    Project Name

    Title

    JK Cement

    Permit

    Version

    Document ID

    1.0s

    JK_BBP_PM_BP_0900_V1.0 

     Author Akhilesh Kumar Singh 

    Reviewed By XXXXXXX XXXXX

    Date 01.11.2012

    T r a n s f o r m i n g E n t e r p r i s e s

    Consulting

  • 8/17/2019 JK_BBP_PM_BP_0900

    2/5

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 2 of 5

    IMPLEMENTATION_BLUE PRINT

    Business Process Details

    ModulePlant Maintenance

    Process Permit Sub Process /No

    Permit JK_BBP_PM_BP_080

    0

    Description Permit 

    SrNo

    Business Process Explanation

    1.1 As Is Process General Explanation

    1.2 Explanation of Proposed Process

    Permits in Maintenance represent a regulation or condition that must be observed andfulfilled when maintenance work is performed (either before starting of the job or at thecompletion of the job) on a technical object.

    Permits can be assigned to the following objects:

      Equipment  Functional locations  Maintenance and service orders

    If permits are assigned to Equipment or Functional location master records then they canbe automatically assigned to Maintenance order created for the Equipments orFunctional Locations which have permits assigned in their master records. Otherwisepermit can be assigned manually to Maintenance order by the order processor at the

    time of creation, according to the technical requirements of the job.

    There are two point of times when permit process can be activated in maintenance orderprocessing

    1. At the time of Order release, if permit condition should be fulfilled before startingthe maintenance job

    2. At the time of Order technical completion (TECO), If permit condition should befulfilled before completing the maintenance job

    When permits are assigned to order, they have to be issued by concerned authority (e.g.,

    Safety department or Maint. incharge of the concerned area) after confirming that all the

  • 8/17/2019 JK_BBP_PM_BP_0900

    3/5

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 3 of 5

    conditions of permit meet at the job site, otherwise order release or TECO will berejected by the system.

    When required permit(s) are not issued for the order then system can behave in twomanners depending upon the system configuration:

    1) it will give warning message, but you can go ahead with order release or TECO2) it will give error message, the release and TECO will be rejected by the system

    until the issue of required permit(s) in the system.

    Notification

     A permit can also be blocked for usage, temporarily, if required.

     A permit master record contains following fields:

    Permit number/code, permit descriptionPermit categoryPermit activation condition: Order Release or Completion and Warning/error messagePermit block (indicator)Permit not modifiable (indicator)

    Naming and numbering conventions:

    Permit code/number: 10 characters maximum

    Maintenance plan

    OrderCreatio

    n

    OrderPlannin

    g

    OrderRelease

    OrderComplet

    ionConfirm

     

    OrderConfirmati

    on

    Permit

    Permit

    History/ Analysis 

  • 8/17/2019 JK_BBP_PM_BP_0900

    4/5

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 4 of 5

    Permit description: 30 characters maximum

    Permit categories:

    Following permit categories will be maintained for JK cement Division.

    W Work Permits

    S Safety PermitsPermits:

    Following permits will be maintained for JK cement Division.

    Permits can be issued, cancelled, reissued.

    If the outside party is involved then the person under whose guidance the work isbeing done will get the permit issued.

    Release of permit can have control on release of order.

    Permits can be printed.

    Permit Permit

    description

    Cat.Usage

    HEIGHT Working atheight

    W Working at height

    SPACE Working atConfined space

    S Working at Confined space

    COLD/HOT Work forCold/Hot Jobs

    S Work for Cold/Hot Jobs

    1.3 Special Organizational Considerations

      Shift engineer or order creator has to identify and assign a permit to themaintenance order during order creation.

      Maintenance order will not be released hence job can not be started withoutissuing of required permit (assigned to order), by the authorized person.

  • 8/17/2019 JK_BBP_PM_BP_0900

    5/5

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 5 of 5

    Sr No Topics

    3.1 Changes Management IssuesNot Applicable.

    3.2 Description of Improvements

      A system for personnel and technical systems safety will be established duringmaintenance job execution.

      Safety related responsibilities will be defined in JK cement Divisionmaintenance departments by defining responsible persons for issuing differentpermits.

      Legal and ISO related requirements will be fulfilled.

    Sr

    No

    Topics

    4.1 Interface / Enhancements considerations

    Not Applicable4.2 Reporting considerations

    Standard SAP Reports (IPM2, IPM3), for printing of permits, ABAP development willbe required.

    4.3 Authorization considerations

     As per organizational needs, not finalized yet. Authorization matrix is being preparedseparately.

    Business Process Signoff

    ModulePlant Maintenance 

    Process Permit 

    Sub Process /No

    Permit JK_BBP_PM_BP_080

    0

    Description Permit 

    SrNo

    Gap Analysis

    2.1 Gap Identified in proposed solution against Requirements & Expectations

    Not applicable

    2.2 Impact of Requirement 

    Not applicable

    2.3 Solution Proposed 

    Not applicable