations and bids
one, being an effective contract management unit. The vacant post of the SCM Officer Demand & Acquisition will be advertised and filled in the current financial year, by end February 2019, and thereafter the Municipality will be in a better position to deal with contract management unit issues. Once the SCM Officer Demand & Acquisition post is filled the official will strictly concentrate on the contract management duties on the daily basis and will be sent on relevant trainings
and will be sent on relevant trainings. Partially adequate response. Request Support from PT for contract management while awaiting to fill the posts.
13 No controls in place to identify related parties/related party transactions
In terms of MFMA Act 56 of 2003 paragraph 62: The accounting officer of a municipality is responsible for managing the financial administration of the municipality, and must for this purpose take all reasonable steps to ensure; a) that the resources of the municipality are used effectively, efficiently and economically; b) that full and proper
During the audit of related parties, we have identified that the management does not have controls in place to identify related parties and related party transactions. This is a repeat finding as the municipality has not implemented the controls that were supposed to be implemented by the 30 January 2018 according to the municipality audit findings action plan.
Financial and performance management Management is unaware of how to identify related party transactions and has not engaged with any external party to ensure that there should be a method of identification. Management did not ensure the
Management acknowledges the finding and agrees with auditors. Management will develop a policy to assist the municipality in identifying and treating related party transactions
Management will develop a policy to assist the municipality in identifying and treating related party transactions. An early timeline needs to be indicated as there is a need to facilitate the policy as the municipality did not know how to identify the related party transaction.
MM/CFO 30 Jne 2019.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
248
records of the financial affairs of the municipality are kept in accordance with any prescribed norms and standards; c) that the municipality has and maintains effective, efficient and transparent systems— i) of financial and risk management and internal control; and ii) of internal audit operating in accordance with any prescribed norms and standards GRAP 20, paragraph 2 states that: “An entity that prepares and presents financial statements under the accrual basis of accounting (in this Standard referred to as the reporting entity) shall apply this Standard in: (a) identifying related party relationships and transactions; (b) identifying outstanding balances, including commitments, between an entity and its related parties; (c) identifying the circumstances in which disclosure of the items in (a) and (b) is required; and (d) determining the disclosures to be made about those items.” GRAP 20, paragraph 5 states that: “Related party relationships exist throughout the public sector, because:
need to implement controls to identify related parties and related party transactions. The entity did not review and monitor compliance with applicable GRAP standards
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
249
(a) departments and municipalities are subject to the overall direction of an executive government or council, and ultimately, parliament, and operate together to achieve the policies of the government; (b) departments and municipalities frequently conduct activities necessary for the achievement of different parts of their responsibilities and objectives through separate controlled entities, and through entities over which they have significant influence; c) public entities enter into transactions with other government entities on a regular basis; and (d) ministers, councillors or other elected or appointed members of the government and other members of management can exert significant influence over the operations of an entity.” GRAP 20, paragraph 27 states that: “Subject to the exemptions in paragraph .32, if a reporting entity has had related party transactions during the periods covered by the financial statements, it shall disclose the nature of the related party relationship as well as information about those transactions
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
250
and outstanding balances, including commitments, necessary for users to understand the potential effect of the relationship on the financial statements. These disclosure requirements are in addition to those in paragraph .35 to disclose remuneration of management. At a minimum, disclosures shall include: (a) the amount of the transactions; b) the amount of outstanding balances, including commitments; and (i) their terms and conditions, including whether they are secured, and the nature of the consideration to be provided in settlement; and (ii) details of any guarantees given or received; (c) provisions for doubtful debts related to the amount of outstanding balances; and (d) the expense recognised during the period in respect of bad or doubtful debts due from related parties.”
14 No performance management review of staff other than s57
Section 67(1)(d) of the MSA requires the municipal to develop and adopt appropriate systems and procedure to monitor, measure and evaluate performance of
It has been identified that only director to comply with the performance management policy which reqires all employees including management, councilors, or any other person who may associate with the
Leadership did not communicate policies and procedures to enable and support understanding and
Management acknowledges auditors finding however, aditors need to understand that traditionally the
Performance Management Reviews for Managers other than s57 will be done quarterly. Q1- 12-14 December
Municipal Manager/ Directors
2018/12/30 05/03/ 2019 052019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
251
staff municipal in the case of performing their duties to sign performance agreements and subject to mid-year and year end reviews
execution of internal control objectives and did not implement effective HR management to ensure that management is monitored.
performance management was only done for S56 and S57 managers, and it was agreed at management meeting that should be gradually cascaded to all employees, starting with the employees reporting to directors, manager level, and reviews will only be done once a year. The performance agreements were signed by both employees, and municipal manager, since there were no director. Performance management reviews for employees below S56 and 57 directors were supposed to be performed in August, for the entire year, unfortunately, the MM got suspended before this could be done, and this was omitted to be reported, or brought to the attention of the
2018 Q2- 04-05 March 2019 Q3 – 02-03 May 2019 Q4 – 04-05 September 2019 will be done the following dates: 12-14 December 2018 for Quarter one Financial Year
03 March 2019 05 Sept 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
252
Acting Municipal manager hence, it still has not been done as yet
15 Employees extended period for acting position not approved by the MEC
Section 56(1) ( c ) of the MSA states that a municipal council, after consultation with the municipal manager, must appoint, a manager directly accountable to the municipal manager; or an acting manager directly accountable to the municipal manager under circumstances and for a period prescribed. A person appointed in terms of paragraph (a) (ii) may not be appointed to act for a period that exceeds three months. Provided that a municipal council may, in special circumstances and on good cause shown, apply in I to the MEC for Local Government to extend the period of appointed equirements in paragraph (a) for further period that does not exceeds three months.
During the audit of HR management, the following concerns were raised with regards to employees in acting positions: This results in non- compliance with the requirements of the MSA and irregular expenditure being understated by R700 992,70.
Financial and performance management. Management dd not exercise adequate concern with regards to having acting position approved as they: failed to seek approval from MEC before extending the period for actin positions.
Management agrees with the finding; these have been since disclosed as irregular expenditure
The Accounting Officer will ensure adequate processes are followed should there be a need for extended period due to the correct situation of the municipality.
Municipal Manager
Immediately
16 Consultants policy not approved and contracts excluded essential contracts management clauses
In terms of the SCM guide for acconting officers, Section3.1.1 states that demand management is the first phase of the supply chain management. The objective is to ensure that the resources required to fulfil the needs identified in the strategic plan of the institution are delivered at the correct time,prices and place and that
The following has been identified: (i) Audit requested the consultant policy a draft was appointed of the consultant was received . Audit were unable to confirm whether the policy has since been approved by council. (ii) contracts entered into did not include clause for transfer of skills, which include the nature, scope and goals of the training program. Details regarding transfer of skills such as employees to be trained skills to
The acconting officer has not performed adequate assessment for the requirement of the SCM Policy and the SCM Guide to ensure compliance and management did not understand the risk associated with the
the draft policy for the use of consultants will be tabled to council this financial year and the resolution kept as proof. (ii) The gap analysis was done in the form of meeting within the finance management and accounting officer where it was
The draft policy will be developed and summitted to council for approval. The consultant reduction plan will be developed and implemented accordingly The policy should be developed and approved at an earlier
Municipal Manager/CFO SCM Manager
30-Jun-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
253
quantity and quality will satisfy those needs. As part of SCM , a total needs equiremen should be undertaken. This analysis should be included as part of the strategic planning process of the institution and hence will incorporate the future needs. Furthermore, in terms of paragraph 5.1.5 of the SCM- a guide for AO of the Municipalities and Municipal entity . “consultant should only be engaged when necessary skills and/or resources to perform a project/ duty/ study are not available and the equiremen officer cannot be reasonably either to train or to recruit equir in time available. And in terms of National Treasury General Condition of contract, Section 25, if the supplier fail to deliver any or all of the good or to perform the service within the period specified in the contract, the purchaser shall without prejudice to it other remedies under the contract , deduct , from the contract price , as a penalty , a sum calculated on the delivered price of the delayed goods or unperformed services using the current prime interest rate calculated for each day of the delay ntil actual delivery or
be I , and monitoring and evaluation arrangement have not been included on the contract of Ngbane and Company. (iii) contract excluded penalty clauses for poor or non performance of consultants.(iv) contracts for were not explicative in stipulating deliveries which are linked to milestones and timeline.(v) contract were not explicating in stipulating deliveries which are linked to milestones and timeline. Contracts for Ngubane and company made reference to and schedule A which was not included on the contract or provided to audit (refere to Communication No.4)
contract/SLA not including a penalty clause in case of non or poor performance , other than contract management principles such as nature and scope of training and skills transfer and specifying contract milestone etc.
identifies that the municipality did not have the capacity at the time and terms of reference were formulated, the second one Kalmia was also emanated from the municipal capacity and was discussed and agreed upon with IT officer. In the future we will ensure that a detailed document gap analysis is performed as recommended. (iii) The skills transferred is done as consultants are allocated municipal staff to work with although not well documented on the SLA and this is now being done all the new SLA’s. This is a result of the Municipality does not have in house legal department to assist with the service legal agreement but rather utilizing a standard SLA’s format for all project, the municipality is engaging with the
date as the 30 June 2019 is the end of your financial year.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
254
performance attorneys on the panel to assist with the drafting of difference SLA to include the legal implications like the penalty clause. (iv) Schedule A for Ngubane is also noted and have consulted with them to provide such, and could not get this might have been mistake from their side.
17 Management reviews of the objective of consultants are not reviewed on the annual basIs
Municipal Supply chain management: A guide for accounting officer of municicpalities and municipal entities paragraph 5.1.5-: “consultants should only be engaged when necessary skills and/or resources to perform projects, duty or study are not available and the accounting officer cannot be reasonably either to train or recruit people in the time available
During our equiremen of the municipality’s use of consultants, itvwas noted that management reviews at least on an annual basis on whether the objective of the institution are better achieved by the municipality through the use of consultants or their permanent staff were nor conducted. Management did not ensure that there are sufficient processes in place to assess the necessity of the use of consultants and also to assess on whether the municipality will benefit by obtaining and empowering permanent staff to conduct the activities provided by the consultants
Management did not implement effective human resource management to ensure that adequate and sufficient skilled resources are in place and that performance is monitored
Human Resources department is working on the filling of all vacant posts but in some critical instances like the two in question being Fixed Asset Register and IT support the consultants will still be required as it require a equirement skill
The concept document will be developed prior any tenders are issued and signed by the Accounting Officer for each type of requested services service which will provide the following: 1. Gap analysis 2. Skills Transfer Plan 3.Detailed TOR’s
Municipal Manager
30-Jun-19
18 Evidence and approval of the requirments ofSIPDM into the SCM policy not provided
In November 2015 National Treasury issue the standards for infrastructure equirement and delivery management (SIPDM) in oeder to improve project outcomes. The effective implementation date by organs of the state
According to the instruction by National Treasury the SCM policy should have been completed by 1 April 2017 but this has not been done to date. The SIPDM provides a control framework for the planning, design and execution of infrastructure projects which are required to provide better quality
There are insufficient control equiremen within the municipality to ensure that all legislative equirements or instructions by National Treasury are Adhered and
Management notes the finding; however the municipality is still awaiting provincial treasury for training on SIPDM and incorporating into the SCM policy
Communication with Provincial Treasury to conduct the training for SCM Officials, HOD’S and Technical Department officials on the SIPDM will be forwarded
CFO 30-Jan-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
255
subject to PFMA was 1 July2016. The full implementation of the SIPDM which is expected to deliver better value for money within an auditable system, requires that a number of action be undertaken , and one of the action is to establish a suitable SCM policy for Infrastructure procurement and delivery equiremen. This Policy should be approved by the head of department and incorporated the following: (i) assign responsibilities for approving or accepting deliverables with the gate in the control framework or equirement the procurement aprocess or procedure. (ii) establish committee which are required by law or equivalent quality management and governance arrangements;.(iii) Establish delegations for the awarding of the contracts or issuing of an order , and ; (iv) Establish ethical standards for those involved int the procurement and delivery of infrastructure.
of life for the citizen of the country. Therefore, any delay in implementing the requirements of the SIPDM will affect the timely delivery of all infrastructure projects prolonging better service delivery and value for money.
implemented withing the required timeframes
19 Audit Committee did not meet four times in the year as required by MFMA 166(4)(b)
MFMA 166(4)(b) requires and Audit Committee of the Muncipality to meet atleast 4 times a financial year.
During the audit of Jozini audit committee,it was noted that the audit committee only met 3 times in the current financial year on the following dates: 29 August 2018 22 February 2018 15 May 2018
Management did not exercise care and adequate control over monitoring compliance with laws and regulations.
Management notes the finding and compliance will be enforced and ensured going forward.
A detailed Audit Committee work plan will be developed and used by the audit committee for its quarterly seating.
Manager Internal Audit
30-Dec-18
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
256
20 Terms of Reference (TOR) – not adequate
Municipal Supply Chain Management: A guide for Accounting Officers of Municipalities and Municipal entities paragraph 5.8.3.1, provides clear steps to follow when appointing consultants where a clear Terms of Reference (TOR), which includes a detailed task directive be compiled and the objectives, goals and scope of the assignment be clearly defined.
a) The TOR for Ngubane and Company was provided for audit. Upon scrutiny it was noted that the TOR did not include requirements on experience and qualification b) TOR for Kalmia Trading not provided for audit (refer to Communication No.4)
Management did not ensure that steps and guidelines provided were not applied in the municipality.
Management Acknowledges and agrees with the finding going forward TOR’s will be developed according to the guidelines.
TOR’s will be developed according to the guidelines. Detailed TOR’s will be formulated with the help of user Departments.
Municipal Manager/Directors
Ongoing
IT -FINDINGS
No. Annexure B AGSA Finding Internal Control Deficiency Management response Remedial action required
Responsibility Due date
1 Vacant Positions in IT
The following five positions within the IT Function were noted as being vacant for the period under review: • Manager IT; • Assistant Manager General IT; • IT Technician; • Systems Administrator; and • IT Assistant In the absence of adequate staff resources the Information Technology function might not be in a position to provide efficient and effective IT support to the entity. This could result in IT not adequately supporting business operations and not meeting the needs of the municipality. The finding was raised in the prior year audit and
The municipality experienced political instability during the year under review and as a result the previously advertised IT positions were frozen. Subsequently the positions were unfrozen and the recruitment process had to start all over again which resulted in delays in filling the positions.
Management Acknowledges the finding, we have presented the reviewed organogram to Council and the IT manager, IT Technician and IT assistant positions have been prioritized and these positions will be filled at the end of the current financial year
The reviewed organogram Council and the IT manager, IT Technician and IT assistant positions have been prioritized and these positions will be filled at the end of the current financial year. The approval of the organogram is submitted to council on the 18th Dec 2018.
MM/Director corporate Services
30-Jun-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
257
no progress has been made to address the issue.
2 Sections of the IT Strategy not completed
As previously reported it was noted that an IT Strategy had been developed by the municipality. This strategy was still in draft and the following sections of the document had not been completed by the municipality: • Approval and version control • Alignment of IT Strategy to IDP • Migration strategy to future IT environment In addition, it was noted that the IT Budget and expenditure were not aligned to the IT Strategy as the projects on the IT Budget did not correspond to those stipulated on the IT Strategy. The absence of an adequately documented and approved IT Strategy may result in the IT Function’s goals and objectives not being aligned to those of the municipality. If the IT Budget is not prepared in line with the IT Strategy this could result in IT not having sufficient funding to adequately support business requirements and may cause IT to not meet management and user’s expectations. The finding was raised in the prior year audit and
Leadership: IT Governance The IT Strategy was not reviewed to ensure that the template developed by the service provider had been adequately completed and was aligned to the IT Budget of the municipality. In addition, management did not priorities approving the IT Strategy as they were not aware of the risks associated with not having an IT Strategy in place
Management Acknowledges the finding, however management has appointed IT Steering Committee as from 01 August 2018 that will look at the IT strategy, make changes where necessary, approve and implement it.
Management has appointed IT Steering Committee as from 01 August 2018 that will look at the IT strategy, make changes where necessary, approve and implement it. The delays have been caused by the AG Audit being on site. The 1st Meeting is planned to seat within period ending 28th Feb 2019. Revise and implement the IT Strategy aligned to IDP and ICT Governance Framework. Enhance functionality of ICT Steering Committee.
MM/Director corporate Services
30-Mar-18
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
258
no progress has been made to address the issue.
3 IT policies and ICT charter not approved by council
During the audit of Information technology, we have determined that the IT policies and the ICT charter were not approved by the council. The following policies were not approved: • CGICT policy • ICT charter • IT change management policy • IT strategy • IT security policy • Patch Management policy • Business continuity plan • Disaster recovery plan • Backup and restore policy • User account management policy
Leadership: IT Governance Management did not exercise adequate concern with regards to having the newly drafted HIT policies approved by council in order to ensure that only council approved policies are being used.
Management Acknowledges the finding, The Municipality will review and table the policies on yearly basis going forward.
The Municipality will review and table the policies and charter on a yearly basis going forward. The approval of policies is dependent on council .
Director Corporate Services
30-Jun-19
4 Inadequate physical access and environmental controls in the server room
As previously reported the following weaknesses were identified with regard to the physical access and environmental controls of the server room: • There is no dedicated server room. Servers are stored in the IT Officer’s office. • A server room visitor’s register to record persons who had entered the IT Officer’s office has not been maintained. • No maintenance plan had been developed for the servicing of server room environmental controls. • The IT Officer’s office
Financial and performance management: IT Systems Management did not implement an effective process to address prior year findings. Lack of funding and municipal office space constraints due to the office expansion project being delayed.
Management acknowledges the finding; Server room is still under construction which will be completed on 30 June 2019
The Server room is still under construction which will be completed by 30 June 2019. It is impractical to have a server room register since the sever is located where the ICT Officer office is therefore the register will be developed once an adequate server is constructed. The current ICT Officer’s office will be converted to a temporary server room and all unsafe equipment will be moved. Installation of
Director Corporate Services
30-Jun-19
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
259
contained numerous flammable materials such as papers and boxes and was also used to store new and used IT equipment. Inadequate physical access controls increase the risk of unauthorized persons gaining access to the server room. In addition, should server resources be damaged or stolen management may not have records of the person or contact information for them if a server room visitor’s register is not maintained. Weak environmental controls could result in environmental damage to the server. This may lead the loss of data and critical IT hardware and software not functioning as intended. The finding was raised in the prior year audit and no progress has been made to address the issue.
access control system
Management has been monitoring the implementation of the above plan in ensuring that all findings by Auditor-General as per management report for the financial year 30 June 2018 are addressed. Furthermore, review of internal controls by management will be undertaken to ensure full compliance with all municipal finance prescripts.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
260
AUDIT OPINIONS FOR THE 3 PREVIOUS YEARS
YEAR AUDIT OPINION
2015/16 Unqualified
2016/17 Unqualified
2017/18 Unqualified
The municipality is committed to improve from the Unqualified Audit opinion to the Clean Audit. There are Audit Steering committee meetings which take place every Thursday to report on the progress of implementing the AG Action plan. The Audit Committee also monitors the implementation of this plan. From the above AG action plan is encouraging to note that at the time of submission of this IDP a total of 19 findings of the total 34 had been resolved and the balance being in progress and anticipated to have been resolved at the year end (30 June 2019).
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
261
C.6.9. MUNICIPAL FINANCIAL VIABILITY SWOT ANAYSIS
STRENGTHS WEAKNESSES
• Availability of Relevant Documents
• Capable Staff
• Availability of possible sources of Funding
• Strong Community Participation on Budgeting in reporting processes
• Positive liquidity
• Strong regulatory Framework
• Approved policies
• Positive Audit Opinion
• Do not have loans/ Borrowings
• Neglect of community assets
• High Staff turnover
• Inability to bill revenue from affording households or businesses
• Overreliance on Consultants
• High grant dependency ratio
OPPORTUNITIES THREATS
• Improvement of staff
• Opportunity of skills transfer from consultants
• The municipality will have a standardized reporting format which will be understood at a provincial and national level.
• Foreigners putting a burden on Municipal Budget
• Fraud and Corruption
• Withholding of conditional grants by national department will result to no service delivery.
• Non- compliance with MSCOA which could result in no transfer on equitable share to the municipality as per the legislated date.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
262
C.7. GOOD GOVERNANCE AND PUBLIC PARTICIPATION ANALYSIS
C.7.1. BATHO PELE
BATHO PELE POLICY AND PROCEDURE MANUAL The White Paper on the Transformation of the Public Service identifies transforming service delivery as one of eight national transformation priorities. This involves achieving service excellence through delivering services professionally, and in a courteous, efficient and cogent manner, which ensures predictable and affordable services to all citizens, all the time. In terms of Chapter 4 section 17 (2) (a) of the Municipal Systems Act 32 of 2000, the Municipality maintains a reputation of aiming to deliver the highest quality of services. The Municipality’s systems and procedures allow for the establishment of mechanisms, processes and procedures to enable local communities to participate in the affairs of the municipality and for this purpose provide for the receipt, processing and considering of petitions and complaints lodge by members of the local communities. Feedback mechanism are in place whereby citizens can communicate to the municipality when services are not being delivered in line with the expectation as espoused within the eight Batho Pele Principles. The Municipality has approved the Batho Pele Policy and is being implemented as per above. Jozini Municipality has appointed the IGR/ Batho Pele Officer and has also formed a Rapid Response Task Team which falls under the Office of the Speaker. This committee holds meetings on a monthly basis. Batho Pele is understood to be an initiative that aims to get our municipal employees to be service oriented, to strive for excellence in service delivery and to commit to continuous service delivery improvement. It commits us, as Jozini Local Municipality to be held accountable by our communities for the level of services we deliver. Therefore, we have to put our communities at the centre in delivering services. Jozini Municipality recognises the need for the existence of Batho Pele and its importance as a service principle and it also acknowledges that a guiding philosophy in service delivery is to get all its employees to be service oriented, to strive for excellence in service delivery and to commit to continuous service delivery improvement. The purpose of the Batho Pele policy is to enable the Municipal employees to deliver services in a customer focused way as stated in the Batho Pele national policy and ensure that the Jozini Municipality’s systems, procedures and attitudes of its employees are reoriented in favour of service delivery. The objectives of the Jozini Municipality Batho Pele Policy which was approved by the Council on May 2019 are:
To have a customer – centred approach to service delivery To reduce financial and time costs incurred arising from poor customer service due to
repeat calls from and to customers. To equip our staff with knowledge and competencies to continuously enhance the
service standards according to changing customer needs. To make the employees of the Jozini Municipality more accountable to citizens To build effective relationships with the end users of public services (consultation) To apply high standards and professional ethics
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
263
Complaints registers and suggestion boxes are available in all municipal offices. The policy contains service standards which all council employees in all departments [including Senior Managers] should adhere to.
To improve service delivery, with a shift away from inward-looking, bureaucratic systems, processes and attitudes as in increased commitment, personal sacrifice, dedication and a search for new ways of working which puts the needs of the public first, which are better, faster and more responsive to the citizen’s needs.
SERVICE DELIVERY IMPROVEMENT PLAN (SDIP) During the Strategic Planning Session, the Municipality identified the following services to be improved and will be implemented in the 19/20 Fiscal Year:
Maintenance of community facilities Youth Development Disaster Management
C.7.2. OPERATION SUKUMA SAKHE (OSS)
The programme aims to embrace the community partnerships and the integration of fieldworkers, by encouraging coordination of comprehensive services of different service providers such as government departments, state owned enterprises and civil society as it views the delivery of anti-poverty programmes as a collective responsibility. The program is anchored on 3 important areas which are food security, healthier communities (addressing HIV/AIDS and T.B.) and empowerment of youth and women. It also aims to address the social ills which are substance abuse, teenage pregnancy, crime, road accidents and gender-based violence. There are different steps to understanding household and community needs. The community care givers (CCGS) visit households whereby a household head will provide information on the individuals in the household, using the household profiling tool which is completed by the CCGS and Youth ambassadors, the baseline information of the household is then established. The war room meetings then take place whereby there is discussion of the household needs per department; the needs are then submitted to the departmental focal person for action. There are three main structures for OSS, the political structure, the coordinating structure and the oversight structure. In Jozini municipality the honourable Mayor is the political champion, there is also a Local Task Team that is supported by the Municipal Executive Council. At the ward level the ward councillors are championing OSS whilst there are Ward Task Teams that are supported by the ward committees. War rooms have been established in all the 20 wards of Jozini with some war rooms in some wards being fully functional.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
264
C.7.3. IGR
Intergovernmental Relations in South African context concern the interaction of the different spheres of government. The Constitution declares that government is comprised of National, Provincial and Local spheres of government which are distinctive, interdependent and interrelated. According to the Constitution of the Republic of South Africa, Act, No.108 of
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
265
1996, Section 41 (2), an Act of Parliament must establish or provide structures and institutions to promote and facilitate Intergovernmental Relations and provide for appropriate mechanisms and procedures to facilitate settlement of Intergovernmental disputes. The primary location of Intergovernmental Relation system is within the Department of Provincial and Local Government (DPLG) in conjunction with the Cabinet Governance. Jozini Municipality has developed a number of programmes and actions to improve good governance and relations with external role-players but also to improve internal efficiencies. Jozini Local Municipality falls under the uMkhanyakude District Municipality which has an operational IGR structure. There are a number of forums/ clusters that have been established in the District and Jozini is part of those forums and participates in IGR forum meetings. Each Forum/ cluster is chaired by municipal managers except for the Mayors’ Forum which is chaired by the District Mayor. The Forums are as follows:
Mayor’s Forum Municipal Managers’ Forum CFO’s Forum Planners’ Forum (which includes LED) Corporate Governance Cluster Technical Services and Infrastructure cluster Community Services cluster
The MUNI-MEC is a provincial intergovernmental body that meets quarterly to analyse the state of local governments and is made up of the MEC and Municipal Mayors and Municipal Managers within the province. The body also serves and platform where programmes and projects by Provincial and National Government that will be implemented locally are packaged. Current issues and challenges affecting municipalities are identified and strategically dealt with. His Worship the Mayor Cllr DP Mabika and the Acting Municipal Manager form an integral part of this forum as representatives of the municipality. The municipality has appointed the IGR/ Batho Pele Officer who will be working with the Assistant Manager Communications.
C.7.4. WARD COMMITTEES
In terms of the Municipal Structures Act, (Act 117 of 1998) municipalities are required to establish ward committees to enhance community participation in municipal development processes. In compliance with this legislative requirement the Jozini Council set up ward committees in each of the twenty wards and the total number of the ward committee members is 200 (10 per ward). The ward committees have since their establishment added much value to municipal processes by providing inputs from a community perspective. They play a major role in the IDP process both in terms of highlighting community priorities but also in maintaining constant communication between the Council and the communities. The municipality has a dedicated Officials that deal with matters relating to ward committees on behalf of the Office of the Speaker. Training opportunities have also been made available for ward committee members to increase their capacity.
C.7.5. TRADITIONAL LEADERSHIP
The Traditional Leadership institution has been and continues to be at the centre of social development within the Jozini Municipality, particularly as the rest of the country experiences challenges resulting lack of social cohesion and the crumbling of family units. Amakhosi
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
266
work and live with people within their communities and are well-positioned to advise and guide the municipality using local/historical knowledge. Jozini is fortunate to have 07 Traditional Authorities and they all sit in the Council meetings. The Synergistic partnership has begun to create a good working relationship and communication between Amakhosi and the Municipality in all matters concerning the development of the area. On a quarterly basis the Office of the Mayor convenes bilateral meetings with Amakhosi to discuss strategic matters pertaining to the operations of the municipality. What is also encouraging to note is that during the 2018/2019 financial year the Municipality took a noble decision to reimburse Amakhosi for all official municipal business travelling expenses and have approved to increase their sitting allowance from a mere R600, 00 per person per sitting to R1, 500.00 per person per sitting on municipal meetings. In addition the Municipality has resolved allocate dedicated funding in its budget to support various cultural and heritage programmes for all Amakhosi especially to enhance the outcome of social cohesion within its area jurisdiction. In the 2019/20 financial year a maximum amount of R100, 000.00 has been allocated per each Traditional Authority earmarked for their cultural and heritage programmes. This is seen as a very gigantic step by Jozini Local Municipality which goes a long way in giving the institution of Traditional Leadership the respect and dignity it deserves in development space.
C.7.6. IDP/ BUDGET STEERING COMMITTEE
The municipality has an IDP/ Budget steering committee which consists of the Managers, HOD’s, Mayor, Speaker and Whips of political parties. This committee has four standing meetings and it seats as and when required. The IDP/ Budget Steering Committee is chaired by the Mayor.
C.7.7. MANAGEMENT STRUCTURES
The municipality has a Top Management Committee (MANCO) which consists of the HOD’s and it seats weekly; and the Extended MANCO which comprises of all HODs, All Managers and Assistant Managers which seats monthly. The main purpose of these weekly and monthly meetings is entrench the culture of performance management system throughout the organization by monitoring the implementation of the SDIBIPs.To take this process further Jozini Municipality has begun to cascade PMS to all levels of the organization by ensuring that there are compulsory meetings from Unit to Section to Department level on a monthly basis where each individual employee is required to report and account about their allocated tasks and responsibilties
C.7.8. COMMUNICATION PLAN/ STRATEGY
Jozini municipality has an adopted communication strategy. The primary purpose of the strategy is to present mechanisms and guidelines for communication between internal and external environment of the municipality. It is further in the interest of the strategy that could be used in formulating the municipal policy on communication. The strategy focuses on a number of interventions/ programmes aimed at strengthening the communications between the stakeholders, strengthening the social responsibility of the municipality and further harmonizing the relationship that the municipality has with the community at large.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
267
C.7.9. PERFORMANCE AND AUDIT COMMITTEE
The municipality has a Permanent Internal Audit Manager who works with Consultants who were appointed during 2018/19. Each financial year a risk based internal audit plan is prepared and approved by the Audit Committee. The Internal Audit Activity reports to the Performance and Audit Committee on the implementation of the risk based internal audit plan and matters relating to internal audit, internal controls, accounting procedures and practices, risk and risk management, performance management, loss control and compliance with the relevant legislations. Jozini Municipality has established a Performance and Audit Committee in accordance with section 166 of the Municipal Finance Management Act, no 56 of 2003. The status, authority, roles and responsibilities are in accordance with section 166 of the Municipal Finance Management Act (MFMA), no 56 of 2003 and MFMA Circular 65 of 2013 and are delegated by the Jozini Municipal Council. The Audit Committee of the Jozini Municipality is authorized, in terms of its charter, to perform the duties and functions required to ensure adherence to the provisions of the Municipal Finance Management Act, the applicable provisions of the Municipal Systems Act and the Municipal Structures Act and other applicable regulations. In carrying out its mandate, the Audit Committee must have regard to the strategic goals of Jozini Municipality and its strategic focus areas and development priorities as outlined in the Integrated Development Plan (IDP) and the Service Delivery Budget Implementation Plan (SDBIP). The Audit Committee is required to consider any matters relating to the financial affairs of the municipality, internal and external audit matters. The committee must review and assess the qualitative aspects of financial reporting, the municipality’s processes to manage business and financial risk, governance processes and compliance with applicable legal, ethical and regulatory requirements. The Audit Committee does not assume the functions of management which remain the responsibility of Exco, Council and the delegated officials. The Audit Committee may:
• Communicate with the Council, Municipal Manager or the internal and external auditors of the municipality.
• Have access to municipal records containing information that is needed to perform its duties or exercise its powers.
• Request any relevant person to attend any of its meetings, and, if necessary, to provide information requested by the Audit Committee.
The following are members of the Audit and Performance Audit Committee and Mr Z Zulu was appointed as the chairperson of the Committee:
NAME DESIGNATION
Mr. Z. Zulu Chairperson
Mr. P. Mntambo Member
Mrs. S Khanyile Member
Mr. M.A. Ngubane Member
Mr. M. Nxumalo Member
The Committee members are remunerated for attendance of meetings in line with the National Treasury Regulation that regulates the remuneration of commission and committee and are reimbursed for expenses incurred for attending audit committee meetings.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
268
C.7.10. RISK MANAGEMENT
C.7.10.1. RISK MANAGEMENT COMMITTEE The municipality has a Risk Management Committee which is functional. The risk responsibility is under the Risk Management and Governance Officer who reports to the Internal Audit Manager.
C.7.10.2. RISK REGISTER & ANTI-FRAUD AND ANTI-CORRUPTION STRATEGY There is a risk register which is updated regularly by the committee comprises of operational risks, Fraud Risks, IT Risks. The municipality conducted a Risk Assessment workshop in preparation for the 2019/20 Risk Register on 21-22 May 2019 with the assistance of Provincial Treasury. Jozini Municipality has adopted an Anti-Fraud and Corruption Strategy, with the following aims:
Enhance public confidence in the municipality, Build and maintain an ethics culture in order to avoid possibilities for conflict of interest
well in advance, Strengthen community participation in exposing and reporting corruption, Create organizational culture of transparency, To encourage councillors in particular to engage communities in anti-corruption initiative, To prevent, detect and investigate fraud and corruption, and take appropriate action in
the event of such irregularities, To build public accountability as well as internal accountability and transparency, To enhance efficiency, effectiveness and responsiveness of the Jozini Municipality, To promote effective participation of municipal stakeholders in decision making and in
corruption prevention, and Increase municipal credibility and remove public distrust
C.7.11. STATUS OF MUNICIPAL POLICIES & STRATEGIES FOR 2019/2020 FY
POLICY COMPLETED Y/N
APPROVED Y/N
DATE OF ADOPTION
1. Municipal Standing Rules and Orders Y Y 29 May 2019
2. Municipal Delegation Register Y Y 29 May 2019
3. Procurement Plans Y Y 29 May 2019
4. 2017/2018 Annual Report Y Y 29 May 2019
5. Workplace Skills Plan (WSP) Y Y 29 May 2019
6. Public Complains Register Y Y 29 May 2019
7. Indigent Register N N 30th June 2019
8. Land Use Management Systems (LUMS)
N N N/A
9. Internal Audit Strategy & Plan Y Y 29 May 2019
10. Risk Register Y Y 29 May 2019
11. National Building Regulations Y Y 29 May 2019
12. Personal Development Plans N N 31ST July 2019
13. Bursary policy Y Y 29 May 2019
14. Desertion and Absconding Policy Y Y 29 May 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
269
POLICY COMPLETED Y/N
APPROVED Y/N
DATE OF ADOPTION
15. Grievance Policy Y Y 29 May 2019
16. Induction Policy Y Y 29 May 2019
17. Injury on duty Policy Y Y 29 May 2019
18. Leave Policy Y Y 29 May 2019
19. Occupational Health and Safety Policy Y Y 29 May 2019
20. Promotion Policy Y Y 29 May 2019
21. Retention Policy Y Y 29 May 2019
22. Car Allowance Policy Y Y 29 May 2019
23. Acting Allowance Policy Y Y 29 May 2019
24. Code of Ethics Policy Y Y 29 May 2019
25. Disciplinary Hearing Policy Y Y 29 May 2019
26. Dress Code Policy Y Y 29 May 2019
27. Employment Equity Policy Y Y 29 May 2019
28. Home Owners ‘Allowance Policy Y Y 29 May 2019
29. Hours of work and Overtime Policy Y Y 29 May 2019
30. Migration and Placement Policy Y Y 29 May 2019
31. Probation Policy Y Y 29 May 2019
32. Recruitment and Selection Policy Y Y 29 May 2019
33. Recognition of long service Policy Y Y 29 May 2019
34. Remuneration Policy Y Y 29 May 2019
35. Sexual Harassment Policy Y Y 29 May 2019
36. Support and funeral assistance policy Y Y 29 May 2019
37. Standby Allowance Policy Y Y 29 May 2019
38. Termination of Employment Policy Y Y 29 May 2019
39. Training and Development Policy Y Y 29 May 2019
40. Activity Monitoring Policy Y Y 29 May 2019
41. Firewall Management policy Y Y 29 May 2019
42. IT Change Management Policy Y Y 29 May 2019
43. IT Risk Management Policy Y Y 29 May 2019
44. Patch Management Policy Y Y 29 May 2019
45. IT Performance and Capacity Management Policy
Y Y 29 May 2019
46. IT Security Policy Y Y 29 May 2019
47. Physical Security and Environmental Controls policy
Y Y 29 May 2019
48. Backup and Restore Policy Y Y 29 May 2019
49. Help-Desk and Incident Policy Y Y 29 May 2019
50. User Account Management Policy Y Y 29 May 2019
51. Budget Virement Policy Y Y 29 May 2019
52. Anti-fraud and Anti-Corruption strategy Y Y 29 May 2019
53. Communication Strategy Y Y 29 May 2019
54. Public Participation Policy & Strategy Y Y 29 May 2019
55. Batho Pele Policy & Manual Y Y 29 May 2019
56. Human Resource strategy Y Y 29 May 2019
57. Risk Management Policy Y Y 29 May 2019
58. Safety and Security Plan Y Y 29 May 2019
59. Asset Maintenance Policy Y Y 29 May 2019
60. Asset Disposal Policy Y Y 29 May 2019
61. Credit Control and Debt collection by-law
Y Y 29 May 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
270
POLICY COMPLETED Y/N
APPROVED Y/N
DATE OF ADOPTION
62. S&T Policy Y Y 29 May 2019
63. Supply Chain Management Policy Y Y 29 May 2019
64. Cellphone, Telephone and 3G Policy Y Y 29 May 2019
65. Indigent Policy Y Y 29 May 2019
66. Tariffs Policy Y Y 29 May 2019
67. Subsistence and Travel Policy Y Y 29 May 2019
68. Petty Cash Policy Y Y 29 May 2019
69. Banking and Investment Policy Y Y 29 May 2019
70. Budget Policy Y Y 29 May 2019
71. Municipal Property Rates Policy Y Y 29 May 2019
72. Geographical Information Systems (GIS) Policy Framework
N N 30 June 2020
73. Informal Economy Policy Framework N N 30 June 2020
74. Gender Equality Policy Framework N N 30 June 2020
75. Performance Management System (PMS) Policy Framework
N N 31ST July 2019
76. Service Delivery Charter / Service Standards
N N 31st July 2019
C.7.12. MUNICIPAL BYLAWS IN TERMS OF SCHEDULE 4B AND 5B
MUNICIPAL BYLAW STATUS ADOPTION DATE PROMULGATION DATE
Pound Management Gazetted
Building control Gazette process
SPLUMA Gazetted March 2017 16 March 2017
Traffic In a process of gazetting
December 2018
Fire Rescue In a process of gazetting
February 2019
C.7.13. BID COMMITTEES
In terms of Section 112(1) of the Local Government Municipal Finance Management Act 56 of 2003 the supply chain management policy of a municipality must be fair, equitable, transparent, competitive and cost-effective and comply with a prescribed regulatory framework for municipal supply chain management. In terms of the Jozini Supply Chain Management Policy the Accounting Officer is required to establish a committee system for competitive bids consisting of:
(i) A Bid Specification Committee; (ii) A Bid Evaluation Committee; and (iii) A Bid Adjudication Committee;
The municipality has made appointments in all Committees and all three Committees are functional. The following officials have been appointed to represent the Jozini Council on the aforementioned Committees:
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
271
BID SPECIFICATION COMMITTEE MEMBERS:
DESIGNATION DEPARTMENT NAME
Chairperson Finance (SCM) Mr. N. Nkambule
Member Technical Mr. S. Bhengu
Member Corporate Mr. SH Myeni
Member Corporate Mr. B. Buthelezi
Member Corporate Mr. S. Mbatha
Secretary Finance Ms. S. Mngomezulu
BID EVALUATION COMMITTEE MEMBERS:
DESIGNATION DEPARTMENT NAME
Chairperson Finance Mr. V Gumede
Member Corporate Mr LR Ndlazi
Member Planning & Economic Development
Mr. S Mabaso
Member Development Planning Mr. S Myeni
Member Technical Mr. M. Nkala
Secretary Finance Ms. B. Nkonyane
BID ADJUDICATION COMMITTEE MEMBERS:
DESIGNATION DEPARTMENT NAME
Chairperson Finance MT Nkosi
Member Corporate Mr MB Mnguni
Member Technical Mr LMV Cele
Member Finance (SCM) Mr S Duma
Secretary Finance Ms. C Manzini
An Employee of the Supply Chain Management Unit is required to be present at the meetings of the Specification and Evaluation Committees as an Observer.
C.7.14. MUNICIPAL PUBLIC ACCOUNTS COMMITTEE (MPAC)
The primary function of the Municipal Public Accounts Committee (MPAC) is to assist the Council in exercising its oversight and accountability responsibilities and functions; by generally exercising political oversight on behalf of the council; by holding the executive and municipal administration to account; by overseeing and reviewing municipal accounts to ensure the effective and efficient utilization of the municipal resources; and by carrying out the responsibilities of initiating and preparing the annual oversight report. The Jozini LM MPAC meets at least quarterly per annum. NAME OF COUNCILLOR/
POLITICAL PARTY
DESIGNATION WARD/PR COUNCILLOR
Cllr P.N.S Ngubane
DA CHAIRPERSON PR
Cllr T.R Fakude ANC Member PR
Cllr. LA Khumalo IFP Member PR
Cllr S.P Myeni ANC Member PR
Cllr DP Jobe IFP Member PR
Cllr M.Z Nxumalo IFP Member Ward 20
Cllr S.S Mkhize ANC Member Ward 11
Inkosi S. Myeni-Ntsinde
MYENI NTSINDE
Inkosi S. Myeni-Ntsinde Inkosi S. Myeni-Ntsinde T/C
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
272
C.7.15. PORTFOLIO COMITTEES
The municipality has 5 Portfolio Committees and they are fully functional. FINANCIAL SERVICES PORTFOLIO COMMITTEE
NAME OF COUNCILLOR/
POLITICAL PARTY
DESIGNATION WARD/PR COUNCILLOR
Cllr D.P. Mabika IFP Chairperson (Mayor) Ward 16
Cllr NS Myeni IFP Member & Deputy Mayor
Ward 1
Cllr S.K Mncwango IFP Member PR
Cllr H.E Myeni ANC Member PR
Cllr V.E Gumede ANC Member Ward 06
Cllr B.I Msweli ANC Member Ward 13
Cllr, NL Gumbi IFP Member Ward 7
Inkosi Nyawo M.M.Nyawo
NYAWO TC Inkosi Nyawo T/C
COMMUNITY SERVICES PORTFOLIO COMMITTEE
NAME OF COUNCILLOR/
POLITICAL PARTY
DESIGNATION WARD/PR COUNCILLOR
Cllr D.P. Mabika IFP Chairperson (Mayor) Ward 16
Cllr JP Mkhwamubi ANC Member Ward 10
Cllr M.Z Nyawo IFP Member Ward 19
Cllr B Nhlenyama IFP Member PR
Cllr B Mahaye IFP Member Ward 05
Cllr P.E Vilane ANC Member Ward 18
Cllr. N.L Gumbi IFP Member Ward 7
Inkosi Myeni -Ngwenya:
MYENI-NGWENYA TC
Inkosi Myeni-Ngwenya T/C
CORPORATE SERVICES PORTFOLIO COMMITTEE
NAME OF COUNCILLOR/
POLITICAL PARTY
DESIGNATION WARD/PR COUNCILLOR
Cllr N.S Myeni IFP Chairperson Ward 01
Cllr B.N Mthethwa ANC Member Ward 3
Cllr S.V Mathenjwa INDEPENDENT Member Ward 15
Cllr. N.R Zulu IFP Member PR
Cllr T.Z Nyawo ANC Member PR
Cllr M.Z Tembe ANC Member PR
Cllr S.P Shabangu ANC Member PR
Inkosi Jobe-: S. Jobe Jobe Tc Inkosi Jobe T/C
INFRASTRUCTURE SERVICES PORTFOLIO COMMITTEE
NAME OF COUNCILLOR/
POLITICAL PARTY
DESIGNATION WARD/PR COUNCILLOR
Cllr T.D Khuzwayo IFP Chairperson PR
Cllr T.M. Khumalo ANC Member Ward 17
Cllr N.F Mthethwa ANC Member PR
Cllr B.Q Gumede IFP Member Ward 12
Cllr. SZ Mathenjwa IIFP Member Ward 2
Cllr M.L Mavundla IFP Member Ward 08
Cllr S.R. Myeni EFF Member PR
Inkosi M. Mngomezulu
MNGOMEZULU TC
Inkosi Mngomezulu T/C
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
273
PLANNING & ECONOMIC DEVELOPMENT SERVICES PORTFOLIO COMMITTEE
NAME OF COUNCILLOR/
POLITICAL PARTY
DESIGNATION WARD/PR
Cllr N.R Zulu IFP Chairperson PR
Cllr M.S Nkosi IFP Member Ward 09
Cllr RH Gumede ANC Member PR
Cllr R.N Ndlovu ANC Member PR
Cllr B Mhlenyama IFP Member PR
Cllr J.E Buthelezi IFP Member PR
Cllr. ME Ndlela ANC Member Ward 14
Cllr. TW Zikalala ANC Member Ward 4
Cllr. M, Mathe IFP Member PR
Inkosi NM Mathenjwa
MATHENJWA TC
Inkosi NM Mathenjwa Mathenjwa T/C
C 7.16 STATUS OF ESTABLISHMENT AND FUNCTIONALITY OF COMPLIANCE STRUCTURES/FORUMS/COMMITTEES
COMPLIANCE STRUCTURE ESTABLISHMENT (YES/NO) FUNCTIONAL / NON-FUNCTIONAL
1. COUNCIL YES FUNCTIONAL
2. EXECUTIVE COMMITTEE (EXCO)
YES FUNCTIONAL
3. MUNICIPAL PUBLIC ACCOUNTS COMMITTEE (MPAC)
YES FUNCTIONAL
4. MUNICIPAL ETHICS AND RULES COMMITTEE
YES FUNCTIONAL
5. MUNICIPAL TROIKA YES FUNCTIONAL
6. PLANNING & ECONOMIC DEVELOPMENT PORTFOLIO COMMITTEE
YES FUNCTIONAL
7. FINANCE PORTFOLIO COMMITTEE
YES FUNCTIONAL
8. CORPORATE SERVICES PORTFOLIO COMMITTEE
YES FUNCTIONAL
9. COMMUNITY SERVICES PORTFOLIO COMMITTEE
YES FUNCTIONAL
10. TECHNICAL SERVICES PORTFOLIO COMMITTEE
YES FUNCTIONAL
11. AUDIT COMMITTEE (AC)
YES FUNCTIONAL
12. PERFORMANACE AUDIT COMMITTEE (PAC)
YES FUNCTIONAL
13. MANAGEMENT COMMITTEE (MANCO)
YES FUNCTIONAL
14. EXTENDED YES FUNCTIONAL
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
274
COMPLIANCE STRUCTURE ESTABLISHMENT (YES/NO) FUNCTIONAL / NON-FUNCTIONAL
MANAGEMENT COMMITTEE (EXTENDED MANCO)
15. INTERNAL AUDIT UNIT YES FUNCTIONAL
16. RISK MANAGEMENT STEERING COMMITTEE
YES FUNCTIONAL
17. BID SPECIFICATION COMMITTEE (BSC)
YES FUNCTIONAL
18. BID EVALUATION COMMITTEE (BEC)
YES FUNCTIONAL
19. BID ADJUDICATION COMMITTEE (BAC)
YES FUNCTIONAL
20. IDP & BUDGET STEERING COMMITTEE
YES FUNCTIONAL
21. IDP REPRESENTATIVE FORUM
YES FUNCTIONAL
22. JOZINI SYNERGISTIC PARTNERSHIPS FORUM
YES FUNCTIONAL
23. WARD COMMITTEES YES FUNCTIONAL
24. MUNICIPAL RAPID RESPONSE TEAM (MRRT)
YES FUNCTIONAL
25. YOUTH DEVELOPMENT & SUPPORT FORUM
NO NON-FUINCTIONAL
26. IGR & BATHO PELE FORUM
YES FUNCTIONAL
27. PUBLIC PARTICIPATION FORUM
YES FUNCTIONAL
28. LOCAL ORGANIZING COMMITTEE (LOC)
YES FUNCTIONAL
29. LOST CONTROL STEERING COMMITTEE
YES FUNCTIONAL
30. FINANCIAL MISCONDUCT DISCILINARY BOARD
NO NON-FUNCTIONAL
31. MUNICIPAL PROPERTY RATES ACT (MPRA) STEERING COMMITTEE
NO NON-FUNCTIONAL
32. REVENUE ENHANCEMENT STEERING COMMITTEE
YES FUNCTIONAL
33. DEBT MANAGEMENT & INDIGENT STEERING
YES FUNCTIONAL
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
275
COMPLIANCE STRUCTURE ESTABLISHMENT (YES/NO) FUNCTIONAL / NON-FUNCTIONAL
COMMITTEE
34. EMPLOYMENT EQUITY FORUM
YES FUNCTIONAL
35. EMPLOYEE WELLNESS FORUM
YES FUNCTIONAL
36. OCCUPATIONAL HEALTH & SAFETY FORUM
YES FUNCTIONAL
37. LOCAL LABOUR FORUM (LLF)
YES FUNCTIONAL
38. ICT STEERING COMMITTEE
YES FUNCTIONAL
39. TRAINING & SKILLS DEVELOPENT STEERING COMMITTEE
YES FUNCTIONAL
40. MUNICIPAL PLANING TRIBUNAL
YES FUNCTIONAL
41. SPLUMA APPEALS AUTHORITY
YES FUNCTIONAL
42. LED FORUM YES FUNCTIONAL
43. TOURISM FORUM YES FUNCTIONAL
44. COMMUNITY TOURISM ORGANIZATION (CTO)
YES FUNCTIONAL
45. JOZINI CHAMBER OF BUSINESS
YES FUNCTIONAL
46. EXPANDED PUBLIC WORKS PROGRAMME (EPWP) STEERING COMMITTEE /FORUM
YES FUNCTIONAL
47. POVERTY ALLEVIATION FORUM
YES FUNCTIONAL
48. INFORMAL ECONOMY CHAMBER
YES FUNCTIONAL
49. MUNICIPAL SAFETY AND SECURITY FORUM
YES FUNCTIONAL
50. DISASTER MANAGEMENT ADVISORY FORUM
YES FUNCTIONAL
51. ENVIRONMENTAL PLANNING & MANAGEMENT FORUM
YES FUNCTIONAL
52. WASTE MANANEGEMENT FORUM
YES FUNCTIONAL
53. LOCAL AIDS COUNCIL (LAC)
YES FUNCTIONAL
54. LOCAL TASK TEAM (LTT) – (OSS)
NO NON-FUNCTIONAL
55. GENDER EQUITY MAINSTREAMING
NO NON-FUNCTIONAL
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
276
COMPLIANCE STRUCTURE ESTABLISHMENT (YES/NO) FUNCTIONAL / NON-FUNCTIONAL
FORUM
56. DISABILITY FORUM YES FUNCTIONAL
57. WOMEN FORUM YES FUNCTIONAL
58. MEN FORUM YES FUNCTIONAL
59. PASTORS FORUM YES FUNCTIONAL
60. MUNICIPAL-WIDE SPORTS COUNCIL
YES FUNCTIONAL
61. TRADITIONAL HEALERS FORUM
YES FUNCTIONAL
62. SINIOR CITIZEN FORUM
YES FUNCTIONAL
63. ARTS & CULTURE FORUM
NO NON-FUNCTIONAL
64. MUNICIPAL LIBRARIES FORUM
YES FUNCTIONAL
From the above table it is encouraging to note that most of the compliance structures/committees have been established and are functional. The few of those that have not been stablished and non-functional are planned to have been attended to not later than 31st July 2019
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
277
PUBLIC PARTICIPATION ANALYSIS
In terms of Chapter 4 section 16 (1), a municipality must develop a culture of municipal governance that complements formal representative government with a system of participatory governance, and must for this purpose encourage, and create conditions for, the local community to participate in the affairs of the municipality, including in the preparation and implementation and review of its integrated development plan in terms of Chapter 4. Jozini Municipality’s public participation unit is mainly responsible for the day to day running of the Speaker’s offices and councillors. Its main purpose is to build a working relationship between the council and the communities; this relationship is through the ward councillors and the ward committees. Ward committees serve as the vehicles of information from the council to the community and from the community to the council. Jozini Municipality has got 20 wards and under each ward 10 ward committee members are elected to serve on the structure. Jozini municipality has trained all the ward committees on 8 skills development modules. And on day to day they get support from the office of the Speaker. They are also getting a stipend of R1000.00 each monthly for easy and smooth running of their programs in their respective wards. This unit has developed a public participation plan that the council adopted. This plan plays a great deal in the IDP processes. It has also developed a ward committee support plan. This plan serves as a guiding document that the council needs to follow when dealing with public participation matters. This unit is also part and parcel of three forums under uMkhanyakude district and the province:
Speakers Forum (where the Speakers of 5 sister municipalities meet to discuss public participation matters since they are the champions of it.)
Public participation practitioner’s forum (5 sister municipalities under the district) Provincial public participation Forum (where all KZ municipalities meet to discuss public
participation related matters) Jozini Municipality through this Unit has conducted a community satisfaction survey in all wards. For the IDP to be in line with provincial guidelines, this unit has developed ward based plans for each ward.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
278
C.7.18. GOOD GOVERNANCE & PUBLIC PARTICIPATION: SWOT ANALYSIS
STRENGTHS WEAKNESSES
• Community consultations
• Internal Audit is in place
• Annual Reports are prepared and submitted as required
• District IGR in place
• Policies are reviewed annually
• Functional War Rooms
• Lack of implementation of some policies
• Difficulty in prioritising community needs in relation to budget constraints
• Ward Committee capacity and resources lacking.
• There are few by-laws that are in place
• Outdated plans and policies
• Lack of implementation of by-laws
• Lack of supervision and guidance of staff that operates out of office premises.
OPPORTUNITIES THREATS
• AG Report provides an opportunity to achieve a Clean Audit
• Low levels of participation by certain stakeholders in the IDP process
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
279
C.7.19. WARD BASED PLANS
The municipality under took the ward-based planning and Ward Based Plans were developed in July/ August 2018. The IDP projects are informed by these ward-based plans.
C.7.20. LAND USE MANAGEMENT
Jozini municipality resolved to establish a Joint Municipal Planning Tribunal. The advert was done and the closing date for nominations was 31 March 2017. The appointment of a Municipal Planning Authorised Officer is still to be finalised by the Municipal Manager. The Appeal Authority is the EXCO members but they still need a workshop. The SPLUMA bylaws were adopted by Council on March 2017 and they have been gazetted.
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
280
C.8. KEY CHALLENGES
KPA CHALLENGE
Basic Service Delivery Backlog on basic infrastructure (housing, water, electricity, sanitation, roads)
Backlog on infrastructure maintenance in towns
Municipal Institutional Development and Transformation
Ageing Infrastructure Lack of proper water and sanitation service Electricity license Backlog of housing development Incomplete and poorly constructed houses
Local Economic Development
Inability to attract investors to the area (mostly due to the infrastructure backlog)
High level of unemployment No strategy in place for SMME’s The spread of HIV/AIDS is neglected and is not taken
seriously by the municipality Escalation in the abuse of the Drug use and other substances Disability programme is not given enough attention and the
budget is limited. Dysfunctional special programmes forums and committees
Municipal Financial Viability and Management
Poor debt management and revenue collection strategies Low equitable share High grant dependency ratio No revenue enhancement strategy Number of Indigent beneficiaries too high Gaps in the Municipal Debtors book Loss of assets.
Good Governance and Public Participation
Lack of support from sector departments in planning processes
Spatial Planning and Environmental Management
Absence of a legal waste disposal site Land tenure- 65 Percent of land is registered under the
Ingonyama Trust Board. The remaining percentage of land is state and privately owned
Illegal developments and mushrooming of shops and small businesses
Challenge in terms of issuing title deeds on low cost housing
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
281
C.9. COMBINED SWOT ANALYSIS
STRENGTHS
• Availability of Relevant Documents
• Capable Staff
• Availability of possible sources of Funding
• Strong Community Participation on Budgeting in reporting processes
• Positive liquidity
• Strong regulatory Framework
• Community consultations
• Internal Audit is in place
• Annual Reports are prepared and submitted as required
• District IGR in place
• Policies are reviewed annually
• Functional War Rooms
• Special programmes budget
• Forums focusing on vulnerable groups
• SDF currently under review
• Implementation of SPLUMA
• IWMP
• Bursary Policy for councillors, employees
• Policies are in place
• Employment Equity Plan
• Municipal Organogram is in place.
• Section 79, 80 and other Council Committees established and are operational.
• A reliable ICT system for effective functioning and efficient service delivery. o Human Resource Policies in Place
• Strength
• Community halls in all but one ward
• Community facilities: sport fields,
• Financial resources
• Quarterly site visit by portfolio committee.
• Subtropical
• Plenty of land under irrigation and without irrigation
• Enough water
• Known as fruit basket
• Existing LED strategy
• Existing Tourism strategy
• Fully functional Unit
WEAKNESSES
• Skewed gender balance
• Basic services backlog
• Office space
• Lack of resources (vehicles)
• No plans for service lines in town
• Unemployment rate
• Poor access to social development services
• The spread of HIV/AIDS is neglected and is not taken serious by the municipality.
• Chronic Vacancy Level
• Neglect of community assets
• High Staff turnover
• Inability to bill revenue from affording households or businesses
• Overreliance on Consultants
• Lack of implementation of some policies
• Difficulty in prioritising community needs in relation to budget constraints
• Ward Committee capacity and resources lacking.
• There are few by-laws that are in place
• Outdated plans and policies
• Lack of implementation of by-laws
• Lack of supervision and guidance of staff that operates out of office premises.
• 65 Percent of land is registered under the Ingonyama Trust Board. The remaining percentage of land is state and privately owned
• Illegal dumpsites
• Illegal developments
• Limited Disaster Management officers
• Limited resources.
• Area prone to Disaster Incidents.
• Sharing national boundaries with 2 Countries.
• Electricity licence
• Inconsistency on goal implementation
• Limited office space
• Incomplete project due to poor management.
• Lack of infrastructure plan.
• Potholes in towns.
• No legal landfill site
• Limited resources to support Cooperatives, SMME’S and big projects
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
282
•
OPPORTUNITIES
• Jozini dam
• Mkuze development
• Formalisation of towns
• Development around Jozini dam
• Provision of in-service training to students
• Jobs creation
• Grading of municipality to a higher level
• Improvement of staff
• Opportunity of skills transfer from consultants
• Cumbersome SCM processes may delay service delivery
• AG Report provides an opportunity to achieve a Clean Audit
• Employment of more staff.
• Sharing of best practices and capacity building obtained from other municipalities, PDMC, NDMC and other institutions.
• External sources of funding
• Implementation of the electronic document management system (EDMS)
• Rural development as identified in national development plan
• Funding sources such as DBSA and donor funds.
• Heritage sites, Monuments (Idlinza Lenkosi Udingane), Caves etc.
• Natural Resources (Pans, Animals Birds, Gorges, Mountains etc)
• Location (Swaziland Mozambique, N2)
• Other attractions (Jozini Dam, Game Reserves)
•
THREATS
• Basic services backlog
• Large rural hinterland
• Dispersed settlement pattern
• Traditional Authorities- land issues
• Late approval of projects
• Limited funds to improve infrastructure development
• Loss of critical skills
• Lack of a job evaluation forum in order to determine post levels. The South African Local Government Association is however in the process of getting a job evaluation framework in place
• Foreigners putting a burden on Municipal Budget
• Fraud and Corruption
• Low levels of participation by certain stakeholders in the IDP process
• Reduction of disaster management funding
• Lack of cooperation
• Climate change impact (Severe weather events).
• Lack of proper water and sanitation service
• Rapid urbanisation without services
• Drought
• Poor maintenance of provincial road.
• No revenue base
• Red tape
• Political Instability
JOZINI MUNICIPALITY IDP 2019/20 REVIEW
283
SECTION D: MUNICIPAL
VISION, GOALS AND OBJECTIVES
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
284
D.1. LONG TERM VISION
The strategic framework will address the objectives and strategies of Jozini municipality that it needs to achieve in a specific time frame to address key issues identified. The objectives and strategies of the municipality are in line with the national and provincial guidelines as well as aligned to the uMkhanyakude District Municipality’s strategy.
D.1.1 MUNICIPAL VISION
The review of the Jozini Municipal IDP remains consistent with the strategic approach and commonly owned vision which was adopted by Council in December 2016 after a strategic planning session. This vision is informed by the SWOT analysis and key challenges that were identified during the Strategic Planning Session.
‘A MUNICIPALITY WITH SUSTAINABLE SERVICES FOR ALL, THRIVING SOCIO- ECONOMIC DEVELOPMENT AND GOOD GOVERNANCE.’
D.1.2 MUNICIPAL MISSION
TO STRENGTHEN DEMOCRACY, PUBLIC PARTICIPATION AND STAKEHOLDER
MANAGEMENT TO MANAGE FINANCIAL RESOURCES OF THE MUNICIPALITY EFFICIENTLY,
EFFECTIVELY AND ECONOMICALLY
TO GROW THE ECONOMY OF THE BEDROCK OF AGRICULTURE AND TOURISM BY CREATING A CONDUCIVE ENVIRONMENT FOR INVESTMENT
The above vision underpins an integrated approach to improving the standard of living of all the people in the Jozini area. In order to achieve the above vision, the municipality will have to continue function in an accountable and financially sound manner.
D.1.3 VALUES
INTEGRITY COMMITMENT
PROFESSIONALISM PATRIOTISM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
285
D.1..4. STRATEGIES, GOALS AND OBJECTIVES
Jozini Local Municipality’s strategic focus is characterized by the following Key Performance Areas:
Municipal Transformation and Institutional Development; Basic Service Delivery; Social and Economic Development; Municipal Financial Viability and Management; Good Governance and Public Participation and Cross Cutting Issues;
It is also aligned to the 12 National Outcome Delivery Agreements, especially Outcome delivery 9 which concerns COGTA and local municipality.
D.2. GOALS, OBJECTIVES AND STRATEGIES
The following tables provide a summary of the municipal strategies, goals and objectives.
KPA: MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT
GOALS OBJECTIVES STRATEGIES
Institutional capacity of the municipality that is responsive to the needs of the community.
To create an appropriate organisational climate that will attract and retain appropriate skills by June 2022.
• To develop, Review and implement all municipal policies annually.
• To establish effective Local Labour Forum
• To provide incentives and intervention in line with the Retention Policy
To ensure maintenance of an organisational structure that is in line with Organisational objectives and optimises service delivery by June 2022
• To review and Implement the Organogram
• To fill all vacant budgeted positions through Recruitment and Selection
• To eliminate ghost employees by conduction continuous physical verification
To improve expenditure control and compliance with MFMA
• Processing review of payment of salaries and benefits to staff and councillors.
• Processing of group life insurance
To capacitate employees and councillors by 30 June 2022
• To implement WSP
• Capacity Building and Team Building
• To Conduct Skills Audit and develop WSP
To ensure compliance with the Occupational Health and Safety Act and Compensation for Occupational injuries and diseases
• Develop and review Occupational Health and Safety Policy
• Implement EAP programmes that promote and support well-being of employee.
To improve citizens skills level of education by June
• Assist students with registration
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
286
2022.
To ensure effective and efficient administration complying with its Legal Mandates by June 2022.
• Provide administrative support for all council committees
• To ensure documents are kept safely by Developing a document management system
To ensure effective fleet management system
• Develop a Fleet Management Policy
• To ensure compliance with fleet polices
• To reduce down time of vehicles on repairs
• Compliance with traffic rules and regulations
• Monitoring and recovery of vehicles
• Sufficient number of vehicles for service needs
• Cleanliness of vehicles
• Vehicle get repaired
• To ensure effectiveness and functionality of fleet department
• To be well-equipped on fleet related information
• Adequate stationery for office use
To provide adequate IT security and software and hardware support.
• Upgrade System and procure relevant Programmes
To provide admin support on IT systems
• Purchasing of network infrastructure
• Pastel, VIP, telephone, etc support
KPA: BASIC SERVICE DELIVERY
GOALS OBJECTIVES STRATEGIES
Efficient and integrated infrastructure
To build, maintain and provide access to improved, sustainable and modernized infrastructure to the community by 2022
• To develop Electricity master plan
• To eradicate electricity supply backlogs through provision of 10 000 house to house connections
• To conduct monthly project implementation meetings with consultants and contractors.
• To develop and implement infrastructure plan
• To enter into a Water services plan
• SLA with the District Municipality
• To develop Roads maintenance plan
• with Department of Transport
• (Prioritize access roads
• Develop skills)
• To maintain 1000km of gravel access roads in-house
• To construct hall in ward 15 and Jozini town hall
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
287
• Construct addition office space
• To FastTrack construction of Mkuze roads and testing ground for the compliance requirements of the act in order for the DLTC to be fully functional
• To sign MOU with Department of Sports and Recreation
• Libraries
• Sports facilities
• Construction of social facilities
• To monitor that there is an increase of public infrastructure Ensure all facilities are user friendly
• MOU with relevant departments
• To consult with the relevant government departments
• Set – up quarterly meetings with relevant departments
To improve the reliability and service life of municipal infrastructure and facilities by 2022.
KPA: LOCAL AND SOCIO- ECONOMIC DEVELOPMENT
GOALS OBJECTIVES STRATEGIES
Stimulation of Local Economic growth through LED and Tourism initiatives
To create an environment that will create jobs and reduce poverty by June 2022.
• To develop and adopt SMMEs strategy
• To facilitate and grow SMME’s.
• To review and implement LED Strategy
• Promoting economic growth by successful delivery of catalytic projects
To implement and co-ordinate Expanded Public Works Programme (EPWP) in a manner that enhances skills development and optimizes decent employment and entrepreneurship by June 2022.
• Promoting economic growth by providing employment opportunities for vulnerable groups.
To promote local tourism by June 2022
• Review of the tourism Strategy
• Ensure marketing and promotion of Jozini as the tourism destination
• To engage with sector departments and civil society
• (Conduct workshops
• HIV/AIDS to presented as an item in
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
288
all municipal structures)
•
• To facilitate the establishment of Wards AIDS committees
•
• To establish local AIDS Council
• Engagement with sector departments and civil society
• Conduct workshops
• HIV/AIDS to presented as an item in all municipal structures
• Facilitate the establishment of Wards AIDS committees
• Establishment of local AIDS Council
• Engagement with sector departments and civil society
• Conduct workshops
• HIV/AIDS to presented as an item in all municipal structures
• Facilitate the establishment of Wards AIDS committees
• Establishment of local AIDS Council
• To Convene intergovernmental relations meetings
• To resuscitate the sitting of IGR structures
• To run awareness programmes for disability
• Develop terms of reference
• Clustering of wards
• To establish special programmes forums
• To develop terms of reference
• Clustering of wards
To promote social cohesion through sports activities by June 2022.
• To develop 5 sports codes by June 2018.
• To conduct 4 sports tournaments
• To conduct 1 Mayoral cup annually
• To participate in SALGA games annually
• To participate in the Indigenous Games annually
Public safety and security
To ensure provision of fire and rescue services
• To compile statistics in operating the Fire station by June 2019
• Conduct fire awareness campaigns
To provide efficient and effective security services
•
To Provide unlimited services in the DLTC
• To have a fully functional DLTC.
• Test and examine learners licence
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
289
applicants
• Renewing Driving licences
• Issue temporal of licences
• Application of public licence permits
KPA: GOOD GOVERNANCE AN DPUBLIC PARTICIPATION
GOALS OBJECTIVES STRATEGIES
Risk governance To ensure that the risk maturity of the organisation is at an enabled level (risk management and internal control fully embedded into the operations of the organisation, high level understanding of risk, effective risk management.
• To Establish full functional Risk Management Section
• Development, implementation of Risk Management Policy or Strategy.
• Conduct risk Assessment bi-annually with implementation, monitoring and on-going review.
• Development of Fraud Risk Management Policy and Strategy
Democratic, responsible, transparent, objective and equitable municipal governance
To ensure reliable and maintain independence of Internal and External Audit.
• Development of Audit Charter
• To establish a fully Functional Internal Audit Section
• Develop an Internal Audit Plan
• Facilitate functionality of the Audit Committee
To maintain a SMART Organisational Performance Management System to ensure Planning, Monitoring reporting and evaluation of municipal performance by June 2022
• To review and Implement PMS policy annually
• To draft section 56/57 performance agreements
•
• Conduct Performance assessments
• Compilation of quarterly performance reports.
• Develop and approve an Organisational scorecard annually.
• Develop and adopt Service Delivery and Budget Implementation Plan for each financial year.
• To develop and submit Annual Performance Report to AG BY 31 August annually
• Develop and submit annual report to Council by 31 January annually
To promote a municipal governance system that enhances and embraces the system of participatory governance
• Development of a credible Integrated Development Plan within a prescribed period.
• To Co-ordinate IDP Rep Forum Meetings
• To conduct IDP/ Budget roadshows on draft IDP and Draft BUDGET by 30 June 2022
• To conduct IDP public participation meetings.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
290
• To co-ordinate IDP steering committee meetings
• Co-ordinate the strategic planning session annually.
• Development of 20 Ward Based Plans.
To promote and foster sound internal and external communication
• To develop and review communication and marketing strategy
• To establish communication/ editor’s forum internally.
• To conduct workshops to Councillors and staff.
• To refurbish the municipal website.
• Attraction adverts through local government handbook
• To showcase services rendered by the municipality and council accountability report (radio slots, newspaper adverts, newsletter)
KPA: MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT
GOALS OBJECTIVES STRATEGIES
Establishment of a budget and treasury office equipped to support municipal strategic goals and priorities in a sustainable manner.
To develop and maintain a financial viable and sustainable institution that achieves full compliance with municipal legislation by 2022
• To table budget process plan by the 31 of August each year
• To host councillors and management workshop on Budget by 30th of September each year
• To table draft budget each year by 31 March
• To table Final budget each year by 31 May
• Drafting of business plans, proposals and motivations for additional funding of projects and programmes each financial year.
• Implementing stringent budgetary controls.
• Tabling of Draft Budget and Final budget within timeframes as legislated
• Full implementation of the Municipal Standard Chart of Accounts (MSCOA) as from the 1st of July 2017
• Spending of grants according to stipulated conditions
• Development and implementation of business plans in accordance with Division of revenue act.
• To collect 50% of monthly billing by 30th of the following month.
• Review and the implementation of
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
291
debt collection and credit control policy.
• Monitoring and management of deliverables of the appointed debt collector each month.
• Development of the revenue enhancement strategy.
• Request support from COGTA or Provincial Treasury on the development of revenue enhancement strategy.
• Reduction of long outstanding debt
• Monitoring and management of deliverables of the appointed debt collector each month.
• Data cleansing exercise
• Hosting of councillors and Management workshop on Supply chain management by 1st of July each year.
• Development and discussion of procurement plan with the finance portfolio committee
• Tabling of SCM monthly report within 10 working days of each month.
• Eradicate occurrences of irregular expenditure
• Perform 100% voucher audit each month
• Tabling of IA SCM quarterly report on the SCM compliance to Audit committee.
• Tabling of reviewed anti-fraud and corruption strategy by the 31st of March each year.
• Eliminate unauthorized expenditure
• Implementation of stringent budgetary controls
• Tabling of adjustment budget to deal with unforeseen expenditure.
• Eliminate fruitless expenditure.
• Implementation of stringent budgetary controls
• Asset maintenance plan
• Amend the contract of FAR service provider to include development of maintenance plan
• Asset maintenance plan
• Amend the contract of FAR service
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
292
provider to include development of maintenance plan
• Statutory reporting
• Hosting of councillors workshop on reporting templates by 1st of July each year
• Obtain and sustain clean audit opinion
• Develop a comprehensive recovery plan that takes to clean audit by 2017/18 Financial Year.
KPA: CROSS CUTTING
GOALS OBJECTIVES STRATEGIES
Improved standard of living by ensuring that future settlements occur in a spatial integrated and economical manner
To acquire 200 hectors of land for development by 2019
• To acquire 200 hectors of land for development.
• To conduct land audit to ascertain how much land does each stake holder own and how much land can be requested from relevant bodies.
• To create a platform for engaging with land owners i.e. State and Ingonyama Trust
• To review Spatial Development Framework
• To conduct workshop for the Municipality
• To Formalize the first town Engagement of service provider to facilitate the formalization of towns
• Development of Land use management scheme (LUMS)
• To develop Land Use Management Systems Engagement of service provider to facilitate the formalization of towns
• Development of the Building inspectorate by-laws
• To enforce Building inspectorate by-laws
• To engage human settlement department for the funding of the rectification project
To promote the achievement of a non-racial, integrated society, through the development of sustainable human settlements and quality housing by June 2022
• To provide housing for vulnerable groups.
• To provide low cost housing
• To provide rental housing
• To review the Housing Sector Plan annually
• To register the township
• Register the municipality with NHBRC
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
293
(National Home Builders Registration Council)
• To conduct workshop on the review of the housing sector plan
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
294
SECTION E: STRATEGIC
MAPPING
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
295
E.1.1. ENVIRONMENTALLY SENSITIVE AREAS
Areas of environmental concern include the following:
• Wetlands and watercourses,
• Areas prone to soil erosion, steep slopes,
• archaeological sites and
• tourism assets Rural Settlement with no adequate water and sanitation are also of big concern. In general, the following areas were identified as future conservation areas.
E.1.2. DESIRED SPATIAL OUTCOMES
INTRODUCTION
Local Government: Municipal Systems Act, Act 32 0f 2000, Section 26 requires one of the core components of each municipal IDP must be a Spatial Development Framework (SDF). The minimum elements that must be included in the SDF are also spelt out therein. It is stated that the SDF should operate as an indicative plan, whereas the detailed administration of land development and land use changes be dealt with by a land use management scheme, which will actually record the land use and development permissions accruing to a piece of land. Jozini Local municipality SDF was approved in May 2019 with the IDP. The SDF is attached in this IDP document.
PURPOSE OF THE SDF
The primary purpose of an SDF is to represent the spatial development goals of the Jozini municipality that result from an integrated consideration and sifting of the spatial implications of different sectoral issues. The SDF contains four main components:
• Guidelines for land use and development;
• Guidelines for land use management;
• A capital expenditure framework showing where the municipality intends spending its capital budget; and a strategic environmental assessment.
The timing of the process of compiling an SDF must correspond with that of the IDP. Each of 11the above mentioned components of the SDF must guide and inform the following:
• Direction of growth
• Major movement routes
• Special development areas for targeted management to redress past imbalances
• Conservation of the natural and built environment
• Areas in which the intensity of land development could either be increased or decreased
• Areas in which particular types of land use should be encouraged and others discouraged The Jozini Municipality in partnership with District and other neighboring Local municipalities are in a good position to implement this idea as the Spatial Development Framework plays a most direct role in influencing spatial planning, land use management, and local development processes and outcomes.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
296
The Spatial Development Framework should give effect to the vision, goals and strategies of the IDP. The main of Spatial Development Framework as defined in the guidelines of the Department of Traditional and Local Government Affairs are:
To promote sustainable functional and integrated settlement patterns in order to: - Discourage low density urban sprawl; - General social and economic opportunities for people; and - Promote ease accessibility to those opportunities.
Maximize resource efficiency, e.g. - Ensuring the protection of the available environmental resources within the municipality;
and - Protecting productive land for agricultural purposes.
Enhance regional identity and unique character of places. Ensure conformance with the neighboring district, local and provincial development
frameworks.
REGIONAL CONTEXT
Jozini Municipality is located in Northern KwaZulu Natal and borders Swaziland and Mozambique. Jozini Municipality falls within the Umkhanyakude District Municipality and covers an area of 3073.08 km². This equates to approximately 32% of the area of the district. The Lebombo Mountains and Makhatini Flats provide diverse and beautiful terrain rich in local resources including water features and even fossil sites. The name Jozini means place of spears and is attributes to the many spears found in the caves in the area that were used during ancient wars. Jozini Municipality borders the following municipal areas as shown on the map at overleaf:
• Umhlabuyalingana Local Municipality to the East
• Hlabisa and the Big 5 False Bay Local Municipalities to the South
• Portions of the Greater St Lucia Wetland Park to the South
• The Uphongolo Local Municipality (Zululand District) to the West
• Mozambique to the North
• Swaziland to the West
ADMINISTRATIVE ENTITIES
The Jozini Municipality has 20 municipal wards. The following is a list of Traditional Councils in the Jozini Municipality:
Mathenjwa Mngomezulu Nyawo Myeni-Ntsinde Jobe Ngwenya Siqakatha
The Jozini Municipality also has a portion of State owned land within its area of jurisdiction as indicated on the map herewith.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
297
Apart from the Administrative entities listed above, the Jozini Municipal area also boasts a number of environmentally sensitive areas, i.e.:
Game Farms Protected Environmentally Sensitive Areas Non-Protected Environmentally Sensitive Areas Ezemvelo Wildlife Protected Areas Areas of High Intrinsic Biodiversity Value
The location of the above are shown on the Environmental Considerations and the Environmental and Tourism Asset maps on the following pages.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
298
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
299
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
300
EXISTING NODES AND CORRIDORS
Investment points (Nodes) are the existing and future growth points and centers of population concentration within the municipality. They form the bases for the allocation of funding and resources as well as the rollout of service delivery. It is crucial to build upon such investment points we also find a clustering of certain activities such as shops, schools, churches, community halls and clinics. The table below contains the hierarchy of investment points for Jozini:
Primary nodes Secondary nodes Tertiary nodes
Mkhuze Jozini
Ingwavuma Ubombo Bhambanana Ndumo
Ophansi Manyiseni Makwakwa Emabhanoyini
Mkhuze: is the economic hub of the municipal area and will remain the focus for future development. Mkuze town is central located and it served by major road such as the N2 which links it with Hluhluwe, Mtubatuba, Richards Bay towns. There is an influx of major services such as offices, residential development and commercial uses has led to Mkuze being the major investment node within the area of Jozini Municipality. Jozini: is the second economic hub within the area of jurisdiction of the Jozini municipality, however the topographical constraints and land tenure issues has led to flee of potential investors to other areas. Rural Areas: rural areas are characterized by extensive commercial and subsistence farming, mainly crop production and cattle farming. Movement Patterns and Routes Investment Links are the activity spines of the municipality as well as they provide access to services and encourage economic development thereby improving the living conditions of local municipalities. Such spines link areas/destinations and carry varying volumes of traffic. In the Jozini context, the following hierarchy of investment links has been identified:
National link (the N2) Primary Investment link Potential Primary Investment Link Secondary Investment Link Potential Secondary Tertiary Investment Link
The above links are all shown on the accompanying spatial development framework map. Both the potential primary and secondary investment links should be noted. The former instance the link to Swaziland off the Bhambanana Ingwavuma road through the Cecil Mark Pass and secondly the route parallel and to the east of the N2. The potential secondary investment link between Ubombo and Jozini has been identified considering the route. Umkhanyakude District New Corridor Names
NORTH - SOUTH CORRIDOR (N-2) (Richards Bay – Mtuba/Hlabisa – Hluhluwe – Mkhuze – Golela)
CULTURAL HERITAGE CORRIDOR HLABISA – NONGOMA (Gateway to the Kingdom)
BORDER HERITAGE CORRIDOR (Cecil Mack Pass – Ingwavuma – Bambanana – Ngwanase – Kosi Bay)
ZULU OCEAN CORRIDOR
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
301
(Richards Bay – St Lucia – Hluhluwe – Kosi Bay to Maputo) AILE OF KINGS HERITAGE CORRIDOR
(Liberation Route: Jozini/N2 Turnoff – Sikhandane – Kwaliweni – Ingwavuma – Cecil Mack Pass)
MAPUTALAND AEROTROPOLIS CORRIDOR New City Corridor (Emabhanoyini)
BROAD LAND USES
The current land uses evident in the municipal area relate to the places people live, the manner in which they live as well as the manner in which they use the land. As such, the following broad, and related, land uses are evident in the Jozini municipal area.
• Wetlands and waterbodies associated with the Pongola River and its course in a northerly direction towards Mozambique as well as the Mkuze River along the southern boundary of the municipality.
• Some, although rather limited, unimproved grassland and barren rock.
• Forests and Woodlands are located along the ridge of the Lubombo Mountains as well as along the Mkuze River.
• The distribution of cultivated land in the municipality is limited.
• Some areas of the municipality are degraded land. A map indicating the distribution of the above-mentioned land uses in the Jozini Local
EXISTING SPATIAL STRUCTURES OF JOZINI
The existing spatial structures of Jozini Municipal are defined by a number of elements. These elements are classified as follows:
• There are areas of conservation and environmental interest within the Jozini areas and those areas are: Ndumo game reserve and the Pongola floodplain.
• Structuring elements of the area include the Lebombo Mountain Range, Jozini Dam, Ingwavuma, Pongola and Mkuze rivers as well as the two hospitals within the area, Bethesda hospital at Ubombo and Mosvold hospital at Ingwavuma. These elements present both opportunities and problems to the development of the municipal area in terms of tourism attractions and the provision of infrastructure and services.
• The inherent potential of the municipality includes areas of high agricultural potential and a number of tourism/ historical sites, such as the Makhathini Flats, Mkhuze Farms, Dingane’s Grave, Border Cave and the Usuthu Gorge.
• Jozini location provides for a number of Tran frontiers the opportunities, as mooted in the Lebombo SDI, along the international boarders of Swaziland and Mozambique, the Cecil Mack Pass etc.
• There are a number of urban areas (nodes) as well as a population settlement pattern.
• Some areas within the Jozini municipality have limited potential, both in terms of access to clean water and sanitation and conservation areas and good soils. In such areas, survival strategies, including improved methods of subsistence agriculture should be pursued. See below showing existing spatial structures
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
302
Existing Spatial Structures
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
303
AREAS OF ENVIRONMENTAL INTEREST
There are a number of environmental sensitive areas (both protected and unprotected) in the Jozini Local Municipality. They include game farms located in ward 1, areas along the Lebombo Mountains, the Pongola river floodplain, Ndumo game reserve as well as Hlathikhulu Forest and the Usuthu George. The above links are all shown on the accompanying spatial development framework map. Both the potential primary and secondary investment links should be noted. The former instance the link to Swaziland off the Bhambanana Ingwavuma road through the Cecil Mark Pass and secondly the route parallel and to the east of the N2. The potential secondary investment link between Ubombo and Jozini has been identified considering the route.
OPPORTUNITY AREAS
The implementation of the Jozini IDP or other location advantages may result in the evolution of development nodes at certain locality in future. Such areas need to be identified as opportunity areas as part of the IDP. They are:
• Proposed agricultural processing of cotton at Nondabuya
• The Msiyane Hall area at the entrance to the tertiary investment link providing access to Hlathikhulu Forest tourism development
• Msiyane Community Healthcare Centre
• Ndumo School of Excellence
• Bhambanana Town Formalisation
• Uhlaza Village
• KwaNyawo area (Master Plan)
• Makhathini flats agricultural processing (proposed LRAD project)
• Hlathikhulu Forest investment by DEAT
• Border Cave/Usuthu Gorge
• Ghost Mountain
• Cecil Mark Pass
INTERVENTION AREAS
A number of areas in the Jozini Municipality are significant as areas of restoration and rehabilitation on the basis of their economic potential and environmental sensitivity, i.e. the cultural tourism attractions of Dingane’s Grave, Border Cave and the Ghost Mountains. It is further a known fact that the land with some of the highest agricultural potential is the Pongola Flood Plain and, as such, this area needs to be managed and developed in a manner that ensures its preservation. Given the above, this natural economic base, agricultural and environmental attractions, needs to be protected to ensure its survival and future contribution to the economic development of the area. Some areas within the Jozini municipality are prone to natural disasters and need to be adopted and enforced to lessen the impact such as natural disasters. Furthermore, some areas within Jozini have limited agricultural and environmental potential lands are relatively isolated. Special measures need to be introduced in such, i.e. improved methods of subsistence agriculture.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
304
THE MAKHATHINI INTEGRATED MASTER DEVELOPMENT PLAN The Makhathini Integrated Master Development Plan is a plan focusing on the development of two local Municipalities i.e. Jozini and Umhlabuyalingana municipalities in the District of UMkhanyakude. The plan was developed on the instruction of the MEC oversight Committee for the Lebombo SDI and Economic Cabinet Cluster. The plan aims to integrate all government activities and develop the two main economic driving sectors in the area, i.e. agriculture and tourism. The planning process will ensure that an integrated plan is developed for the spatial planning of the area which is consistent and part of the IDPs of the two municipalities concerned. This is a multi-billion-rand project both private and public sector will invest in agriculture and tourism. There is also a component of infrastructure development attached to the project. The project is in line with rural development initiatives. A steering committee to oversee the entire planning process for the project has now been established. UMkhanyakude District Municipality has been requested to host all steering committee meetings for the project. The District is also the co-chair of such meetings with the Department of Agriculture Environment and Rural Development. The fact that this is the area has a subtropical climate and water available for the irrigation of around 10000 ha from the Jozini Dam is well known. This means that crops can normally only be grown during the rainy season in the summer rainfall areas of South Africa, can be grown throughout the year on the Makhathini Flats under irrigation. A further benefit is that some crops grown on this area can reach the market 3 to 4 weeks before those grown in other areas of South Africa because of the favorable heat units of the area. Extensive research has been done over many years on the irrigable areas. What is not well done, is the fact that this subtropical area of KwaZulu/Natal is not just limited to this irrigable area of around 10 000 to 13 000ha. The total area of what is generally known as Makhathini (Jozini and Umhlabuyalingana Local Municipalities) totals over 450 000ha, which a recent study has shown to include just over 407 000ha of grazing area and possible area of around 33 000ha on which appropriate crops can be produced in the summer. To unlock the economic potential of the area on a sustainable basis (economical, environmental and social) with agriculture and tourism being the main drivers of the economy of the area, will require an integrated and coordinated effort by all stakeholders. These include the appropriate provincial, national and local government departments and organizations responsible for agriculture, environment, conservation, land, water, electricity, traditional affairs, roads, education, health, housing, economic development, etc. The process must form part of the existing institutional structures for integrated governance in the province. The Provincial Spatial Economic Development Strategy (PSEDS) is such a coordinating institutional structure and it is proposed that the Makhathini Integrated Development Steering Committee will form a sub-committee of Maputo Corridor Sub-committee of the PSEDS. The Makhathini Integrated Development plan will furthermore form part of the UMkhanyakude District and Jozini and Umhlabuyalingana Municipalities’ IDPs and this is already happening as
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
305
information is currently being reflected accordingly. The final result of the integrated planning and implementation of the Makhathini Plan is:
The optimal and sustainable use of the agricultural and tourism potential of the District areas of Umhlabuyalingana and Jozini;
Agricultural development; and The development of adequate support infrastructure.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
306
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
307
TOWN PLANNING SCHEME Jozini municipality was in the last financial year funded by CoGTA to start a process of developing a town planning scheme for all six nodes namely: Jozini, Mkhuze, Ubombo, Ingwavuma, Ndumo and Bhambanana. Draft schemes have been developed with the assistance of COGTA. The municipality is now anticipating to make budget provisions the completion of these.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
308
Jozini draft scheme
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
309
Mkhuze draft scheme
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
310
Ingwavuma draft scheme
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
311
Ubombo draft scheme
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
312
Bhambanana draft scheme
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
313
Ndumo draft scheme
PRIVATE DEVELOPMENTS
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
314
E.2. IMPLEMENTATION PLAN
KPA 1: MUNICIPAL TRANSFORMATION & INSTITUTIONAL DEVELOPMENT
corporate services
IDP NO.
PRIORITY AREA
OBJECTIVES STRATEGIES KPI MULTI- YEAR ARGETS
RESP. DEPARTMENT
PRIOR YEAR 2019/20 2020/21 2021/22
ID01 Human Resources Policies
Review Human Resources Policies to regulate Human Resources functions and retain skills by June 2022
Draft Policies
Number of policies reviewed
28 policies 28 28 28 Corporate Services
Presentation of Draft Policies to all structures
Adoption of Policies
Workshop approved Policies to employees
ID02 Employment Equity
To review the Employment equity plan annually by June 2022
Consultation with employment equity committee
Number of EE Plans Reviewed
1 EE Plan review
1 1 1 Corporate Services
Monitoring EE Plan
Submission of EE Monitor Compliance with the EE targets
ID03 Labour Relations
To convene 4 LLF Meetings per annum to maintain working relations between the employer and the employees in line with the Collective Agreement by 30 June 2022
Develop schedule for sitting of LLF Meetings
Number of LLF meeting convened
4 LLF Meetings
4 4 4 Corporate Services
Train Panel on DC Procedures
ID04 Organizational Re-design
To review organogram
Review organizational
Number of organizational
Review 1 organogram
Review 1 organogram
1 1 Corporate Services
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
315
towards achievement of IDP objectives by June 2022
structure annually structures approved by Council
ID05 Recruitment and Selection
Implement recruitment plan for 18/19 and draft 19/20 recruitment plan by 30 June 2022
Develop recruitment plan
Number of positions filled
6 Critical positions
6 6 6 Corporate Services
Implement recruitment plan
ID06 Personnel Management
To update staff Leave by June 2022
Maintain the personnel files
Number of leave reports prepared
To prepare 12 leave reports by June 2019
12 12 12 Corporate Services
Update leave records
Develop payroll inputs
ID07 Training and Capacity Building
To capacitate municipal councillors, employees and communities to improve skills levels by June 2022
Conduct skills audit
Number of reports on employees and councillors trained
To implement 2018/19 Annual
Training Plan and develop 19/20 Annual Training Plan by June 2019
4 4 4
Corporate Services
Develop annual WSP and annual training plan
Submission of WSP to LGSETA
Number of reports on capacity building programmes for communities conducted
Staff and Councillors capacity building
Spend 100% budget allocated for WSP
% of budget spent on implementing the WSP
100% 100% 100% 100%
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
316
ID08 Employee wellness programmes
To promote wellbeing of all employees for effective and efficient service delivery by June 2022
Conduct Employee wellness programmes
Number of wellness programmes conducted to employees
To Conduct 4 Employee wellness programmes
4 4 4 Corporate Services
ID09 Declaration of interest
To facilitate the declaration of interest process by June 2022
Facilitation of declaration of interest process
Updated declaration register
To facilitate the declaration of interest process
To facilitate the declaration of
interest process
To facilitate the declaration of interest process
To facilitate the declaration of interest process
Corporate Services
ID10 Council Support
To establish and maintain functionality of Council and its Committees by June 2022
Draft annual institutional calendar for Council and Committee sittings
Number of Exco, Council, MPAC and Portfolio Committee meeting held
Develop schedule of sitting for Council Committees and Council
1 Schedule of sittings
1 Schedule of sittings
1 Schedule of sittings
Corporate Services
60 Portfolio committee meetings
60 60 60
Implementation plan for Rules of Order
12 EXCO Meetings
12 12 12
Monitoring of resolutions register
4 Council meetings
4 4 4
4 MPAC meetings
4 4 4
ID11 Registry
To manage municipal records by June 2022
Approval filling plan
Number of registry reports generated
12 registry reports
12 12 12 Corporate Services
Review of procedure manuals and policy
Conduct workshop to employees on the filing plan
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
317
ID12 Fleet management
To manage municipal fleet for safeguarding, increasing of a lifespan of municipal fleet by June 2022
Perform reconciliations
Number of fleet management reports generated
12 fleet management reports
12 12 12
Corporate Services
Review of the Fleet management policy
Council approved Fleet Management Policy
Review Fleet Management policy
Review of fleet management policy
Review of fleet management policy
Review of fleet management policy
ID13 Administration: Office Services
To provide general cleaning of (101) municipal and satellite offices, (48) community halls 6 public toilets; 5 community libraries for conducive working for environment by June 2022
Develop office cleaning plan
Number of time sheet and cleaning plan reports developed
12-time sheet and cleaning plan reports
12 12 12 Corporate Services
Provide general cleaning offices
ID14 ICT To enhance municipal performance through access to ICT Systems by June 2022
Review ICT Policies
Number of ICT policies reviewed
16 ICT Policies review
16 ICT Policies review
16 16
Corporate Services
Number of ICT procedures reviewed
4 ICT procedures
4 4 4
ID15 Systems Administration
Connect users to the relevant System
Number of reports on users connected
12 reports 12 reports 12 12
ID16
Corporate Services Department Functionality
To ensure Corporate Services Departmental functionality by 30 June 2022
Conduct 6 Monthly Corporate Services Departmental Meetings
Number of Corporate Services Departmental Meetings conducted
6 12 12 12 Corporate Services
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
318
ID17
Corporate Services Department Functionality
To ensure Corporate Services Departmental functionality by 30 June 2022
Conduct Monthly Corporate Services Section Heads Meeting
Number of Corporate Services Section Heads Meetings conducted
6 12 12 12 Corporate Services
ID18
Corporate Services Department Functionality
To ensure Corporate Services Departmental functionality by 30 June 2022
Submit six (6) Monthly Corporate Services Strategic Management Reports to the Corporate Services Portfolio Committee
Number of Corporate Services Strategic Management Reports submitted to the Corporate Services Portfolio Committee
6 12 12 12 Corporate Services
ID19
Corporate Services Department Functionality
To ensure Corporate Services Departmental functionality by 30 June 2022
Submit Quarterly Corporate Services Departmental Performance Reports
Number of Corporate Services Departmental Performance Reports submitted to IDP & PMS Section
4 4 4 4 Corporate Services
ID20
Corporate Services Department Functionality
To ensure Corporate Services Departmental functionality by 30 June 2022
Submit Audited Quarterly Corporate Services Departmental Performance Reports to Corporate Services Portfolio Committee
Number of Audited Quarterly Corporate Services Departmental Performance Reports submitted to Corporate Services Portfolio Committee
4 4 4 4
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
319
ID21 Satellite Offices (Mkuze and Ingwavuma
To ensure functionality of the Satellite Offices by June 2022
Submit Monthly Report
Number of reports submitted
12 12 12 12
Corporate Services
Hold Monthly staff Meetings
Number of staff meetings held
12 12 12 12
ID22
Payroll
To recover excessive S&T Claims form employees through payroll
To recover excessive S&T Claims form employees through payroll by June 2019
Report on the recovered excessive claims.
Report on the recovered excessive
claims.
_ _ _
Corporate Services
ID23
Develop a standard kilometer rate for S&T
Develop a standard kilometer rate for S&T.
Number of kilometer rate guidelines developed
Develop a standard
kilometer rate for S&T.
_ _ _
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
320
KPA2: BASIC SERVICE DELIVERY
TECHNICAL SERVICES
IDP NO. PRIORITY
AREA OBJECTIVES STRATEGIES KPI
MULTI- YEAR ARGETS RESPONSIBLE
DEPT. PRIOR YEAR 2019/20 2020/21 2021/22
SD01 Electrification
To develop an electricity Master Plan (EMP) by 2022
Present the Draft EMP to Management.
No. of Electricity Master Plans developed
To develop 1 electricity Master Plan (EMP) by June 2019
Review 1 EMP
Review 1 EMP Review 1 EMP
Technical
Solicit management comments on the Draft EMP.
Workshop of Councillors on the Draft EMP.
Submit the Final Electricity Master Plan to Council for adoption.
Pre-marketing
SD02 Electrification
To provide house to house Connections to build, maintain and provide access to improved, sustainable and modernized infrastructure to the community by 30 June 2022
Appointment of Consultant
No. of households connected to electricity
provide electricity to 300 households (Enkungwini 2, Mandalaza, Lindizwe and Majozini) by June
2019
300 (Nhlangano,
KwaQondile & Mkhuze
Wamanzi)
Technical
Pre-marketing
Survey
Signing of MOU with ESKOM
Appointment of contractor
Construction of backbone infrastructure (excavation, poles)
Energizing
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
321
SD03
Technical Services Department Functionality
To ensure Technical Services Departmental functionality by 30 June 2022
Conduct (06) Monthly Technical Services Departmental Meetings
Number of Technical Services Departmental Meetings conducted
To Conduct (06) Monthly Technical Services Departmental Meetings by 30 June 2019
12 12 12
Technical
SD04
Technical Services Department Functionality
To ensure Technical Services Departmental functionality by 30 June 2022
Conduct Monthly 06 Technical Services Section Heads Meeting
Number of Technical Services Section Heads Meetings conducted
To conduct six (06) Monthly Technical Services Section Heads Meetings by 30 June 2019
12 12 12
SD05
Technical Services Department Functionality
To ensure Technical Services Departmental functionality by 30 June 2022
Submit six (06) Monthly Technical Services Strategic Management Reports to the Technical Services Portfolio Committee
Number of Technical Services Strategic Management Reports submitted to the Technical Services Portfolio Committee
To Submit six (06) Monthly Technical Services Strategic Management Reports to the Technical Services Portfolio Committee by 30 June 2019
12 12 12
SD06
Technical Services Department Functionality
To ensure Technical Services Departmental functionality by 30 June 2022
Submit Quarterly Technical Services Departmental Performance Reports
Number of Technical Services Departmental Performance Reports submitted to IDP & PMS Section
To submit Four (4) Quarterly Technical Services Departmental Performance Reports to the IDP & PMS Section by 30 June 2019
4 4 4
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
322
SD07
Technical Services Department Functionality
To ensure Technical Services Departmental functionality by 30 June 2022
Submit Audited Quarterly Technical Services Departmental Performance Reports to Technical Services Portfolio Committee
Number of Audited Quarterly Technical Services Departmental Performance Reports submitted to Technical Services Portfolio Committee
To submit Four (4) Audited Quarterly Technical Services Departmental Performance Reports to Technical Services Portfolio Committee by 30 June 2019
4 4 4
Technical
SD08 Community Halls
To maintain 08 municipal community halls by 20222022
Identification of maintenance work Number of
municipal community halls maintained
To maintain 8 municipal community halls by June 2019
8 8 8 Appointment of service providers
Execution of maintenance work
SD09 Community amenities
To maintain 6 public toilets in Mkhuze town x2, Mkhuze test ground, Jozini town, Ingwavuma town, Ndumo market stalls toilet by June 2022
Identification of maintenance work
Number of municipal public toilets maintained
To maintain 6 public toilets in Mkhuze town x2, Mkhuze test ground, Jozini town, Ingwavuma town, Ndumo market stalls toilet by June 2019
6 6 6 Technical Appointment of service providers
Execution of maintenance work
SD10 Master plan and policy
To review 1 master maintenance plan and policy incorporating roads, electricity and building maintenance annually by
Data collection of municipal infrastructure assets
Number of master maintenance plans and policies reviewed
Review 1 master maintenance plan and policy incorporating roads, electricity and building maintenance by June 2019
1 1 1 Technical Review maintenance plan and policy
Present Maintenance plan to
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
323
2022 Councillors
Implementation of maintenance plan
SD11 Roads
To maintain 1000 km of gravel access roads by 2022
Conduct assessment
No. of kilometres of gravel access roads maintained
To maintain 250 km of gravel access roads by June 2019
300 400 400 Technical
Hiring of plant machinery
Maintenance plan of gravel roads
Prioritization of maintenance
Execute maintenance work
SD12 Roads
To repair 30 sq metres of black top roads in Jozini, Ingwavuma, UBombo, Mkhuze by June by 2022
Conduct assessment
Square meters of internal roads maintained (black top)
Repair (30) sq metres of black top roads in Jozini, Ingwavuma, UBombo, Mkhuze by June 2019
30 30 30 Technical
Prioritization of maintenance
Appointment of service providers
Execution of maintenance work
SD13 Roads and storm water
To maintain storm water management drainages in 4 towns (Jozini, Ingwavuma, uBombo and Mkhuze) by 2022
Storm water assessments
Number of storm water drainages maintained
To maintain storm water management drainages in 4 towns (Jozini, Ingwavuma, uBombo and Mkhuze) by June 2019
4 4 4 Technical
Appointment of service providers
Execution of maintenance work
Appointment of service providers
Execute Construction work
Close out report
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
324
SD14.1
Capital projects: Access Roads
To upgrade 6 kms re- graveling of access roads by June 2022
Improve access to roads
Number of kilometres of upgraded roads
Upgrade of Jozini Top Town Access roads by June 2019
Ndumane, Ezinhlalavini, Mtshakela/ Ekulingweni Access roads
Technical SD14.2
Upgrade of Majalantini Access road by June 2019.
SD14.3 Upgrade of Mkhuze CBD Roads by June 2019
SD15.1
Capital project: Community halls
To construct 3 community halls by June 2022
Improve facilities for community
Number of community halls constructed
Construction of KwaQhoqhoqho community hall by June 2019
4 (KwaMbusi, Nhlonhlela, Kwaphaweni & Onaleni)
3 (Ndumo, Nhlangano &
Madeya) Technical
SD15.2 Construction of Machobeni community hall by June 2019
SD15.3 Construction of Magwangu community hall by June 2019
SD16 Capital project To construct 3 centres by June 2022
Improve Recreational facilities
Number of centres constructed
Construction of Cezwane Youth Centre by June 2019
2 (Makwakwa & Manyiseni)
Ngwavuma Technical
SD17.1
Capital project To construct sports fields by June 2022
Improve Recreational facilities
Number of sportsfields constructed
Construction of eMthonjeni Sportsfield by June 2019
2 (Nyamane and Sibonokuhle)
5 (Makhane combo court,
Ubombo, Sinethezekile,
Nyathini & Ophansi
sportsfields)
Technical
SD17.2 Construction of Munywana Sportsfield by June 2019
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
325
SD17.3 Construction of eSidakeni Sportsfield by June 2019
SD18 Expenditure on capital Projects
To spend 100% Budget for the capital projects
% of expenditure on Capital Projects
To spend 100% Budget for the capital projects
100% 100% 100% Technical
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
326
KPA 3: LOCAL ECONOMIC DEVELOPMENT
IDP NO.
PRIORITY AREA
OBJECTIVES STRATEGIES KPI MULTI- YEAR ARGETS
RESPONSIBILITY
PRIOR YEAR 2019/20 2020/21 2021/22
LED01 Implementation of the LED strategy
To exploit available opportunities for economic benefit to the community
Implementation of LED Strategy
Council Approved LED Strategy
Adoption of the LED strategy by June 2019
Implementation of LED Strategy
Implementation of LED Strategy
Implementation of LED Strategy
PED
LED02 Business Licences
To process business licence application.
Processing pf business license applications
Issued business licences
To process business licence applications by June 2019
Processing pf business license applications
Processing pf business license applications
Processing pf business license applications
PED
LED03 Tourism
To unlock tourism opportunities to benefit local communities by June 2022
Sitting of tourism forum meetings
Number of tourism forum meetings
To conduct 2 Tourism forum meetings by June 2019
4 4 4
PED
4 tourism awareness campaigns
Number of tourism awareness campaigns
To conduct 4 Tourism Awareness Campaigns by June 2019
4 4 4
4 Tourism Exhibitions
Number of tourism exhibitions attended
To attend 4 Tourism exhibitions by June 2019.
4 4 4
Support Community Tourism Organisation
Number of CTO general meetings held
To conduct 4 CTO general meetings by June 2019
4 4 4
LED04 Agriculture
To exploit available agricultural opportunities for the benefit of local community by June 2022
Establishment of farmers cooperatives and SMME’S in order to assist them to share transport and other business costs
Number of co-operatives trained
To train 04 co-operatives by June 2019
Training of 4 cooperatives
4 4 PED
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
327
Training of cooperatives and SMME'
LED05 Business
To conduct 2 business inspections annually by June 2022
Business Inspections
Number of Business inspections conducted
To Conduct 2 Business Inspections
2 2 2 PED
LED06 Poverty Alleviation
To create an environment that will create jobs and reduce poverty by June 2022.
Develop poverty reduction policy
Number of Poverty Reduction Programmes Implemented
To implement poverty reduction plan by June 2019
Implementation of poverty reduction plan
Implementation of poverty reduction plan
Implementation of poverty reduction plan
PED
Prepare expenditure reports
Number of Poverty Alleviation expenditure reports prepared
To prepare monthly Poverty Alleviation Expenditure reports by June 2019
12 Poverty alleviation Expenditure reports
12 Poverty alleviation Expenditure reports
12 Poverty alleviation Expenditure reports
LED07 Job Creation
Create jobs through LEDInitiatives by June 2022
Job creation through LED
Initiatives
Number of Job Opportunities Created through EPWP To create 1600
job opportunities by june 2019
1600 1600 1600 PED
Number of Job Opportunities Created through CCG
LED08 EPWP Steering Committee meetings
To conduct EPWP Steering committee meetings by June 2022
Sitting of EPWP Steering Committee Meetings by June 2019
Number of LED Steering committee meetings facilitated
To Facilitate Sitting of 6 EPWP Steering Committee Meetings by June 2019
12 12 12 PED
LED09 SMME's/Co-operatives
To provide support to small business and informal traders
Conduct skills audit for SMME’S and Cooperatives
Number of skills audits conducted
To conduct skills audit for SMME’s by June 2019
Conduct skills audit for SMME’S and Cooperatives
1 1 PED
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
328
for sustainability by June 2022
Assist SMME’s and Cooperatives in packaging funding application to existing funders
Number of Informal Economy Policy reviewed and implemented
To review Informal Economy Policy and implementation by June 2019
Review Informal Economy Policy and Implementation.
Implementation of Informal Economy policy
Implementation of Informal Economy policy
PED
LED10 HIV/AIDS
Facilitate promotion and protection of the rights of the persons living with HIV and AIDS by June 2022
Conduct HIV/AIDS Awareness Campaigns
Number of HIV/AIDS Awareness campaigns conducted
1 HIV/AIDS Local implementation plan by June 2019
1 HIV/AID SLocal implementation
plan
1 HIV/AIDS Local implementation plan
1 HIV/AIDS Local implementation plan
PED
Strengthen the functioning of local AIDS Council
PED
LED11 Operation Sukuma Sakhe (OSS)
To institutionalise integrated service delivery model by mobilising community partnerships through OSS by June 2022
Consult OSS Champion
Number of Operation Sukuma Sakhe Programs Implemented
To develop and implement 1 OSS Roll Out Plan by June 2019
To develop and implement 1 OSS Roll Out Plan
To develop and implement 1 OSS Roll Out Plan
To develop and implement 1 OSS Roll Out Plan
PED Facilitate sitting of War Room and Local Task Team Meetings
LED12 Social Development
To mainstream previously disadvantaged groups for socio-economic benefit by June 2022
Develop Social Development Plan
Number of Senior citizens meetings held
To implement Social Development Plan (senior citizens, children, Inter-faith, Traditional Healers, Civil Society, Local Drug Action Committee, Moral Regeneration Movement by June 2019
4 senior citizens meetings
4 senior citizens meetings
4 senior citizens meetings
PED
Develop Year Calendar of events for all Social Welfare Groups
Number of Children’s forum meetings held
4 Children’s forum meetings
4 Children’s forum meetings
4 Children’s forum meetings
Number of Interfaith meetings held
4 Interfaith meetings
4 Interfaith meetings
4 Interfaith meetings
Implement Social Development Plan
Number of Traditional healers’ meetings held
4 Traditional Healers’ meetings
4 Traditional Healers’ meetings
4 Traditional Healers’ meetings
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
329
Number of Local Drug Action Committee meetings held
4 Local Drug Action Committee meetings
4 Local Drug Action Committee meetings
4 Local Drug Action Committee meetings
Number of Moral Regeneration Movement meetings held
4 Moral regeneration Movement meetings
4 Moral regeneration Movement meetings
4 Moral regeneration Movement meetings
LED13 LED Section Functionality
To ensure Planning and Economic development Departmental functionality by 30 June 2022
Conduct Monthly 6 LED Section Meetings
Number of LED Section Heads Meetings conducted
To conduct 06 Monthly LED Section Meetings by 30 June 2019
12 12 12 PED
LED14 LED Section Functionality
To ensure Planning and Economic development Departmental functionality by 30 June 2019
Conduct Monthly 06 Social Development Section Meetings
Number of LED Section Heads Meetings conducted
To conduct 06 Monthly LED Section Meetings by 30 June 2019
12 12 12 PED
LED15 LED Section Functionality
To ensure Planning and Economic development Departmental functionality by 30 June 2022
Submit 06 Monthly LED Reports to the Planning & Economic Development Portfolio Committee
Number of LED Reports submitted to the Planning & Economic Development Portfolio Committee
To Submit 06 Monthly LED Reports to the LED & Tourism Portfolio Committee by 30 June 2019
12 12 12 PED
LED16 LED Section Functionality
To ensure Planning and Economic development Departmental functionality by 30 June 2022
Submit Quarterly LED Quarterly Performance Reports
Number of LED Performance Reports submitted to IDP & PMS Section
To submit Four (4) Quarterly LED Performance Reports to the IDP & PMS Section by 30 June 2019
4 4 4 PED
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
330
KPA 4: MUNICIPAL FINANCIAL VIABILITY
FINANCE DEPARTMENT
IDP NO.
PRIORITY AREA
OBJECTIVE STRATEGIES KPI MULTI- YEAR ARGETS
RESP.
PRIOR YEAR 2019/20 2020/21 2021/22
FV01 Budgeting
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Draft the process plan.
Number of Final Budget Approved 30 days before the start of the Financial Year
To develop and approve one Annual Budget by June 2019
develop and approve one Annual Budget
develop and approve one Annual Budget
develop and approve one Annual Budget
BTO
Table the Process Plan to Council
Request for Draft procurement plan from Departments
Prepare and Table Draft Budget
Submission of Draft Budget to Relevant Stakeholders
Publicise Draft Budget for public comments
Consolidate and consider Public Comments on the Draft Budget.
Table Final Budget to Council
Submission of Final Budget to Relevant Stakeholders
FV02 Revenue
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Issue Monthly Billing Statement
Percentage collection on the Monthly billing
To collect 40% of the total annual billing by June 2019
40% 40% 40%% BTO
Issue letters of Reminder to Customers
Arrange meetings with individual Customers (households, government departments, businesses)
Granting of Amnesty
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
331
Conduct Data Cleansing Exercise
Attend to complains as and when they come
FV03 Supply Chain Management
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Invite Provincial Treasury SCM Unit for the Workshop on Supply Chain Management.
Number of workshops facilitated for councillors and management on Supply Chain Management
To facilitate 1 workshop on Supply-chain management by June 2019
1 1 1 BTO Invite participants on SCM workshop
Organise logistics for the workshop
FV04 Supply Chain Management
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Request Procurement Plans from Departments
Number of reminders sent
To monitor and implement Procurement Plans on quarterly basis by 30th June 2019
1 1 1 BTO Consolidate Procurement Plans
Send out the monthly reminders on the procurement plans
FV05 Supply Chain Management
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Prepare reporting format for irregular expenditure
Number of Irregular Expenditure reports submitted to the Council
To prepare quarterly reports on the extent of irregular expenditure in terms of S32 of the MFMA by the 30th June 2019
4 4 4
Prepare Monthly Reports on Irregular Expenditure
Submit monthly reports on irregular expenditure to the Municipal Manager/Council
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
332
FV06 Supply Chain Management
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Inclusion of Subcontracting clause in the invitation to tender. Percentage of
Local beneficiation for all construction projects
30% of Local beneficiation for all construction projects by June 2019
30% 30% 30%
Emphasis of Local beneficiation for all construction projects in compulsory briefing sessions
FV08 Expenditure
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Develop the reporting template for reporting fruitless and wasteful expenditure
Number of Fruitless and Wasteful Expenditure reports submitted to the Mayor within 10 working days
To prepare 12 Fruitless and Wasteful Expenditure reports by 30th June 2019
12 12 12
Prepare Monthly Reports on Fruitless and Wasteful Expenditure
Submit monthly reports on Fruitless and Wasteful Expenditure to the Municipal Manager/Council
FV09 Expenditure
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Registration of invoices on receipt
Percentage of Creditors paid within 30 days of receipt of valid invoices
100% Payment of Creditors within 30 days on receipt of valid invoice by June 2019
100% 100% 100% Put date received stamp on all invoices received
Process payments
FV10 Expenditure
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Prepare Accounts Payable batch for 3rd Parties
Percentage on Statutory payments made within 7 days of month end.
100% on Statutory payments made within 7 days of month end by June 2019
100% 100% 100%
Check Accounts Payable batch for 3rd Parties
Approve Accounts Payable Batch for 3rd Parties
Approve 3rd parties’ payments
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
333
Send Statutory payment Schedules to 3rd Parties
Attend Queries from 3rd Parties
FV11 Asset Management
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Place Barcodes on all Municipal Assets
Number of GRAP compliant asset registers developed and maintained
One GRAP compliant asset register
1 1 1
Update Asset register on Acquisitions
Monitor asset movements through Control Sheets
Update incidence register
Insurance Claims register
Run Depreciation
FV12 Statutory Reporting
To develop and maintain a financially viable and sustainable institution that achieves full compliance with municipal legislation by 2022
Allocate Direct receipts and Payments to payment and receipts batches
Number Section 71 reports Submitted to the Mayor within 10 working days
12 Section 71 reports 12 12 12
Post Direct Receipts and Payments to General ledger
Recognise income on conditional grants expenditure
Prepare section 71 reports
Submit Section 71 reports to the Mayor, PT and NT
Comply with financial reporting requirements as outlined in the MFMA
No of Municipal financial Ratios Calculated
4 Financial Ratios Calculated by 30 June 2019
4 4 4
FV13 Statutory Reporting
To develop and maintain a financially viable and sustainable institution that achieves full
Prepare all the reconciliations
Number of Financial Statements prepared with no material findings towards
To Prepare two sets of Financial Statements by June 2019
2 2 2 Prepare Financial Statements Action Plan
Prepare Financial Statements
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
334
compliance with municipal legislation by 2022
Submit AFS to Internal Auditors and Audit Committee for a review
attainment of Clean Audit.
Table Annual Financial Statements to Council
Submit AFS to AG for audit
Attend RFI’s from AG
Attend to Audit Queries raised
Draft Audit Action Plan
Prepare interim Financial Statements
Submit Interim Financial Statements to Internal Auditors
FV14 Contracts Management
To ensure contract management
Ensure contract management
Number of contract management reports
To prepare 06 contract management reports by June 2019.
12 12 12
FV15
To procure backup storeroom in order to avoid loss of vouchers
Procurement of backup storeroom in order to avoid loss of vouchers
Number of backup storerooms procured
To procure backup storeroom in order to avoid loss of vouchers by June 2019.
_ _ _
FV16 SCM Appointed service provider
To source external service provider to perform vetting of all suppliers in the municipal database.
_ _ _
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
335
FV17 Consultants reduction
To develop a Use of Consultants Policy by June 2022
Development of Use of Consultants Policy
Number of developed Used of Consultants Policies
To develop Use of Consultants Policy by June 2019.
_ _ _
FV18 Finance Department Functionality
To ensure Finance Departmental functionality by 30 June 2022
Conduct (06) Monthly Finance Departmental Meetings
Number of Finance Departmental Meetings conducted
To Conduct (06) Monthly Finance Departmental Meetings by 30 June 2019
12 12 12
FV19 Finance Department Functionality
To ensure Finance Departmental functionality by 30 June 2022
Conduct Monthly 06 Finance Section Heads Meeting
Number of Finance Section Heads Meetings conducted
To conduct six (06) Monthly Finance Section Heads Meetings by 30 June 2019
12 12 12
F20 Finance Department Functionality
To ensure Finance Departmental functionality by 30 June 2022
Submit six (06) Monthly Finance Reports to the Finance Portfolio Committee
Number of Finance Reports submitted to the Finance Portfolio Committee
To Submit six (06) Monthly Finance Reports to the Finance Portfolio Committee by 30 June 2019
12 12 12
FV21 Finance Department Functionality
To ensure Finance Departmental functionality by 30 June 2022
Submit Quarterly Finance Departmental Performance Reports
Number of Finance Departmental Performance Reports submitted to IDP & PMS Section
To submit Four (4) Quarterly Finance Departmental Performance Reports to the IDP & PMS Section by 30 June 2019
4 4 4
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
336
FV22 Finance Department Functionality
To ensure Finance Departmental functionality by 30 June 2022
Submit Audited Quarterly Finance Departmental Performance Reports to Finance Portfolio Committee
Number of Audited Quarterly Finance Departmental Performance Reports submitted to Finance Portfolio Committee
To submit Four (4) Audited Quarterly Finance Departmental Performance Reports to Finance Portfolio Committee by 30 June 2019
4 4 4
KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION
OFFICE OF THE MM
IDP NO.
PRIORITY AREA OBJECTIVES STRATEGIES KPI MULTI- YEAR ARGETS
RESPONSIBILITY PRIOR 2019/20 2020/21 2021/22
GG01 Risk Management
To ensure that the risk maturity of the organisation is at an enabled level (risk management and internal control fully embedded into the operations of the organisation, high level understanding of risk, effective
To Establish full functional Risk Management Section
Number of functional Risk Reports developed
To develop 4 Risk Reports by June 2019
4 4 4
OMM
Development, implementation of Risk Management Policy or Strategy.
Number of risk management Policies developed
Development, implementation of Risk Management Policy by June 2019
Implementation Implementation Implementation
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
337
risk management) by June 2022
Conduct risk Assessment bi-annually with implementation, monitoring and on-going review.
Number of Risk Assessments conducted
Conduct 2 risk assessments by June 2019
2 2 2
Development of Fraud Risk Management Policy and Strategy
Number of Fraud Risk Management Policies developed
Development of Fraud Risk Management Policy by June 2019
1 1 1
GG02 Strategic Planning
Co-ordinate a Strategic Planning session to review the Municipality’s strategic objectives, vision and mission by June 2022
Appointment of a facilitator
Number of strategic planning session coordinated
To Co-ordinate 1 strategic planning session annually by June 2019.
1 1 1 OMM Coordinate a Strategic Planning session for Management and Councillors
GG03 Annual Report
Co-ordinate development of annual report by June 2022
Preparation of 2018/2019 Annual report
Number of approved annual reports
To develop 1 Annual report
1 1 1 OMM
Present to Management
GG04 Internal Audit
To ensure reliable and maintain independence of Internal and External Audit by June 2022
Development of Audit Charter
Number of Audit Charters developed
To implement a fully functional Audit Unit y June 2019
implement a fully functional Audit
Unit
implement a fully functional Audit
Unit
implement a fully functional Audit
Unit OMM
To establish a fully Functional Internal Audit Section
Number of risk-based audit plan developed
Develop an Internal Audit Plan
Number of Internal Audits executed
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
338
To develop Audit committee work plan.
Number of Audit Committee workplans developed.
Facilitate functionality of the Audit Committee
Number of Audit Committee meetings convened
GG05 Performance Management System
To maintain a SMART Organisational Performance Management System to ensure Planning, Monitoring reporting and evaluation of municipal performance by June 2022
To review PMS policy annually
Number of PMS Policy reviewed
To review PMS policy by June 2019
1 1 1
OMM
To draft 6 section 54 A/and Section 56 performance agreements
Number of performance agreement drafted within the stipulated timeframes
To draft section 54 A/and Section 56 performance agreements by June 2019
Conduct Performance assessments
Number of performance assessments conducted
Conduct Performance assessments
4 4 4
Compile quarterly performance reports.
Number of Performance reports compiled.
Compile 4 quarterly performance reports.
4 4 4
Develop an Organisational scorecard annually.
Number of Organisational Scorecard Developed
Develop an Organisational scorecard annually.
1 1 1
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
339
Submit Annual Performance Report to AG BY 31 August annually
Number of APR submitted to A.G.
Submit Annual Performance Report to AG BY 31 August annually
1 1 1
GG06 IDP
To draft the 2019/20 IDP to promote a municipal governance system that enhances and embraces the system of participatory governance by June 2022
Draft the IDP Process plan
Date of IDP approval by Council
To review the 2019/20 IDP by 30 June 2019.
30-Jun-20 30-Jun-21 Jun-22 OMM
Situational analysis
Draft strategic objectives
Draft IDP
Final IDP
Public participation meetings
Number of wards participating in the public participation meetings
Conduct 4 IDP public participation meetings by 30 June 2019
4 4 4 OMM
IDP roadshows
Number of wards participating in the IDP roadshows conducted
Conduct 2 IDP Roadshows by June 2019.
2 2 2 OMM
GG07 SDBIP
To Develop Annual Service Delivery and Budget Implementation Plan by June 2022
Develop Service Delivery and Budget Implementation Plan
Number of SDBIP's approved within timelines
To develop 19/20 SDBIP by June 2019
1 1 1 OMM Facilitate approval by Mayor
Submit SDBIP to COGTA
Facilitate advertisement of SDBIP
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
340
GG08 Internal Audit
To ensure reliable and maintain independence of Internal and by June 2022
To update AG Action Plan monitoring report
Number of Audit Readiness meetings held
Report on progress on implementation of the AG Action Plan quarterly by 30 June 2019
4 4 4 OMM
GG09 Internal Audit
To develop and maintain an institution that achieves full compliance with municipal legislation by 2022
Presentation of the Draft Anti-Fraud and Corruption Strategy to Management and Audit Committee
Number of Anti-Fraud and Corruption Strategy reviewed To review and
implement Anti-Fraud and Corruption Strategy by June 2019
1 review 1 review 1 review OMM
Solicit Comments from Management, Audit Committee and Treasury
Number of Reports on implementation of anti-Fraud and Corruption Strategy
GG10 Marketing and communication
To promote and foster sound internal and external communication by June 2022
-Approval of communication and marketing strategy & Plan -Establish communication/ editor’s forum internally
Number of marketing and communication programmes implemented
To implement marketing and communication strategy and Plan by June 2019
Implementation of marketing and communication
strategy and Plan
Implementation of marketing and communication
strategy and Plan
Implementation of marketing and communication
strategy and Plan
OMM
-Monthly organisational publication in a form of a newsletter
-Refurbish the municipal website.
-Develop Municipal social media pages (Facebook & Instagram)
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
341
-Showcase services rendered by the municipality and council accountability report (radio slots, newspaper adverts & Billboards) Communiques (Diaries & Calendars, Signage and Dignitary Corporate Image
GG11 Intergovernmental Relations
To establish a framework that provides procedures for integrated planning and regular reporting and feedback by all stakeholders by June 2022
-Attend intergovernmental relations meetings
Number of IGR Meetings held
To participate in 4 IGR meetings by June 2019
4 4 4 OMM
-Resuscitate the sitting of IGR
structures
GG12 Complaints Management System
To establish a complaints management system to address complaints, commitments and suggestions by the community by June 2022
>Develop complaints management strategy in line with complaints management guideline
Number of complaints received
To address all complaints instigated against Jozini Municipality by 30 June 2019
Address all complaints instigated against Jozini Municipality
Address all complaints instigated against Jozini Municipality
Address all complaints instigated against Jozini Municipality
OMM >Develop complaints management committee
>Install suggestions boxes in all strategic points in all Municipal Main and Satellite Offices
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
342
Convene adhoc complaints management meetings as and when there is a complaint to be addressed
>Monitor complaints management register and suggestion boxes for complaints
PP01 Ward Committees meetings
To enhance participatory democracy by increasing interface between communities and council by June 2022.
Development of ward committee annual calendar plan
Number of ward committee meetings organised
To facilitate 12 monthly meetings of ward committees by June 2019
12 12 12 OMM
Development of reporting template for ward committees
Render support to the ward committee meetings
Provide support materials such as diaries, bags, t-shits and tracksuits
Consolidate reports and hand over to various departments in-terms of issues raised
PP02 Ward Committee trainings
To enhance participatory democracy by increasing interface between communities and council by June 2022.
Conduct skills audit forward committees to identify skills gap
Number of ward committee training sessions organised
To organise 1 accredited training sessions for ward committees by June 2019
1 1 1 OMM Draft Training programme
Engage COGTA - Public Participation Unit on the training standard
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
343
Procure services of a Training services provider
PP03 Ward Community Feedback Meetings
To enhance participatory democracy by increasing interface between communities and council by June 2022.
Collection of quarterly ward Community Feedback Meetings reports from Councillors
Number of Ward Community Feedback Meetings Reports collected from Councillors
To Collect 80 Ward Community Feedback Meetings Reports from Councillors by 30 June 2019
80 80 80 OMM
PP04 Ward Committee workshops
To enhance participatory democracy by increasing interface between communities and council by June 2022
Conduct workshop to ward committees
Number of ward committee workshops organised
To conduct 1 workshop on ward committee functionality by June 2019
1 1 1 OMM
PP05 Community Imbizos
To enhance participatory democracy by increasing interface between communities and council by June 2022.
Conduct 2 Izimbizo Imbizo
Number of Imbizo conducted
To conduct 2 Imbizo’s for community participation by June 2019
2 2 2 OMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
344
PP06 Municipal Rapid Response Team Meetings (MRRT)
To enhance participatory democracy by increasing interface between communities and council by June 2022
Conduct Rapid Response Team Meetings (MRRT)
Number of Rapid Response Team Meetings (MRRT Conducted
To Conduct 2 Rapid Response Team Meetings (MRRT) by 30 June 2019
OMM
GG13 Office of the MM Functionality
To ensure Office of the MM functionality by 30 June 2022
Conduct (06) Monthly Office of the MM Departmental Meetings
Number of Office of the MM Departmental Meetings conducted
To Conduct (06) Monthly Office of the MM Departmental Meetings by 30 June 2019
12 12 12 OMM
GG14 Office of the MM Functionality
To ensure Office of the MM functionality by 30 June 2022
Conduct Monthly Office of the MM Section Heads Meeting
Number of Office of the MM Section Heads Meetings conducted
To conduct six (06) Monthly Corporate Services Section Heads Meeting by 30 June 2019
12 12 12 OMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
345
GG15 Office of the MM Functionality
To ensure Office of the MM functionality by 30 June 2022
Submit Quarterly Office of the MM Departmental Performance Reports
Number of Office of the MM Departmental Performance Reports submitted to IDP & PMS Section
To submit Four (4) Quarterly Office of the MM Departmental Performance Reports to the IDP & PMS Section by 30 June 2019
4 4 4 OMM
KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION
COMMUNITY SERVICES
IDP NO.
PRIORITY AREA OBJECTIVES STRATEGIES KPI MULTI- YEAR ARGETS
POE
PRIOR 2019/20 2020/21 2021/22
PP07 Lease agreements with tenants
To ensure that all municipal properties have valid lease agreements by June 2022
Review of lease agreement
Number of municipal buildings with tenants having signed lease agreements
4 signed Lease agreements signed by tenants of 3 municipal properties (121 staff residence, Mkhuze Clinic, Ndumo rental stock & Thusong centre) by June 2019
4 4 4 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
346
PP08 Lease agreements with tenants
To ensure that all municipal properties have valid lease agreements by June 2022
Review Tenants and Landlords Sessions
Number of Tenants and Landlords Sessions Reviewed
To Review quarterly Tenants and Landlords Sessions by 30 June 2019
4 4 4 COMM
PP09 Indigent Management Policy
To ensure that, Council adopt Indigent Management Policy by 30 June 2022
Council adopted Reviewed Indigent Management Policy
Number of Reviewed Indigent Management Policy tabled to Council
To Table Reviewed Indigent Management Policy to Council for adoption by 30 June 2019
1 1 1 COMM
PP10 Indigent Management Register
To ensure that, Council adopt Indigent Management Register by 30 June 2022
Council adopted Indigent Management Register
Number of Reviewed Indigent Management Register tabled to Council
To Table Reviewed Indigent Management Register to Council for adoption by 30 June 2019
1 1 1 COMM
To provide free basic electricity to the Indigent community by June 2022
Provision of free basic electricity
% of indigent community receiving free basic electricity
To provide free basic electricity to the Indigent community by June 2019
30% 30% 30% COMM
PP11 Sports development
To promote social cohesion through sports by 30 June 2022
Conduct Municipal-Wide Sports Development & Sport Council Meetings
Number of Municipal-Wide Sports Development & Sport Council Meetings conducted
To Conduct Municipal-Wide Sports Development & Sport Council Meetings by 30 June 2019
4 4 4 COMM
PP12 Annual Mayoral Cup Tournament/Youth Celebration
To promote social cohesion through sports by 30 June 2022
Co-ordinate Annual Mayoral Cup and Youth day Celebration
Number of Annual Mayoral Cup and Youth day Celebration co-ordinated
To Co-ordinate Annual Mayoral Cup and Youth day Celebration by 30 June 2019
1 1 1 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
347
PP13 Annual SALGA Games
To Coordinate Municipal sports events by 30 June 2022
Co-ordinate Annual SAGA Games
Number of Annual SAGA Games Co-ordinated
To Co-ordinate Annual SAGA Games by 30 June 2019
1 1 1 COMM
PP14 Indigenous Games
To Coordinate Municipal sports events by 30 June 2022
Co-ordinate Indigenous Games
Number of indigenous games Co-ordinated
Co-ordinate Indigenous Games by 30 June 2019
1 1 1 COMM
PP15 Arts and Culture
To promote social cohesion through Arts and cultural activities by June 2022
Conduct Municipal-Wide Arts & Culture Forum Meetings
Number of Municipal-Wide Arts & Culture Forum Meetings conducted
To conduct Municipal-Wide Arts & Culture Forum Meetings by 30 June 2019
4 4 4 COMM
PP16 Arts and Culture
To promote social cohesion through Arts and cultural activities by June 2022
Render Support towards the Annual Umkhosi Wamaganu
Number of Umkhosi Wamaganu rendered Support
To Render Support towards the Annual Umkhosi Wamaganu by 30 June 2019
1 1 1 COMM
PP17 Arts and Culture
To promote social cohesion through Arts and cultural activities by June 2022
Support Traditional Councils with Cultural Development & Support Programmes
Number of Traditional Councils Supported with Cultural Development & Support Programmes
To Support 7 Traditional Councils (Amakhosi) with Cultural Development & Support Programmes by 30 June 2019
7 7 7 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
348
PP18 Arts and Culture
To promote social cohesion through Arts and cultural activities by June 2019
Conduct Jozini Synergistic Partnerships Engagement Sessions
Number of Jozini Synergistic Partnerships Engagement Sessions conducted
Conduct Jozini Synergistic Partnerships Engagement Sessions
4 4 4 COMM
PP19 Special Programmes
To promote social cohesion through Special programmes activities by June 2019
Conduct Jozini Municipal-Wide Women’s Day Celebration
Number of Municipal-Wide Women’s Day Celebration
To conduct Jozini Municipal-Wide Women’s Day Celebration by 30 June 2019
1 1 1 COMM
PP20 Special Programmes
To promote social cohesion through Special programmes activities by June 2022
Conduct Quarterly Municipal-Wide Women Forum Meetings
Number of Municipal-Wide Women Forum Meetings conducted
To Conduct Quarterly Municipal-Wide Women Forum Meetings by 30 June 2019
4 4 4 COMM
PP21 Special Programmes
To promote social cohesion through Special programmes activities by June 2022
Establish Municipal-Wide Youth Forum
Number of Municipal-Wide Youth Forum established
To Establish Municipal-Wide Youth Forum by 30 June 2019
COMM
PP22 Special Programmes
To promote social cohesion through Special Programmes activities by June 2022
Conduct Jozini Municipal-Wide Disability Day and Awareness Campaign
Number of Jozini Municipal-Wide Disability Day and Awareness Campaign conducted.
To Conduct Jozini Municipal-Wide Disability Day and Awareness Campaign by 30 June 2019
1 1 1 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
349
PP23 Special Programmes
To promote social cohesion through Special Programmes activities by June 2022
Conduct Municipal-Wide Disability Forum Meetings
Number of Municipal-Wide Disability Forum Meetings Conducted
To Conduct 4 Municipal-Wide Disability Forum Meetings by 30 June 2019
4 4 4 COMM
PP24 Special Programmes
To promote social cohesion through Special Programmes activities by June 2022
Conduct Jozini Municipal-Wide Albinism Profiling Report
Number of Jozini Municipal-Wide Albinism Profiling Report conducted
To Conduct Jozini Municipal-Wide Albinism Profiling Report by 30 June 2019
1 1 1 COMM
PP25 Special Programmes
To promote social cohesion through Special Programmes activities by June 2022
Council adopted Municipal-Wide Special Programmes Policy Framework
Number of Municipal-Wide Special Programmes Policy Framework tabled to Council
To table Municipal-Wide Special Programmes Policy Framework to Council for adoption by 30 June 2019
1 1 1 COMM
PP26 Special Programmes
To promote social cohesion through Special Programmes activities by June 2022
Council adopted Municipal Enterprises Policy Framework
Number of Municipal Enterprises Policy Framework tabled to Council
To table Municipal Enterprises Policy Framework to Council for adoption by 30 June 2019
1 1 1 COMM
PP27 Schools outreach
To promote literacy through school development programmes by June 2022
Preparation of an Annual outreach program plan for school visits.
Number of schools' outreach programmes conducted
To conduct 8 School outreach programmes by June 2019
8 8 8 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
350
Provision of Mobile Library
PP28 Awareness Campaigns
To promote literacy through school development programmes by June 2022
Conduct outreach awareness programmes
Number of outreach awareness programmes conducted
To conduct 4 Awareness Campaign by June 2016
4 4 4 COMM
Provision of Mobile Library
PP29 Road Safety
To ensure road safety and security to the community by June 2022
Conduct roadblocks Number of road safety programmes conducted
To conduct 48 road blocks by June 2019
48 48 48 COMM
PP30 Road Safety
To compile 12 monthly statistics reports by June 2022
Compilation of12 monthly statistics report of number of charges including speed camera
Number of statistics reports
To compile 12 monthly statistics reports by June 2019
12 12 12 COMM
PP31 Road Safety
To ensure road safety and security to the community by June 2022
Council adopt Municipal-Wide Safety & Security Plan
Number of Municipal-Wide Safety & Security Plan adopted by Council
To facilitate the adoption of Municipal-Wide Safety & Security Plan by Council by 30 June 2019
Review review review COMM
PP32 Road Safety
To ensure road safety and security to the community by June 2022
conduct school visits
Number of school visit conducted
To conduct 8 school visits by 30 June 2019
8 8 8 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
351
PP33 Road Safety
To ensure road safety and security to the community by June 2022
Conduct Municipal-Wide Crime Awareness Campaign
Number Municipal-Wide Crime Awareness Campaign conducted
To Conduct Municipal-Wide Crime Awareness Campaign by 30 June 2019
1 1 1 COMM
PP34 Road Safety
To ensure road safety and security to the community by June 2022
Conduct Arrive Alive Campaign Launch
Number of Arrive Alive Campaign Launch conducted
To Conduct One (1) Arrive Alive Campaign Launch by 31 December 2018
1 1 1 COMM
PP35 Road Safety
To ensure road safety and security to the community by June 2022
Conduct Jozini Operation Valingozi Easter Launch
Number of Jozini Operation Valingozi Easter Launch conducted
Conduct One (1) Jozini Operation Valingozi Easter Launch by 30th March 2019
1 1 1 COMM
PP36 Road Safety To develop Traffic bylaws by June 2022
Develop Draft Traffic by-law
Number of by-law developed
To develop 1 Traffic by-law by June 2019
Review review review COMM
Inputs from relevant stakeholders
Final Traffic by-law
Conduct workshop for councillors on the by-law
Adoption of the Traffic by-law
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
352
PP37 Disaster Management
To develop 1 Disaster Management Framework by June 2022
Develop Disaster Management Framework
Number of Disaster Management Framework developed
To develop 1 Disaster Management Framework by June 2019
Review review review COMM
PP38 Disaster Management
To Review 1 Disaster & Fire Rescue Services Management Plan by 30 June 2022
Review of Disaster & Fire Rescue Services Management Plan
Number of Disaster & Fire Rescue Services Management Plan reviewed
To Review 1 Disaster & Fire Rescue Services Management Plan by 30 June 2019
1 1 1 COMM
PP39 Disaster Management
To form a Disaster & Fire Rescue Services Management forum by June 2022
Form a Disaster & Fire Rescue Services Management forum
Number of Disaster & Fire Rescue Services Management Forum formed
To form a Disaster & Fire Rescue Services Management forum by June 2019
COMM
PP40 Disaster Management
To facilitate the purchasing of Heavy-Duty Jaws of Life by 30 June 2022
Facilitate the purchasing of Heavy-Duty Jaws of Life
Number Heavy Duty Jaws of Life purchased
To Facilitate the purchasing of Heavy-Duty Jaws of Life by 30 June 2019
_ _ _ COMM
PP41 Disaster Management Council Adopt Fire Rescue Bylaws
submit Fire Rescue Bylaws to Council for adoption
Number of Fire Rescue Bylaws adopted by Council
To Develop Fire Rescue Bylaws by 30 June 2019
_ _ _ COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
353
PP42 Disaster Management
Council Adopted Business Plan for the Establishment of the Municipal-Wide Disaster Management & Fire Rescue Centre
Business Plan for the Establishment of the Municipal-Wide Disaster Management & Fire Rescue Centre
Number of Business Plan submitted for the Establishment of the Municipal-Wide Disaster Management & Fire Rescue Centre to Council for Adoption
To submit Business Plan for the Establishment of the Municipal-Wide Disaster Management & Fire Rescue Centre to Council for Adoption by 30 June 2019
_ _ _ COMM
PP43 Disaster Management
To ensure provision of fire and rescue services by June 2022
Conduct 8 disaster awareness campaigns
Number of disaster awareness campaigns conducted
To conduct 8 Disaster Awareness Campaigns by June 2019
8 8 8 COMM
PP44 Driving licence testing centre
To Provide unlimited services in the DLTC by June 2022
Issuing of Public Driving Licence Permits
Number of monthly reports developed on the functionality of DLTC
12 monthly eNatis report by June 2019
12 12 12 COMM Renewal of driving licences
Issuing of temporally Driving Licences
PP45 Animal pound
To ensure that the animal pound is functional by June 2022
Adoption of 2019/2020 Pound Management Bylaws
Number of Pound Management Bylaws adopted by Council
The Council adopt 2019/2020 Pound Management Bylaws by 30 June 2019
_ _ _ COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
354
PP46 Animal pound
To ensure that the animal pound is functional by June 2022
Preparation of an awareness plan
Number of animal pound awareness campaigns conducted
7 Awareness campaigns to Community Leaders by June 2019
7 7 7 COMM Conduct Awareness campaigns to Community and livestock farmers
PP47 Cemeteries
To ensure that the municipal cemeteries are functional by June 2022
Preparation of awareness plan
Number of awareness campaigns conducted for cemeteries
7 Awareness campaigns to communities by June 2019
7 7 7 COMM
Conduct awareness campaigns to Community
PP48 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Conduct Environmental Management Services Site Inspection
Environmental Management Services Site Inspection
To conduct 6 Monthly Environmental Management Services Site Inspection by 30 June 2019
12 12 12 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
355
PP49 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Council adopt Municipal-Wide Integrated Waste Management Plan (IWMP)
Number of Municipal-Wide Integrated Waste Management Plan (IWMP)
To facilitate Council to adopt Municipal-Wide Integrated Waste Management Plan (IWMP) by Council by 30 June 2019
1 _ _ COMM
PP50 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Conduct Waste Management Awareness Campaigns
Number of Waste Management Awareness Campaigns conducted
To conduct Two (4) Waste Management Awareness Campaigns By 30 June 2019
4 4 4 COMM
PP51 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Propose New Ndumo, Bhambanana, Jozini, Cemetery Project Feasibility Study and Entabayengwe Waste Disposal Site Feasibility Study & Business Plan to be adopted by Council
Number of Cemetery and Waste Disposal Project Feasibility Study proposed
To Propose New Ndumo, Bhambanana, Jozini, Cemetery Project Feasibility Study and Entabayengwe Waste Disposal Site Feasibility Study & Business Plan adopted by Council by 30th June 2019
COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
356
PP52 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Provide Waste Cages
Number Waste Cages provided
To Provide 4 Waste Cages by 31 January 2019
4 _ _ COMM
Provide access to basic solid waste removal
% of households with access to basic waste removal
To provide access to basic solid waste removal
30% 30% 30% COMM
PP53 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Conduct Waste Management Skills Training Workshops for Waste General Workers
Number of Waste Management Skills Training Workshops conducted for Waste General Workers
To Conduct (2) Waste Management Skills Training Workshops for Waste General Workers by 30 June 2018
2 2 2 COMM
PP54 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Facilitate the formal Licensing for the Mkhuze Dumping Site in partnership with Department of Environmental Affairs
Number of Dump site Formalised
To Facilitate the formal Licensing for the Mkhuze Dumping Site in partnership with Department of Environmental Affairs by 30 June 2019
Licensing _ _ COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
357
PP55 Integrated Waste Management
To ensure that municipal waste management service is functional in line with NEMA standards by June 2022
Conduct one (1) Quarterly Municipal-Wide Environmental Impact Assessment (EIA)
Number of Municipal-Wide Environmental Impact Assessment (EIA) conducted
To Conduct one (1) Quarterly Municipal-Wide Environmental Impact Assessment (EIA) by 30 June 2019
4 4 4 COMM
PP56 Community Services Department Functionality
To ensure Community Services Departmental functionality by 30 June 2022
Conduct (12) Monthly Community Services Departmental Meetings
Number of Community Services Departmental Meetings conducted
To Conduct (12) Monthly Community Services Departmental Meetings by 30 June 2019
12 12 12 COMM
PP57 Community Services Department Functionality
To ensure Community Services Departmental functionality by 30 June 2022
Conduct Monthly Community Services Section Heads Meeting
Number of Community Services Section Heads Meeting conducted
To conduct Twelve (12) Monthly Community Services Section Heads Meeting by 30 June 2019
12 12 12 COMM
PP58 Community Services Department Functionality
To ensure Community Services Departmental functionality by 30 June 2022
Submit Twelve (12) Monthly Community Services Strategic Management Reports to the Community Services Portfolio Committee
Number of Community Services Strategic Management Reports submitted to the Community Services Portfolio Committee
To Submit Twelve (12) Monthly Community Services Strategic Management Reports to the Community Services Portfolio Committee by 30 June 2019
12 12 12 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
358
PP59 Community Services Department Functionality
To ensure Community Services Departmental functionality by 30 June 2022
Submit Quarterly Community Services Departmental Performance Reports
Number of Community Services Departmental Performance Reports submitted to IDP & PMS Section
To submit Four (4) Quarterly Community Services Departmental Performance Reports to the IDP & PMS Section by 30 June 2019
4 4 4 COMM
PP60 Community Services Department Functionality
To ensure Community Services Departmental functionality by 30 June 2022
Submit Audited Quarterly Community Services Departmental Performance Reports to Community Services Portfolio Committee
Number of Audited Quarterly Community Services Departmental Performance Reports submitted to Community Services Portfolio Committee
To submit Four (4) Audited Quarterly Community Services Departmental Performance Reports to Community Services Portfolio Committee by 30 June 2019
4 4 4 COMM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
359
KPA 6: SPATIAL PLANNING (CROSS CUTTING)
IDP NO.
PRIORITY AREA
OBJECTIVES STRATEGIES KEY PERFORMANCE INDICATOR
QUARTERLY MILESTONE
2018/19 2019/20 2020/21 2021/22
SP01
Human Settlements
To promote the achievement of a non-racial, integrated society, through the development of sustainable human settlements and quality housing by June 2022
Implement Housing Sector plan
Number of Housing projects implemented
To implement Housing sector plan by June 2019
Implementation of Housing sector plan
Implementation of Housing sector plan
Implementation of Housing sector plan
PED
SP02
Coordinate planning of housing projects in 20 Wards
Number of housing projects implemented
To coordinate planning of housing projects in 20 wards by June (2019)
Implementation of Housing Projects
Implementation of Housing Projects
Implementation of Housing Projects
SP03 Provide housing for vulnerable groups
Number of housing projects implemented
To facilitate implementation of housing projects i.e. Jozini ward 5, Ndumo ward 16, KwaJobe phase 2 ward3 and 4 by June 2019
Jozini ward 5, Ndumo ward 16, KwaJobe phase 2 ward3 and 4
Jozini ward 5, Ndumo ward 16, KwaJobe phase 2 ward3 and 4
Jozini ward 5, Ndumo ward 16, KwaJobe phase 2 ward3 and 4
SP04 Facilitate sitting of housing forum meeting
Number of housing Forum meetings convened
To facilitate sittings of four housing forums a year by 30 June 2019
4 Housing Forum meetings
4 4
SP05 Spatial Development Framework
To achieve sustainable and Controlled development in line with Spatial Planning and Land Use Management Act16 of 2013 by June 2022
Review SDF
Number of Spatial Development Frameworks reviewed
To review 1 SDF by June 2019
Draft SDF
Facilitate approval of SDF by Council
Implementation of SDF PED
Facilitate public participation process for draft SDF
Facilitate public participation process for draft SDF Implement SDF
Projects
SP06 Land Use Management
To develop Land Use
Develop Wall to Wall Schemes
Number of wall to wall scheme
To develop 1 wall to wall
Draft wall to wall schemes
final wall to wall schemes
PED
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
360
Management Systems for formalizations of towns development by June 2022
Workshop councillors on Wall to Wall Scheme
developed scheme in line SPLUMA by June 2019
Facilitate public participation
Facilitate approval by Council
SP07 Land Use Management
To achieve sustainable and Controlled development in line with SPLUMA by-law
Facilitate the approval of development applications
Number of development applications received and contravention notices issued
To implement Jozini SPLUMA by-laws by June 2019
Implementation of SPLUMA By laws
Implementation of SPLUMA By
laws
Implementation of SPLUMA By laws
PED
Issue of contravention notices
Convene Municipal Planning Tribunal meetings
Attend Provincial SPLUMA Forum meetings
SP08 Building Control
To Install Building Plan Management software by June 2019
Installation of Building Plan Management Software
Number of Building Plan Management Software installed
To Install of Building Plan Management Software by June 2019
_ _ _ PED
SP09 Building Control
To provide building regulations that guide uniform development within the municipality in compliance with the SANS 400 and NBRSA by 30 June 2022
Draft By-Laws
Number of notices issued
To enforce building by laws in compliance with the SANS 400 and NBRSA by June 2019
Issuing of notices Issuing of notices
Issuing of notices PED
Facilitate Public participation process for draft by laws
Facilitate approval by Council
Facilitate Gazetting of by-law
Facilitate approval of building plans
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
361
Conduct Inspections
SP10
Planning and Economic Development Department Functionality
To ensure Planning and Economic development Departmental functionality by 30 June 2019
Conduct Monthly 06 Planning and Economic Development Section Meetings
Number of Planning and Economic Development Section Heads Meetings conducted
To conduct six (06) Planning and Economic Development Section Meetings by 30 June 2019
12 12 12 PED
SP11
To ensure Planning and Economic development Departmental functionality by 30 June 2022
Submit six (06) Monthly Planning and Economic Development Reports to the Planning Portfolio Committee
Number of Planning and Economic Development Reports submitted to the Planning Portfolio Committee
To Submit six (06) Monthly Planning and Economic Development Reports to the Planning Portfolio Committee by 30 June 2019
12 12 12 PED
SP12
To ensure Planning and Economic development Departmental functionality by 30 June 2022
Submit Quarterly Planning and Economic Development Quarterly Performance Reports
Number of Planning and Economic Development Performance Reports submitted to IDP & PMS Section
To submit Four (4) Quarterly Planning and Economic Development Performance Reports to the IDP & PMS Section by 30 June 2019
4 4 4 PED
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
362
SP13
To ensure Planning and Economic development Departmental functionality by 30 June 2022
Submit Audited Quarterly Planning and Economic Development Departmental Performance Reports to Planning Portfolio Committee
Number of Submit Audited Quarterly Planning and Economic Development Departmental Performance Reports to Planning Portfolio Committee
Submit 4 Audited Quarterly Planning and Economic Development Departmental Performance Reports to Planning Portfolio Committee by 30 June 2019
4 4 4
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
363
PROJECTS
PROJECT WARD SOURCE OF FUNDING 2019/20 2020/21 2021/22
Onaleni Community Hall 12 MIG
Cezwana Youth Centre 4 MIG
Nhlonhlela Community Hall 1 MIG
Sinethezekile Sportsfield 5 MIG
Sidakeni Sports Field 9 MIG
Ndumane Access Road 6 MIG
Munywana Sportsfield 17 MIG
Machobeni Community Hall 14 MIG
Ngonyameni Community Hall 18 MIG
Emthonjeni Sports Field 14 MIG
Upgrading of Roads Ii Mkhuze CBD 20 MIG
Empileni Community Hall 1 MIG
Makwakwa Skills Centre 13 MIG
Kwaphaweni Community Hall 19 MIG
Ndumo Community Hall 16 MIG
Manyiseni Youth Centre 15 MIG
Ubombo Sportsfield 2 MIG
Nhlangano Community Hall 3 MIG
Sibonokuhle Sportsfield 4 MIG
Ophansi Sportsfield 20 MIG
Ngwavuma Multi-Purpose Centre 14 MIG
Combo-Court- Makhane 13 MIG
Madeya Community Hall 17 MIG
Kwambuzi Community Hall 10 MIG
Nyathini Sportsfield 18 MIG
Madeya community hall 17 MIG
Ezinhlalavini access road 8 MIG
Mtshakela/ Ekulingeni access road 9 MIG
Construction of the Jozini Disaster Management & Fire Rescue Services Centre
7 Various Sources
Construction of the Jozini By-Pass 7 Various Sources
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
364
Route
Refurbishment of the Mkhuze Landfill Site
20 Various Sources
Construction of Market Stalls in various Nodes (i.e. Ingwavuma, Ndumo, Bhambanana, Jozini, uBombo & Mkhuze)
2, 7, 12, 14, 16 & 20 Various Sources
Refurbishment of Mkhuze & Jozini Tourism Information Centres
20 Various
Construction of the Cecil Mark's Pass Development
15 EDTEA
Construction of Jozini Sports Complex (Emasotsheni)
7 Various
Construction of Mkhuze Testing Station
20 Various
Construction of KwaSiqakatha Cultural Village and Museum
5 Various
Construction of the Jozini Civic Centre
7 Various
Ingwavuma via Sanitation DC27
Jozini Regional CWSS DC27
Kwajobe Community Water Scheme (Ntshongwe Malobeni)
DC27 R10 000 000,00
Mkuze water Treatment upgrade & Refurbishment
DC27 R10 000 000,00
Rehabilitation of uBombo Water Scheme
DC27 R5 000 000,00
Shemula water upgrade (Phase 2B) DC27 R1 500 000,00
Thembalethu Sanitation (WWTW) DC27 R7 000 000,00
Jozini Low Cost Housing Sewer Upgrade
DC27 R20 000 000,00
Ingwavuma Boreholes (Drought) DC27 R5 000 000,00
Jozini, Umhlabuyalingana VIP Sanitation Project
DC27 R15 000 000,00
Greater Ingwavuma Water Supply Scheme
DC27 R15 000 000,00
Nondabuya CWSS Upgrade DC27 R10 000 000,00
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
365
Siweni/Ingwavuma Emergence Pipeline
DC27 R15 000 000,00
Nhlangano 3
KwaQondile 7
Mkhuze waManzi/Mshophi 1 & 20
Manqonjwana electrification 2
Shemula/ Khonya (722) 12 ESKOM
Nyamana/ Ntabayengwe/ Siweni/ Bhekindoda Electrification (397)
11 ESKOM
Emngceleni Electrification (494) 10 ESKOM
Embadleni (352) ESKOM
Gwaliweni Phase 2 (269) 9 ESKOM
Jozini Bulk extensions (900) Various ward ESKOM
Oshabeni/ Nonjinjikazi (505) 11 ESKOM
Khonya #2 (718) 5 ESKOM
Amandlethu (236) 8 ESKOM
Enkungwini #2 (869) 18 ESKOM
Esihlangwini #2 (500) 14 ESKOM
Mkhonjeni Biva Island (204) 6 ESKOM
Mzinyeni & KwaMbuzi Phase 2 (471)
10 ESKOM
Embadleni #2 (721) 17 ESKOM
Ndumo Phase 3 (Thelamama) (573)
16 ESKOM
Extensions 10 (345) Various wards ESKOM
Extensions 24 Various wards ESKOM
Makhathini Youth farming Small Business Development
Vezithanga Agriculture Small Business Development
Umpheme Poultry Broilers Small Business Development
Ingenzeka Small Business Development
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
366
Amandlethu Junior Secondary School (Jozini)
Construction Of 4 Girls' Toilet Seats, 2 Boys' Toilet Seats And 2 Urinal Spaces, 1m + 1urinal + 1f Teacher Toilet Seats, 1 Disabled Toilets, Grade R: 4 Seats and Water Provisioning.
DBSA 0 R372 000 0
Amaqhawe Primary School 2 ECD Classroom DOPW R240 000 0 0
Banjana Primary School 1 Grade R,1 Multipurpose Classrooms Including Laboratories And Specialist Rooms, 0.5 Media Centre, 0.5 Computer Room(S), 2 Office(S), 3 Storeroom(S), 1 Disabled Toilets, Electrification Provisioning,
KZNDOE 0 R303 000 R320 000
Bhekindlela Secondary School Repairs and Renovations DOPW R670 000 0 0
Dinabanye Primary School 2 ECD Classroom DOPW R197 000 0 0
Egujini Primary School Replacing Roof Structures, Broken Windows And Doors, Plastering And Paint Works , Stormwater Drainage Improvement
KZNDOE 0 0 R666 000
Egujini Primary School 2 Ecd Classroom DOPW R822 000 0 0
Ekulingeni Junior Primary School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition Of Existing Structure, Construction Of New (4g, 2b, 2urinal,2staff &1urinal,1d)
DBSA 0 R372 000 0
Ekulingeni Junior Primary School 2 ECD Classroom DOPW 0 R97 000 R102 000
Ekuveleni Primary School 2 ECD Classroom DOPW R1 353 000 0 0
Emanqayini Primary School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition Of Existing Structure, Construction Of New (2g, 1b, 1urinal,1staff &1urinal,1d,1r)
DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
367
Emanqayini Primary School 1 ECD Classroom And 4 Toilets, 01 Jungle Jim And Fencing
DOPW R71 000 0 0
Emanyiseni Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction Of New Ablution Facilities, Repairs And Renovations Of Existing Ablution/S, Provision For New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction Of Retaining Structures, Construction Of Covered & Open Walkways And Desludging Of Existing Ablutions
DOPW 0 R234 000 0
Emasakeni Primary School Sanitation Phase 3 Programme - Construction of New Ablution Facilities, Repairs and Renovations Of Existing Ablution/S, Construction Of New Borehole, Provision For New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction Of Covered Walkway And Desludging Of Existing Ablutions
DOPW 0 R364 000 0
Embuyiselo Primary School 2 ECD Classroom DOPW R114 000 0 0
Emngceleni Primary School Replacing Roof Structures, Broken Windows And Doors, Plastering And Paint Works, Stormwater Drainage Improvement
KZNDOE 0 0 R666 000
Emngceleni Primary School Construction Of 4 Seats Boys Toilet Block, 6 Seats Girls Toilet Block, 5 Seats Grade R Toilet Block, 4 Seats Teachers Toilet
INDEPENDENT DEVELOPMENT TRUST
0 R195 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
368
Block, Installation of Gutters And 5x2.5kl Rain Water Harvesting Tanks and Refurbishment Of Existing Toilet Facilities.
Empumelelweni Junior Primary School
Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction Of New (10g, 4b, 6urinal,4staff &4urinal,2d)
DBSA 0 R372 000 0
Emthonjeni Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Borehole, Provision For New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction Of Covered & Open Walkways And Desludging Of Existing Ablutions
DOPW 0 0 R360 000
Emunywana Junior Primary School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction of New (6g, 2b, 4urinal,3staff &2urinal,1d,3r,1rt)
DBSA 0 R372 000 0
Engujini Primary School Construction of Boys And Girls Toilet Block,
DBSA 0 0 R432 000
Gwaliweni Primary School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction of New (4g, 2b, 2urinal,2staff &1urinal,1d)
DBSA 0 R372 000 0
Gwaliweni Primary School 2 ECD Classroom DOPW 0 R97 000 R102 000
Gwayini Primary School Storm Damage Repairs DOPW 0 R370 000 R390 000
Hhoye Secondary School Sanitation Programme (Phase DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
369
3), Cluster Umg-24 Demolition of Existing Structure, Construction of New (12g, 4b, 6urinal,4staff &2urinal,2d)
Hlazazane High School Storm Damages to School KZNDOE 0 0 R666 000
Impala Secondary School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction Of New (6g, 2b, 4urinal,3staff &2urinal,1d,3r,1rt)
DBSA 0 R372 000 0
Injula (Gedleza) Intermidiate School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction Of New (8g, 24b, 4urinal,3staff &2urinal,1d)
DBSA 0 R372 000 0
Inkuthazelo Primary School 1 ECD Classroom KZNDOE 0 R197 000 R208 000
Isambulo Primary School Sanitation Phase 3 Programme - Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Provision For New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction Of Covered & Open Walkways And Desludging Of Existing Ablutions
DOPW 0 R180 000 R1 920 000
Isicelosethu High School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction Of New (4g, 2b, 2urinal,2staff &1urinal,1d)
DBSA 0 R372 000 0
Isihlangwini Primary School Sanitation Programme (Phase 3), Cluster Umg-24
DBSA 0 R372 00 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
370
Demolition of Existing Structure, Construction Of New (2g, 1b, 1urinal,1staff &1urinal,1d,1r)
Isihlangwini Primary School Storm Damages to School KZNDOE 0 0 R450 000
Isikhalisanamuhla Junior Primary School
Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction of New (8g, 4b, 4urinal,3staff &4urinal,1d)
DBSA 0 R372 000 0
Isiphosethu High School Construction of Boys and Girls Toilet Block,
DBSA 0 R372 000 0
Isivunguvungu High School Sanitation Programme (Phase 3), Cluster Umg-24 Demolition of Existing Structure, Construction of New (8g, 4b, 4urinal,3staff &2urinal,1d,3r,1rt)
DBSA 0 R372 000 0
Khandane Primary School Construction of Boys And Girls Toilet Block,
DOPW 0 R262 000 0
Khethwayo Primary School Replacement Of Asbestos Roof System To Existing 7 Class Room Block. Demolition and Rebuild Of Existing Storm Damaged Ablution Block. Replacement of Broken Glazing And Doors. Redesigning Of Surface Drainage, Desludging Existing Ablutions, Rainwater Goods & Water Harvesting.
DOPW 0 R370 000 R390 000
Khethwayo Primary School Sanitation Phase 3 Programme - Demolition Of Existing Ablution/S, Construction Of New Ablution Facilities, Repairs And Renovations Of Existing Ablution/S, Construction Of New Borehole, Provision For
DOPW 0 0 R414 000
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
371
New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction Of Covered & Open Walkways And Desludging Of Existing Ablutions
Khindi Jobe Secondary School 8 Classrooms, 1 Multipurpose, Lab, Specialist Room, 1 Media, 1 Computer room, 4 Offices, 4 Storerooms, 1 Strong room, 1 Snp Kitchen, 6 Girls And 4 Boys Toilets, 4 Teachers Toilets And 1 Disabled Toilet.
COEGA DEVELOPMENT CORPORATION
R6 757 000 0 0
Khindi Jobe Secondary School Construction of Boys and Girls Toilet Block,
KZNDOE 0 0 R432 000
Khobongo High School Storm Damages to School KZNDOE 0 0 R450 000
Khobongo Junior Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered Walkway and Desludging of Existing Ablutions
DOPW 0 R372 000 0
Khonya Junior Primary School Construction Of 4 Boys, 6 Urinals, 12 Girls, 2 Disabled, Staff 1m, 2 Urinal 3 F, Grade R 5 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Kwabamba High School Storm Damages to School KZNDOE 0 0 R450 000
Kwadonsa Primary School Storm Damages to School KZNDOE 0 0 R450 000
Kwamakhonyeni Primary School Storm Damages to School KZNDOE 0 0 R450 000
Kwaphaweni Primary School Storm Damages to School KZNDOE 0 0 R450 000
Kwaphaweni Primary School Construction Of 4 Boys, 6 Urinals, 12 Girls, 2 Disabled,
DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
372
Staff 1m, 2 Urinal 3 F, Grade R 5 And 1 Grade R Teacher Toilet Blocks
Kwaqondile Junior Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R 3 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Kwaqondile Primary School Replacing Roof Structures, Broken Windows and Doors, Plastering and Paint Works, Stormwater Drainage Improvement
DOPW 0 R349 000 0
Kwashukela Primary School Repairs and Renovations DOPW R168 000 0 0
Kwashukels Primary School Storm Damages to School KZNDOE 0 0 R450 000
Lubelo Secondary School Storm Damages to School DBSA 0 0 0
Lubelo Secondary School 2 Multipurpose Classrooms, 1 Media Centre Classroom, 1 Computer Room, Team Teaching, 1 Admin Block and Support Spaces, 1 Gate House, Ablutions and Parking Bays
INDEPENDENT DEVELOPMENT TRUST
R869 000 R259 000 0
Lubelo Secondary School Construction of Boys and Girls Toilet Block,
INDEPENDENT DEVELOPMENT TRUST
0 0 R 414 000
Lubhoko Comprehensive School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 0 R 414 000
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
373
Ludaka Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 R 234 000 0
Lundini Primary School Sanitation phase 3 programme - demolition of existing ablution/s, construction of new ablution facilities, construction of new borehole, provision for new water harvesting Jojo tanks, construction of v-drains, construction of covered walkway and desludging of existing ablutions
DOPW 0 R 234 000 0
Madlaka Junior Secondary School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled, Staff 1m, 2urina, L 2 F, Grade R 3 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R 372 000 0
Magugu Primary School Construction Of 1 Boys, 1 Urinals, 2 Girls, 1 Disabled, Staff 1m, 1 Urinal 1 F, Grade R 1 Toilet Blocks
DBSA 0 R 372 000 0
Malobeni Junior Secondary School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled, Staff 1m, 2 Urinals And 1f Toilet Block + Grade R: 5 Seats
DBSA 0 R 372 000 0
Mandla Mthethwa Comprehensive High School (Ndumo New Model High School)
Construction of A New School DOPW 12 638 000 0 0
Mandla Mthethwa Comprehensive High School (Ndumo New Model
Convert Sport Centre To A School Hall (Multiple Use) Bore
DOPW R1 200 000 0 R25 000 000
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
374
High School) Phase 2 Hole, Additional Backup Generator. Landscaping and Additional Retaining Wall. Fans/Air Conditioners: Classrooms, Media Center, Cottages and Laboratories.
Mangwazana Secondary School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled, Staff 1m, 2 Urinals, 2 F, Toilet Blocks
DBSA 0 R372 000 0
Maphindela Primary School 1 Multipurpose Classrooms Including Laboratories and Specialist Rooms, 1 Media Centre, 1 Computer Room(S), 4 Office(S), 4 Storeroom(S), 1 Strong room, 2 Teacher Toilet Seats, 1 Disabled Toilets
DOPW R1 651 000 0 R3 446 000
Matshamhlophe Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Retaining Structures, Construction of Covered Walkway and Desludging of Existing Ablutions
DOPW 0 R234 000 0
Mbalekelwa Primary School Construction of Boys and Girls Toilet Block,
DOPW 0 R372 000 0
Mbalekelwa Primary School 1 ECD, 5 Toilets, 01 Classroom, 01 Jungle Jim, Sand Pit and Isolating Fence
DOPW 0 R1 716 000 R855 000
Mbekwane Secondary School Sanitation Phase 3 Programme - Construction of New Ablution Facilities, Repairs and Renovations of Existing
DOPW 0 0 R414 000
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
375
Ablution/S, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
Mbodla Primary School Sanitation Phase 3 Programme - Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging Of Existing Ablutions
DOPW 0 0 R414 000
Mdladla Secondary School Sanitation phase 3 programme - demolition of existing ablution/s, construction of new ablution facilities, provision for new water harvesting Jojo tanks, construction of v-drains, construction of covered walkway and desludging of existing ablutions
INDEPENDENT DEVELOPMENT TRUST
0 R372 000 0
Mfingose Primary School Upgrades and Additions DOPW 0 R501 000 R529 000
Mgabadeli Primary School Sanitation phase 3 programme - demolition of existing ablution/s, construction of new ablution facilities, provision for new water harvesting Jojo tanks, construction of v-drains, construction of covered walkway and desludging of existing ablutions
DOPW 0 R480 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
376
Mgedula Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R 3 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Mjindi High School Demolish existing ablution blocks which are structurally compromised due to storm damage and reconstruct new block. Replacement of broken glazing and doors. Redesigning of surface drainage desludging existing ablutions, rainwater goods & water harvesting.
DOPW 0 R400 000 R422 000
Mjindi Secondary School Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablutions Provision for New Water Harvesting Jojo Tanks, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 0 R107 000
Mmemezi High School Storm Damages to School KZNDOE 0 0 R486 000
Mpolimpolini Primary School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled, Staff 1m, 2 Urinals, 2 F, Toilet Blocks
DBSA 0 R372 000 0
Mpontshini Junior Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 1 Urinal 1 F, Grade R 1 Toilet Blocks
DBSA 0 R372 000 0
Msiyane Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing
DOPW 0 0 R342 000
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
377
Ablution/S, Provision for New Water Harvesting Jojo Tanks, Construction of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
Msiyane Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 0 R342 000
Msiyane Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 0 R342 000
Mthanti Comtech School Renovations, Rehabilitation or Refurbishments
DOPW 0 R2 326 000 R2 095 000
Mthidlwe Primary School Storm Damages to School KZNDOE 0 0 R486 000
Mtshakela Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and
DOPW 0 R234 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
378
Renovations of Existing Ablution/S, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Retaining Structures, Construction of Covered Walkway and Desludging of Existing Ablutions
Mtshelekwane Secondary School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R 3 And 1 Grade R Teacher toilet Blocks
DBSA 0 R372 000 0
Mthidlwe Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 R480 000 R1 920 000
Mthidlwe Primary School Upgrades & Additions to School DOPW 0 R501 000 R529 000
Mziki Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 R670 000 0
Mzondi Primary School Construction Of 2 Boys, 2 DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
379
Urinals, 4 Girls, 1 Disabled, Staff 1m, 1 Urinals, 1 F, Toilet Blocks
Namaneni High School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R 3 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Ndamkane Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Retaining Structures, Construction of Covered Walkway and Desludging of Existing Ablutions
DOPW 0 R372 000 0
Nethezeka Primary School Sanitation Phase 3 Programme - Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablution/S, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered Walkway and Desludging of Existing Ablutions
DOPW 0 R480 000 0
Nethezeka Primary School Storm Damages to School KZNDOE 0 0 R486 000
Njakazana Primary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-
DOPW 0 R234 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
380
Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
Nobiya Secondary School Sanitation Phase 3 Programme - Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 R480 000 0
Nqobizazi Junior Secondary School Construction Of 1 Boys, 1 Urinals, 2 Girls, 1 Disabled, Staff 1m, 1 Urinal, Grade R 1 Toilet Blocks
DBSA 0 R372 000 0
Nsongweni Junior Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 1 Urinals, 1 F, Toilet Blocks
DBSA 0 R372 000 0
Ntenga Primary School Construction Of 6 Boys, 8 Urinals, 16 Girls, 2 Disabled, Staff 1m, 2 Urinals, 3 F, Toilet Blocks
DBSA 0 R372 000 0
Nyamane Secondary School Construction Of 6 Boys, 6 Urinals, 14 Girls, 1 Disabled, Staff 1m, 2 Urinal 3 F, Grade R 6 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Maphaya Primary School Storm Damage To 4 Classrooms and Administration Block
DOPW R78 000 R529 000 0
Ohlalwini Primary School Storm Damages to School KZNDOE 0 0 R648 000
Okhayeni Primary School Construction Of 4 Boys, 4 Urinals, 8 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R
DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
381
4 And 1 Grade R Teacher Toilet Blocks
Ophansi Primary School Construction Of 1 Boys, 1 Urinals, 2 Girls, 1 Disabled, Staff 1 M, 1 Urinal 1 F, Grade R 1 Toilet Blocks
DBSA 0 R372 000 0
Ophansi Primary School Storm Damages to School KZNDOE 0 0 R648 000
Oshabeni Primary School Demolition of Existing Ablution/S, Construction of New Ablution Facilities, Repairs and Renovations of Existing Ablutions Provision for New Water Harvesting Jojo Tanks, Construction of Covered & Open Walkways and Desludging of Existing Ablutions
DOPW 0 0 R89 000
Othobothini Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 1 Urinal 1 F, 3 Grade R, And 1 Grade R Teacher Toilet Blocks.
DBSA 0 R372 000 0
Phungaza High School Construction Of 1 Boys, 1 Urinals, 2 Girls, 1 Disabled, Staff 1m, 2 Urinal 0 F, 1 Grade R Toilet Blocks.
DBSA 0 R372 000 0
Mkhonjeni Primary School Storm Damage To 5 Classrooms
DOPW R78 000 R500 000 0
Sambane Comprehensive Primary School
2 ECD Classroom DOPW R246 000 0 0
Sambane Primary School Repairs and Renovations DOPW R177 000 0 0
Sandlasenkosi Secondary School Construction Of 4 Boys, 4 Urinals, 8 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R 3 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Sibhamu High School Construction Of 2 Boys, 4 Urinals, 6 Girls, 1 Disabled,
DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
382
Staff 1m, 2 Urinals, 2 F, Toilet Blocks
Sisizakele Primary School Upgrades & Additions to School DOPW R2 067 000 0 R21 374 000
Sisizakele Special School Construction of Boys and Girls Toilet Block,
KZNDOE 0 0 R432 000
St Philips Primary School 6 Cls, 4 Multi, 1 Media, 0 Comp, 7 Offices, 7 Store, 1 Strong, 1 SNP Kitchen, 0 Girls, 0 Boys& Urinals, 6 Teachers TLS, Disable
DOPW R3 193 000 0 0
St Philip's Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 2 Urinal 2 F, Grade R 4 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Nkungwini Priamary School Storm Damage To 7 Classrooms
DOPW R78 000 R529 000 0
Thelamama Primary School 9 Standard Classroom, 2 Grade R,3 Multipurpose Classrooms Including Laboratories and Specialist Rooms, 1 Media Centre, 1 Computer Room(S), 6 Office(S), 5 Storeroom(S), 1 SNP Kitchen/Tuck-shop, 7 Girls' Toilet Seats, 4 Boys' Toilet Seats and Urinal Spaces, 4 Teacher Toilet Seats, 2 Disabled Toilets, Electrification Provisioning,
DOPW R2 277 000 0 0
Uphande Primary School Construction Of 4 Boys, 4 Urinals, 8 Girls, 1 Disabled, Staff 1m, 2 Urinal 3 F, Grade R 5 And 1 Grade R Teacher Toilet Blocks
DBSA 0 R372 000 0
Velakukhanya Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 1 Urinal 1 F,1 Grade R And 1 Grade R Teacher
DBSA 0 R372 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
383
Toilet Blocks.
Vezukusa Primary School Construction Of 2 Boys, 2 Urinals, 4 Girls, 1 Disabled, Staff 1m, 1 Urinals, 1 Female Toilet Block
DBSA 0 R372 000 0
Vezukusa Primary School Upgrades and Additions DOPW 0 R519 000 R548 000
Zamintuthuko High School Storm Damages to School KZNDOE 0 0 R549 000
Zandlazethu High School Storm Damages to School KZNDOE 0 0 R443 000
Zandlazethu Secondary School 10 Classrooms,4 Multipurpose Classrooms, 1 Media Centre, 1 Computer Room,1 Team Teaching Room,1 Administration Building,3 HOD Offices, 1 Garden Storeroom,1 General Storeroom, 1 Counseling Suite, 1 SNP Kicthen.7 Girls Toiles, 4 Boys Toilets, 6 Teachers Toilets, 1 Disabled Toilets.27 Parking Bays
KZNDOE 0 R1 858 000 R10 473 000
Zimele Secondary School 5 Standard Classrooms, 1 Multipurpose, Laboratories A R nd Specialist Rooms, Media Centre, Computer Room, 4 Offices, 3 Storerooms, 1 Strong room, 1 Kitchen, 1 Disabled Toilet
COEGA Development Corporation
R5 565 000 0 0
Zombizwe Secondary School Repairs and Renovations DOPW 0 R3 904 000 R3 760 000
Zombizwe Secondary School Replacement of Asbestos Roof System to Existing 3 & 5 Classroom Blocks, 12 Ablutions and Hall. Replacement of Broken Glazing and Doors. Redesigning of Surface Drainage, Desludging Existing Ablutions, Rainwater Goods & Water Harvesting.
DOPW 0 R385 000 R406 000
Zwilenkosi Secondary School Construction of New Ablution DOPW 0 R42 000 0
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
384
Facilities, Demolition of Existing Ablutions, Construction of New Borehole, Provision for New Water Harvesting Jojo Tanks, Construction Of V-Drains, Construction of Covered & Open Walkways
Ngongo Land care project 3 Agriculture
Manyiseni Land care project 15 Agriculture
Nyamane Land care project 11 Agriculture
Kwajobe Land care project 3 Agriculture
Mthidlwe Land care project 4 Agriculture
Bhambanana feedlot Agriculture
Isihlibhi feedlot Agriculture
Mthidlwe feedlot Agriculture
Kwajona feedlot Agriculture
Khandane feedlot Agriculture
Biva feedlot Agriculture
Sibetheli feedlot Agriculture
Kwajobe sale yard Agriculture
Nhlonhlela sale yard Agriculture
Ophande sale yard Agriculture
Mlube sale yard Agriculture
BOREHOLES/ WINDMILLS
• Nkungwini
• Nyathini
• Bhudlwini
• Thathaweni
• Mzondi
• Gwaliweni
• Zidlele
• Matalabane
• Nkabashini
• Mange
• Nhlonhlela
• Nkabashini
Agriculture
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
385
• Ntenga
• Fohlabenyunda
DAMS
• Magugwana
• Shabeni
• Fahla
• Mbombo
• Nqaba
• Nzosha
• Sibhaheni
• Kwasipokwe
GRAZING CAMPS
• Lahuba
• Mabhuluko
• Ezimbidleni
• Emgqosheni
• Onyaweni
• Munywane
• Eziphunzini
• Esakoleni
• Mthidlwe
DIPTANKS
• Mozi
• Dlamhlehlo
• Gujini
• Mabona
• Embundwini
• Mentena
• Mlesane
• Mpungamlilo
Thembalethu piggery 1
Bhambanana feedlot 12
Ophondweni piggery 9
Myeni goats project 7
Sakhisizwe poultry project 6
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
386
DAM SCOOPING
• Nohihi
• Makhumbini
• Mpungamlilo
• Esihlotsheni
• Ekulingweni
• Manzaluhlaza
• Bheka
IRRIGATION SYSTEMS
• Hlanganani
• Zambula
• Ukhethe
• Sondlisizwe
• Vukuzenzele
19 6 6
16 6
COMMUNITY GARDENS (FENCING)
• Zambula
• Mabhungu
• Sukumasenze
• Nonjinjikazi
• Ukhethe
• Eziphosheni Project
• Sondlisizwe
• Sibuyelekhaya Community Development Trust
6 8
13 11 6
16 16 20
Manqayini School Access Road - New Gravel Road
7 Transport
Sambane School Access Road - New Gravel Road
12 Transport
Mpondwana - New Gravel Road 8 Transport
D2210 - Betterment & Regravel 19 Transport
D1839 - Betterment & Regravel 14 Transport
D1840 - Betterment & Regravel 11 Transport
D1911 - Betterment & Regravel 18 Transport
D1912 - Betterment & Regravel 15 Transport
D1912 - Betterment & Regravel 15 Transport
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
387
D1823 - Betterment & Regravel 2 Transport
D2374 - Betterment & Regravel 1 Transport
L1191 - Betterment & Regravel 1 Transport
D464 - Betterment & Regravel 1 Transport
KwaJobe Rural Housing 3 & 4 Human Settlements
Jozini CRU’s 7 Human Settlements
Mkhuze CRU’s 20 Human Settlements
Ndumo Housing project (1000 units)
15 & 16 Human Settlements
Jozini ward 5 housing (1000 units) 5 Human Settlements
Siqakatha Housing project (1000 units)
6 Human Settlements
Mhlekazi & Mkuze 1 & 20 Human Settlements
Zineshe & Gujini 3 & 4 Human Settlements
Hlalanathi & Mamfene 5 & 6 Human Settlements
Maphaya & Madinyane 2 & 7 Human Settlements
Msiyane & Nondabuya 8 & 19 Human Settlements
Ophondweni & Emziyeni 9 & 10 Human Settlements
Nyamane & Machobeni 11 & 14 Human Settlements
Shemula & Makhanisi 12 & 13 Human Settlements
Mbadleni & Ndumu 16 & 17 Human Settlements
Manyiseni & Nkungwini 15 & 18 Human Settlements
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
388
PRIORITY PROJECTS PER WARD
WARD 1 WARD 2 WARD 3 WARD 4 WARD 5
Empileni community hall Ubombo sports centre (combo- court)
Access roads Cezwane sportsfield Gedleza skills centre
WARD 6 WARD 7 WARD 8 WARD 9 WARD 10
Mbukeni bridge Upgrade of Emasosheni sportsfield
Combo-court sportsfield Bhekindoda community hall
Mzinyeni Multi-purpose centre
Upgrade of Ezibukweni sportsfield
WARD 11 WARD 12 WARD 13 WARD 14 WARD 15
Nyamane sportsfield Thekwane community hall Combo-court sports centre Upgrade of Ingwavuma town hall
Upgrade of Manyiseni sportsfield
WARD 16 WARD 17 WARD 18 WARD 19 WARD 20
Eziphosheni community hall
Sports Field Oshabeni sportsfield Mfingose sportsfield Tshaneni hall
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
389
SECTION F: FINANCIAL PLAN
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
390
F.1. PURPOSE
The purpose of this section is to outline the comprehensive multi-year financial plan that will ensure long-term financial sustainability for the municipality.
A multi-year financial plan is essential to ensure that the municipality continues to implement its mandate effectively without impairing its capital base. It will also enable the municipality to move towards self-sufficiency in meeting the growing demands of service delivery.
The focus here is to outline the role forecasting as a critical tool of local government finance and to provide guidelines to strengthen local public finances in improving the financial management. In particular, proper financial management must: adequately control the total level of revenue and expenditure, appropriately allocate public resources among functional areas and programs, and, ensure that departments operate as efficiently as possible. This Plan is prepared in terms of section 26(h) of the Local Government Municipal Systems Act, as amended, which stipulates that municipalities must prepare a financial plan as part of their Integrated Development Plan. The three-year Financial Plan includes an operating Budget and Capital budget, informed by the IDP priorities. It takes into account the key performance areas of the IDP. All programmes contained in the budget are reflected in the IDP. The key benefit of financial planning and budgeting is that it gives stakeholders the opportunity to stand back and review their organizational performance and the factors affecting operational requirements.
These can include:
Greater ability to make continuous improvements and anticipate problems Sound financial information on which to base decisions Improved clarity and focus A greater confidence in your decision making In contrast with accounting records, which are retrospective, a financial planning or in
simple terms budgeting is generally a projection of future revenues and expenditures. At a minimum, a financial plan is used to control financial transactions as well as a management and planning tool. Because local government provides services, forecasts are needed to plan for and control the receipt and expenditure of monies to meet these ends.
F.2 BACKGROUND
A financial plan is prepared for a period of at least three years; however it is preferred that it should be for over a period of five or more years
A multi-year financial plan is prepared to ensure financial sustainability of the municipality, paying particular attention to the municipality’s infrastructure requirements.
It is also an important component of the municipality’s Integrated Development Plan. The multi-year financial plan will also ensure that the municipality has greater financial
health and sustainability making it easier to collaborate on projects with other levels of government and various public and private stakeholders. This will further enhance the ability of the municipality to have access to more financing, funding and grants.
Municipalities require access to adequate resources and budgetary powers to fulfil their assigned functions. Municipalities need to have access to adequate sources of revenue – either own resources or intergovernmental transfers – to enable them to carry out the functions that have been assigned to them. Municipalities should be encouraged to fully exploit these sources of revenue to allow for realistic planning and should ensure efficient allocation of these financial resources. The rural nature of the municipality and the fact that 95% of all land are under Tribal Management have a serious effect on the revenue base. Tribal land is exempted from property rates with the effect that the Councils revenue collected from property rates are very limited.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
391
F.3 LINKING THE IDP AND THE BUDGET
The general principle in constructing a municipal budget is that the developmental policy proposals that are contained in the IDP of the municipality must be costed and budgeted for. Having looked at the municipality’s IDP, you may want to verify whether priority issues have also been budgeted for in alignment with the IDP documentation. This information should, at least to some extent, be found in the municipality’s budget. The IDP has been taken into a business and financial planning process leading up to the 2019/20 MTREF, based on the approved 2018/19 MTREF, Mid-year Review and adjusted budget. The business planning process has subsequently been refined in the light of current economic circumstances and the resulting revenue projections. With the compilation of the 2019/20 MTREF, each department/function had to review the business planning process, including the setting of priorities and targets after reviewing the mid-year and second quarter performance against the 2018/19 Departmental Service Delivery and Budget Implementation Plan. Business planning links back to priority needs and master planning, and essentially informed the detail operating budget appropriations and three-year capital programme.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
392
F.2. 3 YEAR MUNICIPAL BUDGET
JOZINI MUNICIPALITY2019-20 BUDGET
Funding 2019-20 2020/21 2021/22
Equitable share R181,990,000.00 R191,817,460.00 R202,175,602.84
EPWP R3,217,000.00 - -
FMG R2,435,000.00 R2,566,490.00 R2,705,080.46
Provincialisation R6,186,000.00 R6,520,044.00 R6,872,126.38
Cecil Marks Boarder Development
R1,300,000.00 R1,370,200.00 R1,444,190.80
Rental of Facilities R862,812.00 R909,403.85 R958,511.66
Property rates R31,500,000.00 R33,201,000.00 R34,993,854.00
Refuse R1,600,000.00 R1,686,400.00 R1,777,465.60
Interest on investments R3,500,000.00 R3,689,000.00 R3,888,206.00
Interest on Outstanding Debt
R10,000,000.00 R10,540,000.00 R11,109,160.00
Licences R263,882.09 R278,131.72 R293,150.84
Other R1,000,000.00 R1,054,000.00 R1,110,916.00
Total R243,854,694.09 R253,632,129.57 R267,328,264.57
MIG R37,394,000.00 R39,413,276.00 R41,541,592.90
TOTAL R281,248,694.09
EXPENDITURE R173,315,774.40 R182,674,826.22 R192,539,266.83
ERC & CLLRS ALLOWANCE
R100,710,491.56 R70,957,303.35 R74,788,997.73
NEW POSTS R7,222,428.13
R281,248,694.09 R253,632,129.57 R267,328,264.57
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
393
OPERATIONS AND MAINTENANCE COSTS OF MUNICIPAL FIXED ASSETS
The municipal has put aside 8% of the budget for Repairs and maintenance of municipal assets.
PLANNED REPAIRS & MAINTENANCE
Project Name 2019/20 2020/21 2021/22
Cezwana Youth Centre
R500,000.00 R527,000.00 R555,458.00
Jozini High Masts 500,000.00 R527,000.00 R555,458.00
Main Office Backup Generator
R500,000.00 R527,000.00 R555,458.00
Maintenance of 121 Res
R250,000.00 R263,500.00 R277,729.00
Maintenance of Community Halls
R500,000.00 R527,000.00 R555,458.00
Maintenance of Office Buildings
R1,000,000.00 R1,054,000.00 R1,110,916.00
Maintenance of Office Toilet
R500,000.00 R527,000.00 R555,458.00
Maintenance of Sportsfields
R800,000.00 R843,200.00 R888,732.80
Maintenance of youth centre
R300,000.00
New Tractor & slasher
R50,000.00
Repairs and Maintenance of Municipal Access Roads
R4,000,000.00 R4,216,000.00 4,443,664.00
Repairs and Maintenance of Streetlights and high mast lights
R600,000.00 R632,400.00 R666,549.60
Repairs of Mkhuze testing ground steep hill
R200,000.00
Road Maintenance Tools and Protective Clothing
R150,000.00 R158,100.00 R166,637.40
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
394
F.3. SOUND FINANCIAL STRATEGIES (REVENUE ENHANCEMENT STRATEGIES & EXPENDITURE MANAGEMENT PLAN)
The municipality has put in place strategical measures in place to ensure that the financial status of the Municipality is improved. These measures were shared during the recent Strategic Planning Session which was held in January 2019.
These measures will ensure that the Municipality is not found to be underspending or overspending on the budget that will be utilised towards service delivery in the next financial year. The Municipality has existing structures which will continue to ensure that the budget which has been set aside to better the livelihood of our people is monitored closely. These structures include Budget Steering Committee, MPAC, Audit Committee, and Auditors which are the soldiers guarding the monies of the communities whether they are being spend accordingly.
F.4. PRIOR 3-YEAR OPEX
Budgeted Financial Performance (Expenditure)
Description 2015/16 2016/17 2017/18 Current Year 2018/19
R thousand Audited Outcom
e
Audited Outcom
e
Audited Outcom
e
Original Budget
Adjusted
Budget
Full Year
Forecast
Pre-audit outco
me
Expenditure By Type
Employee related costs 50,599 59,937 76,790 77,367 76,172 76,172 76,172
Remuneration of councillors
10,070 10,370 14,291 13,086 14,181 14,181 14,181
Debt impairment 28,653 46,104 25,959 7,854 24,099 24,099 24,099
Depreciation & asset impairment
15,842 16,238 17,998 20,198 22,252 22,252 22,252
Finance charges – 634 855 15 15 15 15
Bulk purchases – – – – – – –
Other materials – – – – 70 70 70
Contracted services 52,516 82,445 96,219 45,186 28,018 28,018 28,018
Transfers and subsidies
2,633
21,473
16,557
20,100
23,952
23,952
23,952
Other expenditure 76,184
44,881
52,522
49,967
43,795
43,795
43,795
Loss on disposal of PPE
–
–
170
–
–
–
–
Total Expenditure 236,496 282,081 301,363 233,773 232,554 232,554 232,554
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
395
F.5. MTEF ALLOCATIONS
The Municipality’s expenditure framework for the 2019/20 Annual budget and MTREF is informed by the following:
Given that one of the primary drivers of this budget is to keep tariff increases with the inflationary envelope of 5.4 per cent, expenditure allocations in excess of the 2018/19 Adjustments budget are very limited.
Related to the above weakness the capital programme carries the risk of not ensuring that the asset renewal strategy and backlog eradication is achieved in this budget;
Funding of the budget over the Draft medium-term is informed by Section 18 and 19 of the MFMA;
Operational gains and efficiencies will be directed to funding the capital budget and other core services; and
Strict adherence to the principle of “no project plans no budget”. If there is no business plan no funding allocation can be made.
2019-20 Budget Funding 2019-20 2020/21 2021/22
Equitable share 181,990,000.00 191,817,460.00 202,175,602.84
EPWP 3,217,000.00 - -
FMG 2,435,000.00 2,566,490.00 2,705,080.46
Provincialisation 6,186,000.00 6,520,044.00 6,872,126.38
Cicil Marks Boarder Development 1,300,000.00 1,370,200.00 1,444,190.80
Rental of Facilities 862,812.00 909,403.85 958,511.66
Property rates 31,809,039.12 33,526,727.23 35,337,170.50
Less Income forgone 286,481.13 301,951.12 318,256.48
Refuse 3,146,904.00 3,316,836.82 3,495,946.00
Fines 113,809.46 119,955.17 126,432.75
Interest on investments 3,500,000.00 3,689,000.00 3,888,206.00
Interest on Outstanding Debt 10,000,000.00 10,540,000.00 11,109,160.00
Licences 1,269,704.12 1,338,268.14 1,410,534.62
Other 487,988.37 514,339.74 542,114.09
Total 246,031,775.93 255,926,773.83 269,746,819.62
MIG 37,394,000.00 39,413,276.00 41,541,592.90
TOTAL 283,425,775.93 295,340,049.83 311,288,412.52
EXPENDITURE #REF! #REF! #REF!
ERC 73,551,259.27 77,523,027.27 81,709,270.74
Cllrs Allowances 14,832,073.32 15,633,005.28 16,477,187.56
EPWP 7,387,200.00 4,395,390.80 4,632,741.90
NEW POSTS 14,222,428.13 14,990,439.25 15,799,922.97
#REF! #REF! #REF!
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
396
CASHFLOW R thousand July August Sept. October Novembe
r December
January February
March April May June Budget Year 2019/20
Cash Receipts By Source
1
Property rates 1,375
1,375
1,375
1,375
1,375
1,375
1,375
1,375
1,375
1,375
1,375
2,661
17,786
Service charges - electricity revenue
–
–
–
–
–
–
–
–
–
–
–
–
–
Service charges - water revenue
–
–
–
–
–
–
–
–
–
–
–
–
–
Service charges - sanitation revenue
–
–
–
–
–
–
–
–
–
–
–
–
–
Service charges - refuse revenue
133
133
133
133
133
133
133
133
133
133
151
325
1,809
Rental of facilities and equipment
72
72
72
72
72
72
72
72
72
72
72
72
863
Interest earned - external investments
292
292
292
292
292
292
292
292
292
292
292
292
3,500
Interest earned - outstanding debtors
–
–
–
–
–
–
–
–
–
–
–
–
–
Dividends received –
–
–
–
–
–
–
–
–
–
–
–
–
Fines, penalties and forfeits
–
–
–
–
–
–
–
–
–
–
–
114
114
Licences and permits 17
17
17
17
17
17
17
17
17
17
17
17
200
Agency services –
–
–
–
–
–
–
–
–
–
–
–
–
Transfer receipts - operational
65,043
–
–
65,043
–
–
–
–
65,043
–
–
–
195,128
Other revenue 41
41
41
41
41
41
41
41
41
41
41
41
488
Cash Receipts by Source 66,972
1,929
1,929
66,972
1,929
1,929
1,929
1,929
66,972
1,929
1,947
3,521
219,888
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
397
Other Cash Flows by Source
Transfer receipts - capital –
–
12,465
–
–
12,465 –
–
12,465
–
–
–
37,394
Transfers and subsidies - capital (monetary allocations) (National / Provincial Departmental Agencies, Households, Non-profit Institutions, Private Enterprises, Public Corporatons, Higher Educational Institutions) & Transfers and subsidies - capital (in-kind - all)
–
–
–
–
–
–
–
–
–
–
–
–
–
Proceeds on disposal of PPE
–
–
Short term loans
–
–
Borrowing long term/refinancing
–
–
Increase (decrease) in consumer deposits
–
–
Decrease (Increase) in non-current debtors
–
–
Decrease (increase) other non-current receivables
–
–
Decrease (increase) in non-current investments
–
–
Total Cash Receipts by Source
66,972
1,929
14,394
66,972
1,929
14,394 1,929
1,929
79,437
1,929
1,947
3,521
257,282
Cash Payments by Type
Employee related costs 7,127
7,127
7,127
7,127
7,127
7,127
7,127
7,127
7,127
7,127
7,127
9,371
87,774
Remuneration of councillors
1,182
1,182
1,182
1,182
1,182
1,182
1,182
1,182
1,182
1,182
1,182
1,831
14,832
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
398
Finance charges –
–
–
–
–
–
–
–
–
–
-
–
–
Bulk purchases - Electricity
–
–
–
–
–
–
–
–
–
–
-
–
–
Bulk purchases - Water & Sewer
–
–
–
–
–
–
–
–
–
–
-
–
–
Other materials 10
10
10
10
10
10
10
10
10
10
10
10
120
Contracted services 1,337
1,337
1,337
1,337
1,337
1,337
1,337
1,337
1,337
1,337
1,337
11,788
26,500
Transfers and grants - other municipalities
–
–
–
–
–
–
–
–
–
–
–
–
–
Transfers and grants - other
1,167 1,167 1,167 1,167 1,167 1,167 1,167 1,167 1,167 1,167 1,167 1,167
14,000
Other expenditure 4,081
4,081
4,081
4,081
4,081
4,081
4,081
4,081
4,081
4,081
4,081
3,824
48,712
Cash Payments by Type 14,904 14,904 14,904 14,904 14,904 14,904 14,904 14,904 14,904 14,904 14,904 27,992 191,937
Other Cash Flows/Payments by Type
Capital assets 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 5,575 48,900
Repayment of borrowing –
–
–
–
–
–
–
–
–
–
–
–
Other Cash Flows/Payments
–
–
–
–
–
–
–
–
–
–
–
–
–
Total Cash Payments by Type
18,843 18,843 18,843 18,843 18,843 18,843 18,843 18,843 18,843 18,843 18,843 33,567 240,837
NET INCREASE/(DECREASE) IN CASH HELD
48,129 (16,913)
(4,449) 48,129 (16,913) (4,449) (16,913)
(16,913) 60,594 (16,913)
(16,896)
(30,046)
16,445
Cash/cash equivalents at the month/year begin:
38,000 86,129 69,216 64,767 112,896 95,983 91,534 74,620 57,707 118,301 101,387 84,491 38,000
Cash/cash equivalents at the month/year end:
86,129 69,216 64,767 112,896
95,983 91,534 74,620 57,707 118,301
101,387 84,491 54,445 54,445
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
399
SECTION G: ANNUAL
OPERATIONAL PLAN (SDBIP)
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
400
7.1 ANNUAL OPERATIONAL PLAN (SDBIP)
The SDBIP marries the Performance Management System (as required under the Municipal Systems Act) with the budget and the IDP. Thus, the strategic direction mapped out in the IDP is matched with financial resources and delivery of services as specified in the PMS. The requirement for an SDBIP is stated in the MFMA, Section 69.3(a) and is the responsibility of the Accounting Officer or the Municipal Manager. It can of course be delegated under Section 79. Put simply the SDBIP allows the budget to be implemented fully as it identifies:
The Strategic Imperative – Through links with the IDP. The Financial Imperative – Through links with the budget. The Performance Imperative – Through links to the PMS.
The National Treasury Circular 13 describes in detail the approach to SDBIPs. Basically, there is a high level SDBIP for the purposes of high-level monitoring by stakeholders, backed by full detail all the way to the individual employee. Starting from the top (the MM), all staff operate under KPIs within the identified KPAs. In effect the SDBIP becomes the implementation tool for the budget and the basis for non-financial monitoring. At the highest level, every vote could be aligned to an IDP strategy and some KPIs. These then form the basis of future monthly and in year reporting. The state of play at iLembe is that the budget is already married to the IDP and performance indicators are developed for each vote or capital project. The SDBIP is attached.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
401
SECTION H: ORGANISATIONAL &
INDIVIDUAL PERFORMANCE
MANAGEMENT SYSTEM
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
402
H.1.1 INTRODUCTION AND BACKGROUND
Performance management is a strategic management approach that equips the Mayor, Municipal Manager, Heads of Departments, employees and stakeholders with a set of tools and techniques to regularly plan, continuously monitor, periodically measure and review the performance of the institution against indicators and targets for efficiency, effectiveness and impact. The PMS entail a framework that describes and represent how the municipality’s cycle and processes of performance planning, monitoring, measurements, review, reporting and improvement will be conducted, organized and managed. The core elements of the system are:
• Organisational PMS;
• Section 57 Performance contracts;
• Employee Performance Appraisal System;
• IT System;
• Performance Audit Committee;
• Annual Report;
• Quarterly Reports
• Public Participation and internal and external communication mechanisms. The Performance Management Framework has been developed and the PMS policy has been updated and reviewed. The Municipal Manager and Managers directly reporting to the Municipal Manager has signed the Performance Agreements.
H.1.2 PERFOMANCE MANAGEMENT POLICY STATEMENT
Both the Performance Management Framework and Policy outlined the objectives and principles of Jozini Municipality PMS. The objectives of the Jozini PMS are aligned with the IDP strategic objectives which are in section D.
H.1.3 ORGANISATIONAL PERFOMANCE MANAGEMENT SYSTEM
Performance Management involves the setting of targets, and measuring the desired outcomes and activities undertaken to attain the targets of an organization. It also involves measuring the performance of the individuals who contribute towards the achievement of the strategic vision of the organization. For a Performance Management System to be successful it is imperative that:
• Top management and the Council take ownership of the development and implementation of the OPMS.
• All stakeholders understand and are actively involved in performance management processes.
• All officials are trained and take responsibility for performance management The IDP is linked to the PMS and as well as the five national KPAs being:
• Infrastructure and Services / Basic Service Delivery
• Socio-Economic Development / Local Economic Development (LED)
• Institutional Development and Transformation
• Good Governance and Democracy / Public Participation
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
403
• Financial Viability and Management
• Cross cutting Each organizational KPA is cascaded down to a level at which it could be allocated to the department and this the specific individual Section 57 Manager who need to fulfill that functions. For each KPA, a KPI is derived in respect of each of the development priorities and objectives contained in the IDP and a performance target with a timeline for that particular function is assigned. In turn the Performance Contracts/Agreements of each Section 57 Managers enters into a Performance Contract with the municipality. The Performance Contracts are reviewed annually, in line with the requirements of that year’s strategy. The organizational scorecard for Jozini is attached.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
404
H.1.3 BACK TO BASICS
H.1.4.ANNUAL PERFOMANCE REPORT
An annual report is prepared annually and one of the issues considered during the IDP review is the issues and challenges raised in the Annual Report.
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
405
SECTION I: ANNEXURES
JOZINI MUNICIPALITY IDP | 2019/20 REVIEW
406
NO. SECTOR PLAN COMPLETED? (Y/N)
ADOPTED (Y/N)
ADOPTION DATE (IF ADOPTED)
COMMENTS
A ANNUAL 2019/2020 BUDGET Y Y 29 May 2019
B DRAFT 2019/2020 SDBIP Y N N/A
C AG ACTION PLAN Y Y 29 May 2019
D ADOPTED 2019/2020 ORGANOGRAM
Y Y 29 May 2019
E SPATIAL DEVELOPMENT FRAMEWORK (SDF)
Y Y 29 May 2019
E DISASTER MANAGEMENT SECTOR PLAN
Y Y 29 May 2019
F WARD BASED PLAN X 20 Y Y 29 May 2019
G LOCAL ECONOMIC DEVELOPMENT (LED) PLAN
Y Y 29 May 2019
H HOUSING SECTOR PLAN Y Y 29 May 2019
I SAFETY & SECURITY PLAN Y Y 29 May 2019
J ROADS & STORMWATER PLAN Y Y 29 May 2019
K ELECTRIFICATION MASTER PLAN
N N 30TH June 2020
L OPERATIONS AND MAINTENANCE PLAN
N N N/A
M INFRASTRUCTURE MASTER PLAN
N N N/A
N INTEGRATED WASTE MANAGEMENT PLAN (IWMP)
N N N/A
O INTEGRATED TRANSPORT PLAN (ITP)
N N N/A
ENQUIRIES / KEY CONTACTS:
MS. SAMKE MKHIZE: MANAGER: IDP & PMS SERVICES Department: Office of the Municipal Manager Jozini Municipality | Circle Street, Bottom Town | Jozini | 3969 | Mobile: +27 72 556 7997| Tel: +27 35 572 1292 Email: [email protected]; [email protected] Website: www.jozini.gov.za
END!!!!!