Jens Schöneberg Solution Architect MRO/M&E

31
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2) Jens Schöneberg Solution Architect MRO/M&E Rotable Management 2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2)

description

Rotable Management. Jens Schöneberg Solution Architect MRO/M&E. 2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2). Content. Rotable Management in Aerospace. 1. SAP Solution. 2. SAP Future Focus. 3. - PowerPoint PPT Presentation

Transcript of Jens Schöneberg Solution Architect MRO/M&E

Page 1: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2)

Jens SchönebergSolution Architect MRO/M&E

RotableManagement

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2)

Page 2: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 2 Jens Schoeneberg (E2)

SAP Solution2

Rotable Management in Aerospace1

SAP Future Focus3

Content

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 2 Jens Schoeneberg (E2)

Page 3: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 3 Jens Schoeneberg (E2)

SAP Solution2

Rotable Management in Aerospace1

SAP Future Focus3

Content

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 3 Jens Schoeneberg (E2)

Page 4: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 4 Jens Schoeneberg (E2)

Repairable Part Serialized Long Life Cycle Expensive Components Big / Complex Components Life Limit Controlled

What is a Rotable?

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 4 Jens Schoeneberg (E2)

Page 5: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 5 Jens Schoeneberg (E2)

Rotable Management Cycle

Stock

Serviceable Unserviceable

ProcurementScrapping

In-house Repair

Aircraft

Subcontracting

Page 6: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 6 Jens Schoeneberg (E2)

Scenarios with/without Intermediate Storage

WarehousePart(s)

Replacementpart(s)

Part(s)

Part(s)

Technicalobject

Repairprocess

Part(s)

Part(s)

Technicalobject

Repairprocess

Open-loop scenario

Closed-loop scenario

Page 7: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 7 Jens Schoeneberg (E2)

Rotable Management Requirements

Support of maintenance/repair processes In-house Subcontracting

Documentation of all maintenance tasks performed Traceability of rotable parts back to birth

Inventory Configuration (production site) Repair shop (shop floor) / Subcontractor

Handling of rotable part status Tracking of rotable part conditions Part number change due to modification Handling of exchange parts from subcontractors Valuation according to parts condition

Businessrelated

AviationAuthority

related

Page 8: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 8 Jens Schoeneberg (E2)

SAP Solution2

Rotable Management in Aerospace1

SAP Future Focus3

Content

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 8 Jens Schoeneberg (E2)

Page 9: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 9 Jens Schoeneberg (E2)

Func-tionallocation

Equip-ment/Serialnumber

Technicalobjects

As-Maintained Configuration

Assem-bly

Material

Page 10: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 10 Jens Schoeneberg (E2)

Serial Number and Equipment

Equipment master record

Serial data

Material E-2002

Serial number 1351

• Stock information

• Serial number history

Page 11: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 11 Jens Schoeneberg (E2)

Rotable Exchange Process

(1) Rotable exchange process

Return of serviced partReplacement part

Removal of part Shipment of part

(2) Repair process

Warehouse Workshop /Subcontractor

Page 12: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 12 Jens Schoeneberg (E2)

Life Controlled Rotables I

Flight Hours

Take-offs/Landings

Chracteristics ofClassification System

CounterReading

Flight hours 2351CounterReading

Landings 511

Input Sources:- Manually via R/3- Intranet/Internet- PM-PCS Interface

Technical Object

Counter

Page 13: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 13 Jens Schoeneberg (E2)

Aeroplane counter12.02. 350 Take-offs/landings

20.02. 360 Take-offs/landings

Landing gear counter for tires12/02. 20 Take-offs/landings

20/02. 30 Take-offs/landings

Difference of 10 take-offs/landings carried forward

Life Controlled Rotables II

Page 14: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 14 Jens Schoeneberg (E2)

Automaticcreation

Update onFlight Hours

RotableMaintenancePlan R/3

Pump P111

PM/CSPM/CSOrderOrder

Rotable Exchange

1 4 5 3

P111

Hours

Aircraft Configuration

Manualcreation

Discrepancy found

LifeContolledRotable

PM/CSPM/CSNotificationNotification

Trigger/InitiateRotable

Exchange

Page 15: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 15 Jens Schoeneberg (E2)

Usage list

G-BIKA

Installation 01.03.98Removal 20.09.98

01.03. - 20.09.98 G-BIKA

Traceability of Rotable within As-Maintained Configuration

Page 16: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 16 Jens Schoeneberg (E2)

PurchasingPurchasing

Ser. No. 1

Ser No.-1New

New

Ser. No. 1Unservice-

able

Ser No. 1Service-

able

Sub-contractor

In-house

Ser No. 1

Ser No.-1

ShippingShipping

ReceiptReceipt

Rotable Traceability witin Inventory

Page 17: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 17 Jens Schoeneberg (E2)

Materialwith valuation type A

(condition-basedvaluation)

Valuation typeNEW

$ 3,000.00

Valuation typeSERVICE

$ 2,200.00

Valuation typeUNSERVICE $ 1,280.00

Valuation Based on Parts Condition

Page 18: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 18 Jens Schoeneberg (E2)

In-house Repair Process

(1) Rotable exchange process

Return of serviced partReplacement part

Removal of part Shipment of part

(2) In-house repair process

Warehouse In-houseWorkshop

Page 19: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 19 Jens Schoeneberg (E2)

Refurbishment Order

Maintenance order 800175Order type: PM04

Material P-2001 Fuel pumpQuantity 3Serial number 53, 81, 27

From UNSERVICEPlant:0001 SLoc: 0002

To SERVICEPlant: 0001 SLoc: 0001

StockStockPlantPlant 00010001SLocSLoc 00020002

UNSERVICE

Goods issuewith movement

type 261

StockStockPlantPlant 00010001SLocSLoc 00010001

SERVICE

Goods receiptwith movement

type 101SLoc = Storage location

Page 20: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 20 Jens Schoeneberg (E2)

Material P-2001Serial number 53

Plant 1000Storage location0001BatchSERVICE

Material P-2001Serial number 53

Plant 1000Storage location0002BatchUNSERVICE

EnjoySAP - Refurbishment

StockStock

UNSERVICE

StockStock

SERVICE

Refurbishmentorder

Object list:- Serial number 1- Serial number 2- Serial number 3

Object list:- Serial number 1- Serial number 2- Serial number 3

Goods issue

Automatic change of valuation type during goods movement

Proposal of serial numbers during goods issue

Page 21: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 21 Jens Schoeneberg (E2)

Subcontracting Process

(1) Rotable exchange process

Return of serviced partReplacement part

Removal of part Shipment of part

(2) Subcontracting process

New withIS A&D 4.6

Warehouse Subcontractor

Page 22: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 22 Jens Schoeneberg (E2)

Purchase Order for Subcontracting

SubcontractorMRO Provider

10 L 1pc DISC SerNr 471pc DISC SerNr 472pc BLADE

DISC Serial Number 47

Purchase OrderPart that will be receipt back

Parts that will be providedto the subcontractor

+

Page 23: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 23 Jens Schoeneberg (E2)

Warehouse

xxxxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx

Purchase orderSubcontracting

DISC 1pcBLADE 2pc

SC vendor SUBC1

SC inventory monitor

DISC BLADE

(1) Create SDdelivery

(2) Post goodsissue for P/O

Picking, Packing, Shipping

Vendorstock

SC = Subcontracting

Page 24: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 24 Jens Schoeneberg (E2)

SC vendorSC vendor

1)1) Goods receipt for theGoods receipt for theserviced rotableserviced rotable

2)2) Component consumptionComponent consumption

Purch. Orderhistory

Comp.: DISC

Goods receiptof rotable

Goods Receipt

Warehouse

SC = Subcontracting

Page 25: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 25 Jens Schoeneberg (E2)

Goods receipt of servicable parts

Part number change Serial Number change

Valuation change

Consumption of parts from

SC vendor stock

Goods Receipt

Three scenarios are supported at the time of the goods receipt: Rotable with the same material and serial number is received Material number of rotable changes (due to upgrade), but serial number remains the

same Subcontractor sends back replacement part, with different serial number

The new parts condition might require a valuation change For traceability reasons, the history for a specific serial number must be

complete

SC = Subcontracting

Page 26: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 26 Jens Schoeneberg (E2)

Warranty Assignment

Master warranty• Description

• Warranty services

• Warranty counter

Tail G-BIKA• Valid from 5.1.1998

• Measuring point:Flight hoursCycles

Tail C-678• Valid from 12.10.1998

• Measuring point:Flight hoursCycles

Assignment

Page 27: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 27 Jens Schoeneberg (E2)

SAP Solution2

Rotable Management in Aerospace1

SAP Future Focus3

Content

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 27 Jens Schoeneberg (E2)

Page 28: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 28 Jens Schoeneberg (E2)

EnjoySAP - Rotable Exchange Process

Replacement part

Removal of part

Warehouse

Easy-to-use transaction for exchange of rotable part during line maintenance

Supported functions Creation of PM/CS notification to

document discrepancies and which is used as rotable part traveller

IPC access to identify replacement part Configuration update at time of removal /

installation Configuration completeness check Automatic goods movement postings for

Goods receipt/issue Change of ownership Change of parts condition Valuation change

Page 29: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 29 Jens Schoeneberg (E2)

Initial Provisioning / Follow up Procurement*

No of Aircraft No of Parts per Aircraft Flying hours per Aircraft a

Day Mean Time Between

Removal Turn Around Time Service Level ....

No of Locations Turn around time per

Location Stock transfer time

Budget Costs (have to be

calculated)

Optimal Stockper location

Repair Float required

per location

Repair Float required

Level 1 Level 2 Level 3

* Depends on client funding

Page 30: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 30 Jens Schoeneberg (E2)

Integrated Planning for Rotables Using APO*

Fulfillment SystemR/3

Historical data

Maintenance plan

PM/CS order

Inventory

Refurbishment order

P.O. new part

P.O. subcontracting

SynchronizeP.O. = Purchase order

Planning SystemAPO

Detailed PlanningSNP

Fullfillment PlanningPP/DS

ForecastDP

* Depends on client funding

Page 31: Jens Schöneberg Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 31 Jens Schoeneberg (E2)

Reliability Monitoring in BW

Development of Extractors for the following Key Performance Indicators (KPIs):

Mean Time Between Removal (MTBR)

Mean Time Between Unscheduled Removal (MTBUR)

Mean Time Between Failure (MTBF)