JIRA tasks update Weeks 10 December 2019 – 3 March 2020

Transcript of JIRA tasks update - Indico · JIRA tasks update Weeks 10 December 2019 –3 March 2020. Updated...

Page 1: JIRA tasks update - Indico · JIRA tasks update Weeks 10 December 2019 –3 March 2020. Updated tasks •SIM-366–A.Ribon ... oMigrate to new Jenkins server •SIM-768–J.Apostolakis(10.6.Jan

JIRA tasks update

Weeks 10 December 2019 – 3 March 2020

Page 2: JIRA tasks update - Indico · JIRA tasks update Weeks 10 December 2019 –3 March 2020. Updated tasks •SIM-366–A.Ribon ... oMigrate to new Jenkins server •SIM-768–J.Apostolakis(10.6.Jan

Updated tasks• SIM-366 – A.Ribon

o Grid validation of Geant4

• SIM-768 – J.Apostolakiso Reversed points when advancing integration during field propagation

Page 3: JIRA tasks update - Indico · JIRA tasks update Weeks 10 December 2019 –3 March 2020. Updated tasks •SIM-366–A.Ribon ... oMigrate to new Jenkins server •SIM-768–J.Apostolakis(10.6.Jan

New tasks• SIM-771 – A.Ribon (10.6-Jun)

o Find a solution to the problem of missing decay channels for heavy hadrons in Geant4

• SIM-772 – A.Ribon (10.6-Jun)o Include heavy hadron nuclear inelastic interactions in physics lists

• SIM-773 – V.Ivantchenko (10.6-Mar)o Move EM testing suite location at EOS in the right place

• SIM-774 – V.Ivantchenko (10.6-Mar)o Destruction of physics end of run

• SIM-775 – V.Ivantchenko (10.6-Apr)o New G4PARTICLEXS3.0 dataset

Page 4: JIRA tasks update - Indico · JIRA tasks update Weeks 10 December 2019 –3 March 2020. Updated tasks •SIM-366–A.Ribon ... oMigrate to new Jenkins server •SIM-768–J.Apostolakis(10.6.Jan

Rescheduled tasks• SIM-607 – J.Apostolakis (10.5.Dec ↦ 10.6.Mar)

o Check Fatras use of Geant4 Hadronic Interaction as 'Generator’

• SIM-608 – J.Apostolakis (10.5.Dec ↦ 10.6.Jun)o Improve behaviour of propagation in electric field for stopping particles

• SIM-617 – J.Apostolakis (10.5.Dec ↦ 10.6.Mar)o Refine IntersectionLocator which includes a check mode

• SIM-687 – J.Apostolakis (10.6.Jan ↦ 10.6.Mar)o Extend testing of EM shower shape with more realistic geometries and more angles

• SIM-690 – J.Apostolakis (10.6.Jan ↦ 10.6.Mar)o Create realistic setup for testing of EM showers in ATLAS EM-Barrel geometry

• SIM-710 – A.Ribon (10.5.Dec ↦ 10.6.Dec)o Hadron elastic : development, validation, integration in physics lists, and effects on

hadronic showers

• SIM-711 – A.Ribon (10.5.Dec ↦ 10.6.Dec)o Hadronic string models : development, code improvements, validation and impact

on hadronic showers

• SIM-716 – A.Ribon (10.5.Dec ↦ 10.6.Dec)o Compare EPOS with Geant4 hadronic string models

Page 5: JIRA tasks update - Indico · JIRA tasks update Weeks 10 December 2019 –3 March 2020. Updated tasks •SIM-366–A.Ribon ... oMigrate to new Jenkins server •SIM-768–J.Apostolakis(10.6.Jan

Rescheduled tasks - 2• SIM-735 – G.Folger (10.6.Feb ↦ 10.6.Mar)

o Start looking into Drupal 8• SIM-736 – G.Folger (10.5.Dec ↦ Unscheduled)

o Develop pipeline Jenkins job to trigger Continuous builds• SIM-743 – M.Novak (10.5.Dec ↦ 10.6.Jul)

o Introduction of detailed test of stepping for EM calorimeters triggered by ATLAS• SIM-747 – M.Novak (10.5.Dec ↦ 10.6.Dec)

o Further tuning anOptimisation of options for the Goudsmit-Saunderson model for HEP applications

• SIM-748 – M.Novak (10.5.Dec ↦ 10.6.Jul)o New single scattering model for e+- based on ELSEPA (numerical Dirac-Fock PWA)

• SIM-751 – V.Ivantchenko (10.6.Feb ↦ 10.6.Apr)o Evaluate new ion ionisation models for moderate and high energies

• SIM-757 – V.Ivantchenko (10.6.Feb ↦ 10.6.May)o New GEM model

• SIM-760 – G.Folger (10.5.Dec ↦ 10.6.Mar)o Migrate to new Jenkins server

• SIM-768 – J.Apostolakis (10.6.Jan ↦ 10.6.Mar)o Reversed points when advancing integration during field propagation