    3

    Treatment rate will be 3mtpa.

    Anticipated production cost is 150/lb of copper, after gold and silver

    credits.

    The deposit is ideally located for smelting in either the east or the west.

    FFiigguurree 44:: IIddeeaall llooccaattiioonn ffoorr eeaasstt--wweesstt ssmmeellttiinngg

    FFiigguurree 55:: DDeecclliinnee tthhrroouugghh wwhhiicchh oorree wwiillll bbee ttrraammmmeedd

    Being a clean ore, treatment will be by conventional flotation employing

    rougher and scavenger flotation, with two stages of cleaning.

  • 7/31/2019 Jabal Sayid Project

    4/11

    4

    FFiigguurree 66:: RRoocckk ffrroomm JJaabbaall SSaayyiidd mmiinnee sshhoowwiinngg tthhee ccooppppeerr mmiinneerraall,,

    cchhaallccooppyyrriittee

    FFiigguurree 77:: CCooppppeerr bbeeiinngg rreeccoovveerreedd bbyy ffrrootthh fflloottaattiioonn

  • 7/31/2019 Jabal Sayid Project

    5/11

    5

    Plant recoveries are expected to be as follows:

    Copper 95.9% Gold 67.2% Silver 69.8%

    FFiigguurree 88:: FFllooww sshheeeett,, sshhoowwiinngg ccoonnvveennttiioonnaall ssuullpphhiiddee fflloottaattiioonn

    FFiigguurree 99:: CCooppppeerr ccoonncceennttrraattee llooaaddeedd iinn aa sshhiipp

  • 7/31/2019 Jabal Sayid Project

    6/11

    6

    FFiigguurree 1100:: MMeettaalllliicc ccooppppeerr bbeeiinngg ppaacckkeedd

    An entirely new camp and surface infrastructure will have to be

    constructed to attract multi-cultural and multi lingual workers, of the rightcalibre.

    FFiigguurree 1111:: NNeewwllyy ccoonnssttrruucctteedd ccaammpp

  • 7/31/2019 Jabal Sayid Project

    7/11

    7

    FFiigguurree 1122:: NNeeww ssuurrffaaccee iinnffrraassttrruuccttuurree

    FFiigguurree 1133:: MMoorree nneeww iinnffrraassttrruuccttuurree bbeeiinngg ccoonnssttrruucctteedd

  • 7/31/2019 Jabal Sayid Project

    8/11

    8

    Because of the fragile ecosystem in the area of the mine, stewardship of

    the environment will be paramount.

    FFiigguurree 1144:: TThhee ffrraaggiillee ddeesseerrtt eennvviirroonnmmeenntt wwhhiicchh ddeemmaannddss ggoooodd

    sstteewwaarrddsshhiipp oofftthhee eennvviirroonnmmeenntt bbyy mmiinniinngg ooppeerraattiioonnss

    Utilisation of meteoric water is not permitted and drains have to be put in

    to channel such water from the mine site into the nearby wadi. TheBedouins living in the vicinity of the wadi abstract water for human and

    livestock consumption using wells.

    FFiigguurree 1155:: AA BBeeddoouuiinnss wwaatteerr wweellll iinn aa wwaaddii

  • 7/31/2019 Jabal Sayid Project

    9/11

    9

    Plant design entails filtering of tailings to abstract and recycle the

    maximum amount of water. Top up water will be trucked in from Madina,

    being sewage plant overflow.

    The filtered tailings will be dry stacked in a plastic-lined tailings storage

    facility/impoundment (TSF).

    A mist fogging system will be installed in the area of the crusher and at all

    belt transfer points to suppress dust.

    Dust and noise monitoring will be an integral part of mining operations.

    Power will be generated by a contractor on site and purchased at a

    contracted rate.

    An incinerator and waste disposal facility will be installed to deal with

    camp waste. The incinerator will be capable of processing 250 kgh-1 of

    waste at a temperature of 1,000C utilising the 3T formula of time,

    temperature and turbulence.

    FFiigguurree 1166:: PPrrooppoosseedd wwaassttee iinncciinneerraattoorr

    Oil collection facilities will be functional as a precursor to recycling.

    Used batteries will be recycled.

  • 7/31/2019 Jabal Sayid Project

    10/11

    10

    FFiigguurree 1177:: PPllaanntt uunnddeerr ccoonnssttrruuccttiioonn iinn SSeepptteemmbbeerr 22001111

    FFiigguurree 1188:: PPllaanntt uunnddeerr ccoonnssttrruuccttiioonn iinn DDeecceemmbbeerr 22001111

    FFiigguurree 1199:: PPaannoorraammiicc vviieeww oofftthhee ppllaanntt,, llooookkiinngg ffrroomm tthhee WWeessttiinn DDeecceemmbbeerr 22001111

  • 7/31/2019 Jabal Sayid Project

    11/11

    11

    FFiigguurree 2200:: FFlloottaattiioonn aanndd ddeewwaatteerriinngg sseeccttiioonnss uunnddeerr ccoonnssttrruuccttiioonn iinn

    DDeecceemmbbeerr 22001111

    FFiigguurree 2211:: FFuueell ffaarrmm aanndd mmiinniinngg ssttoorreess yyaarrdd

    FFiigguurree 2222:: CCoonnttrraaccttoorrss ppoowweerr ssttaattiioonn