    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 1 of 7

    JHA number: PT-RFQ: LTC/535/!""-JHA Rev No. 00 Date 19-07-2012

    Job being analyzed:R#PLAC#M#NT OF $$/""%&' 5M&A PO(#R TRANSFORM#RS AND ASSOCIAT#D CONTROL

    #Q)IPM#NT

    Deartment ! "e#tion JHA member"

    Area ! lo#ation:$a%ra &out' And (u"'erib

    )rimary &ub"tation"* +atar.Job er,ormer

    A**+o,a Nae S0g1a2+e Da2e4e1e+a o6 +e70+ee12

    /8oo1 PP#

    )roe#t engineer-#overall"

    -"a,ety 'elmet-"a,ety "'oe" "'oe" mu"t not

    be "moot'/

    -"a,ety gla""e" #lear/

    -"a,ety glove"

    -barri#ade ! "ign t'e area.

    -re-"tart "a,ety toolbo tal%

    &a,ety rere"entative

    )roe#t manager

    Any ot'er

    #e+ge189 02a20o1 /

    e,a8a20o1Hazardou" ga"e"* ,ire

    No2e

  • 8/12/2019 Jha for -Transformer

    2/7

    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 2 of 7

    1/ )re-ob "a,ety meeting and

    rearation" o, material"*

    euiment and er"onnel

    na3are o, "ite #ondition"*

    "ite reuirement"

    2/ &ite e"tabli"'ment

    naut'orized a##e""!egre""

    n"a,e #ondition"

    All er"onnel to be indu#ted.

    All er"onnel to attend daily 4oolbo.

    All er"onnel to 3ear mandatory ))5 'ard 'at"* 'ig'

    vi"ibility #lot'ing* "a,ety ,oot3ear* "a,ety eye3ear/.

    6/ &'i,ting manual 'andling o,

    material ,or ,abri#ation*

    de"tru#t!re-#on"tru#t* eart'

    3or%"* #utting* ,illing* grading

    "#a,,olding

    (anual 'andling - #ut"*

    "linter" during 'andling

    in"tallation ! ere#tion.

    8a#% inury

    &li"* tri" and ,all" due to

    "liery "ur,a#e*

    ob"tru#tion" and re"tri#ted

    a##e""

    "e adeuate ))5 a" reuired.

    5n"ure "trong griing during manual 'andling.

    ee t'e load a" #lo"e to body a" o""ible.

    (ove ,eet rat'er t'an t3i"ting ba#% during manual'andling.

    8end %nee" and not ba#% during manual 'andling !

    li,ting

    Avoid manual li,ting 3eig't". $'ere o""ible u"e

    manual 'andling aid"* trolley" 3'eel barro3" et#.

    'e#% ground #ondition" and ta%e a#tion to ma%e it

    rig't.

    Remove all ob"tru#tion" and maintain good'ou"e%eeing

    Due #are and attention to be ta%en ,or re"tri#ted a##e""

    ;oo% a'ead and not do3n at t'e load on#e it 'a" been

    'eld "e#urely.

    Damage to underground

    "ervi#e".

  • 8/12/2019 Jha for -Transformer

    3/7

    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 3 of 7

    1/ )ainting=ire and elo"ion #au"ed

    by ,lammable material". 5.g.

    aint* t'inner"* toi# vaor".

    A "torage building e#lu"ively ,or aint* t'inner" et#.

    &'all be #on"tru#ted re,erably bri#% built and

    maintained at a di"tan#e o, 60m ,rom ob "ite and

    ot'er ,a#ilitie".

    Adeuate ,ire eit" to be rovided. &u#' eit" mu"t

    not be ob"tru#ted in"ide and out"ide/.

    =lammable material" "'all be "tored tidily 3it'

    gang3ay" ,or a##e"" ! egre"".

    5mty and ,ull #ontainer" 3ill be "egregated ,romea#' ot'er.

    )rovide "uitable lo#%" et#. And "are %ey" to be

    rovided to t'e "a,ety team ,or u"e during emergen#y

    "ituation.

    &ign board >,lammable material?@ and no "mo%ing@ no

    na%ed lig't et#. di"layed.

    A##e"" and ot'er road3ay" mu"t be %et ,ree ,rom

    ob"tru#tion due to emergen#y.

  • 8/12/2019 Jha for -Transformer

    4/7

    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 4 of 7

    )rovide adeuate ventilation.

    =ire etingui"'er" to be %et on "tandby in t'e3or%ing area".

    $ear er"onal rote#tive euiment: "a,ety 'elmet*

    "a,ety "'oe* "a,ety ,ull body 'arne""* ,or elevation

    3or%* eye rote#tion* and 'and rote#tion and a"

    reuired re"iratory rote#tion.

    All aint" and t'inner" et#. 4o be u"ed in a##ordan#e

    3it' t'e MSDS"'eet" "e#i,ying t'e 'azard"

    a""o#iated in u"ing t'e "ub"tan#e".

    2/ 5le#tri#al ! in"trumentationin"tallation

    5le#tro#ution* ele#tri# "'o#%*burn" and ,all".

    Bn"e#t tool"* o3er #ord"* and ele#tri#al ,itting" ,ordamage rior to ea#' u"e.

    Al3ay" tae #ord" ,loor" 3'en ne#e""ary.

    "e #ord" or euiment t'at i" rated ,or t'e level o,

    amerage or 3attage t'at you are u"ing.

    Al3ay" u"e #orre#t rating o, ,u"e. Rela#ing a ,u"e

    3it' one o, 'ig'er rating #an #au"e e#e""ive #urrent"

    in t'e 3iring and o""ibly damage t'e euiment and

    "tart ,ire.

    8e a3are t'at unu"ually 'ot outlet" may be a "ign

    t'at un"a,e 3iring #ondition" ei"t. nlug any #ord"

    to t'e"e outlet" and do not u"e until a uali,ied

    ele#tri#ian 'a" #'e#%ed t'e 3iring.

    Al3ay" u"e ladder" made o, 3ood or ot'er non-

    #ondu#tive material" 3'en 3or%ing 3it' or near

    ele#tri#ity or o3er line".

    Do not u"e outlet" or #ord" t'at 'ave eo"ed 3iring.

  • 8/12/2019 Jha for -Transformer

    5/7

    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 5 of 7

    Do not blo#% a##e"" to #ir#uit brea%er" or ,u"e boe".

    Ri"% o, ele#tri# "'o#%!ele#tro#ution i" greater in area"t'at are 3et or dam. Bn"tall Cround =ault ir#uit

    Bnterruter" 4FCI/ a" t'ey "'all interrut t'e

    ele#tri#al #ir#uit be,ore a #urrent "u,,i#ient to #au"e

    deat' or "eriou" inury o##ur".

    no3 3'ere t'e brea%er" and boe" are lo#ated in

    #a"e o, an emergen#y.

    ;abel all #ir#uit brea%er" and ,u"e boe" #learly. 5a#'

    "3it#' "'ould be o"itively identi,ied a" to 3'i#'

    outlet or alian#e it i" ,or. Do not tou#' a er"on or ele#tri#al aaratu" in t'e

    event o, an ele#tri#al a##ident. Al3ay" di"#onne#t t'e

    #urrent ,ir"t.

    During ele#tri# 3or%* metal ring or #'ain "'ould not be

    u"ed.

    ee ready #o2tye and ot'er ,ire etingui"'er".

    "e "'o#% roo, glove"* boot" te"ter et#.

  • 8/12/2019 Jha for -Transformer

    6/7

    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 6 of 7

    6/ "e o, euiment" rane"* Cenerator" et#.

    =ire 'azard during re,uelling &3it#' o,, euiment be,ore "tarting re,uelling 5n"ure "a,e a##e"" to t'e euiment to be re,uelled

    &tay near t'e euiment ,uelling oint 3'en ,uelling.

    Never over,ill t'e ,uel tan%

    Re,uelling to be done at "lo3 rate to redu#e t'e

    otential ,or "illage and "tati# ignition.

    =ire etingui"'er "'all be maintained.

    No ignition "our#e "'ould be available during near

    re,uelling.

    "e roer ))5.

    E/ $or% in oen area Heat "tre"" inury &ummer 3or%ing time "'all be ,ollo3ed.

    Adeuate "'ade or re"t area "'all be rovided

    8rea%" "'all be ta%en and ob rotation may be

    ,ollo3ed.

    "e roer ))5

    F/ Ge'i#le movement A##ident" inury damage

    to roerty

    ;i#en"ed driver" "'all only oerate ve'i#le".

    Ge'i#le" "'all be maintained roerly and not

    overloaded.

    &eed limit" tra,,i# rule" "'all be ad'ered.

    Ge'i#le entry ermit "'all be ta%en rior to entering

    t'e 'azardou" area.

  • 8/12/2019 Jha for -Transformer

    7/7

    PETROSERV LTD

    JOB HAZARD ANALYSIS FORM Page No. 7 of 7

    )reared by:

    (o'd (ua'id

    &a,ety 5ngineer

    )etro"erv ;imited