Joint coordination meeting for the PS complex13th February 2020
David Hay on behalf of all contributors, ATC’s & WSS’s
Master Schedule Version 2.2 (NEW)
Week 7
2
20
18
PSB Linear Schedule Baseline-1
20
19
20
20
BHP TE-EPC power
converter installationInjection and ejection
lines1L1 H- injection
5L1, 7L1 and 13L1 Finemet
testing
3
PSB Linear Schedule Broken line
4
Scraper installation scheduled from week 11
B.361 BHP (transfer lines) D.C cabling campaign
5
• D.C cabling campaign terminates end of this week WIC rack
installed.
• EN-EL general services consolidation weeks 8 & 9
• SMB Painting weeks 10 & 11 in agreement with TE-EPC
Ongoing
TE-EPC Injection BSW’s Power Converters
6
• Installation of the 3 remaining BSW power converters in the BAT
Ongoing
TE-ABT BiDIS10 installation.
7
• Racks installed.
• Cabling of the PFN’s ongoing
SMB works
8
BAT
BOR
BCER
• BAT painting to start week 8 (Ceiling).
• BRF2 hand rail modifications.
PSB Cooling and Chilled Water – B237 Platform (EN-CV)
9
• B289 SMB works ongoing, no further leaks found
• Other SMB contributions scheduled (penetrations, B289 door, drain connection, final cons.)
• CV commissioning with water ongoing.
• Pumps aligned; cooling pumps started; constant pump operation foreseen from Friday (wk7);
• Cooling towers filled, started;
• B361 tunnel pressure test: 12/02/2020 at 17h00
• Items for flushing procured, installation after conclusive pressure tests
Courtesy of M. Nonis
PSB Cooling circuit consolidation EN-CV
10Courtesy of M. Nonis
Dechets KFA20 BCER
EN-STI Absorber/scraper installation edms 1969773
11
In Preparation
Dummy chambers installed
Remplacement gaine alimentation pont roulant PR284
Ongoing
12
EN-EL to remove light fittingsScaffold removal 21st Feb week 8
SMB PSB machine cleaning campaign
13
• Machine cleaning campaign shall start on Monday 24th February until 28th
February.
• Objects such as screws, bolts and other machine equipment parts lying around
will be bagged and left locally for either installation or eventual removal by the
equipment owners.
• Please prepare in advance and remove all materials that you want to keep or
install.
BHZ 15L1 stairs
14
We need to install the stairs ASAP in order to access the inj/ejec areas
EN-EL electrical distribution board removed
15
TE-VSC Vac chambers 11L1 installed
16
TE-ABT stripping foil installation 1L1
17
Caillebotis reinstalled Modif.. Angled wall support needed BSW Tx’s polarity changed
BI line TE-EPC transformers
18
1. SMH10 pulse transformers
• Cabling campaign should terminate Friday 14th February
• DCCT cables to test.
• TE-EPC can connect there cables on Monday 17th February.
• Reinstall the 15L1 stairs thereafter.
BR/BE.BTV
19
Completed
BI Line
BP
M2
0
BC
T1
0
DV
T3
0
BT
V2
0
QN
O3
0
BP
M3
0
QN
O4
0
BD
iS1
0
MB
L1
0D
VT
40
11/07/2019 TE-VSC
TE-VSC 11/07/2019
Installed
Installed
1. Linac4/PSB vac chamber installed and flange welded.
2. Beam pipe protection platform installed. Shielding blocks removal for BI line
survey
3. Scaffold for the cabling team.. To be removed end of week 7
20
Ongoing
1 2
BT-Line
21
BT Line
22
• Shielding blocks PS/PSB to be reinstalled.
When?
EN-SMM PSB survey & ring measurement campaignsOngoing
23
• BT-Line.
Both BVT10’s & BT.BPM.00 aligned.
BE.BTV.15L1 aligned.
SMV.10 aligned
Smoothing campaign to start 13th February week 7
BT Line BT1/4.BVT10 and BT2/3.DVT10
24
Connected and aligned
Completed
BT Line KFA10 preparations
25
• Cable connections in preparation.
Ongoing
BT Line KFA20 preparationsOngoing
BT.D
VT
50
BT.V
PG
22
BT.K
FA
20
BT.Q
NO
40
BT.Q
NO
50
BT.B
HZ
10
BT.B
PM
30
BT.B
CT
10
BT.D
VT
60
26
• 3rd KFA20 magnet measurements tests took place on 10th February 2020
https://indico.cern.ch/event/886373/
• VSC to prepare early next week (connect, pump & leak test).
• BE-BI to prepare the BTV modifications ahead of the 24th of January.
• Vacuum closed, leak testing ongoing
27
15 collars ready for installation in vacuum sector
BR10 in readiness for the BE.SMH bakeout. https://edms.cern.ch/document/1355024/2.0.
RF bypass clamps Ongoing
Port des EPI!
28
Augmentation du nombre de personnes sans EPI
dans les machines!
• Faites un rappel à vos équipes
• Les infractions seront reportées aux DSOs pour
application de la procédure EDMS 1290224
LS2 Machine Activities
Vers PS
Extraction line BTP: (Ref: PS&TT2 coordination)
• Modification of the beam instrumentations
• New beam position monitor
• New beam loss monitors
• Change the quadrupoles
Injection line BI:
• New Injection bending (BHZ INJ)
• New Distributor (BI.DIS10)
• New Septa (BI.SMV10)
• Relocate beam instrumentation (BI.BTV30/40)
• Change of the magnets (BVTs, correctors)
• New BPMs
• New beam loss monitors
• New RF bypasses
• New Absorber/Scraper (8L4)
New PSB Injection Region
• Remove the current sector (1L1)
• New H- charge exchange injection systems• Replace extraction kicker
(BEr.KFA14L1)
• New Wire Scanner x4 (11L1)
• New vacuum window on BTM line
before the PSB Dump
• Replace RF cavities with
new finemet cavities
(BRr.C16 5L1, BR2.C02
7L1 & BR4.C02 5L1,
BRr.C04 13L1)
• Remove RF cavities (BR1.C02 10L1 & BR3.C02 10L1)
• Remove prototype finemet cavities
(BR4.ACWF 6L1)
• Install cooling water circuits 5,6,7
• New Wire Scanner x3 (4L1)
• Warm interlock control (WIC) and
beam interlock system (BIS)
deployment
• Consolidation of the B-train
• Replacement of ion pumps and
pumping groups
• Change the beam stopper (BTP.STP10)
• Upgrade magnets (quadrupoles) and add new corrector magnets
• Replace kicker
magnets (16L4, 2L1)
• Change the bending magnets (BT.BHZ10, BTM.BHZ10)
• Replace bending magnets (INJ
BHZ162, EXT BHZ151) & BTV15L1
All around the machine:
• Laminated side plate on bending (BHZ MAIN)
• Parallel shunt resistors on quadrupoles (QDE,
QFO) and bending (BHZ MAIN) magnets (to
be confirmed)
• Cooling water pressure rating upgrade
LIU
Consolidation
Extraction line BT:
• New extraction bending (BHZ EXT)
• New septum (BT.SMV10 and BT.SMV20)
• Relocate beam instrumentations (BT.BTV10)
• New kicker (BT.KFA10), Modify BT.KFA20
• Replace kicker KSW (16L4, 2L1)
• Change the magnets (BT.BVT10, BT.BVT20, BT.DVT10,
quadrupoles)
• New beam loss monitors & BTV10 & 20
29PS Booster LS2 schedule - David Hay
EN-ACE
EDMS 1890556
LS2 Surface Activities
• New crates for the low level
RF (BOR)
Install new BI. DIS10 PFN’s
• Complete the metallic infrastructure for
new layout of racks (BRF2)
New power converters
• Injection stripping foil chicane
• Finemet cavities 5L1 (BRF2)
• Consolidation of the cooling plant
• Consolidation of the chilled water cooling plant
• Refurbishment of the low voltage distribution system
• Upgrade the transverse feedback system
• New BIS, WIC interlock systems
• Cabling & Decabling
New power converters
• Injection stripping foil chicane Bix.BSW
• Complete the metallic infrastructure for new
layout of racks (BRF1)
• Finemet cavities 13L1 & 7L1 (BRF1)
• Finemet cavities 7L1.
New PSB Inj power converters
• Injection QSTRIP
• Injection Correctors
• Injection Quadrupoles
• Injection Septa BI.SMV10
• RF Finemet cooling
water circuits.
LIU
Consolidation
30PS Booster LS2 schedule - David Hay
EN-ACE
EDMS 1890556