JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status...
-
Upload
francis-patterson -
Category
Documents
-
view
223 -
download
1
Transcript of JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status...
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Argo StatusArgo TC, M. Belbeoch
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
IndicatorsIndicator Result Method Target Note
STATUS Activity 100% Nb Active units vs target
3200 within the initial array (60N/60S, no marginal seas)
Initial: 3349Polar: 244Marginal: 249All: 3843
Intensity 100% Nb Deployed over 12 monthsvs target
800 1007 units
Density 52% % of 6x6 well sampled
100 % Initial design ?
DATA Delivery 94%, 94% Nb of platforms distributing data vs active
GTS , GDACs100%, 100%
3600 / 3843,3628 / 3843
Quality 74% Ratio DM/DM Eligible
100%
Timeliness 92%, 84% Nb Obs. < 24h vs Total Obs.
100%, 100% GTS, GDACsPrevious month
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Density
0
1-3
4-7
> 7
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Density
0
1-3
4
> 4
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Density/Age 6°x 6°
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Density/Age vs Plans
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Deployment Plans Score
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015
Links
• Report• ftp.jcommops.org/Argo/Doc/2015-01-AIC.xlsx • ftp.jcommops.org/Argo/Doc/2015-01-AIC.pdf
• Maps• http://argo.jcommops.org/maps• https://picasaweb.google.com/JCOMMOPS/ArgoMaps• ftp.jcommops.org/Argo/maps/LATEST/
• News• http://www.twitter.com/jcommops