Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007...

11
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:- Corporation of City of Panaji

Transcript of Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007...

Page 1: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

JNNURM PROGRESS REVIEWJNNURM PROGRESS REVIEW

JUNE 2007

Reforms-Projects-Funds Mobilisation & Grant Utilisation

State:- Goa

City:- Corporation of City of Panaji

Page 2: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Contents

Item Page no.

• Project implementation status --• Funds Mobilisation --• Status of Implementation of Reforms --• Projects eligible for accessing second installment (including amount) --• Project Pipeline --• Grant utilisation --• New Initiatives --• Best Practices --

General guidelines for filling in formats-- refer last page of this document

Page 3: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Projects--Progress

Project name:

Approved cost: NIL

CSMC approval date: NIL

No. of packages envisaged NIL

Value of packages under tendering NIL

No. of Packages awarded –Total value of packages awarded -

NIL

Physical Progress:

Expected Project completion (month / year)

Sector :-__________ for each project

Page 4: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Fund Mobilisation-1st Installment

Total projects approved - no.

- value in Rs. Cr

NIL

Separate independent project bank a/c established for each project (Yes/No)

NIL

ACA released (1st installment only) – in Rs. Cr. NIL

ACA transferred to implementing agency (IA) (actual) – in Rs. Cr.

NIL

State govt. commitment (1st installment only) – in Rs. Cr.

NIL

State Govt amount transferred to IA (actual) – in Rs. Cr.

NIL

ULB/ Parastatal commitment (1st installment only) – in Rs. Cr.

NIL

ULB/Parastatal amount transferred to project account (actual) – in Rs. Cr.

NIL

for all projects in aggregate

Page 5: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Reforms

Reforms Target completion year (as per MoA)

Milestones / Activities achieved, since start of JNNURM

< please exclude activities towards reforms undertaken before JNNURM launch >

Accounting • Accrual based double entry system

introduced from the year 2007.

e-Governance

• Collection of property tax.• Preparation of Estimates for civil work.• Procurement of Hard Ware.• Biometric attendance system under procurement.

Property Tax

• Collection Simplified.• Getting ready for crisil rating.

Page 6: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Reforms

Reforms Target completion year (as per MoA)

Milestones / Activities achieved, since start of JNNURM

< please exclude activities towards reforms undertaken before JNNURM launch>

User Charge • Towards door to door collection of segregated solid waste.

Internal Budget earmarking

• Shall be done by Re-appropriation

Provision of Basic Services to Poor

• Sanitation under PPP mode

Page 7: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Sector

No. of DPRs proposed for submission ( next 3 months)

No. of DPR preparation commissioned /initiated

Budgetary value of proposed projects (if possible)- Rs. Cr.

Water Supply

Sewerage

Drainage 1 1 (under finalisation)

Solid Waste Mgmt. 1 1 ”

BRTS / Roads / Other urban transport

1 1 ”

Heritage & Urban Renewal

1 1 ”

Preservation of Water Bodies

1 1 ”

Soil Erosion Prevention 1 1 ”

Others 2 2 ”

8(eight) 8(eight)

Project Pipeline – for quarter

Page 8: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Sector

No. of DPRs proposed for submission ( next 3 months)

No. of DPR preparation commissioned /initiated

Budgetary value of proposed projects (if possible)- Rs. Cr.

Water Supply

Sewerage

Drainage 1 1 (under finalisation)

Solid Waste Mgmt. 1 1 ”

BRTS / Roads / Other urban transport

1 1 ”

Heritage & Urban Renewal

1 1 ”

Preservation of Water Bodies

1 1 ”

Soil Erosion Prevention

1 1 ”

Others 2 2 ”

8(eight) 8(eight)

Project Pipeline – for FY 2007-08

Page 9: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionGrant utilisation

Project name:

Nos. of months since CSMC approval NIL

Estimate month & year when 1st UC will be submitted to GoI

NIL

Estimate month & year when 2nd ACA installment request will be made to GoI

NIL

Sector :- __________ for each project

Page 10: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

General Guidelines for filling in these formats

• For project & grant utilisation: __ These are to be prepared separately for each sector and within each sector. __ Project name: to be given in brief __ Concerning “Physical Progress” as given in the first format- please provide such as: %complete, imp.mileston achieved, confirmation that land sites are secured and handed over to contractor etc. __ Concerning grant utilisation:estimates are for indicative reference purpose only. __ All values to be in Rs.Crores.

• For reforms: __ This presentation & occasion is intended to cover ULB level mandatory. __ Only efforts/activities/milestone achieved since launch of JNNURM are to undertaken during earlier periods are to be excluded. The objective is to describe current/recent initiatives in brief-not historical detailing of all achievements.

• Project pipeline: __ Figures/estimates are for indicative purpose only. __ If no planning has yet been done in this can be specifically stated.

Page 11: Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion New Initiatives

New initiatives taken for improvement of infrastructure after the launch of Mission

A Bio-gas plant for processing of 20 tpd segregated solid waste (wet) is under execution.

Best Practices Good practices being followed which could benefit other ULBs in services delivery

Door to door collection of waste segregated waste