John Arthur

Photon Systems Status [email protected]

April 16, 2007 1

LCLS Photon Systems Status

• Technical status and accomplishments• Response to FY2007 continuing resolution• LCLS/LUSI coordination

John Arthur

LCLS Photon Systems Manager

John Arthur

Photon Systems Status [email protected]

April 16, 2007 2

Recommendations from Oct 2006

Put effort into design of critical x-ray optics components (mirrors and thin crystals)

Make LCLS Photon Systems and LUSI work together to optimize designs and commissioning plans

Putting both recommendations into practice

John Arthur

Photon Systems Status [email protected]

April 16, 2007 3

XTOD Status

Still in advanced design phaseNearly all components at least through conceptual review

Staying on schedule

About to start major procurementsHardware installation can start 11-07

LLNL team is working well with SLAC

John Arthur

Photon Systems Status [email protected]

April 16, 2007 4

XTOD design for attenuators and x-ray intensity monitors

4.5 meter long, gas attenuator

high pressure N2 section

Embedded (Be) solid

attenuators

Upstream embedded gas detector

Downstream embedded gas

detector

John Arthur

Photon Systems Status [email protected]

April 16, 2007 5

LLNL Zygo 20× images of Si test substrates by two

vendors

0.37 mm

vendor 2, loc. 1 vendor 1, loc. 1

0.37 mm

LLNL full-aperture interferometry images of Si test substrates by two vendors

Vendor 1

Vendor 2

XTOD working with x-ray mirror vendors

John Arthur

Photon Systems Status [email protected]

April 16, 2007 6

Effects of 2007 CR on XTOD

Procurements and some design effort were delayed

New plan was developedCommissioning optics in FEE ready for first lightBeam transport to NEH ready by late FY2008All work on Tunnel and FEH delayed until FY2009All work finished by early FY2010

John Arthur

Photon Systems Status [email protected]

April 16, 2007 7

XES Status

In design phaseAMO instrument design going well

2-d detector development going well

Controls area was behind, catching up

Working with Radiation Physics on PPS items

Ready for installation starting 11-07

John Arthur

Photon Systems Status [email protected]

April 16, 2007 8

Concept for AMO Instrument

Focusing optics

Experimental chamber

Diagnostics chamber

John Arthur

Photon Systems Status [email protected]

April 16, 2007 9

E l e c t r o n

D u m p

F E E

H u t c h 1 H u t c h 2 H u t c h 3

X - R a y T u n n e l

H u t c h 4

H u t c h 5

H u t c h 6

S 0

S 1

S 2

S H 1

M 1 S

M 2 S

M 3 / 4 S

X 3 X 4

M 6

S 3

S H 2

S 4

S 5

S 6

H o r i z o n t a l

O f f s e t M i r r o r s

P P S S t o p p e r S e t

X - R a y M i r r o r

X - R a y C r y s t a l

P r i m a r y M o v a b l e

E l e m e n t s

E x p e r i m e n t

N e a r E x p e r i m e n t a l H a l l

F a r E x p e r i m e n t a l H a l l

M o v e a b l e D u m p

X P C S

P o s 2

X P C S

P o s 1

C X I

HE D

X P P

P o s 1

X P P

P o s 2

AM

O

S

X

P

S X P

X-ray shutter and mirror layoutFrom the LCLS operating modes Physics Requirements Doc

John Arthur

Photon Systems Status [email protected]

April 16, 2007 10

Effects of 2007 CR on XES

Some design effort was delayed

New plan was developedSafety and controls work in NEH ready late FY2008First-stage AMO instrument ready late FY2008Work in FEH delayed until FY2009Some AMO instrumentation delayed until FY2009All work finished by early FY2010

John Arthur

Photon Systems Status [email protected]

April 16, 2007 11

LUSI-LCLS Integration Working Group

Define the interface between LCLS and LUSI

Resolve issues overlapping this interfaceFormalize with Interface Control Documents

Find common solutions to common problemsExperimental instrumentation, diagnostics

Standardization where appropriate

The Working Group was created by Keith Hodgson and John Galayda to:

John Arthur

Photon Systems Status [email protected]

April 16, 2007 12

Jerry Hastings (LUSI)John Arthur (LCLS)

Yiping Feng (LUSI instrument scientist, controls)David Fritz (LUSI instrument scientist, diagnostics)Stefan Moeller (LCLS Endstation Systems Manager)Hal Tompkins (LCLS x-ray installation, commissioning)

Other LCLS/LUSI staff as needed

Co-chairs

Working Group Members

John Arthur

Photon Systems Status [email protected]

April 16, 2007 13

Issues before the Working Group

Experimental data flow and interface standards

Vacuum hardware and controls standards

Conventional facilities/hutches

Installation/commissioning

John Arthur

Photon Systems Status [email protected]

April 16, 2007 14

Summary

XTOD and XES are still in design phase, though XTOD is

moving into procurement and XES will follow soon

FY2007 continuing resolution forced some delays,

extension of project

Technical issues are being resolved with no big problems

Should be ready for installation starting 11-07

FEE, NEH ready in FY2009, FEH ready in FY2010

Coordination with LUSI is going well, has been formalized