Transcript of Joe Foutz November 15, 2012 NC DAQ Charlotte, NC Mooresville Regional Office.
MACT – Subpart ZZZZ (4Z)
Reciprocating Internal Combustion Engines (R.I.C.E.)
EPA Enforcement Workshop
Joe Foutz November 15, 2012NC DAQ Charlotte, NCMooresville Regional Office
MACT – Subpart ZZZZ (4Z)
If you have a …..
Stationary Reciprocating Internal Combustion
Engine (R.I.C.E.)
You’re Subject !!
MACT – Subpart ZZZZ (4Z)
Compliance Date
Existing CI at Area Source May 3, 2013
Existing SI at Area Source October 19, 2013
NC – Engine Population (with an Air Permit)
Estimated Number of Existing Engines Potentially Subject to 4Z
Engine Type Size Number of Engines at Permitted Facilities
Percent of Engines Located at Area Sources
Existing Non-Emergency Engines
Compression Ignition (CI)
> 300 hp 344 82% ≤ 300 hp 606 58%
Spark Ignition (SI)
> 500 hp 64 31% ≤ 500 hp 67 54%
Existing Emergency and Other Engines
all sizes 1,423 52%
Grand Total
2,504 57%
MRO – Engine Population
TOTAL Engines 336
CI Engines at Area Source w/ Emission Limit 42
CI Emergency at Area Source 86
SI Emergency at Area Source 24
New Emergency at Area Source 73
New Non-Emerg. at Area Source 28
Emergency Major Source 47
Assorted Others 36
Emission Limits
Area Source – Non Emergency- Existing CI (Table 2d)
- 300 < HP ≤ 500 : CO conc. of 49 ppmvd or 70% CO reduction
- 500 < HP : CO conc. of 23 ppmvd or 70% CO reduction
- Existing SI (Table 2d) - 500 < 4SRB : formald. conc. of 2.7 ppmvd or
76% formald. reduction - 500 < 4SLB : CO conc. of 47 ppmvd or 93 % CO
reduction
*stack test conducted at any load (40 CFR 63.6620(i)). However, pressure
drop cannot change by more than 2 inches of water at 100 % load from the
pressure drop recorded at initial performance testing (Table 2b)
Table 3 for Subsequent Stack Testing
Emission Limits
Major Source – Non Emergency- 500 < Existing or New 4SRB (Table 1a)
- 500 < New 2SLB, CI (Table 2a) - 250 ≤ New 4SLB (Table 2a)- 100 ≤ Existing CI (Table 2c)- 100 ≤ Existing 2SLB, 4SLB, 4SRB ≤ 500 HP (Table 2c)- 100 ≤ Existing Landfill Gas ≤ 500 (Table 2c)
*Stack test at 100 % of load +/- 10% for engines greater than 500 HP (40 CFR 63.6610(d)(5))
Table 3 for Subsequent Stack Testing
Stack Test Process• Submit Stack Test Protocol to NC DAQ 45
days prior to test Stationary Source Compliance Branch (SSCB) will
review and approve• Notify Regional Office 15 days prior to test
Difficult for Peak Shavers
• Regional Office may observe the stack test• Submit Stack Test Report/Results within 30
days to SSCB via Regional Office.
Non-Permitted Facilities
• Must Comply with MACT 4Z
• No Compliance Inspections
• Complaint Oriented Inspections Only
QuestionsContact : Joe Foutz
OrYour Regional Office
Asheville RO Mooresville RO Raleigh RO828.296.4500 704.663.1699 919.791.4200
Fayetteville RO Washington RO Wilmington RO910.433.3300 252.946.6481 910.796.7215
Winston-Salem RO336.771.5000