![Page 1: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/1.jpg)
Jilin Provincial Transport Scientific Research Institute&
PEECE Pty Ltd
Environmental Management Plans
Presented by Phil Hawley & Steve O’Rourke
P E E C E
![Page 2: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/2.jpg)
OverviewEnvironmental
Assessment
Environmental Controls
Contractors Environmental Management
System to ISO14001
Monitoring and Reporting
CEMP
Environmental Laws
Environmental Conditions
![Page 3: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/3.jpg)
CEMP
Contractors Environmental Management Plan
How the Contractor will ensure that he complies with the environmental conditions and requirements whilst building the project
![Page 4: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/4.jpg)
CONTENTS OF A CEMPTypical contents include:• Project description;• Laws and regulations;• Roles and responsibilities;• Impacts of the project;• Mitigation measure;• Performance goals;• Review mechanisms; and• Reporting.
![Page 5: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/5.jpg)
Typical Impacts• Soil and Water;• Noise and Vibration;• Air quality;• Flora and Fauna;• Traffic;• Heritage; and• Waste.
![Page 6: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/6.jpg)
Soil and WaterImpacts Typical Mitigations
Sediment polluting rivers and creeks • Erosion and sedimentation control plans.
Soil instability • Erosion and sedimentation control devices.
Soil erosion
Pollution of groundwater • Lining of storage dams.
![Page 7: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/7.jpg)
Noise and VibrationImpacts Typical Mitigations
Construction noise impacting on community e.g. schools
• Restrict working hours and ensure machines are fitted with effective mufflers.
Construction noise impacting on residents
• Build permanent noise mitigations (e.g. noise mounds, walls) early.
Vibration from construction (from rollers, trucks, blasting damaging buildings and other structures
• Restrict size of compacting equipment and how close it can come to structures; and
• Maximum instantaneous charge limit for blasting.
![Page 8: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/8.jpg)
Air QualityImpacts Typical mitigations
Dust generation during works • Watering of works; and• Use of dust suppressants.
Dust generation from bare ground • Limit area disturbed at any one time; and
• Progressive revegetation.
Vehicle emissions • Regular servicing and inspections.
![Page 9: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/9.jpg)
Flora and FaunaImpacts Typical Mitigations
Destruction of flora • Delineation of work area / exclusion area.
Destruction of fauna • Tree and vegetation Clearing procedures.
Loss of habitat • Ecologists on site.
Loss of biodiversity • Biobanking/Offsets.
![Page 10: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/10.jpg)
Roles and Responsibilities
Senior Management
Project Management
Contractors Environmental Representative
Site PersonnelSub-Contractors
Repo
rting
Authority
Administrator(RMS)
Regulators
HSE Manager
Regulator
Road Authority
Contractor
Legend
![Page 11: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/11.jpg)
Inspections and records
• Regular;• After rain event; and• Typical inspection forms.
![Page 12: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/12.jpg)
Inspection reports
![Page 13: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/13.jpg)
Inspection reports
![Page 14: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/14.jpg)
Review of performance
• Analysing data against performance goals.
![Page 15: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/15.jpg)
Performance against Objectives
Flour Mill MAAC Gwydir Caravan Park
Flour Mill MAAC Gwydir Caravan Park
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
Monthly Dust Deposition (g/m2/month)
Sept Oct Nov Dec Maximum
![Page 16: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/16.jpg)
Operational Management Plan• Monitor environmental impacts relating to the
operation;• Establish standards and criteria for maintenance
and monitoring activities;• Provide details of the management structure,
responsibility and authority;• Provide a framework for compliance and record
keeping; and• Provide an audit/inspection regime to ensure
documented, periodic and objective evaluation of environmental performance.
![Page 17: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/17.jpg)
Erosion and Sediment Control• Revised Universal Soil Loss Equation
(RUSLE) :A = R x K x LS x P x C where
• A = computed soil loss in tonnes/ha/year• R = rainfall erosivity factor• K = soil erodibility factor• LS = slope length/gradient factor• P = erosion control practice factor• C = ground cover and management factor.
![Page 18: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/18.jpg)
Design Process
![Page 19: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/19.jpg)
Controls
![Page 20: Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.](https://reader031.fdocuments.us/reader031/viewer/2022032802/56649dff5503460f94ae6ed3/html5/thumbnails/20.jpg)
Controls