Jabal Sayid Project
-
Upload
ramoutar-ken-seecharran -
Category
Documents
-
view
216 -
download
0
Transcript of Jabal Sayid Project
-
7/31/2019 Jabal Sayid Project
1/11
-
7/31/2019 Jabal Sayid Project
2/11
-
7/31/2019 Jabal Sayid Project
3/11
3
Treatment rate will be 3mtpa.
Anticipated production cost is 150/lb of copper, after gold and silver
credits.
The deposit is ideally located for smelting in either the east or the west.
FFiigguurree 44:: IIddeeaall llooccaattiioonn ffoorr eeaasstt--wweesstt ssmmeellttiinngg
FFiigguurree 55:: DDeecclliinnee tthhrroouugghh wwhhiicchh oorree wwiillll bbee ttrraammmmeedd
Being a clean ore, treatment will be by conventional flotation employing
rougher and scavenger flotation, with two stages of cleaning.
-
7/31/2019 Jabal Sayid Project
4/11
4
FFiigguurree 66:: RRoocckk ffrroomm JJaabbaall SSaayyiidd mmiinnee sshhoowwiinngg tthhee ccooppppeerr mmiinneerraall,,
cchhaallccooppyyrriittee
FFiigguurree 77:: CCooppppeerr bbeeiinngg rreeccoovveerreedd bbyy ffrrootthh fflloottaattiioonn
-
7/31/2019 Jabal Sayid Project
5/11
5
Plant recoveries are expected to be as follows:
Copper 95.9% Gold 67.2% Silver 69.8%
FFiigguurree 88:: FFllooww sshheeeett,, sshhoowwiinngg ccoonnvveennttiioonnaall ssuullpphhiiddee fflloottaattiioonn
FFiigguurree 99:: CCooppppeerr ccoonncceennttrraattee llooaaddeedd iinn aa sshhiipp
-
7/31/2019 Jabal Sayid Project
6/11
6
FFiigguurree 1100:: MMeettaalllliicc ccooppppeerr bbeeiinngg ppaacckkeedd
An entirely new camp and surface infrastructure will have to be
constructed to attract multi-cultural and multi lingual workers, of the rightcalibre.
FFiigguurree 1111:: NNeewwllyy ccoonnssttrruucctteedd ccaammpp
-
7/31/2019 Jabal Sayid Project
7/11
7
FFiigguurree 1122:: NNeeww ssuurrffaaccee iinnffrraassttrruuccttuurree
FFiigguurree 1133:: MMoorree nneeww iinnffrraassttrruuccttuurree bbeeiinngg ccoonnssttrruucctteedd
-
7/31/2019 Jabal Sayid Project
8/11
8
Because of the fragile ecosystem in the area of the mine, stewardship of
the environment will be paramount.
FFiigguurree 1144:: TThhee ffrraaggiillee ddeesseerrtt eennvviirroonnmmeenntt wwhhiicchh ddeemmaannddss ggoooodd
sstteewwaarrddsshhiipp oofftthhee eennvviirroonnmmeenntt bbyy mmiinniinngg ooppeerraattiioonnss
Utilisation of meteoric water is not permitted and drains have to be put in
to channel such water from the mine site into the nearby wadi. TheBedouins living in the vicinity of the wadi abstract water for human and
livestock consumption using wells.
FFiigguurree 1155:: AA BBeeddoouuiinnss wwaatteerr wweellll iinn aa wwaaddii
-
7/31/2019 Jabal Sayid Project
9/11
9
Plant design entails filtering of tailings to abstract and recycle the
maximum amount of water. Top up water will be trucked in from Madina,
being sewage plant overflow.
The filtered tailings will be dry stacked in a plastic-lined tailings storage
facility/impoundment (TSF).
A mist fogging system will be installed in the area of the crusher and at all
belt transfer points to suppress dust.
Dust and noise monitoring will be an integral part of mining operations.
Power will be generated by a contractor on site and purchased at a
contracted rate.
An incinerator and waste disposal facility will be installed to deal with
camp waste. The incinerator will be capable of processing 250 kgh-1 of
waste at a temperature of 1,000C utilising the 3T formula of time,
temperature and turbulence.
FFiigguurree 1166:: PPrrooppoosseedd wwaassttee iinncciinneerraattoorr
Oil collection facilities will be functional as a precursor to recycling.
Used batteries will be recycled.
-
7/31/2019 Jabal Sayid Project
10/11
10
FFiigguurree 1177:: PPllaanntt uunnddeerr ccoonnssttrruuccttiioonn iinn SSeepptteemmbbeerr 22001111
FFiigguurree 1188:: PPllaanntt uunnddeerr ccoonnssttrruuccttiioonn iinn DDeecceemmbbeerr 22001111
FFiigguurree 1199:: PPaannoorraammiicc vviieeww oofftthhee ppllaanntt,, llooookkiinngg ffrroomm tthhee WWeessttiinn DDeecceemmbbeerr 22001111
-
7/31/2019 Jabal Sayid Project
11/11
11
FFiigguurree 2200:: FFlloottaattiioonn aanndd ddeewwaatteerriinngg sseeccttiioonnss uunnddeerr ccoonnssttrruuccttiioonn iinn
DDeecceemmbbeerr 22001111
FFiigguurree 2211:: FFuueell ffaarrmm aanndd mmiinniinngg ssttoorreess yyaarrdd
FFiigguurree 2222:: CCoonnttrraaccttoorrss ppoowweerr ssttaattiioonn