Jja st. james presentation

59
St. James Episcopal May 10, 2011

description

A presentation on the new John James Audubon Bridge, the longest cable-stayed bridge in the Western Hemisphere, crossing the Mississippi River in south-central Louisiana

Transcript of Jja st. james presentation

Page 1: Jja st. james presentation

St. James EpiscopalMay 10, 2011

Page 2: Jja st. james presentation

Bill Grass, JJA SpokespersonLouisiana TIMED Managers

Page 3: Jja st. james presentation

Louisiana TIMED Program• Created by Act 16 of the

1989 Louisiana legislature & voted for by the people

• Largest transportation program in state history

• Sixteen specific projects across the state

• Designed to stimulate economic development

Page 4: Jja st. james presentation

Louisiana TIMED Managers

• Hired in 2002 by Louisiana Department of Transportation and Development to accelerate the TIMED program

• Joint venture– Parsons Brinckerhoff– GEC, Inc.– The LPA Group, Inc.

Page 5: Jja st. james presentation

John James Audubon Bridge Project

• One of the TIMED program’s 16 projects

• Contractor is Audubon Bridge Constructors, a joint venture of– Flatiron Construction Corp.– Granite Construction– Parsons Transportation Group

Page 6: Jja st. james presentation

John James Audubon Bridge• Naming the new bridge after John James

Audubon exemplifies the importance & preservation of the rich history & heritage of the region

• As Pointe Coupee & West Feliciana parishes are widely regarded for their abundance of wildlife, amazing landscapes, & preserved historic structures from the days of Audubon, it is only fitting that the new bridge be named in his memory

Page 7: Jja st. james presentation

John James Audubon Bridge

• The John James Audubon Bridge is the longest cable-stayed bridge in the Western Hemisphere

Page 8: Jja st. james presentation

What is a Cable-Stayed Bridge?

• Consists of one or more towers with cables that support the deck

tower

deck

cable

Page 9: Jja st. james presentation

Cable-Stayed vs. Suspension

• The towers carry the load on cable-stayed bridges– Cables support the deck

• The two large suspension cables carry the load on suspension bridges– Suspender cables, or

hangers, support the deck

Primary load-bearing structure

Primary load-bearing structure

Page 10: Jja st. james presentation

Cable-Stayed vs. Suspension

• Cable-stayed bridges are good for medium-length crossings

• Suspension bridges are ideal for long-length crossings– The largest single-span bridge in the world

is a suspension bridge

Pearl Bridge’s main span: 6,532 feet (1.2 miles)…over 4x longer than the Audubon

Bridge’s main span!!

Page 11: Jja st. james presentation

Types of Bridges

• Cable-stayed bridge– Hale Boggs Memorial

Bridge (“Luling Bridge”)

• Suspension bridge– Golden Gate Bridge

Page 12: Jja st. james presentation

Types of Bridges

• Cantilever bridge– Horace Wilkinson

Bridge (“New Bridge”)

• Truss bridge– Hampden Bridge

Page 13: Jja st. james presentation

Types of Bridges

• Arch bridge– Sydney Harbour

Bridge

• Beam bridge– Lake Pontchartrain

Causeway

Page 14: Jja st. james presentation

JJA General Facts

• 2.44-mile four-lane elevated bridge structure with two 11-foot travel lanes in each direction with 8-foot outside shoulders and 2-foot inside shoulders

Page 15: Jja st. james presentation

JJA General Facts• Approximately 12 miles of two-lane

roadway connecting LA 1 east of Hospital Road in New Roads to U.S. 61 south of LA 966 and St. Francisville

• Four new intersections at existing LA 1, LA 10, LA 981 (River Road) and U.S. 61 for entry to and exit from the new roadway and bridge

• Seven smaller bridges included in project

Page 16: Jja st. james presentation

JJA General Facts

• Project broke ground in May 2006

• The bridge is the longest cable-stayed bridge in the Western Hemisphere– Main span is 1,583 feet

(almost 1/3 mile)

Page 17: Jja st. james presentation

JJA General Facts• First design-build project

in Louisiana• Bridge is the only

Mississippi River crossing between Baton Rouge and Natchez

• $409 million total cost

Page 18: Jja st. james presentation

Economic Development

• What the Audubon Bridge brings:– A more efficient and reliable route for

Pointe Coupee and West Feliciana– A more efficient route for commerce and

shipping traveling from central Louisiana– Increased traffic provides opportunity for

gas stations, restaurants, hotels and other businesses along the corridor

Page 19: Jja st. james presentation

Audubon Mainspan Quick Facts

• Towers– 520’ height– 2 crossbeams– Anchored by 42

drilled shafts 180’ into the Mississippi

Page 20: Jja st. james presentation

Audubon Mainspan Quick Facts

• Mainspan Deck– 1,583’ length– Approximately 130’ elevation– Composed of 428 precast

concrete panels in 63 segments

– 136 stay cables (4,548 individual strands) attached ranging from 220’ to 830’ in length

– 4’ and 8’ expansion joints

Page 21: Jja st. james presentation

Bridge Opening• Bridge was opened on May

5, 2011 due to rising water in the Mississippi River– High water closed ferry

service

• Construction not complete, but bridge is 100% safe for traffic

• Construction will end in late 2011

Page 22: Jja st. james presentation

Bridge Opening Photos

Page 23: Jja st. james presentation

Tower Construction

• Footings– 42 (21 each) drilled shafts anchored into

Mississippi– Cofferdams constructed above water and

lowered; water then pumped out– Cofferdam specs:

•160’ x 64’ x 55’•2500 tons

Page 24: Jja st. james presentation

Cofferdam Photos

Page 25: Jja st. james presentation

Cofferdam Photos

Page 27: Jja st. james presentation

Tower Construction

• Footings– Pedestals constructed– 35 tower “lifts” of 13’ segments performed

on each tower

Page 29: Jja st. james presentation

Audubon Bridge Project Fun Facts

500’

1000’

1500’

State Capitol460’

Audubon Tower520’

One Shell Square, N.O.(Tallest Building in

Louisiana)697’

RMS Titanic882’

Empire State Building1,453’

Page 30: Jja st. james presentation

Audubon Bridge Project Fun Facts

• Deck is 241,600 square feet– Approximately four football fields

• Deck weighs approximately 25.7 million lbs.– Approximately 6,000 tons more than the

Eiffel Tower

Page 31: Jja st. james presentation

Audubon Bridge Project Fun Facts

• 5,668 cubic yards of concrete in deck– Would fill almost two Olympic-sized

swimming pools

• Approximately 13.5 miles of cable stays– Would stretch from downtown Baton

Rouge to Denham Springs

Page 32: Jja st. james presentation

Audubon Bridge Project Fun Facts

• Approximately 473 miles of individual strands– Would stretch from Baton Rouge to Atlanta, GA

• Approximately 3,300 miles of wire in the strands– Would stretch from Baton Rouge to Anchorage,

AK• Approximately 500,000 bolts used

– If placed ½ mile apart, would stretch from Earth to the moon

Page 33: Jja st. james presentation
Page 34: Jja st. james presentation
Page 35: Jja st. james presentation
Page 36: Jja st. james presentation
Page 37: Jja st. james presentation
Page 38: Jja st. james presentation
Page 39: Jja st. james presentation
Page 40: Jja st. james presentation
Page 41: Jja st. james presentation
Page 42: Jja st. james presentation
Page 43: Jja st. james presentation
Page 44: Jja st. james presentation
Page 45: Jja st. james presentation
Page 46: Jja st. james presentation
Page 47: Jja st. james presentation
Page 48: Jja st. james presentation
Page 49: Jja st. james presentation
Page 50: Jja st. james presentation
Page 51: Jja st. james presentation
Page 52: Jja st. james presentation
Page 53: Jja st. james presentation
Page 54: Jja st. james presentation
Page 55: Jja st. james presentation
Page 56: Jja st. james presentation
Page 57: Jja st. james presentation
Page 58: Jja st. james presentation
Page 59: Jja st. james presentation

Be sure to visit www.audubonbridge.com!