JIL Investor Presentation - Aug'12(YEP) -...

37
August 2012

Transcript of JIL Investor Presentation - Aug'12(YEP) -...

August 2012g

Agendag

Section 11 Jaypee Group Overview

Company Overview

Section 11Section 22

Jaypee Group Overview

p y

Yamuna Expressway Progress

22Section 33Section 44 Real Estate Development

Section 5566

Financial Overview

Key HighlightsSection 66

2

Section Jaypee Group Overview11

3

Jaypee Group at a Glanceyp p

Jaypee Group is a leading integrated infrastructure conglomerate in India with exposure to the power generation, cement, construction and real estate sectors,

JAL has participated in projects that have added 9840 MW to the national

Largest Private Hydropower Group

1700 MW operational

Power GenerationEngineering & Construction

grid between 2002 and 2011

Thermal Power

1700 MW operational3920 MW under various stages of development

Construction 2x250 MW at Bina 2x660 MW at Nigrie with captive coal 3x660 MW Bara Project2x660 MW Karchana Project

3rd Largest Cement Group with 33 3 MTPA

165 km Yamuna Expressway (N id t A )

Real Estate & E

Cement

with 33.3 MTPA capacity operational & 35.9 MTPA by FY 2013

(Noida to Agra)

Real Estate DevelopmentY ExpresswaysYamuna expressway:530 Mn. Sq feet expected to be developed33.3 MTPA capacity in operation

4

Jaiprakash Associates Limited (JAL)

Corporate StructureJaiprakash Associates Limited (JAL)

E&CCement – 21.8 MTPA

Real Estate & Hospitality Listed company

BOO Power Infrastructure 67 9%

Cement 67.9%

Cement JVs (4.3 MTPA)

Jaypee Infratech Limited (JIL)

165 Km long expressway

Jaiprakash Power Ventures Ltd (JPVL)300 MW Baspa – II HEP #

400 MW Vishnuprayag HEP #

83.1%( ) 165 Km long expressway

with 530 mn sq ft Real Estate Development(Yamuna Expressway)

400 MW Vishnuprayag HEP1,000 MW Karcham Wangtoo HEP #

1,320 MW Nigrie TPP (UI)*1200 MW Bina TPP (500 MW UI)*

Jaypee Cement Corporation Limited

(9.8 MTPA)100%

100%Coal Mining

(Cement)Mandla (N) - JAL

Mandla (S) – JV of

Himalayan Expressway Limited

(NHAI BOOT Project)Sangam Power Generation Co. Ltd. (1)

1 980 MW K h TPP100%

Prayagraj Power Generation Co. Ltd (1)

3,300 MW Bara TPP - 1980 MW (UI*)100%

( )JAL & MPSMCL

Coal Mining (Power)JVs of JAL &

Jaypee Sports Int’l Limited.

(Formula-1)90.5%

1,980 MW Karchana TPP

Jaypee Arunachal Power Ltd.2,700 MW Lower Siang HEP

500 MW Hirong HEP

%

89%

MPSMCL(For Nigrie Thermal)Jaypee Meghalaya Power Ltd

450 MW Kynshi – II HEP270 MW Umngot - I HEP

74%Jaypee Fertilizer s &

Industries Limited (JFIL)(Fertilizer Plant at Kanpur)

100%

5

(1) JAL has the right to subscribe up to 26% equity in this project.Jaypee Powergrid Limited

214 KM Long Transmission System* UI - Under Implementation

# In Operation

74%

Market Cap. (29 Jun’12) – JAL INR 156.29 Bn (USD 3.12 Bn); JPVL INR 91.34 Bn (USD 1.82 Bn) ); JIL INR 73.75 Bn (USD 1.47 Bn)

Demonstrated Execution Capability p y

JAL is the leader in the construction of multi-purpose river valley and hydropower projects and has been involved in construction of major engineering projects over the last 4 decadesbeen involved in construction of major engineering projects over the last 4 decades

Largest Concrete

Proud To Participate InProud To Participate In

Dulhasti

Baghalihar I **450MW

Karcham Wangtoo1000 MW

Nathpa Jhakri gDam In India –SardarSarovar

390 MW

Baspa-II*300 MW

Vishnuprayag*400 MWTehri

Teesta510 MW

1,500 MW

Largest Rockfill Dam In India –Tehri

Chamera II**300 MW

1,000 MW

BHUTAN

Largest Underground Powerhouse In India–nathpa-jhakri

Sardar Sarovar1,450 MW

Omkareshwar**Second Largest Surface Powerhouse In India –Indira-sagar

B A Y O FB E N G A L

520 MWIndira Sagar

1,000 MW

Tala1,020 MW

g

Projects completed between 2002-2011

*BOO projects

**EPC contracts

6

JAL has participated in projects that have added 9840 MW to the national grid between 2002 and 2011

Section Company Overview22

7

Jaypee Infratech – Unique Balance of Toll & Real Estateyp q

Unique Infrastructure company with balance of Toll & Real Estate revenuesUnique Infrastructure company with balance of Toll & Real Estate revenues

Jaiprakash Associates Ltd.83.1%

Jaypee Infratech Limited

Expressway Real Estate Development along Yamuna Expressway#

Noida (NCR) – 1,235 Acres*

Jaganpur (NCR) 1 235 Acres

Development of Expressway On BOOT Basis

(165 km Yamuna Jaganpur (NCR) – 1,235 Acres

Mirzapur (NCR) – 1,235 Acres

Expressway)

Listed companies

Tappal – 1,235 Acres

Agra 1 235 Acres

8

Listed companies Agra – 1,235 Acres* JIL has sold/ sub-leased 349 acres of the Noida land and plans to develop the remaining 885 acres

# As of Mar 31, 2012, JIL had signed lease deeds and taken possession of approximately 6,043 acres (98.0%) for Real Estate Development

India’s LONGEST 6 Lane Access Controlled Concrete Expresswayp y

165 km long 6 Lane Access Controlled Expressway connecting Noida to AgraEstimated total cost*: Rs. 13,300 Crs.

AGRA

DISTRICTSADABAD

5

,Rights to concessionaire for toll collection of 36 years

Ribbon development of 25 Million Sq mts of land along the Expressway 90 year lease spread over 5 or more locations

MATHURA

DISTRICTAGRA

DISTRICT MahamayaNagar

SADABADDISTRICT MATHURA

DISTRICT ALIGARHSPORTS SDZ (1000 Ha.)

90 year lease spread over 5 or more locations

GAUTAM BUDH NAGAR

GREATER NOIDA

SPORTS SDZ (1000 Ha.)

HARYANA

CHHATA TAHSIL

43

2LEGEND :

•NOIDA 2GREATER NOIDA TO AGRA – YAMUNAEXPRESSWAY

NOIDA TO GREATER NOIDA EXPRESSWAY-COMPLETED

1

LAND FOR DEVELOPMENT AT 5 LOCATIONS TOTALLING 6175 ACRES ** #

PROPOSED METRO UPTO JEWAR

METRO up to Noida City Centre operational

E C i i d i A 2012 A A i t S h d l d COD f A 2013

9

Expressway Commissioned in Aug. 2012 As Against Scheduled COD of Apr 2013* Total cost includes cost of land acquired for development and excludes the cost of real estate development

** JIL has sold/ sub-leased 349 acres of the Noida land and plans to develop the remaining 885 acres# As of Mar 31, 2012 JIL had signed lease deeds and taken possession of approximately 6,043 crs (98.0%) for Real Estate Development

Amongst the Largest Land Banks in Nat. Capital Region PROPOSED NIGHT SAFARI

JAYPEE GREENS MIRZAPUR - DIST. GAUTAM BUDH NAGAR(500 Ha)

JAYPEE GREENS G.NOIDA (182 Ha)

km km km km km

km

50 k

m

52 k

m

SDZ

km

Ch

5km C

h 15

Ch

20

Ch

25 k

Ch

30 k

mC

h 40

Ch

45

Ch

5

Ch

5

ZERO POINT(0 KM)

115 km3 5

Ch

10 k

JAYPEE SPORTS INT’L - DIST GAUTAM BUDH

JAYPEE GREENS TAPPAL

Ch

35 k

m

JAYPEE GREENS AGRA

24

M

PROPOSED

6 km

DIST. GAUTAM BUDH NAGAR(1000 Ha)

JAYPEE GREENS JAGANPUR - DIST. GAUTAM BUDH NAGAR(500 Ha)

(500 Ha)

165 km 6 LANE YAMUNA

(500 Ha)PROPOSED METRO LINK

CE:

14

km

JAYPEE GREENS - 165 km 6 LANE YAMUNA

EXPRESSWAYPROPOSED EASTERN PERIPHERAL EXPRESSWAY

DA

M PROPOSED METRO LINK

DIS

TAN

C

NCR BOUNDARY

GREENS AMAN

JAYPEE GREENS NOIDALAND PARCEL( 00 )EA

TER

NO

IDR

ESSW

AY

METRO LINK

TOTAL(500 Ha)

NO

IDA

-GR

EEX

PR

MAP NOT TO SCALE

1 530 Mn Sq Ft

6175 Acres

311 Mn 3705

TOTAL AREA

NCR

10Real Estate under development

Sq FtAcresAREA

Section Yamuna Expressway Project 33

11

Yamuna Expressway opened to Traffic on 9th August, 12Summary of Qty. of Earthworks, Structures & Concreting

Total Quantity

Summary of Qty. of Earthworks, Structures & Concreting

100% 0%EarthWork (411 Lac Cum.)411 Lac Cum.

100% 0%Culverts (0.78 Lac Cum.)0.78 Lac Cum.

100% 0%Bridges (1.86 Lac Cum.)1.86 Lac Cum.

100% 0%Underpasses (2.60 Lac Cum.)2.60 Lac Cum.

100% 0%Interchanges (4.00. Lac Cum.)4.00 Lac Cum.

100% 0%PQC/DLC (22.63 Lac Cum.)22.63 Lac Cum.

Complete Under Execution

12

Construction Highlights - A Few BenchmarksConstruction Highlights A Few Benchmarks

Largest Quantity of Earthwork and Structures for any Road of Equiv. Length in

ParameterParameter QuantitiesQuantities HighlightsHighlights

India

EQUIPMENTS UTILISATION AT PEAK

EQUIPMENTS UTILISATION AT PEAK

Over 2000 nos. including Dumpers, Excavators, Compactors, Concreting Pumps, DG Sets, Compressors, Crushing and Batching Plants etc.

Over 2000 nos. including Dumpers, Excavators, Compactors, Concreting Pumps, DG Sets, Compressors, Crushing and Batching Plants etc.

2000 nos2000 nos

HANDLING OF FLY ASH HANDLING OF FLY ASH

Largest for any Expressway / Highway Project by taking care of Environmental protection in Substantial manner

Largest for any Expressway / Highway Project by taking care of Environmental protection in Substantial manner

27 lac Cum.27 lac Cum.

EARTHWORKEARTHWORKEquiv. to Kashmir – Kanyakumari 1 lane road of 1.5 m height.250 lac Cum in 2009 - Largest in any road work for equiv. lengthanywhere in India

Equiv. to Kashmir – Kanyakumari 1 lane road of 1.5 m height.250 lac Cum in 2009 - Largest in any road work for equiv. lengthanywhere in India

411 lac Cum.411 lac Cum.

CONCRETING PAVEMENTCONCRETING PAVEMENT

Equivalent to Kashmir – Kanyakumari Single lane road of 1.5 m h i ht b d

Equivalent to Kashmir – Kanyakumari Single lane road of 1.5 m h i ht b d

anywhere in Indiaanywhere in India

25 lac Cum.25 lac Cum.PAVEMENT PAVEMENT height above ground.height above ground.

STRUCTURESSTRUCTURES 380 Nos380 Nos Average length between 2 structures 450 m is also high wrt any Average length between 2 structures 450 m is also high wrt any STRUCTURESSTRUCTURES 380 Nos.380 Nos. g g g yequivalent road.

g g g yequivalent road.

13

Scale of Works: Yamuna Expressway vs. Mumbai-Pune Expway and Delhi Intl. Airport (T3)Mumbai Pune Expway and Delhi Intl. Airport (T3)

ParticularsParticularsDelhi Intl. Delhi Intl.

Airport (T3)Airport (T3)Mumbai Mumbai -- PunePune

ExpresswayExpresswayYamunaYamuna

ExpresswayExpresswayAirport (T3)Airport (T3) ExpresswayExpressway ExpresswayExpressway

1) DescriptionIndia’s Largest

Intl Airport

India’s 1st 6 lane Access Controlled Concrete

India’s Longest 6 lane Access Controlled

Intl. AirportExpressway Concrete Expressway

2) Total Length NA 95 Km 165 Km

3) Land Required 2023 hectares 640 hectares 4100 hectares

3) Earth Work 1.1 Mn. Cum. 7.84 Mn. Cum. 40.6 Mn. Cum.

4) Cement 0.45 Mn. MT 0.72 Mn. MT 1.25 Mn. MT

5) Steel 1 00 000 MT 28 200 MT 1 55 000 MT5) Steel 1,00,000 MT 28,200 MT 1,55,000 MT

6) Construction Period

37 MonthsStart : Jan-1998

Finish : Mar-2002 Start : May-2008Finish : Dec 2011

Period (52 months) (44 months)

7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300 CrsMUCH LARGER SCALE OF WORKS OF YAMUNA EXPRESSWAY WHEN COMPARED WITH NOTABLE INFRASTRUCTURE

PROJECTS OF INDIA14

Yamuna Expressway Photographs -1 (0 - 55 km)p y g p ( )

EXPRESSWAY COMPLETED AT KM 2+000

15

Yamuna Expressway Photographs -2 (55 - 110 km)p y g p ( )

16

Yamuna Expressway Photographs -3 (110 - 165 km)p y g p ( )

17

Project Expenditure & Fundingj p g

Project ExpenditureProject ExpenditureAll fi i R C

Description Total Incurred till Jun 2012

All figures in Rs. Crs

FundingFunding

Project Cost 13,300 12,839**

Description Total Incurred till Jun 2012All figures in Rs. Crs

Equity from Promoters and Others 1,250 1,250

IPO proceeds 1,500 1,072IPO proceeds 1,500 1,072

Accruals from real estate development incl. advances & sales of land 3,550 3,945

Debt 7,000 6,000

Total 13 300 12 839**Total 13,300 12,839

18# IPO of Jaypee Infratech Ltd. successfully completed in May 2010. Total proceeds raised by Jaypee Infratech Ltd.– Rs. 1,650 Crs ; ** Includes Rs 572 Cr of outstanding liabilities.

Section Real Estate Development44

19

Land Acquisition completed for all 5 land parcels

LocationsLocations AreaAreaSaleable Saleable Area (Area (MnMn

Land Leased Land Leased as at Maras at Mar

Remaining Land Remaining Land as of Mar 2012as of Mar 2012Locations Locations AreaArea

(Acres)(Acres)Area (Area (MnMn

Sq Ft)Sq Ft)as at Mar as at Mar

2012 (Acres)2012 (Acres)as of Mar 2012as of Mar 2012

(Acres)(Acres)

1 Noida 1 235 78 1 232* 3Located

1. Noida 1,235 78 1,232* 3

2.District GautamBudh Nagar 1,235 116 1,212 23

In NCR

2. Budh Nagar (parcel 2)

1,235 116 1,212 23

3District GautamBudh Nagar 1 235 116 1 159 763. Budh Nagar (parcel 3)

1,235 116 1,159 76

4 District Aligarh 1 235 116 1225 104. District Aligarh 1,235 116 1225 10

5. District Agra 1,235 103 1215 20

TOTAL 6,175 530 6043 132

20Out of Total 530 Mn Sq Ft developable area, 311 Mn Sq Ft is in NCR alone

* Includes 341.56 acres that was sold as undeveloped land and 8.20 acres that was sub-leased.

Yamuna Expressway: Hub of Noida Real Estate ActivityYAMUNA

EXPRESSWAYJAYPEE GREENS G NOIDA (182 Ha)

p y yJAYPEE SPORTS INT’L -

DIST. GAUTAM BUDH NAGAR

NCR BOUNDARYG.NOIDA (182 Ha)

m km km km km km km 0 km

2 kmZERO POINT

(0 KM) km

SDZPROPOSED NIGHT SAFARI

(1000 Ha)

Ch

5km

Ch

10 k

Ch

15

km Ch

20

Ch

25 k

Ch

30 k

km

Ch

40 k

Ch

45 k

Ch

50

Ch

52(0 KM)

115 km

4 5

Ch

15 k

MTRANSPORT HUB6 k

3

OID

A

Ch

35 k2

MTRANSPORT HUB

14 k

m

6 km

Established Destination for IT/ ITES & Commercial

PROPOSED EASTERN PERIPHERAL EXPRESSWAY

GR

EATE

R N

OPR

ESSW

AY

PROPOSED METRO LINK

ISTA

NC

E:

500 acre GB University, F1, Night Safari and SDZs in areaMetro Connectivity upto Greater Noida and Jewar by 2013

JAYPEE GREENS

NO

IDA

-GEX

P

M

D

Noida’s Preferred Commercial, Residential & Institutional Destination / S Off C

JAYPEE GREENS NOIDALAND PARCEL(500 Ha)

1

IT / ITES Offices include DELL, NIIT, HCL, METLIFE, HEWITT etcHub of Educat. Instn. from Primary to PG level (AMITY university etc)All New Residential Dev. located in vicinity of expresswayNoida Land Parcel: only Integrated Development in the area with the

21MAP NOT TO SCALE

1 y g plargest Residential, Commercial and Institutional dev.

Infrastructure Initiatives in the Region driving Demandg g

Distance from Jaypee GreensDevelopment Location Jaypee Greens

NOIDAIn KM (Appx.)

N id G tYamuna Expressway Noida – Greater Noida 15

Formula 1 Greater Noida 30 First Race h ld i

Commissioned

Jaypee Greens Championship Golf Course (5 Star Resort & Six Senses Spa) Greater Noida 17

held in 2011 Operational

( p )

Planned Metro Rail Link Noida – Greater Noida 5

Pl d B d ki R il St ti d N id G tPlanned Bodaki Railway Station and Transport Hub

Noida – Greater Noida 28

Planned Night Safari Greater Noida 25Planned Night Safari Greater Noida 25

Proposed Amusement Park Greater Noida 18

2222

Proposed International Airport TBD

Jaypee Greens, Noida: Preferred real estate destination of Noidayp ,

First land parcel of the Yamuna Expressway: 1,235 Acres of Contiguous Land DevelopmentApprox. 18 km from South Delhi and 20 kms from Central Delhi%

Green Area of nearly 70% covering 903 acres approx Residential

Commercial

Institutional

Green Area of nearly 70% covering 903 acres approx.

Integrated City - “Opportunity to Live, Learn and Leisure within 5 minutes proximity”Residential - 61 Mn sq ftCommercial - 10 Mn Sq ft

23

Commercial 10 Mn Sq ftInstitutional - 7 Mn Sq ft

Road network of over 20 kms, 126 MVA of captive power generation, 30,000 klpd capacity sewage treatment plants

61 Mn Sq ft of Residential Development – Strong Sales Momentum

PARTICULARS (As on PARTICULARS (As on 30th Jun30th Jun 2012)2012) LAUNCHED (Mn Sq Ft)LAUNCHED (Mn Sq Ft) SOLD (SOLD (MnMn Sq Ft)Sq Ft)Aman –I & II Apartments 4.51 4.63

Klassic Apartments 5.53 5.2Kosmos Apartments 8.50 8.3

Kensington Park Apartments 2.86 2.83g pKensington Boulevard Apartments 2.87 2.79

Kingswood Oriental 0.19 0.19Kasa Isles Apartments 2.35 2.33

Kube Apartments 1.51 1.36Kube Apartments 1.51 1.36Krescent Homes 4.32 4.17

Orchard 2.72 2.57Anant 1.88 0.34

Pebble Court 0 30 0 23Pebble Court 0.30 0.23Garden Isle 4.85 2.68

Sports City: Built Up 1.12 0.39Residential Plots 6.04 5.93C 3 13 3 13

24

Commercial Plots 3.13 3.13TOTAL 52.68 47.10

Orchard & Garden Isles – Recent Launches

OrchardOrchard No. of Units No. of Units AreaArea

Launched 1226 2.7 Mn Sq Ft

Garden IslesGarden Isles No. of Units No. of Units AreaArea

Launched 3087 5.0 Mn Sq Ft

Sold 831 1.8 Mn Sq ft.

Average Rate Rs 4,904 per sq ftSold 1409 2.7 Mn Sq ft.

A R t R 4 131 ftNumber of Towers 8 towers

(Ground + 31 floors)

September 2014

Average Rate Rs 4,131 per sq ft

Number of Towers 26 towers (Ground + 32-38 floors)

25

DeliverySeptember 2014

(3.5 yrs from launch) DeliveryApril 2015

(3.5 yrs from launch)

Pebble Court – Recent Launches

Pebble CourtPebble Court No of UnitsNo of Units AreaAreaPebble CourtPebble Court No. of Units No. of Units AreaArea

Launched 64 0 30 Mn Sq FtLaunched 64 0.30 Mn Sq Ft

Sold 58 0.27 Mn Sq ft.

Average Rate Rs 10,785 per sq ft

DeliveryOct 2013

Delivery(3.0 yrs from launch)

26

JUIT - Noida, Engineering College Operational since 2009 Jaypee Public School by 2011yp y

Around 40 schools & colleges planned

Pre-Nursery to Post Graduation courses

Accessible within 5 minutes fromAccessible within 5 minutes from residential communities

First Engineering College already ti l

27

operational

Commercial - approx. 10 mn sq ft of Development Plannedpp q p

Walk to work conceptPure commercial belt fronting the Noida – Greater Noida ExpresswayUsage for office space, shopping malls, hotels, restaurants, etc.Integrated retail & recreation areas

28

Super Specialty Medical & Research Centrep p y

Complete Health Care solutionsp

450 bed super specialty hospital

Well –equipped with the best of medical equipments

29

Recreation - Multiple Facilities Plannedp

Jaypee Greens Wish Town offers multiple recreational facilities such as:18-hole & 9-hole golf course18 hole & 9 hole golf courseMultiple & dedicated social clubsSports facilities & kids play areasThematic parks

30

Thematic parksTown Centre with facilities like cultural galleries, restaurants & café’s, etc.

Real Estate Performance

PERIODPERIOD No. of Units Sold No. of Units Sold Area Sold Area Sold ((MnMn Sq Ft)Sq Ft)

Average Net Rate Average Net Rate (Rs / Sq Ft)(Rs / Sq Ft)

Net Sales Value Net Sales Value ( Rs ( Rs MnMn))

Advances Advances Received Received (Rs(Rs MnMn))(Rs (Rs MnMn))

2008-09(Dec. ’08 – Mar’09) 700 0.95 3,328 3,162 630

2009-10 (Apr. ’09 – Mar’10) 13,205 20.35 2,540 51,705 16,699

2010-11(Apr. ’10 – Mar’11) 7,906 12.38 3,308 40,953 31,455

2011-12(Apr’11- March ’12) 5,100 10.92 4,162 45,450 29,378

2012-13(1st-30th June’12) 967 2.50 3,724 9,310 8,050

TOTAL 27,878 47.10 3,197 1,50, 580 86,212

31

Section Financial Overview55

Profit & Loss Account

For the For the YearYear

For the For the YearYear

For the For the YearYear For the For the

Y E d dY E d d % Growth% Growth For Q1For Q1 For Q1For Q1

All figures in Rs. Mn

Particulars Particulars Year Year

Ended Ended March 31, March 31,

2009 2009

Year Year EndedEndedMarch March

31, 2010 31, 2010

Year Year EndedEndedMarch March

31, 201131, 2011

Year EndedYear EndedMarch 31, March 31,

20122012

% Growth % Growth over FY over FY 20092009--1010

For Q1For Q1

FY ’12FY ’12

For Q1For Q1

FY ’13FY ’13

Revenues 5,563 6,529 27,787 31,559 120% 6,170 6,783

Expenditure 2 387 493 9 840 15 715 465% 2 961 4 068Expenditure 2,387 493 9,840 15,715 465% 2,961 4,068

EBITDA 3,176 6,035 18,134 16,492 65% 3,279 2,728

Depreciation 140 162 86 16 -69% 4 6

Profit /(Loss) 3 036 5 874 18 146 15 974 65% 2 973 2 625( )before Tax 3,036 5,874 18,146 15,974 65% 2,973 2,625

Tax 369 999 3,796 3,077 76% 595 525

Net Profit/(Loss) after tax 2,667 4,875 14,351 12,897 63% 2,378 2,099

EPS 2 76 4 33 10 48 9 29 46% 1 71 1 51

33

EPS 2.76 4.33 10.48 9.29 46% 1.71 1.51

Section Key Highlights66

Jaypee Infratech Limited – USPsypIndia’s LONGEST Six Lane (expandable to Eight lanes) Access Controlled Expressway with Concrete Pavement connecting NCR to Agra.

A i t th t d ti ti f t i t i th tAgra is amongst the top destinations for tourists in the countryReduction in travel time between New Delhi and Agra from present 4 hrs to 2 hrs

Expected Ribbon Development along the expressway by Yamuna Expressway AuthorityExpected Ribbon Development along the expressway by Yamuna Expressway Authority Special Development Zones for IT, Industries, Biotechnology, Service Sectors & CommercialFive integrated townships with total real estate development of 530 mn sq ft of which 311 mn sq ft is in NCR.

Unique Infrastructure Company enjoying 80 I(A) tax benefit with two revenue streams - toll income and real estate revenues.

Real Estate Demand 2009-13 – NCR is expected to have 2nd highest Real Estate Demand in this periodNCR – 1.02 mn units for residential and 24.9 mn sq ft for office space*Mumbai – 1.64 mn units for residential and 23.7 mn sq ft for office space*

* Source : Cushman & Wakefield India Real Estate Investment Report 2009

Jaypee Infratech has successfully sold 47.10 mn sq ft in 43 months (Dec 08 – Jun 12)

Developing integrated townships (a city in itself) Offering a bouquet of products catering to high-midDeveloping integrated townships (a city in itself) Offering a bouquet of products catering to high-mid segment

Walk to work concept with world class institutional, recreational & commercial facilities within walking distance of residential options.

35

p

Key Highlightsy g g

Ability to leverage Jaypee’s Group’s well documented technical, project management & execution skills

Strength of Brand JaypeeStrength of Brand Jaypee

Integrated development with real estate projects being developed alongside an expresswayIntegrated development with real estate projects being developed alongside an expressway

Strong Regional Growth ProspectsStrong Regional Growth Prospects

Large & mostly contiguous land reserves among 3 parcels in the NCR with significant land use flexibility

Single state location of the entire Yamuna ExpresswaySingle state location of the entire Yamuna Expressway

Strong & experienced management team, well-trained workforce and

36

streamlined operating processes

Section THANK YOU