Matt Mettler, P.E.DOWL HKM
![Page 2: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/2.jpg)
Isolation Joints Construction Joints Contraction Joints Expansion Joints
![Page 3: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/3.jpg)
Doweled Tied Keyed Tooled Insert (zip strips) Butt Joints
![Page 4: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/4.jpg)
Type of control joint Allows for drying shrinkage and other
movements Provides no vertical or horizontal restraint May act as an expansion joint if needed
![Page 5: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/5.jpg)
![Page 6: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/6.jpg)
Can be constructed of multiple types of joints: Doweled Tied Keyed Butt Joint
Are spaced and or located to facilitate construction Concrete quantity limitation Sequencing of construction tasks
![Page 7: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/7.jpg)
![Page 8: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/8.jpg)
Also known as control joints Controls cracking due to drying shrinkage May be constructed from a variety of
methods: Hand tooled Saw Cut (my preference) Inserts
![Page 9: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/9.jpg)
![Page 10: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/10.jpg)
Used primarily in exterior conditions Can be doweled but not keyed or tied Allows for un-restrained movements due to
temperature gradients Can be sealed
![Page 11: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/11.jpg)
![Page 12: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/12.jpg)
Function of concrete thickness, coarse aggregate size and concrete slump
PCA recommends the joint spacing be 2 to 3 times (in feet) the concrete thickness (inches) Example: a 5 inch slab would have joints
spaced 10 to 15 feet It is good practice to maintain a square
shape in so much as practical
![Page 13: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/13.jpg)
Slab Slump, 4 to 6 inches SlumpThicknessMCA<3/4" MCA>3/4" < 4"
(in.) (ft.) (ft.) (ft.)5 10 13 156 12 15 187 14 18 218 16 20 249 18 23 2710 20 25 30
![Page 14: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/14.jpg)
Structure geometry and other elements such as interior walls, columns and piers may dictate layout.
![Page 15: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/15.jpg)
Contraction joints: Should be doweled or tied Saw cut floors Formed with chamfer strips for walls Try to maintain a square shape between joints May need waterstop and or joint sealant
Construction joints: Should be doweled or tied and keyed Use chamfer strips for adequate consolidation May need special attention regarding drainage because
of hydraulic loading.
![Page 16: Joints in Concrete Construction](https://reader035.fdocuments.us/reader035/viewer/2022081415/56815cbc550346895dcabbf0/html5/thumbnails/16.jpg)
Bureau of Reclamation, “Concrete Manual,” 8th Edition Revised, 1981
Ringo & Anderson, “Designing Floor Slabs on Grade,” 1992
Spears & Panarese, Concrete Floors on Ground, EB075.2D, Portland Cement Association, Skokie, IL, second edition 1983; revised 1990.
Young & Paxson, Undermining of Spillway Chutes, Safety of Dams Conference, Seattle, WA, Fall 2010.