Job Performance Requirement 10-24
4
Job Performance Requirement 10- 24 Advancing the Triple-Layer Load
-
Upload
eugenia-norris -
Category
Documents
-
view
31 -
download
1
description
Job Performance Requirement 10-24. Advancing the Triple-Layer Load. A Grab the layer with the nozzle and place it on the shoulder. JPR 10-24A. B Pull the layers out of the slot, or another firefighter can grab the next layer. JPR 10-24B. C Stretch the hose to the fire. - PowerPoint PPT Presentation