Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 3: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 4: John little, whiskey and flow

Flow numbers at the bar

Page 5: John little, whiskey and flow

WIP

• The number of bottles in the bar. Bottles

that have been opened, but not yet

empty.

Page 6: John little, whiskey and flow

Lead time

• The time between the bottle is added to

the bar and the bottle comes out of the

bar (empty).

Page 7: John little, whiskey and flow

Cycle time

• The time between two successive empty

bottles leaving the bar

Page 8: John little, whiskey and flow

Throughput

• The rate at which bottles are passing through

the bar.

Page 9: John little, whiskey and flow

Batch size

• The size of the bottles.

Page 10: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 11: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 12: John little, whiskey and flow

Flow numbers at the Kanban board

Page 13: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

Page 14: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

WIP

Page 15: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

Lead Time

10 10Day 1Day 6

Page 16: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

Day 1Day 1

Cycle time

Day 2

Day 3Day 3

Page 17: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

AmyThroughput

Page 18: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

475

112

John

Suzy

Paul

Amy

Batch size

Page 19: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 20: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 21: John little, whiskey and flow

Little’s Law

Page 22: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

WIP

Page 23: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

WIP

ThroughputDemand

Page 24: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

WIP

Lead Time

Page 25: John little, whiskey and flow

Doing DoneTo Do

10

5

9

3118

17

21

4

75

112

John

Suzy

Paul

Amy

WIP

Lead Time

# WIP is proportional to average lead time

Page 26: John little, whiskey and flow

“The average number of work

items in a stable system is equal

to their average completion rate,

multiplied by their average time

in the system.”

John Little, 1961

Page 27: John little, whiskey and flow

WIP = Throughput x Lead time

Page 28: John little, whiskey and flow

The numbers at my bar

• My bar has 12 bottles of whiskey

• I finish an average of 6 bottles per year

• What is the average lead time for a bottle of

whiskey?

Page 29: John little, whiskey and flow

?

Page 30: John little, whiskey and flow

WIP = Throughput x Lead time

12 b= 6 b / year x Lead time

Lead time = 2 years

Page 31: John little, whiskey and flow

Cycle time is the inverse of

Throughput

Page 32: John little, whiskey and flow

WIP = Throughput x Lead time

<=>

Lead Time = WIP x Cycle Time

Page 33: John little, whiskey and flow

Lead Time = WIP x Cycle Time

2 years = 12 b x Cycle time

Page 34: John little, whiskey and flow

Cycle time = 1 year / 6 b

Page 35: John little, whiskey and flow

Converting to months…

Page 36: John little, whiskey and flow

Cycle time = 2 months / 1 b

Page 37: John little, whiskey and flow

In average, I finish a bottle every

2 months

Page 38: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 39: John little, whiskey and flow

Agenda

• Flow numbers at the bar

• Flow numbers at the Kanban board

• Little’s Law

• Q&A

Page 40: John little, whiskey and flow

Questions to the audience

• What happens if my bar size reduces by half?

• What if I only buy small bottles (half size)?

• What if I double my drinking average?

• Q&A

Page 41: John little, whiskey and flow

John Little,

whiskey and flow

Paulo Caroli Agile Coach

[email protected]: @paulocaroli

Page 42: John little, whiskey and flow

Thank you!

Questions?

feedback please: @paulocaroli

www.KanbanAndBeyond.com

Paulo Caroli Agile Coach

[email protected]: @paulocaroli