jan-feb BOQ II (1)111111111111111.xls

11
Mat'l Labor Total QTY Percentage QTY Percentage QTY Percentage CARRIER DUCTED TYPE 40RM012/38HDS012 2 sets 355,950.00 711,900.00 Php 711,900.00 Php 5.9325% 2 5.6359% 2 0.0000% 2 5.6359% CARRIER WINDOW TYPE WCARP24ED 9 units 31,200.00 280,800.00 280,800.00 2.3400% 9 2.2230% 9 0.0000% 9 2.2230% MITSUBISHI ELECTRIC (SPLIT-TYPE) PK-4FAKLD/ PU-4TJSA.TH 6 sets 102,680.00 616,080.00 616,080.00 5.1340% 6 4.8773% 6 0.0000% 6 4.8773% PC-4GAKD/ PU-4TJSA.TH 2 sets 98,600.00 197,200.00 197,200.00 1.6433% 2 1.5612% 2 0.0000% 2 1.5612% MITSUBISHI ELECTRIC (ACCESSORIES) CMY-Y62-G-E 179 units 7,500.00 1,342,500.00 1,342,500.00 11.1875% 179 10.6281% 179 0.0000% 179 10.6281% BONDS Downpayment Bond 40,067.32 40,067.32 40,067.32 0.3339% 0.3339% 0.3339% Performance Bond 45,778.02 45,778.02 45,778.02 0.3815% 0.3815% 0.3815% Guarantee Bond 20,487.83 20,487.83 20,487.83 0.1707% 0.1707% 0.0000% 0.1707% CARI 58,813.50 58,813.50 58,813.50 0.4901% 0.4901% 0.4901% SUB - TOTAL ( I ) 3,313,626.67 Php 3,313,626.67 Php 27.6136% 26.3017% 0.0000% 26.3017% Descri tion QTY UNIT Amount %Wei ht Mat'l Labor Total QTY Percentage QTY Percentage QTY Percentage Mobilization / Demobilization 1 lot 60,000.00 60,000.00 60,000.00  0.5000% 0.212% 0 0.0000% 0.2121% Temporary Facilities 1 lot 30,000.00 10,000.00 40,000.00 40,000.00  0.3333% 0.141% 0.0000% 0.1414% Representation 1 lot 30,000.00 30,000.00 30,000.00  0.2500% 0.106% 0.0000% 0.1061% Submittals / Shop Drawings 1 lot 70,000.00 70,000.00 70,000.00  0.5833% 0.247% 0.0000% 0.2475% As Built Plans 1 lot 75,000.00 75,000.00 75,000.00  0.6250% 0.265% 0.0000% 0.2652% Utilities (Water / Electricity & Housekeeping) 1 lot 15,000.00 5,000.00 20,000.00 20,000.00  0.1667% 0.071% 0.0000% 0.0707% Testing Commissioning (Labor) 1 lot 70,000.00 70,000.00 70,000.00  0.5833% 0.247% 0.0000% 0.2475% Overhead & Contingecies 1 lot 427,204.45 427,204.45 427,204.45  3.5600% 1.297% 0.0000% 0.6070% SUB - TOTAL ( II ) 792,204.45 Php 792,204.45 Php 6.6017% 2.5871% 0.0000% 1.8974% Mat'l Labor Total QTY Percentage QTY Percentage QTY Percentage 6TH FLOOR Copper Tube 5/8" 340 ft 261.00 88,740.00 88,740.00 0.7395% 340 0.7395% 0 0.0000% 340 0.7395% Copper Tube 1/2" 190 ft 188.40 35,796.00 35,796.00 0.2983% 190 0.2983% 0 0.0000% 190 0.2983% Copper Tube 3/8" 340 ft 109.00 37,060.00 37,060.00 0.3088% 340 0.3088% 0 0.0000% 340 0.3088% Copper Tube 1/4" 190 ft 116.75 22,182.50 22,182.50 0.1849% 190 0.1849% 0 0.0000% 190 0.1849% Copper Elbow 5/8" 48 pcs 93.00 4,464.00 4,464.00 0.0372% 48 0.0372% 0 0.0000% 48 0.0372% Copper Elbow 1/2" 24 pcs 71.64 1,719.36 1,719.36 0.0143% 24 0.0143% 0 0.0000% 24 0.0143% Copper Elbow 3/8" 48 pcs 66.50 3,192.00 3,192.00 0.0266% 48 0.0266% 0 0.0000% 48 0.0266% Copper Elbow 1/4" 24 pcs 62.00 1,488.00 1,488.00 0.0124% 24 0.0124% 0 0.0000% 24 0.0124% Copper Coupling 5/8" 34 pcs 66.50 2,261.00 2,261.00 0.0188% 34 0.0188% 0 0.0000% 34 0.0188% Copper Coupling 1/2" 19 pcs 55.00 1,045.00 1,045.00 0.0087% 19 0.0087% 0 0.0000% 19 0.0087% Copper Coupling 3/8" 34 pcs 55.00 1,870.00 1,870.00 0.0156% 34 0.0156% 0 0.0000% 34 0.0156% Rubber Insulation 5/8" x 1' Thickness 57 L/6 711.13 40,534.41 40,534.41 0.3378% 57 0.3378% 0 0.0000% 57 0.3378% Rubber Insulation 1/2" x 1' Thickness 32 L/6 660.71 21,142.72 21,142.72 0.1762% 32 0.1762% 0 0.0000% 32 0.1762% Rubber Insulation 3/8" x 1' Thickness 57 L/6 581.11 33,123.27 33,123.27 0.2760% 57 0.2760% 0 0.0000% 57 0.2760% Rubber Insulation 1/4" x 3/4' Thickness 32 L/6 323.72 10,359.04 10,359.04 0.0863% 32 0.0863% 0 0.0000% 32 0.0863% EMT Pipe 1/2" 53 L/10 399.00 21,147.00 21,147.00 0.1762% 53 0.1762% 0 0.0000% 53 0.1762% EMT Elbow 1/2" 48 pcs 66.34 3,184.32 3,184.32 0.0265% 48 0.0265% 0 0.0000% 48 0.0265% EMT Coupling 1/2" 150 pcs 39.80 5,970.00 5,970.00 0.0498% 150 0.0498% 0 0.0000% 150 0.0498% G.I. Wire # 16 10 Kgs 172.48 1,724.80 1,724.80 0.0144% 10 0.0144% 0 0.0000% 10 0.0144% Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.0093% 80 0.0093% 0 0.0000% 80 0.0093% Fullthread 3/8" 14 L/10 317.49 4,444.86 4,444.86 0.0370% 14 0.0370% 0 0.0000% 14 0.0370% Nuts 3/8" 70 pcs 5.50 385.00 385.00 0.0032% 70 0.0032% 0 0.0000% 70 0.0032% Washer 3/8" 70 pcs 5.50 385.00 385.00 0.0032% 70 0.0032% 0 0.0000% 70 0.0032%  Anchor Grip 3/8" 70 pcs 39.80 2,786.00 2,786.00 0.0232% 70 0.0232% 0 0.0000% 70 0.0232% Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.0133% 4 0.0133% 0 0.0000% 4 0.0133% Paint 1 Lot 400.00 400.00 400.00 0.0033% 1 0.0033% 0 0.0000% 1 0.0033%  Access Valve 16 pcs 119.50 1,912.00 1,912.00 0.0159% 16 0.0159% 0 0.0000% 16 0.0159% Nitrogen 2 cyl 1,460.00 2,920.00 2,920.00 0.0243% 2 0.0243% 0 0.0000% 2 0.0243% Silver Rod 80 pcs 40.00 3,200.00 3,200.00 0.0267% 80 0.0267% 0 0.0000% 80 0.0267% Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.0232% 1 0.0232% 0 0.0000% 1 0.0232% Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.0029% 2 0.0029% 0 0.0000% 2 0.0029% Junction Box 24 pcs 66.50 1,596.00 1,596.00 0.0133% 24 0.0133% 0 0.0000% 24 0.0133% 26-Feb-13 Previous Accomplishment Present Accomplishment To Date To Date Unit Cost Amount QTY Previous Accomplishment Present Accomplishment 1 lot Description QTY UNIT Unit Cost Amount THE ADDRESS - Wack Wack Mandaluyong City CP-08A Supply and Delivery of A/C Equipment (Common Areas) & Installation of Piping Works for Residential Areas I EQUIPMENT Previous Accomplishment III INSTALLATION To Date 1 Present Accomplishment Unit Cost Itemized Cost Breakdown January 20, 2012 - February 21, 2013 % Weight Description 1 % Weight UNIT 1 II GENERAL REQUIREMENTS

Transcript of jan-feb BOQ II (1)111111111111111.xls

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 1/12

Mat'l Labor Total

CARRIER DUCTED TYPE

40RM012/38HDS012 2 sets 355,950.00 711,900.00Php 711,900.00Php 5.932

CARRIER WINDOW TYPE

WCARP24ED 9 units 31,200.00 280,800.00 280,800.00 2.340

MITSUBISHI ELECTRIC

(SPLIT-TYPE)

PK-4FAKLD/ PU-4TJSA.TH 6 sets 102,680.00 616,080.00 616,080.00 5.134

PC-4GAKD/ PU-4TJSA.TH 2 sets 98,600.00 197,200.00 197,200.00 1.643

MITSUBISHI ELECTRIC

(ACCESSORIES)

CMY-Y62-G-E 179 units 7,500.00 1,342,500.00 1,342,500.00 11.187

BONDS

Downpayment Bond 40,067.32 40,067.32 40,067.32 0.333

Performance Bond 45,778.02 45,778.02 45,778.02 0.381

Guarantee Bond 20,487.83 20,487.83 20,487.83 0.170

CARI 58,813.50 58,813.50 58,813.50 0.490

SUB - TOTAL ( I ) 3,313,626.67Php 3,313,626.67Php 27.613

Descri tion QTY UNIT Amount % Wei htMat'l Labor Total

Mobilization / Demobilization 1 lot60,000.00 60,000.00 60,000.00  0.500

Temporary Facilities 1 lot 30,000.00 10,000.00 40,000.00 40,000.00  0.333

Representation 1 lot 30,000.00 30,000.00 30,000.00  0.250

Submittals / Shop Drawings 1 lot70,000.00 70,000.00 70,000.00  0.583

As Built Plans 1 lot 75,000.00 75,000.00 75,000.00  0.625

Utilities (Water / Electricity &

Housekeeping)1 lot

15,000.00 5,000.00 20,000.00 20,000.00  0.166

Testing Commissioning (Labor) 1 lot70,000.00 70,000.00 70,000.00  0.583

Overhead & Contingecies 1 lot 427,204.45 427,204.45 427,204.45  3.560

SUB - TOTAL ( II ) 792,204.45Php 792,204.45Php 6.601

Mat'l Labor Total

6TH FLOOR

Copper Tube 5/8" 340 ft 261.00 88,740.00 88,740.00 0.739

Copper Tube 1/2" 190 ft 188.40 35,796.00 35,796.00 0.298

Copper Tube 3/8" 340 ft 109.00 37,060.00 37,060.00 0.308

Copper Tube 1/4" 190 ft 116.75 22,182.50 22,182.50 0.184

Copper Elbow 5/8" 48 pcs 93.00 4,464.00 4,464.00 0.037

Copper Elbow 1/2" 24 pcs 71.64 1,719.36 1,719.36 0.014

Copper Elbow 3/8" 48 pcs 66.50 3,192.00 3,192.00 0.026

Copper Elbow 1/4" 24 pcs 62.00 1,488.00 1,488.00 0.012

Copper Coupling 5/8" 34 pcs 66.50 2,261.00 2,261.00 0.018

Copper Coupling 1/2" 19 pcs 55.00 1,045.00 1,045.00 0.008Copper Coupling 3/8" 34 pcs 55.00 1,870.00 1,870.00 0.015

Rubber Insulation 5/8" x 1' Thickness 57 L/6 711.13 40,534.41 40,534.41 0.337

Rubber Insulation 1/2" x 1' Thickness 32 L/6 660.71 21,142.72 21,142.72 0.176

Rubber Insulation 3/8" x 1' Thickness 57 L/6 581.11 33,123.27 33,123.27 0.276

Rubber Insulation 1/4" x 3/4' Thickness 32 L/6 323.72 10,359.04 10,359.04 0.086

EMT Pipe 1/2" 53 L/10 399.00 21,147.00 21,147.00 0.176

EMT Elbow 1/2" 48 pcs 66.34 3,184.32 3,184.32 0.026

EMT Coupling 1/2" 150 pcs 39.80 5,970.00 5,970.00 0.049

G.I. Wire # 16 10 Kgs 172.48 1,724.80 1,724.80 0.014

Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.009

Fullthread 3/8" 14 L/10 317.49 4,444.86 4,444.86 0.037

Nuts 3/8" 70 pcs 5.50 385.00 385.00 0.003

Washer 3/8" 70 pcs 5.50 385.00 385.00 0.003

 Anchor Grip 3/8" 70 pcs 39.80 2,786.00 2,786.00 0.023

Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.013Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 16 pcs 119.50 1,912.00 1,912.00 0.015

Nitrogen 2 cyl 1,460.00 2,920.00 2,920.00 0.024

Silver Rod 80 pcs 40.00 3,200.00 3,200.00 0.026

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.002

Junction Box 24 pcs 66.50 1,596.00 1,596.00 0.013

Unit CostAmountQTY

1 lot

Description QTY UNITUnit Cost

Amount

THE ADDRESS - Wack Wack Mandaluyong City

CP-08A Supply and Delivery of A/C Equipment (Common Areas) & Installation of Pi

I EQUIPMENT

III INSTALLATION

Unit Cost

Itemized Cost Breakdown

January 20, 2012 - February 21, 2013

% WeightDescription

% Weight

UNIT

II GENERAL REQUIREMENTS

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 2/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Polyethelene Tape 18 rolls 133.00 2,394.00 2,394.00 0.020

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 67,895.98 67,895.98 67,895.98 0.565

431,347.20 PhP 431,347.20 PhP 3.594

7TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

8TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

9TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 3/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.01

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.21

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.08

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.17

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.04

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.10

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.01

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.03

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.00

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.00

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.00

Paint 1 Lot 400.00 400.00 400.00 0.00

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.01

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.03

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.02

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.02

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.00

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.41

272,883.25 PhP 272,883.25 PhP 2.274

10TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.47

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.14

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.19

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.09

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.01

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.01

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.21

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.08

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.17

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.04

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.10

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.01

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.03

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.00

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.00

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.00

Paint 1 Lot 400.00 400.00 400.00 0.00

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.01

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.03

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.02

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.02

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.00

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.41

272,883.25 PhP 272,883.25 PhP 2.274

11TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.47

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.14

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.19

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.09

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.01

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.01

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.21

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.08

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.17

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.04

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.10

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.01

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.03

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.00

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 4/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

12TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

14TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 5/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

15TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

16TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

17TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 6/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.01

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.21

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.08

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.17

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.04

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.10

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.01

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.03

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.00

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.00

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.00

Paint 1 Lot 400.00 400.00 400.00 0.00

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.01

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.03

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.02

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.02

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.00

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.41

272,883.25 PhP 272,883.25 PhP 2.274

18TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.47

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.14

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.19

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.09

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.01

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.01

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.21

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.08

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.17

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.04

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.10

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.01

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.03

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.00

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.00

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.00

Paint 1 Lot 400.00 400.00 400.00 0.00

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.01

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.03

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.02

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.02

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.00

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.41

272,883.25 PhP 272,883.25 PhP 2.274

19TH FLOOR

Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.47

Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.14

Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.19

Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.09

Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.01

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.01

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.21

Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.08

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.17

Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.04

EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.10

EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.01

EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.03

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 7/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

272,883.25 PhP 272,883.25 PhP 2.274

20TH FLOOR

Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465

Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125

Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194

Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077

Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003

Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009

Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213

Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077

Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174

Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037

EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028

EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 7 pcs 119.50 836.50 836.50 0.007

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

264,558.90 PhP 264,558.90 PhP 2.204

21ST FLOOR

Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465

Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125

Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194

Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077

Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003

Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009

Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213

Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077

Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174

Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037

EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028

EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 7 pcs 119.50 836.50 836.50 0.007

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 8/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

264,558.90 PhP 264,558.90 PhP 2.204

22ND FLOOR

Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465

Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125

Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194

Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077

Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003

Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009

Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213

Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077

Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174

Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037

EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028

EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 7 pcs 119.50 836.50 836.50 0.007

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

264,558.90 PhP 264,558.90 PhP 2.204

23RD FLOOR

Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465

Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125

Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194

Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077

Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003

Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009

Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213

Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077

Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174

Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037

EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028

EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 7 pcs 119.50 836.50 836.50 0.007

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

264,558.90 PhP 264,558.90 PhP 2.204

24TH FLOOR

Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465

Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125

Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194

Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077

Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 9/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.01

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.01

Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.00

Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.00

Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.21

Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.07

Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.17

Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.03

EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.09

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.02

EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.04

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.00

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.00

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.00

Paint 1 Lot 400.00 400.00 400.00 0.00

 Access Valve 7 pcs 119.50 836.50 836.50 0.00

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.03

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.02

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.02

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.00

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.41

264,558.90 PhP 264,558.90 PhP 2.204

25TH FLOOR

Copper Tube 5/8" 260 ft 261.00 67,860.00 67,860.00 0.56

Copper Tube 1/2" 85 ft 188.40 16,014.00 16,014.00 0.13

Copper Tube 3/8" 260 ft 109.00 28,340.00 28,340.00 0.23

Copper Tube 1/4" 85 ft 116.75 9,923.75 9,923.75 0.08

Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.02

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.02

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 26 pcs 66.50 1,729.00 1,729.00 0.01

Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 26 pcs 55.00 1,430.00 1,430.00 0.01

Rubber Insulation 5/8" x 1' Thickness 44 L/6 711.13 31,289.72 31,289.72 0.26

Rubber Insulation 1/2" x 1' Thickness 15 L/6 660.71 9,910.65 9,910.65 0.08

Rubber Insulation 3/8" x 1' Thickness 44 L/6 581.11 25,568.84 25,568.84 0.21

Rubber Insulation 1/4" x 3/4' Thickness 15 L/6 323.72 4,855.80 4,855.80 0.04

EMT Pipe 1/2" 35 L/10 399.00 13,965.00 13,965.00 0.11

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.02

EMT Coupling 1/2" 137 pcs 39.80 5,452.60 5,452.60 0.04

G.I. Wire # 16 6 Kgs 172.48 1,034.88 1,034.88 0.00

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.00

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.00

Paint 1 Lot 400.00 400.00 400.00 0.00

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.01

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.03

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.02

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.02

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.00

Polyethelene Tape 12 rolls 133.00 1,596.00 1,596.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.41

299,515.48 PhP 299,515.48 PhP 2.496

26TH FLOOR

Copper Tube 5/8" 260 ft 261.00 67,860.00 67,860.00 0.56

Copper Tube 1/2" 85 ft 188.40 16,014.00 16,014.00 0.13

Copper Tube 3/8" 260 ft 109.00 28,340.00 28,340.00 0.23

Copper Tube 1/4" 85 ft 116.75 9,923.75 9,923.75 0.08

Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.02

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.00

Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.02

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.00

Copper Coupling 5/8" 26 pcs 66.50 1,729.00 1,729.00 0.01Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.00

Copper Coupling 3/8" 26 pcs 55.00 1,430.00 1,430.00 0.01

Rubber Insulation 5/8" x 1' Thickness 44 L/6 711.13 31,289.72 31,289.72 0.26

Rubber Insulation 1/2" x 1' Thickness 15 L/6 660.71 9,910.65 9,910.65 0.08

Rubber Insulation 3/8" x 1' Thickness 44 L/6 581.11 25,568.84 25,568.84 0.21

Rubber Insulation 1/4" x 3/4' Thickness 15 L/6 323.72 4,855.80 4,855.80 0.04

EMT Pipe 1/2" 35 L/10 399.00 13,965.00 13,965.00 0.11

EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.02

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 10/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

EMT Coupling 1/2" 137 pcs 39.80 5,452.60 5,452.60 0.045

G.I. Wire # 16 6 Kgs 172.48 1,034.88 1,034.88 0.008

Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004

Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.02

Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.00

Washer 3/8" 40 pcs 5.50 220.00 220.00 0.00

 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 12 rolls 133.00 1,596.00 1,596.00 0.013

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

299,515.48 PhP 299,515.48 PhP 2.496

27TH FLOOR

Copper Tube 5/8" 218 ft 261.00 56,898.00 56,898.00 0.474

Copper Tube 1/2" 72 ft 188.40 13,564.80 13,564.80 0.113

Copper Tube 3/8" 218 ft 109.00 23,762.00 23,762.00 0.198

Copper Tube 1/4" 72 ft 116.75 8,406.00 8,406.00 0.070

Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.027

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.020

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 7 pcs 55.00 385.00 385.00 0.003

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 12 L/6 660.71 7,928.52 7,928.52 0.066

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 12 L/6 323.72 3,884.64 3,884.64 0.032

EMT Pipe 1/2" 29 L/10 399.00 11,571.00 11,571.00 0.096

EMT Elbow 1/2" 42 pcs 66.34 2,786.28 2,786.28 0.023

EMT Coupling 1/2" 113 pcs 39.80 4,497.40 4,497.40 0.037

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 36 pcs 14.00 504.00 504.00 0.004

Fullthread 3/8" 7 L/10 317.49 2,222.43 2,222.43 0.018

Nuts 3/8" 36 pcs 5.50 198.00 198.00 0.00

Washer 3/8" 36 pcs 5.50 198.00 198.00 0.00

 Anchor Grip 3/8" 36 pcs 39.80 1,432.80 1,432.80 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

262,452.13 PhP 262,452.13 PhP 2.187

28TH FLOOR

Copper Tube 5/8" 218 ft 261.00 56,898.00 56,898.00 0.474

Copper Tube 1/2" 72 ft 188.40 13,564.80 13,564.80 0.113

Copper Tube 3/8" 218 ft 109.00 23,762.00 23,762.00 0.198

Copper Tube 1/4" 72 ft 116.75 8,406.00 8,406.00 0.070

Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.027

Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009

Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.020

Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007

Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012

Copper Coupling 1/2" 7 pcs 55.00 385.00 385.00 0.003

Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010

Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219

Rubber Insulation 1/2" x 1' Thickness 12 L/6 660.71 7,928.52 7,928.52 0.066

Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179

Rubber Insulation 1/4" x 3/4' Thickness 12 L/6 323.72 3,884.64 3,884.64 0.032

EMT Pipe 1/2" 29 L/10 399.00 11,571.00 11,571.00 0.096

EMT Elbow 1/2" 42 pcs 66.34 2,786.28 2,786.28 0.023

EMT Coupling 1/2" 113 pcs 39.80 4,497.40 4,497.40 0.037

G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007

Tox With Metal screw #8 36 pcs 14.00 504.00 504.00 0.004

Fullthread 3/8" 7 L/10 317.49 2,222.43 2,222.43 0.018

Nuts 3/8" 36 pcs 5.50 198.00 198.00 0.00Washer 3/8" 36 pcs 5.50 198.00 198.00 0.00

 Anchor Grip 3/8" 36 pcs 39.80 1,432.80 1,432.80 0.01

Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013

Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036

Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023

SUBTOTAL

SUBTOTAL

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 11/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023

Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.00

Junction Box 15 pcs 66.50 997.50 997.50 0.008

Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.01

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 49,605.42 49,605.42 49,605.42 0.413

262,452.13 PhP 262,452.13 PhP 2.187

29TH FLOOR

Copper Tube 5/8" 513 ft 261.00 133,893.00 133,893.00 1.115

Copper Tube 1/2" 135 ft 188.40 25,434.00 25,434.00 0.212

Copper Tube 3/8" 513 ft 109.00 55,917.00 55,917.00 0.466

Copper Tube 1/4" 135 ft 116.75 15,761.25 15,761.25 0.13

Copper Elbow 5/8" 54 pcs 93.00 5,022.00 5,022.00 0.04

Copper Elbow 1/2" 54 pcs 71.64 3,868.56 3,868.56 0.032

Copper Elbow 3/8" 54 pcs 66.50 3,591.00 3,591.00 0.029

Copper Elbow 1/4" 54 pcs 62.00 3,348.00 3,348.00 0.027

Copper Coupling 5/8" 51 pcs 66.50 3,391.50 3,391.50 0.028

Copper Coupling 1/2" 13 pcs 55.00 715.00 715.00 0.006

Copper Coupling 3/8" 51 pcs 55.00 2,805.00 2,805.00 0.023

Rubber Insulation 5/8" x 1' Thickness 86 L/6 711.13 61,157.18 61,157.18 0.509

Rubber Insulation 1/2" x 1' Thickness 23 L/6 660.71 15,196.33 15,196.33 0.126

Rubber Insulation 3/8" x 1' Thickness 86 L/6 581.11 49,975.46 49,975.46 0.416

Rubber Insulation 1/4" x 3/4' Thickness 23 L/6 323.72 7,445.56 7,445.56 0.062

EMT Pipe 1/2" 65 L/10 399.00 25,935.00 25,935.00 0.216

EMT Elbow 1/2" 75 pcs 66.34 4,975.50 4,975.50 0.04

EMT Coupling 1/2" 215 pcs 39.80 8,557.00 8,557.00 0.07

G.I. Wire # 16 10 Kgs 172.48 1,724.80 1,724.80 0.014

Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.009

Fullthread 3/8" 16 L/10 317.49 5,079.84 5,079.84 0.042

Nuts 3/8" 80 pcs 5.50 440.00 440.00 0.003

Washer 3/8" 80 pcs 5.50 440.00 440.00 0.003

 Anchor Grip 3/8" 80 pcs 39.80 3,184.00 3,184.00 0.026

Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.013

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 30 pcs 119.50 3,585.00 3,585.00 0.029

Nitrogen 5 cyl 1,460.00 7,300.00 7,300.00 0.060

Silver Rod 150 pcs 40.00 6,000.00 6,000.00 0.050

Oxy-Acethylene 2 set 2,787.00 5,574.00 5,574.00 0.046

Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.002

Junction Box 45 pcs 66.50 2,992.50 2,992.50 0.024

Polyethelene Tape 22 rolls 133.00 2,926.00 2,926.00 0.024

Rugby 1 bot 172.98 172.98 172.98 0.00

Labor  1 lot 95,519.88 95,519.88 95,519.88 0.796

565,392.30 PhP 565,392.30 PhP 4.71

30TH FLOOR

Copper Tube 5/8" 514 ft 261.00 134,154.00 134,154.00 1.118

Copper Tube 1/2" 118 ft 188.40 22,231.20 22,231.20 0.185

Copper Tube 3/8" 514 ft 109.00 56,026.00 56,026.00 0.466

Copper Tube 1/4" 118 ft 116.75 13,776.50 13,776.50 0.114

Copper Elbow 5/8" 84 pcs 93.00 7,812.00 7,812.00 0.065

Copper Elbow 1/2" 39 pcs 71.64 2,793.96 2,793.96 0.023

Copper Elbow 3/8" 84 pcs 66.50 5,586.00 5,586.00 0.046

Copper Elbow 1/4" 39 pcs 62.00 2,418.00 2,418.00 0.020

Copper Coupling 5/8" 51 pcs 66.50 3,391.50 3,391.50 0.028

Copper Coupling 1/2" 12 pcs 55.00 660.00 660.00 0.005

Copper Coupling 3/8" 51 pcs 55.00 2,805.00 2,805.00 0.023

Rubber Insulation 5/8" x 1' Thickness 86 L/6 711.13 61,157.18 61,157.18 0.509

Rubber Insulation 1/2" x 1' Thickness 20 L/6 660.71 13,214.20 13,214.20 0.110

Rubber Insulation 3/8" x 1' Thickness 86 L/6 581.11 49,975.46 49,975.46 0.416

Rubber Insulation 1/4" x 3/4' Thickness 20 L/6 323.72 6,474.40 6,474.40 0.054

EMT Pipe 1/2" 64 L/10 399.00 25,536.00 25,536.00 0.212

EMT Elbow 1/2" 129 pcs 66.34 8,557.86 8,557.86 0.07

EMT Coupling 1/2" 322 pcs 39.80 12,815.60 12,815.60 0.106

G.I. Wire # 16 11 Kgs 172.48 1,897.28 1,897.28 0.015

Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.009

Fullthread 3/8" 16 L/10 317.49 5,079.84 5,079.84 0.042

Nuts 3/8" 80 pcs 5.50 440.00 440.00 0.003

Washer 3/8" 80 pcs 5.50 440.00 440.00 0.003

 Anchor Grip 3/8" 80 pcs 39.80 3,184.00 3,184.00 0.026

Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.013

Paint 1 Lot 400.00 400.00 400.00 0.003

 Access Valve 30 pcs 119.50 3,585.00 3,585.00 0.029

Nitrogen 5 cyl 1,460.00 7,300.00 7,300.00 0.060

Silver Rod 150 pcs 40.00 6,000.00 6,000.00 0.050

Oxy-Acethylene 3 set 2,787.00 8,361.00 8,361.00 0.069

Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.002

Junction Box 39 pcs 66.50 2,593.50 2,593.50 0.02

Polyethelene Tape 22 rolls 133.00 2,926.00 2,926.00 0.024

Rugby 1 bot 172.98 172.98 172.98 0.00Labor  1 lot 95,519.88 95,519.88 95,519.88 0.796

570,349.30 PhP 570,349.30 PhP 4.752

SUB - TOTAL ( III )

GRAND TOTAL 100.00(Equipment, General requirements & Installation) 12,000,000.00PhP

SUBTOTAL

SUBTOTAL

SUBTOTAL

(Installation) 7,894,168.88PhP

7/27/2019 jan-feb BOQ II (1)111111111111111.xls

http://slidepdf.com/reader/full/jan-feb-boq-ii-1111111111111111xls 12/12

Mat'l Labor TotalDescription QTY UNIT

Unit CostAmount % Weight

PREPARED BY: NOTED BY: CONFORMED BY

Ma. Diana Rose D. Japone Francis O. Velarde