Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., Burgess, S. andSmith, N. (2016) Development of a benchmark for green infrastruc-ture. In: UK-Ireland Planning Research Conference, University ofCardiff, Wales, UK, 6-7 September 2016. Available from: http://eprints.uwe.ac.uk/30057
We recommend you cite the published version.The publisher’s URL is:http://eprints.uwe.ac.uk/30057/
Refereed: No
(no note)
Disclaimer
UWE has obtained warranties from all depositors as to their title in the materialdeposited and as to their right to deposit such material.
UWE makes no representation or warranties of commercial utility, title, or fit-ness for a particular purpose or any other warranty, express or implied in respectof any material deposited.
UWE makes no representation that the use of the materials will not infringeany patent, copyright, trademark or other property or proprietary rights.
UWE accepts no liability for any infringement of intellectual property rightsin any material deposited but will remove such material from public view pend-ing investigation in the event of an allegation of any such infringement.
PLEASE SCROLL DOWN FOR TEXT.
Planning Research Conference 2016
Setting the standard for green infrastructure
Gemma Jerome
Danielle Sinnett 1Mortlock, Roger 2Calvert, Tom 1Burgess, SarahSmith, Nick 11
1 Centre for Sustainable Planning and Environments, UWE Bristol
2 GloucestershireWildlife Trust
6-7 September 2016
Promoting the form, role and benefits of GI and ecosystem services at a range of spatial scales
Securing implementation is key
Contrasting development opportunities
Urban planning and Gl policy context
Setting GI priorities
Taking a partnership approach
Local Planning Authorities
Tewkesbury Borough Council
Stroud District Council
Cheltenham Borough Council
Cotswold District Council
Gloucester City Council
South Gloucestershire Council
BANES Council
Development schemes (live planning applications)
West of Stonehouse, Stroud (2000+ new homes; strategic allocation; outline plan approved; at detailed design stage and reserved matters)
Chesterton, Cirencester (Cirencester urban extension; strategic allocation; outline plan submitted, awaiting determination)
Former Filton Airfield, South Glos. (mixed use development; strategic allocation; pre-application)
Elms Park, North West Cheltenham (4000+ new homes; strategic allocation; pre-application)
Ecotricity ‘Eco Park’, Stroud (green technology park and sporting venue; not in plan i.e. speculative; outline submitted, awaiting determination)
Planning policy documents
Tewkesbury Borough (Local) Plan – Green Infrastructure Strategy
South Glos. Council – Green Infrastructure Strategy
BANES – West of England Green Infrastructure Strategy
Development of a local GI benchmark
• Agreement to develop a local GI benchmark
• Project extension to explore the potential for a national GI benchmark
- Desk study to review existing benchmarks in the sector
- Expert symposia to test these findings with stakeholders and end-users
Review of existing standards and benchmarks
Stakeholders involved to date
Scope
Award
Operation
• Need / market• Terminology• Focus of criteria
• Spatial scale / project relevance• Nature of users• Fit with other benchmarks / standards
• Relationship with planning
• Assessment timing
• Cost• Type of guidance
• Calculating performance
• Grading of award
• Method of assessment• Nature and expertise of the
assessors• Transparency of the process
• Marketing of the benchmark• Monitoring and review
Beta-benchmark creation
Two levels
“Normalising a green infrastructure approach / raising the baseline”Achieve – this is what good GI looks likeExcellent – this is what exemplary GI looks like
Mandatory Standards
to establish that a scheme has adopted a green infrastructure approach which is sustainable
Thematic standards Wildlife Water Wellbeing
Desk study Different scoring methodologies testedOption selected based on desk study and consultation with customers = ‘Strict’ Two levels
Findings from customer requirements testing (‘Frontrunner testing’)Standards at correct level; parity; themes are helpful; ‘Pending’ award at Outline assists planning conditions/ s.106
• Technical guidance to be published alongside
• Desk-study testing
• Internal ‘operational’ review
• External review
• Front runner testing
Ensuring successfulimplementation