Site specific Risk Assessment and Method Statement
Page | 1
J C Asbestos Solutions Ltd, Unit B1, 60 Chain House
Lane, Whitestake, New Longton, Preston, PR4 4LG
Tel: 01772 610730 email: [email protected]
Site specific Risk Assessment and Method Statement
Page | 2
Section 1: Details of contract
Details of where work is to be carried out:
Address: Former Grove Park Girls Grammar School
Penymaes Avenue Wrexham
LL12 7AA
Tel: Not applicable Email: Not applicable
Who are we contracted to:
Company name: MJF Demolition Ltd
Company address:
MJF Demolition Ltd 2nd floor
Station House Stamford New Rd
Altringham Cheshire
WA14 1EP Company contact: Michael Finnigan
Tel: 07870 865959 Email: [email protected]
When will the work be carried out:
Start date: /05/2016 Completion date: /06/2016
No of days: 40 days Hours of work: 0800 – 1600
Details of asbestos survey:
Company: Lucion Environmental Ltd Type: Demolition
Date: 08/12/2012 Reference: 18280
Site specific Risk Assessment and Method Statement
Page | 3
Details of analytical company:
Company name: APEC Environmental Ltd
Company address: Unit 9
Telford Court Dunkirk Trading Estate
Chester Gates Chester
CH1 6LT Company contact: Peter Keeling
Tel: 01244 851753 Email: [email protected]
Employed by: J C Asbestos Solutions Ltd
Details of air monitoring requirements:
Type DATE TIME YES NO
Personal air monitoring TBC
Background air testing
Reassurance air testing
Leak air testing
Certificate of reoccupation (Enclosure 1) TBC TBC TBC
Certificate of reoccupation (Enclosure 2) TBC TBC TBC
Certificate of reoccupation (Enclosure 3) TBC TBC TBC
Certificate of reoccupation (Enclosure 4) TBC TBC TBC
Certificate of reoccupation (Enclosure 5) TBC TBC TBC
Certificate of reoccupation (Enclosure 6) TBC TBC TBC
Certificate of reoccupation (Enclosure 7) TBC TBC TBC
Site specific Risk Assessment and Method Statement
Page | 4
Details of J C Asbestos employees involved in this contract:
Name Job description Contact
number
Y/N Signature
Andrew
Cooksley
Managing Director 07967
016151
Y
Site visits
Jamie Waters Office manager 07967
571035
Y
Office
Mark Holland Contracts manager 07967
571031
Y
Site audits
Steve Christian Asbestos supervisor 07967
571033
Y
Site
Frank Pye Asbestos supervisor 07967
571036
Y
Site
Steve Dutton Asbestos supervisor 07967
571030
Michael Christian
Asbestos supervisor (New)
07701 345257
Steve Marsh Asbestos operative 07586 353599
Y Site
Steve Littler Asbestos operative 07787
307159
Matthew
Murphy
Asbestos operative 07818
113439
Y
Site
Steve Parr Asbestos operative 07766 727182
Danny Shaw Asbestos operative (New)
07468 326309
Y Site
Kieran Green Asbestos operative
(New)
07824
162785
Site specific Risk Assessment and Method Statement
Page | 5
Section 2: Scope of works
Brief description of the works to be carried out:
Work to be carried out within the service ducts / under crofts (x2) and boiler
room. Removal of asbestos insulation residues and debris from walls / floors / pipe
work and associated hangar brackets. Carry out a full environmental clean of the affected areas.
Details of site specific working methods if different from those stated in J C
Asbestos Solutions standard procedures:
Site and set up the DCU prior to the start of any works.
Establish transit / waste routes, and clearly mark out using barrier tape. Pre-clean areas where air / bag locks are to be sited.
Pipe work with asbestos residues will be removed using a wrap and cut technique.
All pipe hangar brackets will be removed and disposed of as asbestos waste.
Walls / floors / surfaces will be vacuumed using H type vacuum cleaners. Stubborn residues will be removed using hand tools (scrapers / wire brushes)
whilst shadow vacuuming using H vacs. Siting of negative pressure units – where possible existing access covers will be
use to site the units. If no existing access covers are available then access will be made through the concrete floor (Refer to note2 below)
Siting of 3 stage air / bag locks – as with the negative pressure units above the duct system. (Refer to note 1 below)
NOTES:
Where necessary access will be required through the timber floors above the under
crofts in this event the following process will be carried out:
1. Where ever possible it is proposed to utilise the already existing access points
in order to access / egress the works. If there is a requirement to make additional holes for safety reasons they would be no greater than 1.5m2 and
we confirm that they would be carefully lifted and re-laid. We also confirm that photographs and condition surveys will be taken in agreement with the
council before, during and after all asbestos removal works.
Additional access into service duct through concrete floors above service ducts:
2. We do not envisage that this will be necessary. If it was however necessary the areas would be saw cut, lifted out and replaced / “made good” so as to
not impact on the condition of the floors.
Site specific Risk Assessment and Method Statement
Page | 6
Section 3: Asbestos risk assessment
Details of asbestos products:
Type: Chrysotile / Crocidolite
Product: Insulation residues / debris Condition: Poor
Quantity: Throughout duct system (approximately 200m x 1.5m x 1.25m) Location: 1/001 Service duct
Comments:
Medium - High risk due to the poor condition of the product Chance of release of asbestos fibres into the atmosphere
Use of an enclosure placed under negative pressure to control spread Full decontamination procedures to be used by operatives
Details of asbestos products:
Type: Chrysotile / Crocidolite Product: Insulation residues / debris
Condition: Poor Quantity: Throughout boiler room
Location: 1/002 Boiler room
Comments:
Medium - High risk due to the poor condition of the product
Chance of release of asbestos fibres into the atmosphere Use of an enclosure placed under negative pressure to control spread
Full decontamination procedures to be used by operatives
Details of asbestos products:
Type: Chrysotile / Crocidolite
Product: Insulation residues / debris Condition: Poor
Quantity: Throughout under croft (approximately 29m x 12m x 1.5m) Location: 1/003/ Under croft
Comments: Medium - High risk due to the poor condition of the product
Chance of release of asbestos fibres into the atmosphere Use of an enclosure placed under negative pressure to control spread
Full decontamination procedures to be used by operatives
Site specific Risk Assessment and Method Statement
Page | 7
Details of asbestos products:
Type: Chrysotile / Crocidolite
Product: Insulation residues / debris
Condition: Poor Quantity: Throughout under croft (approximately 11m x 9m x 1.5m)
Location: 1/004 Under croft
Comments:
Medium - High risk due to the poor condition of the product Chance of release of asbestos fibres into the atmosphere
Use of an enclosure placed under negative pressure to control spread Full decontamination procedures to be used by operatives
Details of RPE to be used:
Pre-cleaning PPR
Phantom
Sundstrom SR100
½ mask
Disposable P3 Y
Set up of enclosure
PPR Phantom
Sundstrom SR100 ½ mask
Disposable P3 Y
Work in the enclosure
PPR Phantom
Y Sundstrom SR100 ½ mask
Disposable P3
Work with no
enclosure
PPR
Phantom
Sundstrom SR100
½ mask
Disposable P3
Additional comments:
During the setting up of the enclosures operatives are to wear disposable P3 mask if there is a chance of contact with asbestos. (Nominal protection factor * 10)
During the cleaning work within the enclosure the operatives are to wear PPR Sabre Phantom (Nominal protection factor * 40)
Site specific Risk Assessment and Method Statement
Page | 8
Section 4: Non asbestos risks assessment:
Hazard identified
People at risk
Control measures Actions taken
Slips, trips and falls
Operatives Supervisor
Ensure all transit routes and work areas are free
from trip hazards and spillages.
In the event of a spillage
clean up immediately.
Keep all electrical extension leads flat to
the floor or tie up with zip ties.
Make sure the floor
area is tidy with no spillages visible prior to
the start of works. Do not cross doorways
with leads.
Manual
handling
Operatives
Supervisor
Assess each load prior to
making the lift. Can the load be broken
down? Use mechanical aids (i.e.
sack trucks).
Do not exceed your own ability.
Do not overfill waste
sacks.
Cuts, abrasions, skin
irritation
Operatives Use of correct PPE Workers are to wear gloves.
Cover bare flesh. Use of cat 5 type 3
disposable overalls with hood and
elasticated sleeves and
ankles.
Working at
height
Operatives
Supervisor
Use of mobile access
tower
Tower to be erected by
PASMA trained operative.
Ensure all hand rails, toe boards are in
place. Ensure tower is sited
on level ground.
Risk of electrocution
Operatives All isolations to be carried out by the PC prior to
start of works.
Do no cut / disconnect any cables in the work
areas.
Site specific Risk Assessment and Method Statement
Page | 9
Section 5: Management and control of the job
How will the work be supervised: Yes No
Will the supervisor need to enter the enclosure / work area to
supervise the work?
YES
Are viewing panels required in the enclosure walls? YES
Are viewing panels required in the inner stage of the 3 stage air
lock?
YES
Will CCTV / Gopro camera system be used? YES
Additional comments:
Supervisor will be on site at all times. Enclosures vary – supervisor will need to enter the duct system to assess
cleanliness prior to arranging for the analyst to carry out the 4 stage clearance. Position viewing panels in the inner stage of the 3 stage air locks to witness the
preliminary decontamination of the operatives. Position viewing panels in the enclosure wall so all areas of the enclosure are
visible. Where there are blind spots use of a Gopro camera set up linked to an iPad will be
used to view inside the enclosures.
Details of control measures to be used: Yes No
Controlled wetting using surfactant / water solution applied with a
low pressure sprayer
YES
Controlled wetting using the Asbesto-strip safe strip system (Red Box)
NO
Localised extraction using an H type vacuum cleaner YES
Use of a 3 stage air lock to enter / exit the enclosure YES
Use of a separate 3 stage bagging out facility YES
Use of negative pressure unit(s) YES
Use of additional air intakes within the enclosure walls to increase / improve air flow
NO
Additional comments: Spray residues / debris with BP astrip / water solution using a low pressure spray
bottle prior to removal
Details of Smoke test: Yes No
Will a smoke test be carried out on each enclosure? YES
Can the smoke test be witnessed by a third party? YES
Will the asbestos supervisor witness the smoke test? NO
Additional comments:
Supervisor is to contact PC site foremen (if available) to witness the smoke test.
Site specific Risk Assessment and Method Statement
Page | 10
Details of H Type vacuum cleaners:
Number of vacuum cleaners required on site? 4
Number of vacuum cleaners required inside the enclosure? 2
Additional comments: All vacuum cleaners are to be fitted with new vac bags prior to the start of the
works. Vac bag to be removed on completion of works within the enclosure and disposed of
as asbestos waste.
Details of the enclosure: All measurements are in meters (unless otherwise stated)
Yes No
Is the enclosure < 120m3 including air / bag locks (If yes refer to section A below)
NO
Is the enclosure > 120m3 (If yes refer to section B below) YES
Section A (ALL DIMENSIONS ARE IN METERS) NOT APPLICABLE
Length = Width = Height = Total volume =
Additional comments:
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/001 Duct system (Enclosure 1)
Length Width Height Volume
Enclosure 80 2 1.25 200
Air lock 3 1 2 6
Bag lock 3 1 2 6
Additional chamber
- - - -
Total 212m3
Additional comments:
Enclosure 1 includes additional spur to under croft 1/003
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/001 Duct system (Enclosure 2)
Length Width Height Volume
Enclosure 50 2 1.25 125
Air lock 3 1 2 6
Bag lock 3 1 2 6
Additional chamber
- - - -
Total 137m3
Additional comments:
Site specific Risk Assessment and Method Statement
Page | 11
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/001 Duct system (Enclosure 3)
Length Width Height Volume
Enclosure 50 2 1.25 125
Air lock 3 1 2 6
Bag lock 3 1 2 6
Additional chamber
- - - -
Total 137m3
Additional comments:
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/001 Duct system (Enclosure 4)
Length Width Height Volume
Enclosure 50 2 1.25 125
Air lock 3 1 2 6
Bag lock 3 1 2 6
Additional
chamber
- - - -
Total 137m3
Additional comments:
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/002 Boiler room (Enclosure 5)
Length Width Height Volume
Enclosure 9 8 4 288
Air lock 3 1 2 6
Bag lock 3 1 2 6
Additional chamber
- - - -
Total 300m3
Additional comments:
Site specific Risk Assessment and Method Statement
Page | 12
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/003 under croft (Enclosure 6)
Length Width Height Volume
Enclosure 11 15
9 2
1.25 1.25
161.25
Air lock 3 1 2 6 x 2 = 12
Bag lock 3 1 2 6 x 2 = 12
Additional chamber
- - - -
Total 185.25 m3
Additional comments:
Section B: All measurements are in meters (unless otherwise stated)
Enclosure Location: 1/004 under croft system (Enclosure 7
Length Width Height Volume
Enclosure 35 12 1.25 525
Air lock 3 1 2 6 x 3 =18
Bag lock 3 1 2 6 x 3 =18
Additional chamber
- - - -
Total 561m3
Additional comments:
Site specific Risk Assessment and Method Statement
Page | 13
Details of negative pressure units:
ID (cfm) Actual
(m3/hr) at
last DOP
DOP test
date
DOP retest
date
Use on this
contract
NPU 1 500 543 N/A N/A N/A
NPU 2 500 577 N/A N/A N/A
NPU 3 500 250 N/A N/A N/A
NPU 4 1500 2213 06/11/2015 06/05/2016 YES
NPU 5 1500 2571 06/10/2015 06/04/2016 YES
NPU 6 1500 2192 18/01/2016 18/07/2016 YES
NPU 7 2000 3976 06/11/2015 06/05/2016 YES
NPU 8 4000 6750 17/11/2015 17/05/2016 -
NPU 9 4000 6955 06/11/2015 06/05/2016 -
NPU 10 4000 5970 28/05/2015 28/11/2015 -
NPU 11 4000 6340 22/06/2015 22/12/2015 -
NPU 12 900 1346 04/02/2016 04/08/2016 YES
NPU 13 900 1336 14/12/2015 14/06/2016 YES
NPU 14 900 1366 18/01/2015 18/07/2016 YES
Additional comments:
If enclosure is >120m3 Calculation for NPU: Volume of enclosure x 8 (Air changes / hour) = m3/hour
required. Enclosure Location:1/001 Duct system (Enclosure 1)
212 x 8 = 1696 m3/ hour Use 1 x 1500 cfm 1 x 900 cfm 1 x 500 cfm
Enclosure Location:1/001 Duct system (Enclosure 2) 137 x 8 = 1096 m3/ hour
Use 1 x 1500 cfm Enclosure Location:1/001 Duct system (Enclosure 3)
137 x 8 = 1096 m3/ hour Use 1 x 1500 cfm
Enclosure Location:1/001 Duct system (Enclosure 4) 137 x 8 = 1096 m3/ hour
Use 1 x 1500 cfm
Enclosure Location:1/002 Boiler room (Enclosure 5) 300 x 8 = 2400 m3/ hour Use 1 x 2000 cfm
Enclosure Location:1/003 under croft (Enclosure 6)
135.75 x 8 = 1086 m3/ hour Use 3 x 900 cfm
Enclosure Location:1/004 under croft (Enclosure 7) 537 x 8 = 4296 m3/ hour
Use 3 x 1500 cfm
Site specific Risk Assessment and Method Statement
Page | 14
Details of Decontamination units required: Yes No
Is there sufficient space to site a mobile DCU? YES
Is 240v power available on site? NO
Is water available on site at mains water pressure? YES
Is a booster pump required? NO
ID DOP test
date
DOP retest
date
Use on this contract
DCU 1 TBC
DCU 2
DCU 3
DCU 4
JCMOD 1
JCMOD 2
Additional comments: Water supply available on site. Principle contractor to provide stand pipe.
Power supply for DCU to be provided by generators.
Details of entry / exit procedure if different to standard 3 stage airlock
procedures:
As per standard procedures section 9 : Transit from air lock to the DCU
Additional comments:
Details of transit route:
Comments: Remove and trip hazards and pre-clean using an H type vacuum cleaner.
Mark out with barrier tape and display appropriate signs
Details of waste route:
Comments:
As transit route Waste to be loaded in van and transited to locked asbestos skip on site.
Details of welfare arrangements: Yes No
Are suitable washing facilities available on site? YES
Are w/c facilities available on site? YES
Is there a suitable area for eating and drinking on site? YES
Is there a suitable drying area available on site? YES
Additional comments:
All Welfare facilities are available on site in agreement with the client. Use of the
facilities available in Triplex House.
Site specific Risk Assessment and Method Statement
Page | 15
Details of waste disposal arrangements: Yes No
Is there < 333 kg of amphibole asbestos? YES
Is there < 1000 kg of bonded chrysotile asbestos? NO
Does the work require an asbestos skip? YES
Will the waste be transported to a waste transfer station? NO
Address of waste transfer station: Not applicable
Comments:
Asbestos skip to be provided by waste contractor employed by J C Asbestos Solutions Ltd.
Site specific Risk Assessment and Method Statement
Page | 16
Site supervisor is authorised to make minor amendments to the Plan of Work. The
office is to be notified of any amendments.
Site supervisor is to communicate any changes to the operatives prior to further
works taking place
Details of amendments:
Amendment Reason for amendment Date Signed
Site specific Risk Assessment and Method Statement
Page | 17
Section 4 Diagrams / Photographs:
-1/001 Enclosure 1 duct system under corridor
-1/001 Enclosure 2 duct system under corridor
Site specific Risk Assessment and Method Statement
Page | 18
-0/001 Enclosure 3 – External section under walk way
-0/001 Enclosure 4 – External section under walk way
Site specific Risk Assessment and Method Statement
Page | 19
Entrance to basement
level boiler room
Site NPU on vent
Site specific Risk Assessment and Method Statement
Page | 20
-0/003 under croft beneath timber floor with 15m length of duct leading into main
service duct.
-0/004 under croft beneath timber floor
Site specific Risk Assessment and Method Statement
Page | 21
-0/004 under croft beneath timber floor pipe work runs around the perimeter
Site specific Risk Assessment and Method Statement
Page | 22
Site specific Risk Assessment and Method Statement
Page | 23
Site specific Risk Assessment and Method Statement
Page | 24
Site specific Risk Assessment and Method Statement
Page | 25
Site specific Risk Assessment and Method Statement
Page | 26
Site specific Risk Assessment and Method Statement
Page | 27
Site specific Risk Assessment and Method Statement
Page | 28