Nicolas AIMARD Journées Pétrole 2008 Atelier 5: Les conditions du captage et du stockage géologique de CO2 Le point de vue d'un pétrolier

Transcript of Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... ·...

Page 1: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

Nicolas AIMARD

Journées Pétrole 2008

Atelier 5: Les conditions du captage et du stockage géologique de CO2

Le point de vue d'un pétrolier

Page 2: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

2

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Total, oil and gas producer, is also producing CO2Total operates a daily production of more than 2,5 Bboe/d worldwideTotal supplies 2% of heating and automotive fuels used worldwideCO2 emissions to the atmosphere are about 60MtCO2 equivalent per year

Our objective is to keep strengthening our portfolio while contributing to energy efficiency and limitation of CO2 emissions

Page 3: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

3

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Beyong the current solutions to reduce greenhouse gases emissions :Existing facilities gas flaring reductionImprovement of existing and new facilities energy efficiency

Carbon Capture and Storage is considered as a breakthroughtechnology to be promoted for high CO2 emissions facilitiesSustainable development of Extra Heavy Oil (inc. mining, hot production and upgradingDevelopment of very acid gas fields (high CO2 content i.e. >10%)Large LNG facilitiesNon conventional ressources (oil shales)Large refining and petrochemical complex

Carbon Capture and Storage (CCS) is one solution to reduce our CO2 emissions from our facilities

Page 4: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

4

Journées Pétrole – Atelier CCS - Nicolas AIMARD

020406080

100120140160180200

kgCO2/bbl

Conve

ntionn

al Ligh

t 34°A

PI

Conve

ntionn

al Heav

y 24°A

PI

EHO 10-20

°API/c

old prod

uctio

n

Bitumen

8°API/S

AGD/NG

Bitumen

9,5°API/M

ining

/NG

Bitumen

8°API/S

AGD/petco

keGTL LN

G

Refining

Upgrading

Production

Targets for implementing CCS to be prioritised: high to very high CO2 content gas fields orhigh combustion CO2 emission intensity

Combustion CO2 only

Page 5: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

5

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Capture technologies are progressing and O&G producers are keen to promote technologies that are adapted to their specific needs

Large CO2 networks implementation similar to large historical oil and gas networks development

For CO2 storage, there is a significant know-how within the industry forSite characterisationDrilling and injectivity issues Reservoir simulation, monitoring techniques ....

CCS is a promising solution for the O&G industry

ButThe site qualification and integrity studies workflow and tools have to be tested on real cases and within different geological contexts (i.e. pilots)

Commercial storage will be only developped in several incremental steps

Well integrity understanding is still to be improved

Public acceptance is not granted and there is minimum geoscienceknowledge within the public

Page 6: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

6

Journées Pétrole – Atelier CCS - Nicolas AIMARD Lacq deep gas reservoir

OxygenProduction

Unit

Lacq gas production

1

Natural gas inlet

2

Lacq gas treatment plant

3

Commercial gas

4

UtilitiesBoiler oxycombustion

5

CO2

6

CO2 Transportation

7

Compression

8CO2 injection

9

CO2 storage

10

4000 m

4500 m Natural gas

Steam

Purification / CO2 dehydration

Compression

Rousse reservoir

CO2 injection

CO2 transportation

CO2 capture

Gas production

Example of Total contributionAn integrated CCS project at Lacq to start early 2009

Page 7: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

7

Journées Pétrole – Atelier CCS - Nicolas AIMARD

CO2 pilot at Lacq general objectives

Demonstrate the technical feasibility and reliability of an integrated CO2 capture, transportation, injection and storage onshore scheme for steam production at a reduced scale (1/10th of future facilities)

Design and operate a 30MWth oxycombustion boiler for CO2 capture 50% improvement of CO2 capture energy efficiency50% reduction of capture cost compared to classical post capture technologies

Develop and apply geological storage qualification methodologies, monitoring and verification techniques on a real operationnal case to prepare future larger scale long term storage projects

CO2 Capture CO2 transport and injection CO2 storage

Page 8: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

8

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Example of Extra Heavy Oil production with steam injection

Steam Generation

Infield pads

(SAGD)

Oil & Watertreatment

500 to 1000m

Min. overburden100m

~5m

500 to 1000m

Min. overburden100m

~5m

500 to 1000m

Min. overburden100m

~5m

SyntheticCrude

Upgrader(Atm. Distillation + Coker+ HDT…)

To Refineries

Residue(Bitumen, VDR,

Asphalt, Petcoke)

CO2 4–5 M tons / year

200'000 BPD

86'000 t/d

Fuel gas

Residue(Bitumen, VDR,

Asphalt, Petcoke)

Oxygen

Air

Air Separation Unit

Oxyboiler

CO2

Typical application of oxycombustion as capture technique in Extra Heavy Oil production schemes

for steam generation

Page 9: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

9

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Pilot locationTotal Exploration & Production in France

Atla

ntic

ocea

n

800

km

PARIS

LACQ

Lacq plant

Page 10: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

10

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Boiler revamping

Existing boiler revamping withCO2 recycling

40 t/h of steam 60b/450°C (30MWth) to HP steam network

in charge of boiler revamping works

Cryogenic Air Separation Unit

240t/day oxygen required

OxygenNatural GasFlue GasFeed waterProduced Steam

Blower for Flue Gas Treatment

Flue GasTreatment

Flue gas recycle Fan Stack

COOLING

WATER

MV POWER TO

MOTOR TERMINALS

LV POWER TO

SWITCHBOARD

GOX TIE-IN

Page 11: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

11

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Transportation and injection into a gas depleted reservoir

Pont d’As

Saint-Faust

Baysères

Lacq

WH50 barg

27barg

5 km

Existing right of way

City of PAU

ROUSSE-1Injection well

Typical CO2 compositionCO2: 92.0 %O2: 4.0%Ar: 3.7%N2: 0.3%

Pilot phase: 120,000 T CO2 injected for 2 years85,000 Sm3/d

Page 12: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

12

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Capture facilities within Lacq existing utilities plant

Page 13: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

13

Journées Pétrole – Atelier CCS - Nicolas AIMARD

CO2 injection into Rousse depleted gas reservoir

Existing unique well RSE-1 producing since 1972Well work over planned summer 2008

Jurassic fractureddolomitic reservoir(in red)

Thick cap rock (in green and orange)

Depth # 4500m/MSLTemp. # 150°CInitial P = 485 bargCurrent P # 30 bargInitial CO2 = 4,6%Initial H2S < 1%No aquifer

Injection well

Tertiary

Upper Cretaceous

Low Cretaceous

Rousse depleted gas field

Pyrenean compressive

phase

Pre-Pyrenean Extensive

phase

S N

Page 14: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

14

Journées Pétrole – Atelier CCS - Nicolas AIMARD

CO2 Monitoring planInjection phase

• Flowrate & composition of injected gas

• P and T borehole and reservoir pressure (optical fibre)

• Microseismic monitoring of reservoir andcaprock

• baseline before injection

• Gas migration at the surface : • soil gas survey (baseline before injection)

• surface detectors on well pad

• Aquifer sampling

Post injection phase

• P and T bottom hole and reservoir pressure

• Microseismic monitoring of reservoir andcaprock

• Gas migration at the surface

• Aquifer sampling

Page 15: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

15

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Public consultation and dialogue requiredObjectives:

Share the opportunity of having such project in Lacq area and provide technical information of the Lacq pilot itselfProvide a better understanding of CCS technology context, issues and therefore promote the CCS technology deploymentHave all questions raised to propose answers at different stepsProvide information on short and longer term scientific follow up(dedicated scientific committee appointed with external experts) and monitoringHelp identifying project possible contribution to local socio-economic developmentDemonstrate transparency and provide access to relevant information

Total's approachOpen dialogue with all stakeholders upstream permitting processSeveral public meetings open to public in 2007Transparency and access to detailed informationLocal follow up committee with stakeholders during construction,injection and monitoring phase

Page 16: Journées Pétrole 2008 - Ecritel Groupjdp.ecritel.net/Presentations/documents/Atelier_5/1_N... · 2008-11-18 · Sustainable development of Extra Heavy Oil (inc. mining, hot production

16

Journées Pétrole – Atelier CCS - Nicolas AIMARD

Project schedule – main milestones

Project information also available on

www.total.com/corporate-social-responsibility

2006 2007 2008 2009 2010 2011Site screening and conceptual studies

Basic engineering studies

Detailed engineering and procurement

Construction works

Well work over

Injection

Base line surveys and monitoring