Joint Exchange / Interop Work Group Test Workgroup
Joe Lamy/Judith Hutman/Eric Heflin/John DonnellySept 26, 2012
![Page 2: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/2.jpg)
Roll
2
Name Organization RepresentationNick VanDuyne NYeC StateIvan Handler ILJohn Donnelly NJ Task Group Co-Chair - IWGMarty Prahl SSA
Federal agencyDennis Peterson, Curtus Browning, Elaine Hunolt, Taimur Aslam, Willie Singletary, Monica VanDyke VHA
Kevin Brady NIST NISTDavid Tao, Dan Huber Siemens
EHR VendorDave Cassel, Rob Klootwyk Epic Bill Howard, Charles Parisot GEJeff Cunningham, Tim Dunnington ICA
HIE vendor
Mike LaRocca Intersystems
Vladi Reznikov, Jennifer Puyenbroek CONNECT PMO
Matt Bell, Tom Wilson, Kathy Lin AxolotlTeddy Gedamu MedfxMelissa Owens Marshfield Clinic Health SystemSteve Leighty MedVirginia
Regional HIE Brian Bonnington, Dave Trepanier, Dave Smith, Steve Michael IHIE
Anuj Desai Interop WG Interop WGEric Heflin THSA Task Group Co-Chair - ExchangeMariann Yeager Exchange Exchange Ed O'Connor, Judith Hutman Nitor ONC Testing Contractor
Dennis Wilson, Alisa Ray, Sue Rieber CCHIT
ATCBs and Testing SMEs
Jim St. Clair IHE USA
Amit Trivedi, Kevin Brown, Michella Knighton ICSA Labs
Traci Mapps SLI Global SolutionsKyle Meadors, Timothy Bennett Drummond Group
Milton Padilla, Steve Wilson, Mark Shin, Doublas Biggs, Les Biggs InfoGuard
![Page 3: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/3.jpg)
• Roll Call – Cayla
• Announcements – John
• Pilot Results Review – Eric
• Direct Optionality Discussion – Joe/John
• Direct Cert Discovery Review/Head’s Up – Joe/David
• Open Discussion on Direct Optionality & Test Cases - All
• Wrap Up/Schedule Review - John
Agenda
3
![Page 4: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/4.jpg)
Announcements
Eric Heflin
![Page 5: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/5.jpg)
• Harmonized PD/QD/RD/MP/AF (aka Patient Record Lookup) Tests Were Ratified a few weeks back• http://exchange-iwg.wikispaces.com/Test+Artifacts+Harmonization
• Pilot is complete (just for the pre-pilot process!)
• Received good feedback on the checklist and overall process and limited feedback on test cases
Announcements
5
![Page 6: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/6.jpg)
Pilot Results
Eric Heflin
![Page 7: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/7.jpg)
Basic Tests Coverage
7
![Page 8: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/8.jpg)
All Tests Coverage
8
![Page 9: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/9.jpg)
BIG THANKS to Pilot Participants! Send your Logo/Text for the Healtheway web site!
![Page 10: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/10.jpg)
Direct Optionality Discussion
Joe Lamy / John Donnelly
![Page 11: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/11.jpg)
• Encoding
• Content types
• Signature algorithms (level of encryption)
• Use of XDM zip files
• XD* (conversion)
• Optional additional wrapping of internal message (RFC822)
• Possible Approaches• Establish a base?
• Require more robust capabilities for receiver and strict for sender?
• Other?
Optional Direct Features
11
![Page 12: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/12.jpg)
Direct Cert Discovery Test Package Walk-thru
Joe Lamy / David DeGroot
![Page 13: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/13.jpg)
‘round-the-room
• Will it be viable for Direct tests to have the approach of “send strictly and accept broadly”
• Overall thoughts about the Direct test cases approach just demo’ed
![Page 14: Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032708/56649e695503460f94b6685e/html5/thumbnails/14.jpg)
•RFP released — July 2nd
•Questions received by 6 organizations
•Answers distributed — July 13th
•Bids due — July 20th
•Evaluating
•Expected award — “Any day now”
•Contract start — TBD
Schedule Review
14
We are here (running late)