Name: Haris Aziz
Reg No: MBA 103007
Subject: Operation Management
Section: MGT5083 (S2)
Why was the QR approach significant in improving the company supply
chain performance?
Implementation of a Quick Response (QR) system improves the performance of the supply
chain and thus reflects positively on sales of the company. Various initiatives were
undertaken by the supply chain team at Jossey Menswear and their manufacturing plant to
implement Quick Response (QR) ideas. To test the efficiency of the new idea, a set of
performance measures were introduced. The Quick Response (QR) approach improves the
manufacturing of the jacket and trouser assembly in the plant, payment system and supply
chain performance. Individuals were moved towards team working system. 30 per cent of
factory assembly was moved to QR, leaving the rest as conventional manufacturing.
Do you think the Cornwall plant’s approaches to introducing QR ideas
were appropriate?
Yes, as Connwall plant is a main profit centre of Jossey menswear. Its production rises from
1200 suit equivalents (SE) to 1900 suit equivalents (SE) per week. In order to introduce the
QR in the Cornwall plant, an experienced operation manager Frank Hawkins was moved to
an advisory role in the plant. The QR approach help the plant in improving limited factory
space, a rigid payment system, limited skills flexibility and specialist machinery. The plant
factory floor was move from traditional “individual operator” based training to “team”
working. 30 percent of the factory resources assembly was converted to quick response (QR).
Two QR teams were made, one for the jacket assembly and other for the trouser assembly.
The teams increased the proportion of trousers being made under quick response conditions
from 35–40 per cent of production, and increase the proportion of jackets from 30–35 per
cent in July 2000. Seeing from the above facts the introducing QR ideas in Cornwall plants
did well as the production of the plant have increases.
1 | P a g e
Which of the possible future actions identified by the supply chain team do
you think worth pursuing and why?
The possible future action identified by the supply chain team which I think is worth pursuing
is “exploring ways of choosing even more flexible cloth” because with perfect information on
market tends the supply chain team would always be limited by the availability of the cloths.
Cloths are the main product in which Jossey Menswear deals in. As the supply chain project
teams increases the awareness among the designers, their performance will also increase the
performance of the factory. This can also be done by getting the whole team aligned to the
single chain goal for improving full price sales.