JC Summary - Piping

41
NO JOBCARD NO PLATFORM LOCATION DRAWINGS PHASE CAT 1 Pre-SD L&R 2 Pre-SD L&R 3 Pre-SD L&R 4 5 Pre-SD GEN 6 Pre-SD GEN 7 Pre-SD GEN 8 SD GEN 9 10 Pre-SD SCAFF 11 Pre-SD REMOVE 12 Pre-SD INSTALL 13 Post-SD/Decom INSTALL 14 Post-SD TP 15 Post-SD DESCAFF 16 17 Pre-SD SCAFF 18 SD GEN 19 SD INSTALL 20 SD REMOVE 21 SD WELDING 22 SD NDT 23 SD INSTALL 24 SD REMOVE 25 Post-SD INSTALL 26 Post-SD TP 27 Post-SD DESCAFF 28 29 Pre-SD SCAFF 30 SD GEN 31 SD SPADING 32 SD REMOVE 33 SD WELDING

description

jobcard summary

Transcript of JC Summary - Piping

TKP-A (PIPING) - SDTRADESNOJOBCARD NOPLATFORMLOCATIONDRAWINGSPHASECATSCOPE DESCRIPTION / JOBCARDS TITLERGRSFW BPMWSFSWLPFPWLIFITELENDT WHCCHBTVRTOTAL MHRS1Pre-SDL&RLift-up & move pipe spools (SD) to laydown area2Pre-SDL&RLift-up & move manual valves (SD) to laydown area3Pre-SDL&RLift-up & move gaskets & stud bolts (SD) to laydown area45Pre-SDGENWashdown at drip pans below CD prior to SD6Pre-SDGENWashdown at drip pans below MD prior to SD7Pre-SDGENWashdown open drain header prior to SD8SDGENWashdown closed drain header910Pre-SDSCAFFErect scaffolds for removal of spool at Line 150-D-008-1101 (TP-007/008) & new spools installation11Pre-SDREMOVERemoval of pipe spool at Line 150-D-008-1101 (TP-007/008)12Pre-SDINSTALLPartially install spool c/w gaskets & bolting set at Line 150-D-008-1101/11432 (TP-007/008)13Post-SD/DecomINSTALLInstall final spool of Line 150-D-008-1101/11432 (TP-007/008) c/w valve, gaskets & bolting sets14Post-SDTPTouch-up painting at new Line 150-D-008-1101/11432 (TP-007/008)15Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 150-D-008-1101/11432 (TP-007/008)1617Pre-SDSCAFFErect scaffolds for removal of spool at Line 250-PL-101-6101X (TP-003/004) & new spools installation18SDGENWashdown & purge Line 250-PL-101-6101X (TP-003/004) 19SDINSTALLInstall spading at Line 250-PL-101-6101X (TP-003/004) 20SDREMOVE Removal of pipe spool (Cold Cut) at Line 250-PL-101-6101X (TP-003/004) 21SDWELDINGWelding at field joints of Line 250-PL-101-6101X/61432 (TP-003/004)22SDNDTNDT at field joints of Line 250-PL-101-6101X/61432 (TP-003/004)23SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 250-PL-101-6101X/61432 (TP-003/004)24SDREMOVE Remove spading at Line 250-PL-101-6101X (TP-003/004) 25Post-SDINSTALLInstall PS-0003-003 (250-PL-101-6101X/61432)26Post-SDTPTouch-up painting at new Line 250-PL-101-6101X/61432 (TP-003/004)27Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 250-PL-101-6101X/61432 (TP-003/004)2829Pre-SDSCAFFErect scaffolds for removal of spool at Line 200-PL-011-1101X (TP-011/012) & new spools installation30SDGENWashdown & purge Line 200-PL-011-1101X (TP-011/012)31SDSPADINGInstall spading at Line 200-PL-011-1101X (TP-011/012)32SDREMOVERemoval of pipe spool (Cold Cut) at Line 200-PL-011-1101X (TP-011/012)33SDWELDINGWelding at field joint of Line 200-PL-011-1101X/11432 (TP-012)34SDNDTNDT at field joint of Line 200-PL-011-1101X/11432 (TP-012)35SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 200-PL-011-1101X/11432 (TP-011/012)36SDDE-SPADINGRemove spading at Line 200-PL-011-1101X (TP-011/012)37Post-SDTPTouch-up painting at new Line 200-PL-011-1101X/11432 (TP-011/012)38Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 200-PL-011-1101X/11432 (TP-011/012)3940Pre-SDSCAFFErect scaffolds for removal of spool at Line 50-V-002-1101 (TP-001/002) & new spools installation41SDGENPurge Line 50-V-002-1101 (TP-001/002)42SDSPADINGInstall spading at Line 50-V-002-1101 (TP-001/002)43SDREMOVERemoval of pipe spool (Cold Cut) at Line 50-V-002-1101 (TP-001/002)44SDWELDINGWelding at field joints of Line 50-V-002-1101/11432 (TP-001/002)45SDNDTNDT at field joints of Line 50-V-002-1101/11432 (TP-001/002)46SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 50-V-002-1101/11432 (TP-001/002)47SDDE-SPADINGRemove spading at Line 50-V-002-1101 (TP-001/002)48Post-SDTPTouch-up painting at new Line 50-V-002-1101/11432 (TP-001/002)49Post-SDDESCAFF Dismantle scaffolds after installation of new spools for Line 50-V-002-1101/11432 (TP-001/002)5051Pre-SDSCAFFErect scaffolds for removal of spool at Line 80-DD-001-11430 (TP-013/014) & new spools installation52SDGENWashdown & purge Line 80-DD-001-11430 (TP-013/014)53SDSPADINGInstall spading at Line 80-DD-001-11430 (TP-013/014)54SDREMOVERemoval of pipe spool (Cold Cut) at Line 80-DD-001-11430 (TP-013/014)55SDWELDINGWelding at field joint of Line 80-DD-001-11430/11432 (TP-014)56SDNDTNDT at field joint of Line 80-DD-001-11430/11432 (TP-014)57SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 80-DD-001-11430/11432 (TP-013/014)58SDDE-SPADINGRemove spading at Line 80-DD-001-11430 (TP-013/014)59Post-SDTPTouch-up painting at new Line 80-DD-001-11430/11432 (TP-013/014)60Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 80-DD-001-11430/11432 (TP-013/014)6162Pre-SDSCAFFErect scaffolds for removal of spool at Line 80-D-007-1101X (TP-015/016/017/020) & new spools installation63SDGENWashdown & purge Line 80-D-007-1101X (TP-015/016/017/020)64SDSPADINGInstall spading at Line 80-D-007-1101X (TP-015/016/017/020)65SDREMOVERemoval of pipe spool (Cold Cut) at Line 80-D-007-1101X (TP-015/016/017/020)66SDWELDINGWelding at field joints of Line 80-D-007-1101X/11432 (TP-016/017)67SDNDTNDT at field joints of Line 80-D-007-1101X/11432 (TP-016/017)68SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 80-D-007-1101X/11432 (TP-015/016/017/020)69SDDE-SPADINGRemove spading at Line 80-D-007-1101X (TP-015/016/017/020)70Post-SDTPTouch-up painting at new Line 80-D-007-1101X/11432 (TP-015/016/017/020)71Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 80-D-007-1101X/11432 (TP-015/016/017/020)7273Pre-SDSCAFFErect scaffolds for removal of spool at Line 150-BD-004-1101X (TP-005/006) & new spools installation74SDSPADINGInstall spading at Line 150-BD-004-1101X (TP-005/006)75SDREMOVERemoval of pipe spool at Line 150-BD-004-1101X (TP-005/006)76SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 150-BD-004-1101X/11432 (TP-005/006)77SDDE-SPADINGRemove spading at Line 150-BD-004-1101X (TP-005/006)78Post-SDTPTouch-up painting at new Line 150-BD-004-1101X/11432 (TP-005/006)79Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 150-BD-004-1101X/11432 (TP-005/006)8081Pre-SDSCAFFErect scaffolds for removal of spool at Line 50-IA-1003-1808/13411 (TP-009/010) & new spools installation82SDSPADINGInstall spading at Line 50-IA-1003-1808/13411 (TP-009/010)83SDREMOVERemoval of pipe spool (Cold Cut) at Line 50-IA-1003-1808/13411 (TP-009/010)84SDINSTALLThread at field joints of Line 50-IA-1003-1808/13411 (TP-009/010)85SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 50-IA-1003-1808/13411 (TP-009/010)86SDDE-SPADINGRemove spading at Line 50-IA-1003-1808/13411 (TP-009/010)87Post-SDTPTouch-up painting at new Line 50-IA-1003-1808/13411 (TP-009/010)88Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 50-IA-1003-1808/13411 (TP-009/010)8990Pre-SDSCAFFErect scaffolds for removal of spool at Line 50-P-13512-11432 (TP-021/022) & new spools installation91SDGENWashdown & purge Line 50-P-13512-11432 (TP-021/022) 92SDSPADINGInstall spading at Line 50-P-13512-11432 (TP-021/022)93SDREMOVERemoval of pipe spool (Cold Cut) at Line 50-P-13512-11432 (TP-021/022)94SDWELDINGWelding at field joints of Line 50-P-13512-11432 (TP-022)95SDNDTNDT at field joints of Line 50-P-13512-11432 (TP-022)96SDINSTALLInstall spools and associated gaskets & bolting set at Line 50-P-13512-11432 (TP-021/022)97SDDE-SPADINGRemove spading at Line 50-P-13512-11432 (TP-021/022)98Post-SDTPTouch-up painting at new Line 50-P-13512-11432 (TP-021/022)99Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 50-P-13512-11432 (TP-021/022)100101SDGENWashdown at drip pans below CD prior to start-up102SDGENWashdown at drip pans below MD prior to start-up103SDGENWashdown open drain header prior to start-up

TKP-A (PIPING) - POST-SD rev0.1TRADESNOJOBCARD NOPLATFORMLOCATIONDRAWINGSPHASECATSCOPE DESCRIPTION / JOBCARDS TITLERGRSFW BPMWSFSWLPFPWLIFITELENDT WHCCHBTVRTOTAL MHRS1Post-SDL&RLift-up & move pipe spools (Post-SD) to laydown area2Post-SDL&RLift-up & move manual valves (Post-SD) to laydown area3Post-SDL&RLift-up & move MOV-13504, MOV-13505 & ABV-1351 to laydown area4Post-SDL&RLift-up & move gaskets & stud bolts (Post-SD) to laydown area56Post-SDSCAFFErect scaffolds for installation of Line 250-P-13501-6YYYYX 7Post-SDHBTSet-up safety habitat for field joints welding of Line 250-P-13501-6YYYYX and pipe supports installation8Post-SDWELDINGPrelay spools of Line 250-P-13501-6YYYYX and field joints welding9Post-SDNDTNDT at field joints of Line 250-P-13501-6YYYYX10Post-SDHTHydrotesting for Test Pack, TKP-A-HT-P-001 (250-P-13501-6YYYYX)11Post-SDINSTALLInstall MOV-13504, MOV-13505 & ABV-135112Post-SDINSTALLInstall associated manual valves of Line 250-P-13501-6YYYYX & associated gaskets and bolting sets 13Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-001 (250-P-13501-6YYYYX)14Post-SDPSInstall Pipe Supports for Line 250-P-13501-6YYYYX (PS-0003-001-PSD, PS-0002-001-PSD, PS-0002-005-PSD, PS-0002-006-PSD)15Post-SDDHBTDismantle safety habitat after field joints welding of Line 250-P-13501-6YYYYX and pipe supports installation16Post-SDTPTouch-up Painting for Line 250-P-13501-6YYYYX17Post-SDDHBTDismantle scaffolds after installation of Line 250-P-13501-6YYYYX 1819Post-SDSCAFFErect scaffolds for installation of Line 200-P-13500-61432 20Post-SDREMOVERemove 8'' x 600# blind flange at TP-102 (200-PL-101-6101X/61432)21Post-SDWELDINGPrelay spools of Line 200-P-13500-61432 and field joints welding22Post-SDNDTNDT at field joints of Line 200-P-13500-61432 23Post-SDHTHydrotesting for Test Pack, TKP-A-HT-P-002 (200-P-13500-61432 )24Post-SDINSTALLInstall spools of Line 200-P-13500-61432 and associated manual valves, gaskets & bolting sets.25Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-002 (200-P-13500-61432)26Post-SDINSTALLInstall sampling point DBB valve, SP-13508 and return line DBB valve, SP-13509 for H2S Analyzer.27Post-SDINSTALLInstall injection DBB valves, SP-13505/1350728Post-SDINSTALLInstall corossion coupon (SP-13504), scale corrosion coupon (SP-13503), bioprobe (SP-13502) and sampling DBB valve (SP-13501)29Post-SDHBTSet-up safety habitat for pipe supports installation of Line 200-P-13500-6143230Post-SDPSInstall Pipe Support for Line 200-P-13500-61432 (PS-0003-007-PSD)31Post-SDDHBTDismantle safety habitat after pipe support installation of Line 200-P-13500-6143232Post-SDTPTouch-up Painting for Line 200-P-13500-6143233Post-SDDESCAFFDismantle scaffolds after installation of Line 200-P-13500-614323435Post-SDSCAFFErect scaffolds for installation of Line 150-P-13503-61432 & 50-P-13504-6143236Post-SDHBTSet-up safety habitat for field joints welding of Line 150-P-13503-61432 & 50-P-13504-61432 37Post-SDWELDINGPrelay spools of Line 150-P-13503-61432 & 50-P-13504-61432 and field joints welding38Post-SDDHBTDismantle safety habitat after field joints welding of Line 150-P-13503-61432 & 50-P-13504-6143239Post-SDNDTNDT at field joints of Line 150-P-13503-61432 & 50-P-13504-6143240Post-SDHTHydrotesting for Test Pack, TKP-A-HT-P-003 (150-P-13503-61432 & 50-P-13504-61432)41Post-SDINSTALLInstall associated manual valves of Line 150-P-13503-61432 & 50-P-13504-61432 and associated gaskets & bolting sets 42Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-003 (150-P-13503-61432 & 50-P-13504-61432)43Post-SDTPTouch-up Painting for Line 150-P-13503-61432 & 50-P-13504-6143244Post-SDDHBTDismantle scaffolds after installation of Line 150-P-13503-61432 & 50-P-13504-614324546Post-SDSCAFFErect scaffolds for installation of Line 50-V-62100-61432 & 50-V-62101-6143247Post-SDINSTALLInstall spools of Line 50-V-62100-61432 & 50-V-62101-61432 and associated manual valves, gaskets & bolting sets.48Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-V-001 (50-V-62100-61432 & 50-V-62101-61432)49Post-SDTPTouch-up Painting for Line 50-V-62100-61432 & 50-V-62101-6143250Post-SDDESCAFFDismantle scaffolds after installation of Line 50-V-62100-61432 & 50-V-62101-614325152Post-SDSCAFFErect scaffolds for installation of Line 50-V-62102-11432 & 50-V-62103-1143253Post-SDREMOVERemove 2'' x 150# blind flange at TP-101 (50-V-002-1101/11432)54Post-SDHBTSet-up safety habitat for field joints welding of Line 50-V-62102-11432 & 50-V-62103-11432 and pipe supports installation55Post-SDWELDINGPrelay spools of Line 50-V-62102-11432 & 50-V-62103-11432 and field joints welding56Post-SDNDTNDT at field joints of Line 50-V-62102-11432 & 50-V-62103-1143257Post-SDHTHydrotesting for Test Pack, TKP-A-HT-V-002 (50-V-62102-11432 & 50-V-62103-11432)58Post-SDINSTALLInstall associated manual valves of Line 50-V-62102-11432 & 50-V-62103-11432 & associated gaskets and bolting sets 59Post-SDLT Reinstatement Leak Test for Test Pack, TKP-A-LT-V-002 (50-V-62102-11432 & 50-V-62103-11432)60Post-SDPSInstall Pipe Supports for Line 50-V-62102-11432 & 50-V-62103-11432 (PS-0003-009-PSD, PS-0003-014-PSD, PS-0003-013-PSD, PS-0003-012-PSD, PS-0003-011-PSD)61Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-V-62102-11432 & 50-V-62103-11432 and pipe supports installation62Post-SDTPTouch-up Painting for Line 50-V-62102-11432 & 50-V-62103-1143263Post-SDDHBTDismantle scaffolds after installation of Line 50-V-62102-11432 & 50-V-62103-11432 6465Post-SDSCAFFErect scaffolds for installation of Line 80-D-65101-6143266Post-SDINSTALLInstall spools of Line 80-D-65101-61432 & associated manual valves, gaskets and bolting sets 67Post-SDINSTALLInstall spools of Line 80-D-65102-61432 & associated manual valves, gaskets and bolting sets 68Post-SDINSTALLInstall spools of Line 80-D-65103-61432 & associated manual valves, gaskets and bolting sets 69Post-SDINSTALLInstall spools of Line 80-D-65104-61432 & associated manual valves, gaskets and bolting sets 70Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-CD-001 (80-D-65101-61432, 80-D-65102-61432, 80-D-65103-61432 & 80-D-65104-61432)71Post-SDHBTSet-up safety habitat for pipe supports installation of Line 80-D-65101-61432 72Post-SDPSInstall Pipe Supports for Line 80-D-65101-61432 (PS-0003-006-PSD, PS-0003-003-PSD, PS-0003-005-PSD, PS-0003-004-PSD, PS-0003-002-PSD)73Post-SDDHBTDismantle safety habitat after pipe supports installation of Line 80-D-65101-61432 74Post-SDTPTouch-up Painting for Line 80-D-65101-61432, 80-D-65102-61432, 80-D-65103-61432 & 80-D-65104-61432 75Post-SDDESCAFFDismantle scaffolds after installation of Line 80-D-65101-614327677Post-SDSCAFFErect scaffolds for installation of Line 80-D-65100-1143278Post-SDREMOVERemove 3'' x 150# blind flange at TP-103 (150-BD-004-1101X/11432)79Post-SDHBTSet-up safety habitat for field joints welding of Line 80-D-65100-11432 and pipe supports installation80Post-SDWELDINGPrelay spools of Line 80-D-65100-11432 and field joints welding81Post-SDNDTNDT at field joints of Line 80-D-65100-1143282Post-SDHTHydrotesting for Test Pack, TKP-A-HT-CD-001 (80-D-65100-11432)83Post-SDINSTALLInstall associated manual valve of Line 80-D-65100-11432 & associated gaskets and bolting sets 84Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-CD-002 (80-D-65100-11432)85Post-SDPSInstall Pipe Supports for Line 80-D-65100-11432 (PS-0003-010-PSD, PS-0002-008-PSD, PS-0002-009-PSD, PS-0002-010-PSD, PS-0002-012-PSD, PS-0002-013-PSD)86Post-SDDHBTDismantle safety habitat after field joints welding of Line 80-D-65100-11432 and pipe supports installation87Post-SDTPTouch-up Painting for Line 80-D-65100-1143288Post-SDDESCAFFDismantle scaffolds after installation of Line 80-D-65100-11432 8990Post-SDSCAFFErect scaffolds for installation of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-1143291Post-SDHBTSet-up safety habitat for field joints welding of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432 and pipe supports installation92Post-SDWELDINGPrelay spools of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432 and field joints welding93Post-SDNDTNDT at field joints of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-1143294Post-SDHT Hydrotesting for Test Pack, TKP-A-HT-D-001 (80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432)95Post-SDREMOVERemove 3'' x 150# blind flange at TP-104 (150-D-008-1101/11432)96Post-SDINSTALLInstall associated gaskets and bolting sets of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-1143297Post-SDPSInstall Pipe Supports for Line 80-D-64100-11432 (PS-0002-008-PSD, PS-0002-009-PSD, PS-0002-010-PSD, PS-0002-012-PSD, PS-0002-013-PSD, PS-0002-014-PSD, PS-0002-015-PSD)98Post-SDPSInstall Pipe Supports for Line 50-D-64109-11432 (PS-0002-003-PSD, PS-0002-004-PSD, PS-0002-016-PSD)99Post-SDPSInstall Pipe Supports for Line 50-D-64110-11432 (PS-0002-002-PSD)100Post-SDDHBTDismantle safety habitat after field joints welding of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432 and pipe supports installation101Post-SDTPTouch-up Painting for Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432102Post-SDDESCAFFDismantle scaffolds after installation of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432103104Post-SDSCAFFErect scaffolds for installation of Line 50-IA-54000-13411105Post-SDREMOVERemove 2'' x 150# blind flange at TP-105 (50-IA-1003-1808/13411)106Post-SDREMOVETemporary remove existing gratings for installation of Line 50-IA-54000-13411107Post-SDHBTSet-up safety habitat for field joints welding of Line 50-IA-54000-13411 and pipe supports installation108Post-SDWELDINGPrelay spools of Line 50-IA-54000-13411 and field joints welding109Post-SDNDTNDT at field joints of Line 50-IA-54000-13411110Post-SDHTHydrotesting for Test Pack, TKP-A-HT-IA-001 (50-IA-54000-13411)111Post-SDINSTALLInstall associated manual valve of Line 50-IA-54000-13411 & associated gaskets and bolting sets 112Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-IA-001 (50-IA-54000-13411)113Post-SDPSInstall Pipe Supports for Line 50-IA-54000-13411 (PS-0004-004-PSD, PS-0004-003-PSD, PS-0004-002-PSD, PS-0004-001-PSD)114Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-IA-54000-13411 and pipe supports installation115Post-SDTPTouch-up Painting for Line 50-IA-54000-13411116Post-SDINSTALLReinstate removed gratings after installation of Line 50-IA-54000-13411117Post-SDDESCAFFDismantle scaffolds after installation of Line 50-IA-54000-13411118119Post-SDSCAFFErect scaffolds for installation of Line 50-C-68100-13411120Post-SDHBTSet-up safety habitat for field joints welding of Line 50-C-68100-13411 and pipe supports installation121Post-SDWELDINGPrelay spools of Line 50-C-68100-13411 and field joints welding122Post-SDNDTNDT at field joints of Line 50-C-68100-13411123Post-SDHTHydrotesting for Test Pack, TKP-A-HT-C-001 (50-C-68100-13411)124Post-SDINSTALLInstall associated gaskets and bolting sets for Line 50-C-68100-13411125Post-SDPSInstall Pipe Supports for Line 50-C-68100-13411 (PS-0004-001-PSD, PS-0004-002-PSD, PS-0004-003-PSD, PS-0004-004-PSD, PS-0003-015-PSD, PS-0003-016-PSD, PS-0003-017-PSD, PS-0003-018-PSD, PS-0003-019-PSD, PS-0003-020-PSD, PS-0003-021-PSD)126Post-SDDHBTDismantle safety habitat after field joints welding of 50-C-68100-13411 and pipe supports installation127Post-SDTPTouch-up Painting for Line 50-C-68100-13411128Post-SDDESCAFFDismantle scaffolds after installation of Line 50-C-68100-13411129130Post-SDSCAFFErect scaffolds for installation of Line 50-C-68101-13411131Post-SDHBTSet-up safety habitat for field joints welding of Line 50-C-68101-13411 and pipe supports installation132Post-SDWELDINGPrelay spools of Line 50-C-68101-13411 and field joints welding133Post-SDNDTNDT at field joints of Line 50-C-68101-13411134Post-SDHTHydrotesting for Test Pack, TKP-A-HT-C-002 (50-C-68101-13411)135Post-SDINSTALLInstall associated gaskets and bolting sets for Line 50-C-68101-13411136Post-SDPSInstall Pipe Supports for Line 50-C-68101-13411 (PS-0004-001-PSD, PS-0004-002-PSD, PS-0004-003-PSD, PS-0004-004-PSD, PS-0003-015-PSD, PS-0003-016-PSD, PS-0003-017-PSD, PS-0003-018-PSD, PS-0003-019-PSD, PS-0003-020-PSD, PS-0003-021-PSD)137Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-C-68101-13411 and pipe supports installation138Post-SDTPTouch-up Painting for Line 50-C-68101-13411139Post-SDDESCAFFDismantle scaffolds after installation of Line 50-C-68101-13411140141Post-SDSCAFFErect scaffolds for installation of Line 50-C-68102-13411142Post-SDHBTSet-up safety habitat for field joints welding of Line 50-C-68102-13411 and pipe supports installation143Post-SDWELDINGPrelay spools of Line 50-C-68102-13411 and field joints welding144Post-SDNDTNDT at field joints of Line 50-C-68102-13411145Post-SDHTHydrotesting for Test Pack, TKP-A-HT-C-003 (50-C-68102-13411)146Post-SDINSTALLInstall associated gaskets and bolting sets for Line 50-C-68102-13411147Post-SDPSInstall Pipe Supports for Line 50-C-68102-13411 (PS-0004-001-PSD, PS-0004-002-PSD, PS-0004-003-PSD, PS-0004-004-PSD, PS-0003-015-PSD, PS-0003-016-PSD, PS-0003-017-PSD, PS-0003-018-PSD, PS-0003-019-PSD, PS-0003-020-PSD, PS-0003-021-PSD)148Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-C-68102-13411 and pipe supports installation149Post-SDTPTouch-up Painting for Line 50-C-68102-13411150Post-SDDESCAFFDismantle scaffolds after installation of Line 50-C-68102-13411151152Post-SDSCAFFErect scaffolds for installation of Line 50-UN-59100-61432153Post-SDINSTALLInstall spools of Line 50-UN-59100-61432 & associated manual valves, gaskets and bolting sets 154Post-SDLTReinstatement Leak Test for Test Pack, TKP-A-LT-UN-001 (50-UN-59100-61432)155Post-SDHBTSet-up safety habitat for pipe supports installation of Line 50-UN-59100-61432156Post-SDPSInstall Pipe Supports for Line 50-UN-59100-61432 (PS-0003-008-PSD)157Post-SDDHBTDismantle safety habitat after pipe supports installation of Line 50-UN-59100-61432158Post-SDTPTouch-up Painting for Line 50-UN-59100-61432159Post-SDDESCAFFDismantle scaffolds after installation of Line 50-UN-59100-61432

TKP-A (PIPING) - DECOMMTRADESNOJOBCARD NOPLATFORMLOCATIONDRAWINGSPHASECATSCOPE DESCRIPTION / JOBCARDS TITLERGRSFW BPMWSFSWLPFPWLIFITELENDT WHCCHBTVRTOTAL MHRS1Post-SD/DecomL&RLift-up & move pipe spools (Decom) to laydown area2Post-SD/DecomL&RLift-up & move manual valves (Decom) to laydown area3Post-SD/DecomL&RLift-up & move gaskets & stud bolts (Decom) to laydown area45Post-SD/DecomSCAFFErect scaffolds for removal of Line 250-PL-010-6101X/614326Post-SD/DecomSPADINGInstall spading at PL-2107Post-SD/DecomHBTSet up safety habitat for oxy-cutting of long spools (250-PL-010-6101X/61432) 8Post-SD/DecomREMOVEOxy-cutting at Line 250-PL-010-6101X/61432 & spools rig-down9Post-SD/DecomDHBTDismantle safety habitat after Oxy-cutting at Line 250-PL-010-6101X/6143210Post-SD/DecomREMOVECold cut at TP-204 & spools removal of Line 250-PL-010-6101X/6143211Post-SD/DecomHBTSet up safety habitat for field joint welding at TP-204 (250-PL-010-6101X/61432) 12Post-SD/DecomWELDINGWelding at TP-204 (250-PL-010-6101X/61432) and blind-off 10'' x 600# WN flange13Post-SD/DecomDHBTDismantle safety habitat after field joints welding at TP-204 (250-PL-010-6101X/61432)14Post-SD/DecomDE-SPADINGRemove spading at PL-21015Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 250-PL-010-6101X/614321617Post-SD/DecomSCAFFErect scaffolds for removal of Line 250-PL-101-6101X/6143218Post-SD/DecomINSTALLClose ball valve 250VB-13508 at Line 250-PL-101-6101X/6143219Post-SD/DecomREMOVERemove Line 250-PL-101-6101X/6143220Post-SD/DecomINSTALLBlind-off ball valve 250VB-13508/TP-205 (250-PL-101-6101X/61432)21Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 250-PL-101-6101X/614322223Post-SD/DecomSCAFFErect scaffolds for removal of Line 50-V-002-1101/1143224Post-SD/DecomINSTALLClose ball valve 50VB-62105 (50-V-002-1101/11432)25Post-SD/DecomREMOVERemove Line 50-V-002-1101/1143226Post-SD/DecomINSTALLBlind-off ball valve 50VB-62105/TP-203 (50-V-002-1101/11432)27Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 50-V-002-1101/114322829Post-SD/DecomSCAFFErect scaffolds for removal of Line 80-DD-001-11430/1143230Post-SD/DecomREMOVETemporary remove existing grating (for removal of Line 80-DD-001-11430/11432)31Post-SD/DecomREMOVERemove Line 80-DD-001-11430/1143232Post-SD/DecomINSTALLBlind-off TP-200 (80-DD-001-11430/11432)33Post-SD/DecomINSTALLReinstate grating after removal of Line 80-DD-001-11430/1143234Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 80-DD-001-11430/114323536Post-SD/DecomSCAFFErect scaffolds for removal of Line 80-D-007-1101X/1143237Post-SD/DecomREMOVETemporary remove existing grating (for removal of Line 80-D-007-1101X/11432)38Post-SD/DecomINSTALLClose ball valve 80VB-62106 & 80VB-62107 (80-D-007-1101X/11432)39Post-SD/DecomREMOVERemove Line 80-D-007-1101X/11432 (TP-201/202)40Post-SD/DecomINSTALLBlind-off TP-201/202 (80-D-007-1101X/11432)41Post-SD/DecomINSTALLReinstate grating after removal of Line 80-D-007-1101X/11432 (TP-201/202)42Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 80-D-007-1101X/114324344Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-P-13513-1143245Post-SD/DecomREMOVERemove spool at Line 50-PL-13512-11432/TP-21346Post-SD/DecomREMOVERemove flexible hose at TP-212 (50-PL-001-1101)47Post-SD/DecomINSTALLTie-in A-6511 to TP-212 (50-PL-001-1101)48Post-SD/DecomHBTSet up safety habitat for field joint welding of Line 50-P-13513-11432 49Post-SD/DecomWELDINGPrelay spools of Line 50-P-13513-11432 and field joints welding50Post-SD/DecomNDTNDT at field joints of Line 50-P-13513-1143251Post-SD/DecomHTHydrotesting for Test Pack, TKP-A-HT-P-010 (50-P-13513-11432)52Post-SD/DecomINSTALLInstall associated gaskets and bolting sets of Line 50-P-13513-1143253Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-010 (50-P-13513-11432)54Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 50-P-13513-11432 55Post-SD/DecomTPTouch-up Painting for Line 50-P-13513-1143256Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-P-13513-114325758Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)59Post-SD/DecomREMOVERemove 3'' x 150# blind flange at TP-208 (80-D-65100-11432)60Post-SD/DecomHBTSet up safety habitat for field joint welding of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208) and pipe supports installation61Post-SD/DecomWELDINGPrelay spools of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208) and field joints welding62Post-SD/DecomNDTNDT at field joints of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)63Post-SD/DecomHTHydrotesting for Test Pack, TKP-A-HT-P-011 (50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432)64Post-SD/DecomINSTALLInstall associated manual valves of Line 50-P-13507-11432, 50-P-13508-11432 and 50-D-65105-11432 (TP-208) & associated gaskets and bolting sets 65Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-011 (50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432)66Post-SD/DecomPSInstall Pipe Supports for Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (PS-0002-004-DCOM, PS-0002-005-DCOM, PS-0002-006-DCOM)67Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 and pipe supports installation68Post-SD/DecomTPTouch-up Painting for Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)69Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)7071Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-P-13505-1143272Post-SD/DecomINSTALLEnsure ball valve 50VB-13531 (TP-211) is closed73Post-SD/DecomREMOVERemove 2'' x 150# blind flange at TP-21174Post-SD/DecomHBTSet up safety habitat for field joint welding of Line 50-P-13505-11432 & pipe supports installation75Post-SD/DecomWELDINGPrelay spools of Line 50-P-13505-11432 and field joints welding76Post-SD/DecomNDTNDT at field joints of Line 50-P-13505-1143277Post-SD/DecomHTHydrotesting for Test Pack, TKP-A-HT-P-012 (50-P-13505-11432)78Post-SD/DecomINSTALLInstall associated manual valves of Line 50-P-13505-11432 & associated gaskets and bolting sets 79Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-012 (50-P-13505-11432)80Post-SD/DecomPSInstall Pipe Supports for Line 50-P-13505-11432 (PS-0002-013-DCOM, PS-0002-002-DCOM, PS-0002-001-DCOM, PS-0003-001-DCOM, PS-0004-005-DCOM)81Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 50-P-13505-11432 and pipe supports installation82Post-SD/DecomTPTouch-up Painting for Line 50-P-13505-1143283Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-P-13505-11432 8485Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-P-13506-1143286Post-SD/DecomHBTSet up safety habitat for field joint welding of Line 50-P-13506-11432 & pipe supports installation87Post-SD/DecomWELDINGPrelay spools of Line 50-P-13506-11432 and field joints welding88Post-SD/DecomNDTNDT at field joints of Line 50-P-13506-1143289Post-SD/DecomHTHydrotesting for Test Pack, TKP-A-HT-P-013 (50-P-13506-11432)90Post-SD/DecomINSTALLInstall associated manual valves of Line 50-P-13506-11432 & associated gaskets and bolting sets 91Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-P-013 (50-P-13506-11432)92Post-SD/DecomPSInstall Pipe Supports for Line 50-P-13505-11432 (PS-0002-004-DCOM, PS-0002-005-DCOM)93Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 50-P-13506-11432 & pipe supports installation94Post-SD/DecomTPTouch-up Painting for Line 50-P-13506-1143295Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-P-13506-114329697Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-D-64107-1143298Post-SD/DecomREMOVERemove 2'' x 150# blind flange at TP-207 (80-D-64100-11432)99Post-SD/DecomINSTALLInstall spool of Line 50-D-64107-11432 and associated gaskets & bolting sets.100Post-SD/DecomHBTSet up safety habitat for pipe support installation of Line 50-D-64107-11432101Post-SD/DecomPSInstall Pipe Supports for Line 50-D-64107-11432 (PS-0002-012-DCOM)102Post-SD/DecomDHBTDismantle safety habitat after pipe support installation of Line 50-D-64107-11432103Post-SD/DecomTPTouch-up Painting for Line 50-D-64107-11432104Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-D-64107-11432105106Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)107Post-SD/DecomREMOVERemove 3'' x 150# blind flange at TP-206 (80-D-64100-11432)108Post-SD/DecomHBTSet up safety habitat for field joint welding of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206) and pipe supports installation109Post-SD/DecomWELDINGPrelay spools of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206) and field joints welding110Post-SD/DecomNDTNDT at field joints of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)111Post-SD/DecomHTHydrotesting for Test Pack, TKP-A-HT-D-001 (50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)112Post-SD/DecomINSTALLInstall associated manual valve, gaskets and bolting sets of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206) 113Post-SD/DecomINSTALLInstall sampling connection, SP-6510 (80-D-64108-11432)114Post-SD/DecomPSInstall Pipe Supports for Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (PS-0002-009-DCOM, PS-0002-008-DCOM)115Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 and pipe supports installation116Post-SD/DecomTPTouch-up Painting for Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432117Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432118119Post-SD/DecomSCAFFErect scaffolds for installation of Line 100-V-018-1101/11432 (TP-209/210)120Post-SD/DecomGENPurge Line 100-V-018-1101121Post-SD/DecomSPADINGInstall spading at Line 100-V-018-1101122Post-SD/DecomHBTSet up safety habitat for oxy-cutting & field joint welding at TP-209/210 (100-V-018-1101)123Post-SD/DecomREMOVEOxy-cutting at TP-209/210 (100-V-018-1101)124Post-SD/DecomWELDINGField joint welding at TP-209/210 (100-V-018-1101) & install spool125Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 100-V-018-1101/11432 (TP-209/210)126Post-SD/DecomDE-SPADINGRemove spading at Line 100-V-018-1101127Post-SD/DecomTPTouch-up Painting for Line100-V-018-1101/11432 (TP-209/210)128Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 100-V-018-1101/11432 (TP-209/210)129130Post-SD/DecomSCAFFErect scaffolds for installation of Line 80-V-62104-11432131Post-SD/DecomHBTSet up safety habitat for field joint welding of Line 80-V-62104-11432 and pipe supports installation132Post-SD/DecomWELDINGPrelay spools of Line 80-V-62104-11432 and field joints welding133Post-SD/DecomNDTNDT at field joints of Line 80-V-62104-11432134Post-SD/DecomHTHydrotesting for Test Pack, TKP-A-HT-V-001 (80-V-62104-11432)135Post-SD/DecomINSTALLInstall associated gaskets and bolting sets of Line 80-V-62104-11432 136Post-SD/DecomPSInstall Pipe Supports for Line 80-V-62104-11432 (PS-0002-011-DCOM, PS-0002-010-DCOM)137Post-SD/DecomDHBTDismantle safety habitat after field joints welding of Line 80-V-62104-11432 and pipe supports installation138Post-SD/DecomTPTouch-up Painting for Line 80-V-62104-11432139Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 80-V-62104-11432140141Post-SD/DecomSCAFFErect scaffolds for removal of A-6810's vent tubing 142Post-SD/DecomREMOVERemove vent tubing of A-6810 143Post-SD/DecomDESCAFFDismantle scaffolds after removal of A-6810's vent tubing 144145Post-SD/DecomSCAFFErect scaffolds for installation of 50-IA-54000-13411146Post-SD/DecomREMOVERemove 2'' x 150# blind flange at TP-214 (50-IA-54000-13411)147Post-SD/DecomINSTALLInstall final spool of Line 50-IA-54000-13411 (TP-214)148Post-SD/DecomTPTouch-up Painting for Line 50-IA-54000-13411 (TP-214)149Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-IA-54000-13411 (TP-214)150151Post-SD/DecomSCAFFErect scaffolds for installation of Line 50-C-68100-13411, 50-C-68101-13411 & 50-C-68102-13411152Post-SD/DecomINSTALLInstall final spool of Line 50-C-68100-13411 (TP-215) and associated gaskets & bolting sets.153Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-C-001 (50-C-68100-13411)154Post-SD/DecomINSTALLInstall final spool of Line 50-C-68101-13411 (TP-216) and associated gaskets & bolting sets.155Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-C-002 (50-C-68101-13411)156Post-SD/DecomINSTALLInstall final spool of Line 50-C-68102-13411 (TP-217) and associated gaskets & bolting sets.157Post-SD/DecomLTReinstatement Leak Test for Test Pack, TKP-A-LT-C-003 (50-C-68102-13411)158Post-SD/DecomTPTouch-up Painting for Line 50-C-68100-13411, 50-C-68101-13411 & 50-C-68102-13411159Post-SD/DecomDESCAFFDismantle scaffolds after installation of Line 50-C-68100-13411, 50-C-68101-13411 & 50-C-68102-13411160161Post-SD/DecomGENWashdown at drip pans below CD prior to demobilization162Post-SD/DecomGENWashdown at drip pans below MD prior to demobilization163Post-SD/DecomGENWashdown open drain header prior to demobilization

WLDP-C (PIPING) - SDTRADESNOJOBCARD NOPLATFORMLOCATIONDRAWINGSPHASECATSCOPE DESCRIPTION / JOBCARDS TITLERGRSFW BPMWSFSWLPFPWLIFITELENDT WHCCHBTVRTOTAL MHRS1Pre-SDL&RLift-up & move pipe spools (SD) to laydown area2Pre-SDL&RLift-up & move manual valves (SD) to laydown area3Pre-SDL&RLift-up & move gaskets & stud bolts (SD) to laydown area45Pre-SDGENWashdown at drip pans below CD prior to SD6Pre-SDGENWashdown open drain header prior to SD7SDGENWashdown closed drain header89Pre-SDSCAFFErect scaffolds for removal of spool at Line 250-P-13305-6101X (TP-005) & 12''-P-016-6101X (TP-006/018) & new spools installation10SDGENWashdown & purge Line 12''-P-016-6101X (TP-006/018)11SDSPADINGInstall spading at Line 250-P-13305-6101X (TP-005) & 12''-P-016-6101X (TP-006/018)12SDREMOVERemoval of pipe spool (Cold Cut) at Line 250-P-13305-6101X (TP-005) & 12''-P-016-6101X (TP-006/018)13SDWELDINGWelding at field joints of Line 12''-P-016-6101X/61432 (TP-006/018)14SDNDTNDT at field joints of Line 12''-P-016-6101X/61432 (TP-006/018)15SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 250-P-13305-6101X/61432 (TP-005)16SDINSTALLInstall ABV-802 at Line 250-P-13305-6101X/61432 (TP-005)17SDDE-SPADINGRemove spading at Line 250-PL-101-6101X (TP-003/004) 18Post-SDPSInstall Pipe Supports for Line 250-P-13305-6101X/61432 (TP-005) (PS-0003-003-SD, PS-0003-005-SD, PS-0003-002-SD)19Post-SDTPTouch-up painting at new Line 250-P-13305-6101X/61432 (TP-005) & 12''-P-016-6101X/61432 (TP-006/018)20Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 250-P-13305-6101X/61432 (TP-005) & 12''-P-016-6101X/61432 (TP-006/018)2122SDREMOVERemoval of pipe spool at Line 80-P-13304-6101X (TP-007/008) 23SDINSTALL Install spools and associated valves, c/w gaskets & bolting set at Line 80-P-13304-61432 (TP-007/008)24Post-SDPSInstall Pipe Support for Line 80-P-13304-61432 (TP-007/008) (PS-0003-001-SD)25Post-SDTPTouch-up painting at new Line 80-P-13304-61432 (TP-007/008)2627SDREMOVERemove 8'' x 600# blind flange at TP-004 (12''-P-016-6101X)28SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 200-P-13301-61432 (TP-004)29Post-SDPSInstall Pipe Support for Line 200-P-13301-61432 (TP-004) (PS-0003-004-SD)30Post-SDTPTouch-up painting at new Line 200-P-13301-61432 (TP-004)3132Pre-SDSCAFFErect scaffolds for removal of spool at Line 50-V-62404-61430/11430 (TP-012/013) & new spools installation33SDGENPurging Line 50-V-62404-61430/11430 (TP-012/013)34SDSPADINGInstall spading at Line 50-V-62404-61430/11430 (TP-013)35SDREMOVALRemoval of pipe spool (Cold Cut) at 50-V-62404-61430/11430 (TP-013)36SDWELDINGWelding at field joints of Line 50-V-62404-61430/11432 (TP-013)37SDNDTNDT at field joints of Line 50-V-62404-61430/11432 (TP-013)38SDINSTALLInstall spools and associated valves, c/w gaskets & bolting set at Line 50-V-62404-61430/11430 (TP-012/013)39SDDE-SPADINGRemove spading at Line 50-V-62404-61430/11430 (TP-012/013)40Post-SDTPTouch-up painting at new Line 50-V-62404-61430/11430 (TP-012/013)41Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 50-V-62404-61430/11430 (TP-012/013)4243Pre-SDSCAFFErect scaffolds for removal of blind flange & valve installation at Line 2''-VH-6203-11430/1143244SDREMOVERemove 2'' x 150# blind flange at TP-009 (2''-VH-6203-11430/11432)45SDINSTALLInstall 2'' x 150# ball valve c/w gaskets & bolting sets at TP-009 (2''-VH-6203-11430/11432)46Post-SDTPTouch-up painting at new valve (2''-VH-6203-11430/11432)47Post-SDDESCAFFDismantle scaffolds after removal of blind flange & valve installation for Line 2''-VH-6203-11430/114324849Pre-SDSCAFFErect scaffolds for removal of spool at Line 3''-D-052-1101X (TP-014/015) & new spools installation50SDGENWashdown & purge Line 3''-D-052-1101X (TP-014/015)51SDSPADINGInstall spading at Line 3''-D-052-1101X (TP-014/015)52SDREMOVERemoval of pipe spool (Cold Cut) at Line 3''-D-052-1101X (TP-014/015)53SDWELDINGWelding at field joints of Line 3''-D-052-1101X (TP-014/015)54SDNDTNDT at field joints of Line 3''-D-052-1101X (TP-014/015)55SDINSTALLInstall spools c/w gaskets & bolting set at Line 3''-D-052-1101X (TP-014/015)56SDREMOVERemove spading at Line 3''-D-052-1101X (TP-014/015)57Post-SDTPTouch-up painting at new Line 3''-D-052-1101X (TP-014/015)58Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 3''-D-052-1101X (TP-014/015)5960Pre-SDSCAFFErect scaffolds for removal of spool at Line 2''-D-002-6101X/11430 (TP-010/011) & new spools installation61SDGENWashdown & purge Line 2''-D-002-6101X/11430 (TP-010/011)62SDSPADINGInstall spading at Line 2''-D-002-6101X/11430 (TP-010/011)63SDREMOVERemoval of pipe spool (Cold Cut) at Line 2''-D-002-6101X/11430 (TP-011)64SDWELDINGWelding at field joints of Line 2''-D-002-6101X/11430 (TP-011)65SDNDTNDT at field joints of Line 2''-D-002-6101X/11430 (TP-011)66SDINSTALLInstall spools and associated valves c/w gaskets & bolting set at Line 2''-D-002-6101X/11430 (TP-011)67SDDE-SPADINGRemove spading at Line 2''-D-002-6101X/11430 (TP-010/011)68Post-SDPSInstall Pipe Support for Line 2''-D-002-6101X/11430 (TP-010/011) (PS-0003-006-SD)69Post-SDTPTouch-up painting at new Line 2''-D-002-6101X/11430 (TP-010/011)70Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 2''-D-002-6101X/11430 (TP-010/011)7172Pre-SDSCAFFErect scaffolds for removal of spool at Line 2''-PD-6411-11430 (TP-002/003) & new spools installation73SDGENWashdown & purge Line 2''-PD-6411-11430 (TP-002/003)74SDSPADINGInstall spading at Line 2''-PD-6411-11430 (TP-002/003)75SDREMOVERemoval of pipe spool (Cold Cut) at Line 2''-PD-6411-11430 (TP-002/003)76SDWELDINGWelding at field joints of Line 2''-PD-6411-11430 (TP-002/003)77SDNDTNDT at field joints of Line 2''-PD-6411-11430 (TP-002/003)78SDINSTALLInstall spools and associated valve c/w gaskets & bolting set at Line 2''-PD-6411-11430 (TP-002/003)79SDDE-SPADINGRemove spading at Line 2''-PD-6411-11430 (TP-002/003)80Post-SDTPTouch-up painting at new Line 2''-PD-6411-11430 (TP-002/003)81Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 2''-PD-6411-11430 (TP-002/003)8283Pre-SDSCAFFErect scaffolds for removal of spool at Line 2''-D-6506-11430/11432 (TP-019/020) & new spools installation84SDGENWashdown & purge Line 2''-D-6506-11430/11432 (TP-019/020)85SDSPADINGInstall spading at Line 2''-D-6506-11430/11432 (TP-019/020)86SDREMOVERemoval of pipe spool (Cold Cut) at Line 2''-D-6506-11430/11432 (TP-019)87SDWELDINGWelding at field joints of Line 2''-D-6506-11430/11432 (TP-019)88SDNDT NDT at field joints of Line 2''-D-6506-11430/11432 (TP-019)89SDINSTALLInstall spools c/w gaskets & bolting set at Line 2''-D-6506-11430/11432 (TP-019/020)90SDDE-SPADINGRemove spading at Line 2''-D-6506-11430/11432 (TP-019/020)91Post-SDTPTouch-up painting at new Line 2''-D-6506-11430/11432 (TP-019/020)92Post-SDDESCAFFDismantle scaffolds after installation of new spools for Line 2''-D-6506-11430/11432 (TP-019/020)9394SDGENWashdown at drip pans below CD prior to start-up95SDGENWashdown open drain header prior to start-up

WLDP-C (PIPING) - POST-SDTRADESNOJOBCARD NOPLATFORMLOCATIONDRAWINGSPHASECATSCOPE DESCRIPTION / JOBCARDS TITLERGRSFW BPMWSFSWLPFPWLIFITELENDT WHCCHBTVRTOTAL MHRS1Post-SDL&RLift-up & move pipe spools (Post-SD) to laydown area2Post-SDL&RLift-up & move manual valves (Post-SD) to laydown area3Post-SDL&RLift-up & move MOV-13304, MOV-13305 & ABV-1330 to laydown area4Post-SDL&RLift-up & move gaskets & stud bolts (Post-SD) to laydown area56Post-SDSCAFFErect scaffolds for installation of Line 250-P-13300-6YYYYX 7Post-SDHBTSet-up safety habitat for field joints welding of Line 250-P-13300-6YYYYX and pipe supports installation8Post-SDWELDINGPrelay spools of Line 250-P-13300-6YYYYX and field joints welding9Post-SDNDTNDT at field joints of Line 250-P-13300-6YYYYX10Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-P-001 (250-P-13300-6YYYYX)11Post-SDINSTALLInstall MOV-13304, MOV-13305 & ABV-133012Post-SDINSTALLInstall associated manual valves of Line 250-P-13300-6YYYYX & associated gaskets and bolting sets 13Post-SDLT Reinstatement Leak Test for Test Pack, WLDP-C-LT-P-001 (250-P-13300-6YYYYX)14Post-SDPSInstall Pipe Supports for Line 250-P-13300-6YYYYX (PS-0002-001-PSD, PS-0002-002-PSD, PS-0002-003-PSD)15Post-SDDHBTDismantle safety habitat after field joints welding of Line 250-P-13300-6YYYYX and pipe supports installation16Post-SDTPTouch-up Painting for Line 250-P-13300-6YYYYX17Post-SDDESCAFFDismantle scaffolds after installation of Line 250-P-13300-6YYYYX & pipe supports1819Post-SDSCAFFErect scaffolds for installation of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-6143220Post-SDREMOVERemove 8'' x 600# blind flange at TP-103 (200-P-13301-61432)21Post-SDHBTSet-up safety habitat for field joints welding of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 and pipe supports installation22Post-SDWELDINGPrelay spools of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 and field joints welding23Post-SDNDTNDT at field joints of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-6143224Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-P-002 (200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432)25Post-SDINSTALLInstall associated manual valves c/w gaskets & bolting sets for Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-6143226Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-P-002 (200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432)27Post-SDINSTALLInstall sampling point DBB valve, SP-13505 and return line DBB valve, SP-13506 for H2S Analyzer.28Post-SDINSTALLInstall corossion coupon (SP-13304), scale corrosion coupon (SP-13303), bioprobe (SP-13302) and sampling DBB valve (SP-13301)29Post-SDPSInstall Pipe Support for Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 (PS-0003-004-PSD, PS-0003-003-PSD, PS-0003-001-PSD, PS-0003-006-PSD)30Post-SDDHBTDismantle safety habitat after field joints welding of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 and pipe supports31Post-SDTPTouch-up Painting for Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-6143232Post-SDDESCAFFDismantle scaffolds after installation of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-614323334Post-SDSCAFFErect scaffolds for installation of Line 50-V-62400-61432 & 50-V-62401-6143235Post-SDHBTSet-up safety habitat for field joints welding of Line 50-V-62400-61432 & 50-V-62401-61432 and pipe supports installation36Post-SDWELDINGPrelay spools of Line 50-V-62400-61432 & 50-V-62401-61432 and field joints welding37Post-SDNDTNDT at field joints of Line 50-V-62400-61432 & 50-V-62401-6143238Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-V-001 (50-V-62400-61432 & 50-V-62401-61432)39Post-SDINSTALLInstall associated manual valves of Line 50-V-62400-61432 & 50-V-62401-61432 and associated gaskets & bolting sets 40Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-V-001 (50-V-62400-61432 & 50-V-62401-61432)41Post-SDPSInstall Pipe Support for Line 50-V-62400-61432 & 50-V-62401-61432 (PS-0003-014-PSD,PS-0003-013-PSD)42Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-V-62400-61432 & 50-V-62401-61432 and pipe supports43Post-SDTPTouch-up Painting for Line 50-V-62400-61432 & 50-V-62401-6143244Post-SDDESCAFFDismantle scaffolds after installation of Line 50-V-62400-61432 & 50-V-62401-614324546Post-SDSCAFFErect scaffolds for installation of Line 50-V-62402-11432 & 50-V-62403-1143247Post-SDREMOVERemove 2'' x 150# blind flange at TP-104 (2''-VH-6203-11430/11432)48Post-SDHBTSet-up safety habitat for field joints welding of Line 50-V-62402-11432 & 50-V-62403-11432 and pipe supports installation49Post-SDWELDINGPrelay spools of Line 50-V-62402-11432 & 50-V-62403-11432 and field joints welding50Post-SDNDTNDT at field joints of Line 50-V-62402-11432 & 50-V-62403-1143251Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-V-002 (50-V-62402-11432 & 50-V-62403-11432)52Post-SDINSTALLInstall gaskets & bolting sets of Line 50-V-62402-11432 & 50-V-62403-1143253Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-V-002 (50-V-62402-11432 & 50-V-62403-11432)54Post-SDPSInstall Pipe Support for Line 50-V-62402-11432 & 50-V-62403-11432 (PS-0003-011-PSD,PS-0003-012-PSD)55Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-V-62402-11432 & 50-V-62403-11432 and pipe supports56Post-SDTPTouch-up Painting for Line 50-V-62402-11432 & 50-V-62403-1143257Post-SDDESCAFFDismantle scaffolds after installation of Line 50-V-62402-11432 & 50-V-62403-114325859Post-SDSCAFFErect scaffolds for installation of Line 50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-6143260Post-SDHBTSet-up safety habitat for field joints welding of Line 50-D-65400-61432 and pipe supports installation61Post-SDWELDINGPrelay spools of Line 50-D-65400-61432 and field joints welding62Post-SDNDTNDT at field joints of Line 50-D-65400-6143263Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-CD-001 (50-D-65400-61432)64Post-SDINSTALLInstall associated valves c/w gaskets & bolting sets of Line 50-D-65400-6143265Post-SDINSTALLInstall associated valves c/w gaskets & bolting sets of Line 50-D-65402-6143266Post-SDINSTALLInstall associated valves c/w gaskets & bolting sets of Line 50-D-65403-6143267Post-SDINSTALLInstall associated valves c/w gaskets & bolting sets of Line 50-D-65404-6143268Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-CD-001 (50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-61432)69Post-SDPS Install Pipe Support for Line 50-D-65400-61432 (PS-0003-007-PSD,PS-0003-008-PSD)70Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-D-65400-61432 and pipe supports71Post-SDTPTouch-up Painting for Line 50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-6143272Post-SDDESCAFFDismantle scaffolds after installation of Line 50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-614327374Post-SDSCAFFErect scaffolds for installation of Line 50-D-65401-11432 75Post-SDREMOVERemove 2'' x 150# blind flange at TP-102 (2''-PD-6411-11430/11432)76Post-SDHBTSet-up safety habitat for field joints welding of Line 50-D-65401-11432 and pipe supports installation77Post-SDWELDINGPrelay spools of Line 50-D-65401-11432 and field joints welding78Post-SDNDTNDT at field joints of Line 50-D-65401-1143279Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-CD-002 (50-D-65401-11432)80Post-SDINSTALLInstall gaskets & bolting sets of Line 50-D-65401-11432 (TP-102)81Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-CD-002 (50-D-65401-11432)82Post-SDPSInstall Pipe Support for Line 50-D-65401-11432 (PS-0002-009-PSD,PS-0002-007-PSD, PS-0002-008-PSD, PS-0002-006-PSD)83Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-D-65401-11432 and pipe supports84Post-SDTPTouch-up Painting for Line 50-D-65401-1143285Post-SDDESCAFFDismantle scaffolds after installation of Line 50-D-65401-114328687Post-SDSCAFFErect scaffolds for installation of Line 50-D-64400-11432 & 50-D-64401-1143288Post-SDREMOVERemove 2'' x 150# blind flange at TP-101 (2''-D-6506-11430/11432)89Post-SDHBTSet-up safety habitat for field joints welding of Line 50-D-64400-11432 & 50-D-64401-11432 and pipe supports installation90Post-SDWELDINGPrelay spools of Line 50-D-64400-11432 & 50-D-64401-11432 and field joints welding91Post-SDNDTNDT at field joints of Line 50-D-64400-11432 & 50-D-64401-1143292Post-SDHTHydrotesting for Test Pack, WLDP-C-HT-OD-001 (50-D-64400-11432 & 50-D-64401-11432)93Post-SDINSTALLInstall gaskets & bolting sets of Line 50-D-64400-11432 & 50-D-64401-1143294Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-CD-002 (50-D-64400-11432 & 50-D-64401-11432)95Post-SDPSInstall Pipe Support for Line 50-D-64400-11432 & 50-D-64401-11432 (PS-0002-002-PSD,PS-0002-003-PSD, PS-0002-004-PSD, PS-0002-009-PSD)96Post-SDDHBTDismantle safety habitat after field joints welding of Line 50-D-64400-11432 & 50-D-64401-11432 and pipe supports97Post-SDTPTouch-up Painting for Line 50-D-64400-11432 & 50-D-64401-1143298Post-SDDESCAFFDismantle scaffolds after installation of Line 50-D-64400-11432 & 50-D-64401-1143299100Post-SDSCAFFErect scaffolds for installation of Line 50-UN-59100-61432101Post-SDINSTALLInstall spools of Line 50-UN-59100-61432 and associated valves c/w gaskets & bolting sets.102Post-SDLTReinstatement Leak Test for Test Pack, WLDP-C-LT-UN-001 (50-UN-59100-61432)103Post-SDHBTSet-up safety habitat for pipe supports installation of Line 50-UN-59100-61432104Post-SDPSInstall Pipe Support for Line 50-UN-59100-61432 (PS-0003-010-PSD)105Post-SDDHBTDismantle safety habitat after pipe support installation of Line 50-UN-59100-61432106Post-SDTPTouch-up Painting for Line 50-UN-59100-61432107Post-SDDESCAFFDismantle scaffolds after installation of Line 50-UN-59100-61432

WLDP-C (PIPING) - DECOMMTRADESNOJOBCARD NOPLATFORMLOCATIONDRAWINGSPHASECATSCOPE DESCRIPTION / JOBCARDS TITLERGRSFW BPMWSFSWLPFPWLIFITELENDT WHCCHBTVRTOTAL MHRS1Post-SD/DecomL&RLift-up & move blind flanges, gaskets & stud bolts (Decom) to laydown area23Post-SD/DecomSCAFFErect scaffolds for removal of Line 10''-P-010-6101X/614324Post-SD/DecomHBTSet up safety habitat for oxy-cutting of long spools (10''-P-010-6101X/61432) 5Post-SD/DecomREMOVEOxy-cutting at Line 10''-P-010-6101X/61432 & spools rig-down6Post-SD/DecomDHBTDismantle safety habitat after Oxy-cutting at Line 10''-P-010-6101X/614327Post-SD/DecomREMOVECold cut at TP-201 & spools removal of Line 10''-P-010-6101X/614328Post-SD/DecomHBTSet up safety habitat for field joint welding at TP-201 (10''-P-010-6101X/61432) 9Post-SD/DecomWELDINGWelding at TP-201 (10''-P-010-6101X/61432) and blind-off 10'' x 600# WN flange10Post-SD/DecomDHBTDismantle safety habitat after field joints welding at TP-201 (10''-P-010-6101X/61432)11Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 10''-P-010-6101X/614321213Post-SD/DecomSCAFFErect scaffolds for removal of Line 200-P-13305-6143214Post-SD/DecomINSTALLClose ball valve 200VB-13310 at Line 200-P-13305-6143215Post-SD/DecomREMOVERemove Line 200-P-13305-6143216Post-SD/DecomINSTALLBlind-off ball valve 200VB-13310 (Line 200-P-13305-61432/TP-202)17Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 200-P-13305-614321819Post-SD/DecomSCAFFErect scaffolds for removal of Line 80-P-13304-6143220Post-SD/DecomINSTALLClose ball valve 80VB-13322 (80-P-13304-61432)21Post-SD/DecomREMOVERemove Line 80-P-13304-6143222Post-SD/DecomINSTALLBlind-off ball valve 580VB-13322 (80-P-13304-61432/TP-204)23Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 80-P-13304-614322425Post-SD/DecomSCAFFErect scaffolds for removal of Line 2''-D-002-6101X/11430/1143226Post-SD/DecomREMOVETemporary remove existing grating (for removal of Line2''-D-002-6101X/11430/11432)27Post-SD/DecomINSTALLClose ball valve 50VB-65408 (2''-D-002-6101X/11430/11432)28Post-SD/DecomREMOVERemove Line 2''-D-002-6101X/11430/1143229Post-SD/DecomINSTALLBlind-off ball valve 50VB-65408/TP-203 (2''-D-002-6101X/11430/11432)30Post-SD/DecomINSTALLReinstate grating after removal of Line 2''-D-002-6101X/11430/1143231Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 2''-D-002-6101X/11430/114323233Post-SD/DecomSCAFFErect scaffolds for removal of Line 3''-D-052-1101X/1143234Post-SD/DecomREMOVETemporary remove existing grating (for removal of Line 3''-D-052-1101X/11432)35Post-SD/DecomREMOVERemove Line 3''-D-052-1101X/11432 (TP-206)36Post-SD/DecomINSTALLBlind-off TP-206 (3''-D-052-1101X/11432)37Post-SD/DecomINSTALLReinstate grating after removal of Line 3''-D-052-1101X/11432 (TP-206)38Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 3''-D-052-1101X/114323940Post-SD/DecomSCAFFErect scaffolds for removal of Line 50-V-62404-6143041Post-SD/DecomREMOVERemove Line 50-V-62404-61430 (TP-205)42Post-SD/DecomINSTALLBlind-off TP-205 (50-V-62404-61430)43Post-SD/DecomDESCAFFDismantle scaffolds after removal of Line 50-V-62404-61430 (TP-205)4445Post-SD/DecomGENWashdown at drip pans below CD prior to demobilization46Post-SD/DecomGENWashdown open drain header prior to demobilization