Transcript of Jet Works - Paint Presentation
Jet Works Air Center
Maintenance – Paint – Interior – Completions
FBO
Charter / Management
Aircraft Sales
Interior – Cabinetry
CNC Machine
Interior – Softgoods Engineering
Service Center
Paint
Interior – Softgoods
Interior – Cabinetry
Maintenance
Founded in 1996
109,000 Square Ft
168 Employees
ASF – Pilatus & Piaggio
Hangar # 1
30,000 Square Ft
Light – Medium Jets
Gulfstream V & Global Capable
Hangar # 2
43,000 Square Ft
Medium to Large Aircraft
757-200 Capable
Paint Hangar
12,000 Square Ft
Down Draft /Climate Controlled
Gulfstream G IV SP Capable
Renderings / Drawings
Custom Exterior Designer
9 Page Full Color Renderings
Turn time – 24 Hours
Strip & Paint Schedule
Challenger 604
Span time – 28 Days
DuPont Products
Paint Process
Incoming Inspection
0 Day
Span time – 0 Days
Paint Process
Mask Aircraft for Strip
2 Days
Span time – 2 Days
Paint Process
Strip Aircraft & Post Strip Insp.
2 Days
Span time – 4 Days
Paint Process
Mask & Prep Aircraft
4 Days
Span time – 8 Days
Paint Process
Wash, Etch & Alodine Aircraft
1 Day
Span time – 9 Days
Paint Process
Mask & Prime / Rivet Prime
1 Day
Span time – 10 Days
Paint Process
Prep Aircraft for Base Paint
3 Days
Span time – 13 Days
Paint Process
Mask & Paint Aircraft Base
1 Day
Span time – 14 Days
Paint Process
Layout Stripes & Logos
2 Days
Span time – 16 Days
Paint Process
Prep Stripes and Mask Aircraft
1 Day
Span time – 17 Days
Paint Process
Paint Stripes & Logos
1 Day
Span time – 18 Days
Paint Process
Prep Secondary Structures(Wing Tops, Pylons, Entry Door)
1 Day
Span time – 19 Days
Paint Process
Paint Secondary Structures(Wing Tops, Pylons, Entry Door)
1 Day
Span time – 20 Days
Paint Process
Detail Aircraft
6 Days
Span time – 26 Days
Paint Process
Squawks & Weight / Balance
1 Day
Span time – 27 Days
Paint Process
Final / Acceptance Flight
1 Day
Span time – 28 Days
Strip & Paint
Challenger 604
Matterhorn White
Custom Striping
Strip & Paint
Emivest SJ 30
Metallic Paint / Pearl Effect
Custom Logos (Tail)
Strip & Paint
Piaggio P-180
Black Pearl
Custom Graphics (Tazer)
Strip & Paint
Falcon 10
Snow White
Custom Metallic Stripes
DuPont Corrosion Primer
DuPont High Build Primer
DuPont High Solids Paint
DuPont Clear
Interior - Softgoods
Piaggio P-180
Complete Softgoods Refurb
Turn Time – 3 Weeks
Seats, Sidewalls & Headliner
Challenger 604
Interior LED Lighting
Premium Soundproofing
Cabin Seats
Gulfstream G IV
16 G Capabilities
Custom Material Selections
Cabinet Project # 1
Boeing 737
Remote Installation Support
Turn time – 6 Months
Cabinet Project # 2
Challenger 605
Multiple Configurations
Exotic Woods Available
Cabinet Project # 3
Gulfstream G III
Custom Artistry
Custom Faux Finishes
Maintenance Project # 1
Citation 560
Phase 5 Inspection
Turn time – 10 Days
Maintenance Project # 2
Lear 60
12 Year Inspection
Turn time – 32 Days
Maintenance Project # 3
Challenger 604
6/12/36 Month Inspection
Turn time – 5 Days
Maintenance Project # 4
Boeing 727 & 737
Line Maintenance
Avionics Installs
We’re not the highest bidder!
We’re not the lowest bidder!
But we’ll stack our quality,
Against ANY bidder!
?